It goes like this: I want a model railroad. I'm going to build one. 

1(1).jpg 

Ten years have gone by and numerous designs have been dreamt up, but none of them stuck - except for this one. Join me, as I stumble along (often blindly) in my journey to build a modular N Scale shelf layout. I'm looking at the Port of Long Beach / Los Angeles areas as my prototype inspiration, focusing on the Pacific Harbor Line operations around 2005-2010. 

kPlan(3).png 

Reply 8
ctxmf74

"Since the double bridges are

Quote:

"Since the double bridges are elevated (bridges need 1.1625 inches clearance from the top of the roadway) there needs to be a grade leading up to them"

      Looking at the prototype photo it looks like the tracks run on top of the levee so the highway between them would also have to be levee height or higher so it might not be able to dip down and go under that upper track that close to the levee?  Does the highway cross the lower double tracks at grade, I don't see a bridge there? What is the highway traffic scenario in the scene? .....DaveB

Reply 1
Neil Thomas Cadmaster

Ivan, How long is the

Ivan, How long is the industrial run around from foul point to foul point. I know this is N scale but that looks pretty short. You may want to consider for operational reasons to extend that length. If the runaround ends up being on a slight incline thats no big deal. Adds in the option of a hand brake a the location.5_213518.jpg 

Neil

Reply 1
Ivan I

Runaround Length

Neil,

The run around length is about 14 inches from foul point to foul point - it is longer than any of the individual industry tracks, though I guess it could be made longer to accommodate the full train. I like the idea of the handbrake, that's pretty neat! I'll have to think about extending the run around how far up would you suggest? Should I do it half way to the bridges (between current turnout location and beginning of first span), on the bridges, past the bridges?

Reply 1
Neil Thomas Cadmaster

The fact that you have the

The fact that you have the module seams does not help, so either b4 or just after it. As long as you don't end up with the frog or the points on the gap you can cut the turnout basically the same as any other piece of track. I figure that in 14" you can get 4 40' cars on the run around. I would measure say 4 cars and the power your planning to use then add a 1 car buffer to determine the min distance you need. My rule would be take that dimension and round up. 

#1 rule it's your railroad.

Neil

Reply 1
Ivan I

Tweaking

Neil,

Though it is my railroad, I'm pretty aware of my limitations when it comes to track planning and operations experience. Your suggestions are sound and don't infringe on any other layout goals (okay, they do add more track, but I can live with the extra few inches). I think this should work pretty well:

kPlan(3).png 

I really appreciate the help from everyone, this has been a fun learning experience so far.

Reply 1
Bill Brillinger

Tweaked!

Ivan, I think the plan looks great!

It could easily keep 2 or 3 crews busy for quite some time.

Bill Brillinger

Modeling the BNML in HO Scale, Admin for the RailPro User Group, and owner of Precision Design Co.

Reply 1
RSeiler

Looks good...

I like it, looks fun to operate. If only you could have one more track in your staging area, you could have a "mole" who made up new trains back there on that track. When a crew came in with a train, the next one could be sitting there ready. Infinite train capacity.  

Randy

Randy

Cincinnati West -  B&O/PC  Summer 1975

http://model-railroad-hobbyist.com/node/17997

Reply 1
Neil Thomas Cadmaster

One more thought. Left side.

ackplan3.jpg One more thought. Left side. Reducing the number of turnouts that come off the Main/passing Track. In regards to the double track you have there. I would ensure that the main is the track closest to the layout edge. Right now it looks like you have the diverging route closest to the edge, but it would make more sense if they are swapped. 

Planning on paper does not cost anything. It only hurts when you start cutting wood.

Neil

Reply 1
Ivan I

Prototype Traffic Scenario

DaveB,

I can see where the confusion is coming from when you compare my plan with the prototype - I took a few liberties in making it fit in with the overall operational objective of the layout. Perhaps a side by side comparison might help:

rototype.png 

On the prototype image, the top twin bridges (elevated) are double tracked and the lower one (ground level) is single. With my track plan, it made more sense to have the bottom one (ground level) to be double tracked and the top double bridges (elevated) to be single track. Therefore on my layout the highway crossing with the twin tracks coming off the lower bridge will be at grade level. My upper double bridge will be an overpass over a side street joining the highway near (L). The fact that this is a side street will allow me to implement some of the road lowering techniques mentioned in previous replies in order to lower the grade needed to traverse the double bridge overpass. Much of the main highway traffic will be tractor trailers and tankers, with a few personal vehicles in the mix. I hope that clears things up a bit.

Reply 1
ctxmf74

the top twin bridges

  Thanks for the clarification, I was looking at the other photo where the tracks run along the levee. The only thing that might be a problem now  is the tracks on the hi bridge appear to cross a side road and the at grade  tracks cross the major road?  Maybe bow the highway back toward the rear instead of off the front, it could probably turn up toward the rear where the side road is now located with a curve taking it between the L and D locations? Then the side road could run between the track and the D buildings to connect with the other roads over by the runaround turnout......DaveB

Quote:

 

Reply 1
Ivan I

A question of height

DaveB,

I thought of that but I didn't really like how it looked on the plan. As a side note, if you look to the left of the immediate area (intersection of bridges) on the prototype you will see a single track intersecting the 8 lane highway - So it wouldn't be too much of a stretch to say that a single main and a run around track couldn't intersect it in my world. I do appreciate the suggestion though.

 

Now a question for the masses: How deep should I make the cutout for the waterway? Another way of asking that is: how tall is the following bridge above the surface of the water, and how much depth do I need to add for the water effects on my layout?

geHeight.PNG 

For those looking for a better view, here are the coordinates for google maps: 33.7770577,-118.2412403

At first glance, it doesn't seem like I will need more than .75 to 1.125 inches in depth (from road level down to water level) for this waterway on my layout, but this is just a wild guess... does anyone have any better methods?

Reply 1
ctxmf74

the coordinates for google maps: 33.7770577,-118.2412403

   I took a look at that area and here's a few things I see. The bridge over the main road has a clearance sign listing it as 15 ' 6" from road to bottom, looks like about 5 more feet up to track level so tracks about 21 feet above road at the crossing. I don't know the railroad traffic pattern there but my guess is the elevated line is the main line or busy line and those other tracks crossing the streets at grade are lesser used industrial leads. The low rail bridge crossing the water of the marina looks to be about 8-10 feet above the water level ( looks like high tide btw.) so maybe 13 feet from top of levee to water at mid tide?  There's a lot going on in that area so lots of choices to make as for compression and what to include and what to leave out. N scale is ideal for these large industrial complexes as many of the small details can be suggested or implied from the larger features modeled.....DaveB 

Reply 1
Ivan I

There's a lot going on in

Quote:

There's a lot going on in that area so lots of choices to make as for compression and what to include and what to leave out. N scale is ideal for these large industrial complexes as many of the small details can be suggested or implied from the larger features modeled.....DaveB 

So I think if I go for about an inch in depth for the waterway it should look pretty close to scale. I agree with your point about the main line vs smaller industry leads comment - in terms of real world operations, it seems a bit silly. Still, I'm reluctant to change things, I guess I just don't like how the large road would look curving so suddenly and disappearing in the backdrop. It's a lot easier to hide a small side street than an 8 lane highway.

As for your statement above - that is so true and a big reason why I chose N Scale. I know I can't accurately portray the size of an intermodal dock operation, even in N scale, but doing it in HO would have made for an even more unconvincing display. I'm not saying it can't be done - I'm just saying I don't have the skillset to pull it off in the amount of space I have at my disposal. My goal was to try and model the area and the overall atmosphere of the scene, and have trains going through there as a bonus. I've certainly deviated a bit from that ideal, but I think I can achieve a nice balance for operations and railfanning on my layout.

Reply 1
Ivan I

Tee nuts...

So having assembled and reassembled my modules a few times now (man, I shouldn't have made it so easy for me to take them apart) I noticed an issue with the tee nuts I was using with my 5/16 bolts at each junction. I had three of them shear their "teeth" as they would get stuck as I would loosen them in preparation of taking the modules apart.

1_180516.jpg 2_144531.jpg 

I found that the threads of the stainless tee nut inserts were degrading and fouling the threads on the stainless bolts. I remedied this by replacing the stainless tee nuts with zinc plated steel ones. These seem to be holding up a lot better.

2_180101.jpg 

Reply 1
Dave.S58

adhesive

What I have done in a case where they get used very often, is to put a small dab of adhesive, like liquid nails, on the out side of the T-nut before installing them. I haven't had a problem with them coming loose.

DaveS

Reply 1
HVT Dave

Try screws

Saw a post where after inserting the tee-nut the modeler used #6 wood screws in the little 'V' notches on the flange of the tee-nut to hold it permanently in place.

Dave

Dave

Member of the Four Amigos

 

Reply 1
Graeme Nitz OKGraeme

I had a similar problem...

...So I threw away the T nuts and just used ordinary nuts. I drilled out the hole with a size smaller than the Nut and just deep enough for the nit to be flush and spread a little liquid nails on the outside of the nut and hammered them home. They never moved again!

Graeme Nitz

An Aussie living in Owasso OK

K NO W Trains

K NO W Fun

 

There are 10 types of people in this world,

Those that understand Binary and those that Don't!

Reply 1
Oztrainz

It looks like a case of ?

Hi Ivan

The way the T- bolt is bent it looks more like a case of perhaps over-torqueing the T-bolt when initially installed.  The flights on the T-bolt should not have bent like as shown in the photo - especially if they are of "good" stainless.  Or perhaps the T-bolt is not what is claims to be?

Stainless on stainless shouldn't oxidise or grab unless there is either a thread miss-match or very significant metallurgical difference between the two components.. The clue to a thread miss-match is that T-nut is very tight on the bolt before it is screwed into the timber. You should be able to run  the T-nut down the length of the thread by hand  without having to resort to pliers/vice-grips or similar tools. If it feels too tight to be turned by hand then perhaps try some dry lubricant like graphite on the thread. If it doesn't free up, then there is another bigger problem than perhaps a just rough thread on either the bolt of T-nut. .

If they were easy to go in and then locked up solid, then I'd suspect something wrong with the metal used in either the bolt or the T-nut. An the way the T-bolt has behaved as shown by the photos, I'd suspect a dodgy lot of T-bolts with perhaps an imperfect internal thread compounding the problem.  

Having used this type of connection in the past, the aim of the game is to tighten the bolts so that they just
"nip up" and load up the thread. You can easily over-tighten these type of connectors such that they try and turn the T-nut. All this does is make the tangs on the T-nut into a "loose fit" inside the initial holes in the module's timber end-braces that they formed when they were pulled up tight the first time.

The suggestions of using construction-grade adhesive to hold the T-nuts in place is a good one when it comes to refitting any of the other T-bolts that have caused trouble. And Graeme's fix is "permanent" as well. 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
Ivan I

Good Solutions!

Thanks for the suggestions gents, all of them are good ones. As I upgraded the SS nuts to the steel ones, I glued them in place with liquid nails adhesive and that seems to have fixed the issue. I'm in agreement with John's post above, the SS nuts probably weren't the best quality... the steel ones I got were so much nicer. Now, on to more exciting things!

 

Reply 1
Ivan I

Bus wires

I was looking around MRH in my free time and saw someone using parallel wires (I believe they got it from a common household AC insulated 3 wire cable) running the length of their layout that acted as a bus. I liked the idea and decided to implement it on my modules. I started by cutting lots of "anchors" that would hold the wires in place from leftover 7/16" plywood scraps. My table saw and miter saw made quick work of it. Then I cut two grooves for the wires to run through on the table saw.

9_182115.jpg 0_191523.jpg 

Then I drilled a 1/8" hole in the center of both top and bottom parts of the brackets - I'd run a wood screw through this to fasten the top layer to the bottom, which would be fastened to the layout with a liberal application of wood glue. Each long module would have 5 mounting blocks for the bus, while the rounded end modules would have 2. I soldered 14g stranded wires that connected the bus to the next module with Anderson Powerpoles. 

0_194332.jpg 1_180304.jpg 

I did a quick test and attached some feeders to the bus. Stripping the wires was pretty easy with a sharp Exacto blade and soldering was very quick. We'll see how this solution holds up over time, but for now I'm happy with the results. 

8_185003.jpg 

Reply 1
ctxmf74

"I did a quick test and

Quote:

"I did a quick test and attached some feeders to the bus. Stripping the wires was pretty easy with a sharp Exacto blade and soldering was very quick. We'll see how this solution holds up over time, but for now I'm happy with the results"

    Looks nice and neat. I've used a similar method with the holes drilled tru the cross members, the problem with it is one has to thread the whole buss wire from end to end ,your method makes it easier to install the bus. For stripping the wire try one of the pliers type strippers, you can just place it on the wire and squeeze a clear spot for attaching the feeder. I'd also put one feeder on the right of the block and one on the left or  stagger them some way so they can't short out if the wires get pushed together, that way no tape is needed for insulation. Anyone else trying this method should make sure they know how to use a table saw as cutting small pieces can be dangerous....DaveB

Reply 1
Ivan I

Just Add Water

One of the downsides of having identical modules built prior to having a trackplan or even an idea of where you want things on your layout is that you have to go back and cut things up in order to add water features. Thankfully, I only have one canal I have to carve into my center module so it wasn't too much of a setback. This is the section I'm talking about:

rototype.png 

The first step was to mark out the canal on the module. This was done by transferring measuremetns by hand from the plan and some freehand sharpie doodles to connect the dots. I figured this didn't have to be exact - it's a water feature, so the edges wouldn't be perfect on the prototype.

2_141330.jpg 

Then I had a go at it with a small plunge router. To be honest, I probably should've used my jigsaw for this... not sure what I was thinking, but it seemed like fun at the time. Shrugs. As they say, when you have a lot of fun using a hammer, all of your problems start to look like nails... or something like that. 

2_155500.jpg 

I got fed up with working on the module with the valance and backdrop in place so I unscrewed 12 screws and separated the top elements from the bottom box I was working on. That made things a lot easier going forward. In order to get my ~1" depth for my canal, I had to glue some spacer plywood to the bottom of my top layer before I attached the canal bottom. 

2_175243.jpg 2_175259.jpg 

If anyone wants to send me more clamps, I won't complain. You may have noticed that I put a 45 degree chamfer on the edges of the top and spacer pieces. I certainly could have left them as vertical surfaces and just added pink foam and carved that to the correct contour, but I had the tools and materials at hand to use wood and filler, so I did it (what some might consider) the hard way. 

3_134807.jpg 3_135517.jpg 

Speaking of wood filler, I had a lot of the Elmers stuff left over from a previous project, and i like how easy it is to use. It is water based so it doesn't smell and is non-toxic, but it also needs to be sealed after sanding. It sands very easily and sticks to a large variety of surfaces. It's also quite cheap. 

3_142347.jpg 5_184123.jpg 

Then it was off to paint - I still had a good bit of the grey latex primer I used on the modules so that went on and dried overnight. It has good gap filling qualities and a nice neutral tone. 

3_171916.jpg 5_203623.jpg 

Reply 1
Ivan I

 I'd also put one feeder on

Quote:

 I'd also put one feeder on the right of the block and one on the left or  stagger them some way so they can't short out if the wires get pushed together, that way no tape is needed for insulation. Anyone else trying this method should make sure they know how to use a table saw as cutting small pieces can be dangerous

Yeah, the idea of offsetting the wire taps dawned on me as I finished cutting the first pair. I'll be doing that for the rest of the connections. 

All tools are dangerous if used improperly - that goes without saying, but I'll repeat it because everyone has moments when they forget. Respect the tool and be mindful of cutting paths. If you plan to cut small pieces on a table saw, do yourself a favor and make a nice cross cut sled with a clamp and an adjustable end stop. It makes cutting pieces like these so much less stressful. 

Reply 1
Ivan I

So... a question.

I'm thinking of using 1/4" (~5mm) foam posterboard as a base for my scenery and trackwork. I've seen this done somewhere and I liked it for whatever reasons that escape me now... was it sound deadening? Should I bother putting the stuff down and covering the entire module, carving out ditches and lower areas for the track where it runs at street level? Or should I put the track down on the bare ply and then just raise whatever areas that need to be raised with the posterboard (roads, buildings)? In other words, do I make a blank canvas with the posterboard and then carve away whatever relief I need, or do I work from the ply as a base level and then just add small sections of foamboard where I need higher elevation?

Much of the tracks I've seen on the PHL are at street level where the top of the rails match the height of the top of the asphalt. There doesn't seem to be much of that iconic "ballast hump" see on most model railroads - it looks like the rails are laid very close to the ground and then just ballasted over top of the ties and spread out. 

Also, how do you guys go about gluing the large areas of posterboard down to your plywood? Liquid nails? Contact cement? White glue? Spray adhesive? Any advice is appreciated. 

Reply 1
Ivan I

20,000 Reads!

Whoah, that's a lot of people checking out my blog! (or just a few who are addicted and need help haha)

Pretty cool seeing the numbers go, makes me want to spend more time on the photos and use my real camera to take them... Maybe later when I'm on to scenery and the phone camera doesn't cut it.

So in my last post I posed the question about foam. I was mistaken - it's actually 3/16" thick - slightly thicker than the height of the code 80 track. I'm slowly starting to think that laying the foam over the ply indiscriminately and then carving the low areas out will be the way to go. Still not sure what adhesive to use for that, so some advice from my fellow modelers would be much appreciated.

In the meantime, I have been working a bit with the electronics underneath the layout. After adding the canal to the center module, I re-routed the main track power bus to accommodate the elevation change.

5_230338.jpg 

This operation didn't take very long so I went ahead and positioned the rest of the electronics in the module. On the left I have the main power strip, which goes to the 12v bus and lighting, along with powering the NCE Cab and Raspberry Pi3. The Pi3 runs JMRI and talks to the NCE system via USB Adapter. While it won't be necessary for general layout ops, it lets me run trains and throw switches from my phone and makes programming locomotives a breeze. 

8_190842.jpg 

Since I have a long run of hidden tracks in my plan, I decided to add current based occupancy detection to know which hidden sections are occupied. I purchased 3 DCCOD boards from JLC enterprises and assembled them in an evening. The reason I chose the DCCOD over the BD20 was for their easy adjustment; the slightly lower price point wasn't really a factor. Besides, I enjoyed putting the boards together myself.

8_230626.jpg 

I installed one in each module, connected to the feeder wires for each 46" long section of straight track running behind the fascia. Each DCCOD needs connections to the track bus, 12v bus and the feeders being measured. There are also contacts for a logic output (brings line down to ground when occupied) though I still haven't decided how I'm going to handle displaying occupancy for each section. 

1_203510.jpg 8_221552.jpg 

Almost ready to run a train now (though it will only be through the hidden part of the loop). Even so, I couldn't wait and put down a very rudimentary bridge and put a train on top. My imagination filled in the (sizable) gaps in scenery.

8_225723.jpg 

Reply 1
Reply