Ivan I

It goes like this: I want a model railroad. I'm going to build one. 

1(1).jpg 

Ten years have gone by and numerous designs have been dreamt up, but none of them stuck - except for this one. Join me, as I stumble along (often blindly) in my journey to build a modular N Scale shelf layout. I'm looking at the Port of Long Beach / Los Angeles areas as my prototype inspiration, focusing on the Pacific Harbor Line operations around 2005-2010. 

kPlan(3).png 

Reply 8
Ivan I

200th post and Topside progress

In two and a half years, this "layout journal" has amassed 200 posts and 46326 views, which is more than I could have imagined, especially considering my posting habits and the fact that I only get to see the layout a few months a year. Thank you all for joining me on this exciting journey and I hope to keep posting for at least a few more years.

As far as progress goes, this past weekend was great. I installed the last servos for the engine service facility turnouts and wired up a second stationary decoder to control them. I had soldered up the boards earlier, so I just had to run the connecting wires between the decoder, servo breakout board, and relay board. Once everything was electrically sound, I installed it under the module, hooked up the servos and powered the frogs. Then I programmed the decoder and adjusted servo throws.

11502037.jpg 

As you can see above, the wiring is a lot less chaotic when there's only 2 turnouts being controlled by the decoder. After all of the work underneath the layout was done, I took a break and admired the progress top side:

03418159.jpg 

And underneath didn't look terrible either, I just have to find a way to route the servo leads in a neat manner.

01650469.jpg 

I took a moment to print out and glue together a full size track plan for Modules B and C, as the track and scenery placement had already been carefully laid out and would save me time when installing track. The cat decided to check in to see if I needed any help.

91836122.jpg 

It was neat to see things in full size, removing my suspicions that the industries would be too small to be believable. 

95444392.jpg 

The next step was to start shaping the cork around the canal in Module B. This was accomplished with a razor, a rasp, and some 80 grit sandpaper.

54803729.jpg 61626247.jpg 

Reply 2
Ivan I

Paint and Mockups

Once I was happy with the shape of the banks of the canal, I moved my attention to the layout of the roads in Module B. There is one road in specific that passes underneath a bridge that I needed to lower the elevation on in order to make the grade leading up to the bridge crossing it more reasonable. I used my 1:1 printed plan to transfer the location of that road using a drill bit to poke holes through the paper and then using a sharpie to mark dots along the outlines of the road.

62944487.jpg 63051990.jpg 

After that, I removed the paper plan and went at removing the cork. A boxcutter and sharp chisel made quick work of things, and I used a rasp and sandpaper to smooth out the transitions.

63654878.jpg 

All of this cork shaping left me with a tupperware container of varying sizes of cork particles. Perhaps I can stain them and use them later as ground cover? Has anyone tried this?

01237181.jpg 

Then it was time to seal the cork with latex primer: 

74340000.jpg 

I'll let the paint dry overnight and then start mocking up the bridges and where the tracks will go on this module.

Reply 1
kcsphil1

Now that its primed

you really can't tell the cork is there.  Should work out nicely.

 

Never tried dying cork - I imagine if you make a thick enough solution it would take up color but would need a long soak time.

Philip H. Chief Everything Officer Baton Rouge Southern Railroad, Mount Rainier Div.

"You can't just "Field of Dreams" it... not matter how James Earl Jones your voice is..." ~ my wife

My Blog Index

Reply 1
trainmaster247

Wow those semi trucks are nice!

I've been meaning to print some out but was wary you proved they can turn out nice.

23%20(2).JPG 

Reply 1
Ivan I

Mockups

Phil,

I think I'll throw some into an india ink solution overnight and see what it looks like in the morning.

trainmaster247,

They are nice models, but they do need a lot of well placed supports - I found that my slicer auto support feature wasn't adequate, as each tire needed 3 small supports at the bottom in order to stick to the build plate. You will also lose the mirror details (in N scale, you should be okay in HO)

 

The paint on Module B dried overnight and I set about laying out the track and mocking up some bridges over the canal.

21356891.jpg 

I set the height of the bridge to just clear the top of the semi+40ft container trailer. 

21410290.jpg 

Then I put some tracks on the mockup and put a locomotive on them to get a sense of scale. I think this will be a good shot once the scenery is complete. 

21727204.jpg 

For reference, here is a photo of the scene I'm trying to recreate:

l_780(1).jpg 

Reply 1
Ivan I

Starting to design an build the bridge

I started by finding a good side shot of the bridge in Google Streetview:

bridge.jpg 

Notice there is still a good amount of lens distortion in the shot - I'm not too worried about it, as I'm just using the bridge as "inspiration", and am not building a faithful reproduction. Just good enough to resemble the overall look of the scene, but not quite matching all the details. During my Streetview exploration of the area, I saw a sign stating that the bridge had a clearance of 15 feet, 6 inches. I imported the photo above into illustrator and scaled it so that the approximate space from the top of  the roadway to the bottom of the bridge was 29mm, which is approximately what 15.5 feet scales to in N Scale. From here, I knew that the rest of the photo was mostly in scale and could draw rectangles on top of it to pull dimensions.

Capture2.JPG 

From here I pulled the size of the beams of the structure. I knew my bridge had to be compressed to a length of 230mm so created a rectangle that was 5mm x 230mm for the bottom beam. Then I overlayed it on top of the photo and added the vertical and diagonal members, spanning a top beam across the outermost members. This left me with a reasonably complete side plate:

Capture3.JPG 

I used Illustrator's Pathfinder tool to combine the overlapping rectangles and create a single outline for the sideplate. Then I exported it as an SVG and imported it into LaserWeb and set things up to cut on the CO2 laser. I picked some 2.3mm thick acrylic sheets I had leftover from a previous project and had a go:

44017444.jpg 64639460.jpg 

I doubled up the pieces for each side to get the appropriate thickness. I roughed up the pieces with some worn out sandpaper prior to bonding them with acrylic cement. The sanding also cleaned up the little bits of distortion from the melting plastic when it was being cut by the laser.

71907723.jpg 

The side pieces turned out satisfactory so I called it a day. I will have a go at the top and bottom plates tonight and tomorrow.

72240961.jpg 

Reply 1
railandsail

Track Roadbed, etc,...etc

I've been reading thru this subject thread this morning, and it proving quite INTERESTING in many respects. It all began when i was looking for container cranes.

I had also considered some of the floor laminate products for track laying, so I thought I would repeat some of that here so I could find it at a later date....
 

Turning my attention to the layout itself, I noticed I had some issues with the first module. I had glued some 3/16" thick foamboard to the top surface of the module to act as an underlayment for the tracks and also allow me to carve some drainage ditches and other topographical features into the scene. Unfortunately, the foam seemed to have shrunk and was coming unglued in several places. It was also pretty soft and dented easily. Since I hadn't done any scenery work and only laid on piece of track, I decided to tear up the foam. It wasn't going to work out. 

-750x422.jpg 

Right now I am taking some time to think about alternatives. I know I'd like to have some sort of elevation changes so laying the track directly on the plywood isn't an option. Right now I'm thinking of using some 1/4" thick corkboard (the stuff people put under their floors) might be my best bet. Some input would be really appreciated here .

 

Cork

Good idea.  It comes like tiles at the home improvement stores. Not to expensive, cuts easily, and is good for sound deadening and laying track. I cut them in strips with an angle on some side to represent the ballast slope and lay it like the commercial stuff.  For more elevation you can glue one on top of another and sand down the approaches. It makes a bit of a mess but not like foam. 

Neil Erickson, Umauma, HI

Visit my weblog or Garden Railroad

Experimenting with TOMA

Scoping out cork sheets

Neil, thanks for the confirmation.

I'm thinking something like this ought to have me covered:

 

I also have some of the Atlas corkboard that is precut for N scale if I ever need to create ballast slope, though I have noticed that very few places in the prototype have the rails elevated above the surrounding area... they're mostly flat with the surface. Only the main line areas that get high traffic have elevation changes, the smaller lines that service industrial areas and yards are all at street level. 

I'm assuming cork plays nice with plywood once it's sealed (in terms of expansion and contraction ratios)?

Underlay

Ivan - I use laminate floor underlay. Its much cheaper than cork ( you do need to by a lot though) and has better sound insulation properties:Athtwn66.jpg I fix it down with a rubber solution adhesive which maintains the flexibility.

Rob Clark

Last week I picked up some cork floor underlayment material from a local contractor. Got it for $15 for 30 sqft which should be more than enough to cover the top level of the layout. Grabbed some glue from Home Depot (10$ per gallon) that is specially formulated for the task and glued down a piece of cork to my leftmost wing module. The glue has a 60 minute working time and then acts as a contact cement, remaining flexible. I quite enjoyed having the extra time to make sure the piece of cork was aligned and fully pressed down to the module.

 

The glue set overnight and I started carving out some elevation change for the loop of track that connects the hidden track with the rest of the tracks in Module A. This is where my change to cork really paid off - I really enjoyed carving and shaping the corkboard, and there were no issues of it delaminating from the top of the module. 

 

Next up - trackwork... take 2. I do have a question though. Do you guys seal the cork with paint/primer or do you just lay the track on the bare stuff and just ballast/scenic over it?

 

Either

Ivan:

I've done both but lean toward painting with latex first now-a-days. It gives a finish that needn't rely on a sassy to conceal and covers all the wood or foam so you have some "instant" ground cover. I am less likely to leave stuff lying on the layout if it looks more finished. Of course I lay my own track (ties and rail) so your mileage may vary. Make sure the paint is completely dry if using caulk to set flex track.

Reply 1
railandsail

So Many Great Ideas, Wiring etc

ivan, I am enthralled by your ingenuity.

https://forum.mrhmag.com/post/pacific-harbor-lines-shelf-layout-build-12203180

 


 

Reply 1
Joe Circus

Hope all is well

and looking forward to some updates here.

Reply 1
Ivan I

Priorities and moving along in life

Joe and Brian,

Thanks for the comments - I just checked this blog after being away for nearly 5 months and it made me happy to see that someone else had posted. 

I moved back to Germany in September to finish my Master's degree and haven't really thought about model railroading since. I relocated to Munich, which was a bit stressful, but now that I'm settled in and progressing well with my job and thesis, I've finally gotten the urge to come back to the hobby. The next post will attempt to wrap up the progress I made with the scratch built bridge before I left the country and we'll take it from there. 

Thanks again for following along despite my infrequent posting habit, it's nice to be back.

Reply 1
railandsail

casting containers

Very interesting, for both a container facility, and my stone viaduct bridge construction,...

https://forum.mrhmag.com/post/pacific-harbor-lines-shelf-layout-build-12203180

Reply 1
Ivan I

Vacation Update

I finished my Master's in Software Engineering and I'm back at my parents' house for a month of vacation so I've got some time to work on the layout. I'll be going back to Munich to work for another year or two after my break, so I'm going to try to make the most of my time at "home". This means picking back up where I left off with the bridge construction.

Using the photos from Google Streetview, I was able to get approximate measurements for the cross members that run between the two side trusses on the bridge. I drew them up in Illustrator and exported to the laser. They are supposed to be I-beams so I cut the cores from acrylic sheet and then cut the caps from thinner styrene.

93924641.jpg 22408868.jpg 

These pieces were cleaned up with some sandpaper (to remove burn marks and deformation from the heat generated during the cut) and then joined together with CA to form a sort of I-beam sandwich. I definitely could have made individual beams here and assembled them one by one, but this seemed like an appropriate shortcut to take that would save a lot of time without sacrificing too much realism.

24005652.jpg 

Next up were the plates that hold the I-beams together in the real bridge - they are just cosmetic in my model. I cut them out of varying thicknesses of styrene on the laser.

82947688.jpg 

These plates were also cleaned up with sandpaper and then embossed with an awl to simulate rivet heads. These were glued onto the cross members I had just assembled to provide some nice details to hide the fact that the members were all one piece.

64607725.jpg 71820958.jpg 

The next task was to glue the completed cross members between the two side plates.

Reply 2
Ivan I

Bridge Progress

Having added the plate and rivet details to the cross members, I was ready to join the two side plates together. I used a machinists square and a ruler with some magnets to ensure that things were square to my work surface. Then I used CA to bond the pieces together.

73853764.jpg 

I added more connecting plates to the top and bottom of the bridge to help strengthen the joints and add detail.

05344653.jpg 

I also added similar plates to the side members of the bridge, and glued some thin pieces of styrene to the vertical members in order to simulate I-beams.

14919084.jpg 

Next, I glued in the bottom cross member assembly and turned my attention to the smaller structural members inside the bridge. Since the design only required three cross members inside it, I actually made styrene I-beams from scratch (didn't feel like waiting for the evergreen profiles to ship) and then cut out simple silhouettes of the remaining structures on the laser. These were bonded with MEK and glued into the main bridge structure.

72516120.jpg 84801044.jpg 

I repeated the same steps for the pieces on the ends of the bridge, trying to match the type of structure and reinforcement I could see on my Streetview tour.

83823142.jpg 90613699.jpg 03451525.jpg 

Now I just have to paint it with primer and see how it looks on the layout. It may be a bit rough in some spots, but I'm pretty excited about how it's turning out, for what is essentially the first major structure I've scratch built.

Reply 2
Vince P

That bridge is looking great

Really turned out nicely. I delivered in the harbor once back in 2001 and had a PHL Ex ICG SD20-2 ( rebuilt sd24 with chop nose) go by in the black with silver stripes scheme.
Reply 1
Ivan I

Paint!

Thanks Vince! That's pretty cool, I love hearing from people who worked/work and lived/live in the area that I'm basing things off of.

I sprayed the bridge with some grey primer this morning and I'm very pleased with how it looks. I will have to hit it with some acrylics and add some rust and weathering on it, but for now the primer coat will suffice.

44907062.jpg 73728690.jpg 73754260.jpg 

The main beams do appear a bit "heavy" but I suppose the real thing isn't a slouch either. I think my compression from a 2 track to a 1 track span might have something to do with that. A few of the rivet details appear a bit crude as well, but I'm being pretty critical at this point - overall quite pleased with how it looks in the mock up and am excited to start working on the other bridges in the scene. I have 5 more bridges to make.

Reply 2
Joe Atkinson IAISfan

Progress

Looking great Ivan!  Really nice progress.

Reply 1
Ivan I

More Bridges

Thanks for the kind words, Joe! It's amazing how focused I can be on layout progress when I only have access to it for 5 weeks a year. So many ideas on what to do, already fully thought through by the time I get back to the layout and can actually bring them into existence. 

Instead of working on the second, identical girder bridge that is supposed to span the road running parallel to the canal, I decided to go for something a bit simpler and work on the connecting bridge that runs between the two bigger girder bridges. 

pture(3).PNG 

I did some rough calculations on the height of the (tall I-beams?) and then measured how much space I needed to take up between the two bridge on the trackplan. Then I used an exacto and a ruler and started cutting styrene strips the old fashioned way. 

95849519.jpg 

The construction of this bridge was pretty simple compared to the last one I had made, so the glueup went pretty quickly.

02026738.jpg 03118798.jpg 93014121.jpg 

It was at this point that I got bored of doing things by hand and decided to try something different. We'll see how it goes - if it's successful, it will probably change the way I make bridges from this point on. If it isn't, then I'll be back to hand cutting, embossing rivets, and messing around with MEK, which is fun in its own right.

Reply 1
Ivan I

Getting Lazy, or just resourceful?

Last night I CAD'ed up the small bridge in Fusion360. I wanted to see how well the small rivet details would show up when printed and painted, and whether I would be able to make them smaller than my hand-embossed rivets on the first bridge I made. Though it was initially time consuming, making the bridge in CAD allows me to make multiple copies with minimal effort and also to share the digital files with other modelers who may be interested in using it on their layouts - assuming the thing can be successfully printed.

pture(4).PNG 

I set the bridge up to print at an angle, to minimize the suction forces as the build plate raises from the FEP on each layer, and also to hopefully reduce the possibility of visible layer lines. 

Capture.JPG 

I set this up to print overnight, and this morning I was greeted with a finished bridge! All it took was a good night's sleep - kinda reminds me of Christmas when I was a kid.

70847769.jpg 

The print was washed in isopropyl alcohol and the supports were removed. Then it was post-cured in a small UV-LED oven for about 10 minutes so the resin could reach its final hardness.

75944402.jpg 

The detail on this thing is fantastic - I would even say it rivals injection molded parts, although there are still a few tweaks I need to make to make the layer lines completely invisible. The vertical ribs on the beams are 0.5mm thick. The rivets are 0.2mm in diameter and 0.1mm proud of the surface, and they are still visible. 

81142975.jpg 62853391.jpg 

I'll have to paint it now and see if I can retain the details, but it looks like I'll be relying heavily on 3d printing for the rest of the bridges and possibly other structures on the layout. It was really fun making a bridge from scratch, but this is definitely the way to go if you have multiple similar structures that need to be made.  

Reply 1
Ivan I

Paint and More Prints

I painted the 3d printed plate girder bridge and printed a second one to go on the other side of the single-track beam bridge. Then I started working on the design of the concrete roadbed that goes on top of the girders/beams across all 4 bridges. The profile was pretty simple, and I scaled the length to approximately match that of the sections in real life.

pture(5).PNG I printed a bunch of sections at once, this time using a mix of flexible and standard (cheap) resin in order to make the prints less brittle. Printing a full build plate doesn't increase the print time, so LCD resin printing actually has an advantage over FDM printing in this category. I bonded the sections together using CA.

74326924.jpg 

Then, more paint. This time I used a krylon "almond" paint/primer spray to approximate concrete. This is a base coat which I plan to add highlights and weathering to, but it gets things to an approximate color range that lets me quickly check if things look right or not. The girders on the underside were painted with a flat red primer and topped with grey. I found that this combination struck a nice balance of detail retention and surface bonding.

01743843.jpg 01707589.jpg 

The joints between the concrete sections don't look pretty, but I plan to address that with some paint later. For now I was having too much fun putting the bridge sections together and imagining what the finished layout would look like...

02107374.jpg 02150581.jpg 

After the good results with the small girder bridges, I think I may try to re-make the large beam truss in CAD and then print it out as well. This will give me better detail and more consistent lines, and will be half the effort of building a second one to cross the road to the right of the photo above. Either that, or I will start looking at the bridge that carries the double tracks across the marina closer to the edge of the scene. Plenty of fun to be had, just have to choose a project and apply myself to it.

Reply 1
Rick Sutton

Ivan

Fascinating work! Those bridges are perfect for the printer you are using and I really appreciate the commentary that explains your method and progress.

Reply 1
PKMACLEOD

YOUR CURRENT LAYOUT PLAN

Just getting my toe in the water while trying to find my way back to the beginning of your N scale layout adventure.

Is there a layout plan for your project with dimensions available?  I like the concept but cannot find the actual size.  I am looking for an N scale shelf layout suitable for me to build in my basement, while I still have one with tools and mess allowance, and then move it into a typical apartment bedroom once the downsizing move takes place in 2 to 3 years.  Hope this is not too much to ask.

Cheers, Peter

Reply 1
Ivan I

Track Plan, Dimensions

Hello Peter,

Thank you for your interest in my layout. Here is a link to the track plan (pdf) with scale markings - each grid line is 1 inch. This makes my modules just over 26" deep, with the corner modules being 14" long and the main modules being 46" long. I find this is the largest module that I can comfortably carry and work on.

Reply 1
Ivan I

A new year, a new bridge

My last update ended with the decision to either model the large scratchbuilt bridge in CAD and print out its twin, or to go on and build the curved twin track bridge that spanned the bay just in front of the scratchbuilt bridges. Since I found it more exciting to build something new instead of modelling something had already made, the new bridge won out.

pture(6).PNG 

The curved bridge on the left of the google maps satellite view is the bridge in focus. Here is another photo from the Marina/Chowder Barge area showing some of the bridge details and one of the lovely PHL locomotives pulling some doublestacks.

boats4.jpg 

This photo shows me that the bridge is a series of I-beams supported by concrete pilings. There is metal grate walkway on either side of the tracks, and a simple guard rail made from what looks to be angle iron. The overhead views show wooden ties with slightly longer beams extending to support the walkways every 8 feet or so. With this bridge, I decided to design the entire thing digitally and then print it in parts without too much back and forth iteration, as I felt fairly confident with my abilities to realize the structure in both worlds. 

I started designing the bridge by mocking up the curve that spans the bay on my layout and calculated the spacing between the tracks. This gave me a few sets of radii and an arc length from which I could start designing the ties. I tried to scale their spacing and dimensions using a fusion of the measurements I took from standard code 80 flex track and the real dimensions I pulled from the satellite photo. They were generated as a circular pattern from a single tie.

pture(8).PNG 

I extruded the beams and added details like guard rails and spike plates to the model, always working on one instance of the feature and then patterning it along the length of the bridge. I also carefully measured a piece of code 80 flex track rail and added it to the model.

pture(9).PNG 

I fused all of the separate bodies together, except for the rails, and then cut the bridge into 10-beam sections that would be more manageable to print on my 3d printer. I was really happy with the detail and functionality of the design, as I spent a considerable amount of time making sure I would be able to insert the flex track rails into my custom printed ties.

ture(10).PNG Next I extruded the 4 main I-beams. I estimated their height based on their relative scale in photographs. I used the height of the 40ft intermodal containers as a reference point and then just counted pixels. I created a sketch with their profile and then used the rotate function in Fusion360 to extrude the curved I-beams. I made them a bit taller so they would interfere with the ties and then subtracted the tie body from the beams. This had the effect of creating notches that would help me align the beams in exactly the right place underneath the ties when I assembled the bridge.

ture(11).PNG Next I modeled the concrete pilings. I made the columns a bit longer than I would need so I could cut and sand them to the final length once they were installed on the layout. Once again, I added a keying feature into them so the I-beams would be held captive and snap into the tops of the pilings when assembled.

ture(12).PNG The last features to be added to the bridge were the walkways and railings. These were a bit tricky as I wasn't sure if I wanted to print them or laser cut them from styrene. Etching them from brass would have been optimal, but I don't have the setup to do that economically. It was also at this point that Fusion360 started getting rather angry at me and would freeze constantly. Apparently it doesn't like all of the small details I add to large assemblies and my methods for patterning weren't optimized. For now I will work through these shortcomings, but I am not at all impressed with how performance hits a brick wall for a paid program with a pretty wide acceptance and good community acceptance. The top section of walkways was a bit wonky in how it fit together, but it would have taken much longer for me to try to fix it with all of the crashes then if I had just printed it and sanded the ends on a circular sander. 

ture(13).PNG With the last bits finished, I was really excited to turn the digital model into something I could run a train on.

 

Reply 1
Ivan I

Printing Pilings

The first parts to be printed were the concrete pilings. I decided to work from the ground up, and they seemed like a rather simple part. I printed them all in one shot with a relatively thick layer height as they didn't have too much fine detail. Parts were printed from a mix of standard anycubic resin which offers fast print times and nice details, and Siraya Blu which is added to keep the parts from cracking in the event of an impact.

01749343.jpg 

The parts were cleaned and post cured. Then I sprayed them with a base coat of flat primer to knock down any gloss surfaces and promote adhesion of my paint later. They kinda reminded me of Stone Henge at this point.

0394_HDR.jpg 

Painting these was a bit tricky, so I drilled some 1/8" holes in the bottoms of the columns to accept some plastic skewers. Then I hit the pilings with some "almond" color paint for a decent concrete base color.

9641_HDR.jpg 

The I-beams were up next in the print queue. Each of the 4 I-beams was printed in 4 sections at a medium resolution, since there were some finer details and rivets that I wanted to show up. You can clearly see the ridges that allow the ties to snap into position in top of the beams.

85830113.jpg 

I temporarily tacked the beams together with CA to help make painting go a bit faster. It's easier to hold and spray one big thing vs 4 little I-beams.

94935419.jpg 

The beams were painted with the same red primer and then sprayed with a coat of grey. This isn't really the color that they will have in the end, but it serves as a nice base and approximates their color tone when they are placed in the scene. Having raw or primered parts on the layout really makes it difficult to envision how the scene will look in its early stages.

7994_HDR.jpg 

You can definitely see the pixel lines on these prints, but they should go away once the beams are glued underneath the rest of the bridge structure. Some weathering will make them even less visible. If I were to do this again, I would probably change the orientation at which the beams were printed to help mitigate this.

Reply 1
Ivan I

Printing Ties and Rails

The next step was to print the tie sections of the bridge deck. These were printed one section at a time, flat on the build plate of the printer. This meant that each section took around 25 minutes to print, so I was running back and forth from the printer for a few hours. While it wasn't ideal, there were no failures and I was quite happy with the results.

82306253.jpg 83012404.jpg 42343915.jpg 

As you can see in the photos above, the code 80 rails slid in quite nicely and worked well to hold the sections together. The resin was flexible and strong enough that the small spike heads did not snap off with repeated insertion and removal of the rails. I painted the individual deck sections with brown primer and let it dry.

2060_HDR.jpg 75558397.jpg 

I must admit, seeing it assembled like this made me very pleased with how it was turning out. It was almost looking like a real bridge at this point.

Reply 3
Reply