Ivan I

It goes like this: I want a model railroad. I'm going to build one. 

1(1).jpg 

Ten years have gone by and numerous designs have been dreamt up, but none of them stuck - except for this one. Join me, as I stumble along (often blindly) in my journey to build a modular N Scale shelf layout. I'm looking at the Port of Long Beach / Los Angeles areas as my prototype inspiration, focusing on the Pacific Harbor Line operations around 2005-2010. 

kPlan(3).png 

Reply 8
Ivan I

Assembly and walkways

The next step was to join the I-beams and deck together. I used a wire wheel on my dremel to remove the paint from the mating surfaces and then added a dab of CA glue in the recessed areas where the ties were keyed to the top of the I-beams to make the joint permanent when they were snapped in place. This went very quickly and everything was aligned perfectly on the first try. That almost never happens. 

With the bridge starting to resemble a load bearing structure, I decided to prepare the area of the layout where the bridge would be installed. I laid out where the bridge lay with a sharpie outline, then removed the top layer of cork with a chisel to make the bridge mount flush with the top of the embankment. 

72717912.jpg 

I took some liberties in shaping and installing the concrete pilings. The ones I cut in half aren't the most realistic, but you won't be able to see my crimes when the bridge is in place so I didn't worry too much about it. The pilings were glued in with epoxy. I plan to make the top of the bridge removable for maintenance and future detailing work when I work on the bay itself. 

04307541.jpg 

At this point, I started experimenting with how to best make the walkways. My first attempts to 3d print them ended up a bit too thick for my liking and ended up being fragile and oversized. I fell back to my second approach of using my laser to cut them out of styrene.

14937742.jpg 

You can see that the laser leaves a bit of a melted edge on the styrene, but that is pretty easy to sand down with some 220 grit sandpaper and a file.

34234301.jpg 

Here is the difference between the styrene walkways and my first 3d printed effort. Though they could be made even better, I am content with how they look for the amount of effort I put in.

20015032.jpg 

Installing the walkways went pretty quickly. I also used the same laser cutting method to make some handrails. Those can be seen in the top left corner of the photo.

72028459.jpg 

Next up is the unenviable task of cleaning up and gluing in the handrails. Thankfully the bridge isn't that long relatively speaking.

Reply 2
pierre52

Nice job Ivan

What a great combination of modern technologies to produce a stunning result.  I wonder if your PC's processing power may be the cause of the F360 crashes.  Many years ago I use to have similar problems when doing high detail dwgs in Corel Draw. 

Peter

The Redwood Sub

Reply 1
kcsphil1

nothing like modern era modeling with modern tools

Now, where can we order some of those pilings from you? Walkways too.

 

Nicely done.

Philip H. Chief Everything Officer Baton Rouge Southern Railroad, Mount Rainier Div.

"You can't just "Field of Dreams" it... not matter how James Earl Jones your voice is..." ~ my wife

My Blog Index

Reply 1
Ivan I

Thank you!

Peter and Philip,

Thanks for the kind words! I enjoy being able to share my progress and techniques on here and it's nice to hear that people find them interesting. 

My PC specs aren't too bad. 32gb ram, ssd with plenty of space, 7th gen core i7, Nvidia graphics with 2gb ram. Solidworks never had any issues on it, so I'm thinking it's just poor optimization of large assemblies on Fusion 360's part. It seems like the developers focus more on adding flashy new features like generative design rather than fixing the difficult long standing issues, or perhaps the way I am using the program isn't correct. I feel like it may be a case of the program trying to do too much, but it's free for me to use so I shouldn't really complain.

As for my designs being available in physical form, I don't know. Sounds too much like work to me, plus international shipping probably wouldn't be worth it. I have considered putting the files on thingiverse, but that site isn't being actively maintained and has become borderline unusable. We'll see.

Reply 1
Ivan I

Handrails and more progress

I cut, sanded and glued one full side of handrails and took a break to put the bridge back on the layout and see how it looked. Even though the tracks leading up to the bridge are just mocked up, the whole thing looks like it belongs, which was satisfying to see.

7383_HDR.jpg 

Seeing a locomotive on the bridge was enough motivation to make me get back to the bench and get to work on the tracks leading to and from the bridge. Since the bridge was slightly elevated from the surrounding ground level, I had to raise the ballast level with some cork. This was the first place on the layout where I was able to use the pre-cut n scale cork strips.

12004433.jpg 12905880.jpg 

I let things dry and then smoothed out the profile to a taper as it reached the area where the road began. This was done with a rasp and some 80 grit sandpaper on a sanding block. Then I moved to the left side of the bay and repeated the same steps.

01753218.jpg 

After the glue was dry and the slope of the cork was blended in with the surrounding ground level, I glued down the first set of tracks leading up to the bridge. I made sure to align the end closest to the bridge with the bridge installed so I wouldn't have to do a massive amount of filing afterwards to get the tracks to line up.

53512106.jpg 53519047.jpg 

You can see in the photo above that I already had a turnout made for the yard throat, but after lining everything up and seeing the short gaps to the left that I would have to fill with bits of flex track, I opted to make a custom sized turnout with slightly longer rails. It was a nice change of pace to sit down and make a turnout after not making one for a while.

35520201.jpg 

Reply 1
Ivan I

Laying more track

After adding the wooden ties and styrene base plate to the turnout I had made in the post above, I had to join it with a piece of flex track that would extend the tracks all the way up the bridge. Previously, I would just butt the flex track up to the end of the turnout and solder the joint. After an extended period of time, I found a few of these joints coming apart in my yard ladder, which was causing half of the turnout to lose power so the issue had to be fixed. I needed some sort of mechanical reinforcement across the joint, and I took inspiration from the prototype. I hammered out some thin strips of copper out of solid 20g wire on an anvil-shaped piece of metal and cut small rail joiners out of the material.

63321577.jpg 

I applied the joint bars across the butt joints and soldered everything together. This provided a much stronger joint without interfering with the wheel travel on top of the rails. They were difficult to photograph due to their small size, but I think this photo shows them fairly clearly (albeit on a different turnout). I went back and applied the bars to every single turnout on the layout. Time will tell how well this fix holds up.

64124913.jpg 

Back to the bridge sections, I drilled holes in the layout for feeder wires and added the wires to the turnout and flex track segment.

63638120.jpg 95355022.jpg 

Then I glued the assembled and wired track section into place and weighed things down while the glue was setting.

00335240.jpg 

Reply 1
Ivan I

Odds and Ends

There were a few things under the layout that required my attention for quite some time now and I decided to finally take care of them. The first was the assembly, soldering, and programming of the stationary decoder in charge of controlling the servos for the bridge module. This is the same as the two units installed in module A to the left of the bridge module, and are based on Mr. Bunza's SMA20 decoder running modified arduino code to control the polarity of the frogs via a relay. The bridge module only has two turnouts, so I outfitted this decoder with a twin relay board instead of the usual 8 relay unit. This was attached to the underside of module B with hook and loop tape and wired into the main track power bus.

12704371.jpg 

While I was underneath the layout, I noticed that the extension servo leads I had used to connect the turnout servos to the stationary decoders in module A were hanging rather haphazardly and ruining the overall appearance of the underside of the module. I wanted a non permanent way of fixing them to the underside of the module that didn't require a million zipties, so I quickly designed a wire "hanger" in fusion 360 and printed a bunch on my father's Ender3 fdm printer. These are designed to be held in place with a drywall screw and have enough space to hold 3 pairs of 18 gauge feeder wires or 4 servo leads.

ture(14).PNG 75151860.jpg 

I applied these judiciously to the underside of module A and printed more for the other two main modules. Installing them was quite easy and they did the job they were designed to do. I could have used staples or something less overengineered, but this solution will make me happy every time I peek under the layout or have to fix a wiring problem. The underside of the layout has been brought up to standard.

81004444.jpg 

The mildly embarrassing reason for the requirement to have the servo leads removable? I had several servos lock up and become unresponsive after a surprisingly short period of time. I guess when you buy them in batches for less than 2 dollars a piece it's bound to happen, but it's not something I want happening again so I replaced the suspect brand with a slightly more reputable one. Hopefully that's that problem solved.

After all of the work under the layout, I switched back to the bridge and finished sanding and installing the handrails on the other side of the bridge. I found my soldering jig to be the perfect way to hold the bridge at a comfortable angle while I messed around supergluing the styrene handrails to the bridge (avoiding the all too common and surprisingly strong finger-to-bridge joint). This was a task I was putting off and it was nice to have it finished.

35409463.jpg 

To round out the stream of random layout-related tasks, I designed a holder for my NCE Power Cab throttle. I got tired of it laying on top of the layout or somewhere on the floor, partially hanging by its wires. I almost exclusively use wi-throttle and my phone to control the layout, so the throttle is relegated to just doing dcc main station duties. I even pulled the logo from the NCE website and added it to the design, though in hindsight the limitations of the fdm printer made it turn out worse than I had hoped. Thankfully the aesthetics didn't get in the way of functionality.

ture(15).PNG 02738707.jpg 

Mounted to the layout, you can't see the ugly logo (sorry NCE, you could use a 21st century update) and it keeps the throttle out of the way of operations while still being accessible if my phone or the wifi drops dead.

03548828.jpg 03606108.jpg 

Although most of the tasks were scattered around the layout and seemingly inconsequential, the sum of their improvements really made the layout feel much closer to being "operational".

Reply 1
jeffshultz

Wire hanger

I don't suppose you'd be interested in making that wire hanger design available, perhaps on Thingyverse?

Please?

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 1
Ivan I

I'll deal with Thingiverse's slow website once more

https://www.thingiverse.com/thing:4134460

Jeff, hopefully you and others will find this useful. I didn't really think much of the design considering how simple it is in my mind so the thought of putting it online didn't cross my mind.

If people see things I've printed that they may find useful, feel free to request them - if I don't expect to print them for profit in the future, I have no problems sharing them on Thingiverse for free. Otherwise I may consider printing and selling models by request in the future... maybe.

Reply 1
Ivan I

Wrapping up wiring on the bridge install

It is my intention to have all large bridges be removable on the layout to facilitate doing the scenery, track cleaning, and doing minor repairs, With that requirement in mind, I had to wire them separately and connect them to the dcc bus with some plugs. I went with some 2-pin jst connectors as they were plentiful and easy to crimp. I soldered the power leads to one end of the rails and left plenty of length on the leads to make installation and removal easier.

44132348.jpg 

Then I drilled 1/2" holes underneath each set of tracks where the bridge would rest on its abutment. The size of the connectors required a 7/16" hole but I decided to go a size up because there was less chance the connectors would get stuck in them. With the bridge installed the holes and wires were completely invisible.

41237023.jpg 9338_HDR.jpg 

With the bridge in its place and electrically connected to the rest of the layout, I set about finishing the other side of the tracks leading from the bridge to module C. I installed the second of the two turnouts located in module B and wired it into the newly installed decoder/turnout servo/frog juicer controller. After doing all the work for the yard, I find that I am really starting to enjoy laying track and installing turnouts. I suppose it is an acquired taste after all.

64315890.jpg  You can see the rail joiner bars I described in a previous post quite clearly in the photo above. They make it easier to align things during soldering and I feel a lot more confident about the joints holding through the seasonal expansion/contraction cycles the layout sees in the basement. 

65124870.jpg 

Reply 1
Ivan I

More track work and bridges

The glue had dried on the last sections of track I had glued to so went ahead and installed the last pieces of flex track located to the right of the bay. Once again, I spent some time aligning everything before gluing things down, getting the tracks cut to length and marking where it would lay. 

85106076.jpg 31107871.jpg 

The moment the glue was dry, I cleaned the rails and flipped on the power. Everything ran smoothly and you really couldn't notice the gaps between the bridge and the rest of the tracks. I just need to extend the guard rails a bit further off the bridge and then paint the rest of the tracks on the layout. Here is an aerial view of the progress. It's exciting to see the layout slowly progressing right.

31022680.jpg 

At this point, the missing second truss in the background is what draws the most attention, so in turn it shall receive the most attention from me in the coming days.

Reply 2
Ivan I

Home is where the layout is

After spending the entirety of this past year living in Germany, I finally had a chance to see my family for the holidays - which means I have access to my workshop and layout. I am on vacation (and in voluntary quarantine) so I get a month to enjoy the hobby!

In preparation for this, I spent some time bringing the first girder bridge I made by hand into Fusion360 so I could 3d print a second one. This turned out to be a fairly straightforward process, as I already had the main dimensions and drawings done in Illustrator so I just imported them as sketches and built up the 3d structure based on them. The most challenging thing was managing the level of detail in the model to try and keep Fusion360 from freezing and crashing. I was mostly successful, although even my beast of a computer (ryzen 3700x, rtx 2080 super, 64gb ram) still takes more than a minute to open the file.

pture(1).JPG 

ture2(1).JPG 

After creating one span, I decided to model the full assembly to see how things would fit:

ture3(1).JPG 

Designing the bridge, with all the details, took about a week, and it was definitely quite frustrating working within the limitations of the CAD program. However, things looked promising at this point so I cut the bridge into two components (otherwise it would not fit in my printer) and placed supports and sliced it. Then it was off to the printer, with each half taking about 5 hours to finish:

20337027.jpg 

The supports were removed and the parts were cleaned and cured. Then the two bridge halves were glued together with thin CA. Here is the resulting span placed next to the hand built one:

85458544.jpg  

From a distance both spans look very similar, but when viewed up close, the 3d printed one definitely had higher levels of detail and accuracy than the original handmade model. At this point I decided to print a second span and replace the original. Perhaps I'll use the original somewhere else in the future. While the second bridge was printing, I set about fixing a slight layer shift on the printed bridge that made the vertical members appear skewed. I cut them where they were bent and masked the fix with a thin strip of styrene:

6_180330.jpg 

Once painted with a light coat of primer, the fix was invisible:

6_182918.jpg 

Now I can go to sleep and wake up to a finished second bridge in the morning. Technology is pretty amazing.

Reply 2
Ivan I

Print, Paint, Repeat

This morning I popped the second half of the bridge off the printer and post processed it. I glued the two halves together and put it on the layout - yep, still looks like a bridge! I then hit it with a coat of primer so it would match the color of the first bridge, and temporarily added the concrete roadbed.

6_182931.jpg 

Then I made sure to check for clearance with my tallest doublestack, which cleared with about 3mm to spare:

6_213552.jpg 

My next goal will be to design and print the piles for the 4 bridges, and start working on the slopes leading up to the bridges. Here are a few reference photos of what I'll be aiming to reproduce:

Capture4.JPG Capture5.JPG Capture6.JPG 

Reply 2
Seoras7

PHL shelf layout blog...

A Blog found in a wildcard search but one with a Superb layout plan wonderfully finessed - and a construction supported by a lot of skills and patience.

A loop to run stuff in on and credible shunting including street running.

A lot can be learnt from reading just this one Blog.

This should finish as good as the top guys stuff yet it's a 'first layout'.

I look forward to discovering the looks of the buildings...

 

Reply 1
Russ Bellinis

There will be few buildings around the PHL

The area is mostly container terminals, coal terminals for overseas shipment, petroleum products and tank farms.  PHL is located almost entirely in the Los Angeles Harbor.  I don't think it actually crosses into Long Beach Harbor at all., but I mght be mistaken. There is some warehousing, but many of the warehouses have been moved inland to make room for more container terminals or other maritime industries.

When I worked in the harbor prior to leaving in 1989, there was a sulfer dock with a huge pile of sulfer out in the open.  I think it may have been moved into a building since.  I think the epa now recognises sulfer as hazardous and forbids it beeing stored outside in the weather.

There is a coke dock, but I think the coke is now moved inside a warehouse.  Oil generally runs underground through pipes from tankers and oil wells to refineries and from the refineries to tanks and fuel depots.  I'm not sure if U.P. still runs the tank train from the Bakersfield oil wells to refineries in the harbor.  The refineries are all in Wilmington.

Reply 1
Ivan I

Thank you!

@Seoras7 - I am really glad you found my blog worth your time. I, too, am looking forward to designing the buildings, although I seem to be putting that task off till later, perhaps due to the amount of time I foresee it taking. One of these days I will just cut some carboard mockups and plop them on the layout, but for now I will continue pushing the task off till the next day.

@Russ - 4 years ago you posted your first reply to my blog, and every single one has been very informative and helpful for me to get an understanding of how things were done (and I went back and just read through all of them). Thank you! As for the warehouses and other local industries, I have also noticed that they are further inland from any of the port industries and the main PHL yards, however I am using selective compression to move them closer and include some small-industry switching opportunities in the leftmost module.

 

Yesterday I managed to get the three main pilings designed for the girder bridge assembly. I modelled them with taller cylindrical portions so that I would be able to shorten them in place on the layout to achieve the correct level for the bridges. If you can't make things accurate, make them adjustable. The pilings were hollowed out with a 2mm wall thickness:

pture(2).JPG 

I set these up to print and an hour and a half later I had 3 pilings that needed to be post processed:

8_113548.jpg 8_125127.jpg 

Once the prints were cleaned up and cured, I temporarily glued them to a strip of plywood and sprayed them with grey primer and a concrete-ish color base coat. I will be weathering them and changing the tones a bit later:

8_125955.jpg 

Next I marked out where I wanted the pilings to go on the center module and used a hollow copper tube to punch some holes in the top layer of cork, which I later enlarged with a rotary tool and a sanding drum.

8_181808.jpg 

I then positioned the pilings in their final location and marked off how much of the cylindrical legs I needed to trim. This was done without much effort on the disc sander:

8_181938.jpg 

I repeated these steps with the other two pilings until the four bridges were supported at the right heights and angles:

8_184628.jpg 8_185519.jpg 8_201242.jpg 

Since I feed off of instant gratification and a closed feedback loop I set the bridges up and took some photos (my excuse is that I wanted to check that the scene still looked right). I did have a few concerns about the pilings looking rather short and low to the ground, but looking at the prototype photos confirms that they are more or less buried in the ground (no need to make the bridge any higher than it needs to be)

8_201147.jpg 8_201152.jpg 8_201501.jpg 

(yes, I know the bridge in the foreground is floating, I removed it while working on the bridge in the back)

Tomorrow I hope to design and print the other two pilings to replace the mdf blocks at the ends of the 4-bridge assembly and maybe even start with the design of the inclined ramp leading to and from the structure. Sometime next week I should be receiving the material to try my hand at making n scale ballast (following Joe F's great article in this month's issue) so the yard module should get some love once I finish my bridge binge.

 

Reply 3
Joe Circus

@Ivan

Welcome back! Glad to read that you're safe, watching the continued progress!

Reply 1
Russ Bellinis

I worked in the Port of L.A. from 1977-1989.

Then the terminal company I worked for was bought out and closed, and I went back to work for the Carrier Transicold dealer in L.A. and later moved to City of Industry until I retired in 2006.  In 2005 I was sent on service calls to a company that operated a barge/tug system to haul refrigerated trailers from Wilmington to Catalina Island, and bring back the empties.  It turned out that this company was located across the street from PHL's yard.  That was before PHL received all of the rebuilt low emission diesels like the one pictured on your lead photo.  At that time they had quite a mismash of locomotives in various schemes.  I remember their original Emd sw7 units in light blue, originally owned by the company when it was called the Harbor Belt Line.  They also had an EMD Sd23 or 24 in Santa Fe zebra stripe.  They had a lownose ex S.P. Gp9 in black widow, and an ex S.P. sd40-2t in bloody nose.  They had an Also Rs11 in quite a colorful scheme from an Eastern road that I'm not aware of the origin.  They had a couple of new hybrid locomotives that I think were in a solid black, but don't remember for sure.  The markings were fore a leasing company rather than PHL. 

They had received a grant from the EPA & Los Angeles County or City  that was conditioned on them buying low emission diesels and hybrid locomotives and that is when they standardised with the locomotives like you show in your lead photo with the old Santa Fe zebra stripe.  I understand that the owner of the PHL is a railfan who likes the old railroad liveries.

Reply 1
Ivan I

@Joe Circus - Thanks for

@Joe Circus - Thanks for stopping by, glad to have others interested in my work, even though the progress only happens once or twice a year.

@Russ Bellinis - Indeed, the varied roster (from the 2000-2010 era that I am hoping to model) is what initially brought me to pick the PHL as my prototype inspiration. I love the look and various paint schemes of the different locomotives!

 

Reply 1
Ivan I

Bridge Pilings and other stuff

I spent some time virtually traveling around the harbor, looking at how the bridge were held up and what style of abutments were used. Here's what I settled on:

ture2(2).JPG pture(3).JPG 

I took the prototype inspiration and put it into a 3d form in Fusion360:

ture3(2).JPG ture4(1).JPG 

The patterned ramp walls run for about 12-20 inches, so I needed to print quite a few sections. I set up the printer to print 24 of the top roadway pieces (per print plate) and 9 of the patterned ramp wall sections (per print plate). While the printer was going, I took care of some loose ends on the layout. 

The first order of business was to glue a layer of cork underlayment to the rightmost module, module C. Since the ramp leading to the bridge assembly crosses over into module C, I needed to have a solid base from which I can build up the ramp. 

9_184311.jpg 

I sanded down the areas where the seams are between modules, using masking tape to separate the modules and adding some liquid nails adhesive in any gaps that appeared. 

0_115846.jpg 

Then I sealed the raw cork with a layer of grey latex primer - now all three main modules and the two wing modules are covered with a sealed cork layer. 

0_123930.jpg 

After the paint dried, I transferred the features from the printed out full scale track plan onto the surface of module C:

0_145207.jpg 0_182422.jpg 

Reply 1
Ivan I

Other details

In between printing sessions, I designed a quick re-railer wedge to put on the hidden track that runs behind the hardboard background of all three modules. I noticed several bits of debris that had fallen from the concrete wall onto the hidden track, and although there is a piece of masonite that acts as a guard rail and keeps the trains from hitting the floor, it wouldn't hurt to make an attempt to re-rail the trains at each end of the module.

9_141021.jpg 9_141207.jpg 

I found that these simple plastic wedges were very effective at getting trains back on the track. 

The other small change was updating my Raspberry Pi computer with the latest OS and JMRI. I had previously configured an image myself, but I found it easier to just modify the one provided here:

https://mstevetodd.com/jmri-raspberrypi-access-point

I removed the wifi hotspot functionality and just had the RPi connect to my home wifi, added my locomotive roster (all 2 units), updated the list of turnouts, and then started building up the track plan in JMRI's layout editor. Here's how things look on the JMRI webserver:

ture5(1).JPG ture6(1).JPG 

Although this change does not modify the physical appearance of the layout, it makes a really nice improvement to the overall operability - I don't have to remember the turnout numbers to set routes, and even family members can operate a train if they want, it's that intuitive. It also helps keep the layout a "one button" layout - turn it on (wait 15 - 25 seconds for the RPi to boot) and run for a half hour, then turn it off and it will be ready to run the next time you're free. So far, the layout has done just that, ready to run after a year of inactivity with just a quick wipe of the rails with a 3000 grit sandpaper block. 

Reply 2
Ivan I

The last time I posted here, the forum looked a lot different - but here we are almost 2 years later and I must say I've been much better at working on the layout than posting actual updates of the progress on here. I'll do my best to pick up where I left off and take a trip down memory lane. To summarize: many things changed, some things stayed the same, I'm really happy with where I am in life right now, and the layout is still alive and progressing well.


Picking up where I left off, I printed off a lot of ramp sections and roadway surface covers and lined them up  to visualize how many I would need for the scene.
IMG_20201220_130913.jpg

 The ramps would have a slight curve in them, so I took the sections to my disc sander and used a miter gauge to get a consistent angle on all of them. This would have been very difficult to do without the help of the fixture.
IMG_20201220_221652.jpgIMG_20201220_222137.jpg

I then glued the retaining wall sections together with super glue and carefully used a Dremel with a cut-off wheel to cut a gradual slope in the wall. I capped it off with the roadway sections.
IMG_20201220_231548.jpg

 Once the glue cured I painted everything with a light coat of krylon almond spray paint to simulate concrete. I will definitely be adding weathering to this later on, but it's nice to get something close enough in color that it starts to blend into the scene.
IMG_20201221_002138.jpg 
The ramp crossed a module boundary so I needed to cut it in half. I carefully marked the parting line and used a Japanese pull saw to make a neat cut. I sealed the open ends of the ramp with a thin sheet of styrene.
IMG_20201221_111119.jpg  IMG_20201221_111337.jpg  IMG_20201221_113833.jpg

 I test fit everything before gluing the sections of the ramp down to their respective modules. 
IMG_20201221_120805.jpg  IMG_20201221_121200.jpg 

Reply 2
Ivan I
While the glue was drying on the ramp installation, I went ahead and fixed a problem that was bothering me for a long time. The light strips I got a few years ago for the valance lighting were of the waterproof variety, which had a clear acrylic/plastic coating on them to protect them from the elements. This coating became quite yellow with the heat generated by the strips and shifted the color of the layout lighting pretty dramatically. 
IMG_20201222_142502.jpg  IMG_20201222_142448.jpg 
It doesn't show up as much on the photos since the camera automatically adjusts for white balance, but this made a big difference in person.
Reply 1
Ivan I
Around this time the pandemic hit full force and I wasn't able to visit my family much throughout 2021. I got a few weeks during the holidays, but those were mostly spent away from the layout. I did however get a chance to paint the tracks in the yard and engine service facility. This was done with a simple rustoleum primer spray can.
IMG_20210108_200316.jpg 
I also tried my hand at dyeing some sand in order to use as ballast. This was done following Joe Fugate's article on handmade ballast and the results seemed good enough to keep around.
IMG_20201224_122149.jpg  IMG_20201226_231034.jpg 

Lastly, I finally got a dedicated compressor and a decent hobby airbrush. I built a small spray booth from an old dehumidifier fan and some furnace air filters. The LED lighting uses the same strips as the layout so the color rendering should match what it will look like on the layout.
IMG_20210104_212743.jpg 
Reply 1
Ivan I
The big event, both for myself and the layout, was me moving from Germany to Boston in the summer of 2021. I was finally able to bring my layout out of the basement of my parents house and test the portability and durability of the modular construction. Sure, the modules could have been built lighter and a tad smaller, but I was able to take them out of the basement, into a uhaul truck, and into my new place with zero incidents. The only casualty of the move was a connector that got caught underneath a module as it was being carried off the moving truck.

The modules sat in my living room for about a week as I prepared the mounting braces so it could be hung up on the wall. I took the original 2x4 solution I made for my parents basement and cut it down and painted it to make it a bit more presentable.  I 3d printed small pads for the inclined surfaces of the french cleat mounting system to reduce some friction when moving the modules on their mounts. The braces were screwed into the wall using a combination of heavy duty drywall anchors and normal wood screws where they lined up with a stud.
20210926_204047.jpg  20210927_210151.jpg
20210927_210203.jpg 
I used a laser level to help me keep things aligned and horizontal. 
20210926_213413.jpg 
I wanted to keep the layout around chest level for me. Since I was living alone, I took the opportunity to do as I pleased and put the layout as the focal point of my living room, resting it on the surrounding entertainment center and just above the AC unit. The AC unit was at precisely the wrong height so I had to cut out a section of module A to allow it to fit on top of the air conditioner without blocking it.
20210928_111202.jpg  20210928_112131.jpg 
The apartment didn't have any walls where the layout could have fit in its previous configuration - as one straight shelf. Instead I had to make it into an L shape with the yard module following the wall to the left of the  entertainment center.
20211001_175839.jpg 
Naturally, the next step was to fill in the empty space in the corner with a small curved module. I had to wait until I was at my parents house to do this as I did not want to annoy my new neighbors with construction noise any more than I already had.
Reply 5
Reply