Ivan I

It goes like this: I want a model railroad. I'm going to build one. 

1(1).jpg 

Ten years have gone by and numerous designs have been dreamt up, but none of them stuck - except for this one. Join me, as I stumble along (often blindly) in my journey to build a modular N Scale shelf layout. I'm looking at the Port of Long Beach / Los Angeles areas as my prototype inspiration, focusing on the Pacific Harbor Line operations around 2005-2010. 

kPlan(3).png 

Reply 8
Ivan I

Re: Pain

Peter,

Thanks for the comments, as I've written in your blog, I'm following along with your build and it's providing some nice motivation to continue with mine. The elevation changes shouldn't be too hard for me to achieve, I will most likely be doing as you suggested and building above and below the plywood top with pink insulation foam and then carving away the details. 

As for operations... that comment actually helped a lot, probably more than you know. A few years back I really wanted a full blown intermodal facility and then ran into issues with the technical and scaling challenges associated with the task. The last few years I've slowly convinced myself that I don't need any intermodal stuff in my layout, that it was way too big to model (and have it look right). Still that desire to watch a gantry load 40' containers into a well car persisted in the back of my mind. In the meantime, I researched refinery, transloading and bulk loading operations and became comfortable with the thought of a layout based on that. Your comment made me go back and give the intermodal idea another chance, this time in a more limited scope. I think I can make it work. I'll still have room for one or two small industries in between the intermodal facility and the yard. 

I'll have to check out Ian Rice's book. I've been giving a lot of consideration to Lance Mindheim's blog the past few years. Plug in cassettes area a viable option for my layout, so I'll have to give more thought as to how they'd integrate with my operational goals.

Reply 1
ctxmf74

"Still that desire to watch a

Quote:

"Still that desire to watch a gantry load 40' containers into a well car persisted in the back of my mind. In the meantime, I researched refinery, transloading and bulk loading operations and became comfortable with the thought of a layout based on that. Your comment made me go back and give the intermodal idea another chance, this time in a more limited scope. I think I can make it work. I'll still have room for one or two small industries in between the intermodal facility and the yard. "

    You could build two 2 by 12 N layouts stacked on wall shelves. One could be a large intermodal facility and the other a yard, loco shops, and industries. The two levels could be connected by a train elevator along the wall behind the scenes or a helix if you can find some room at the end of the layout......DaveB

Reply 0
Ivan I

Re: Building two levels...

Dave,

That's a very good suggestion - it's quite tempting to do, especially the hidden elevator idea. I have a good bit of experience with linear motion (made a few cnc machines, volunteered with a robotics team, worked in an EE lab at Penn State) so I'm confident I could make a compact and reliable solution. I could easily attach a lower level to the bottom of my current modules (the 4 inch depth of the current bottom boxes would allow ample space for wiring and lighting for another level below it)...

My initial reaction was - no, that's way too complex and it violates my goals of making the layout modular, but after 24 hours to think on it, it might be the best way to go.

I guess my one concern was how much vertical space the layout would take up as a double decker. At the moment, I have 4 inches in the top valance, 14 inches of backdrop and 4 inches in the bottom box. That adds up to a manageable 22 inches in height. This leaves plenty of space below the layout for storage, bookshelves, ect. Will that space ever be used? Probably not. Still, it was a battle getting that space for the layout, as my parents are opposed to a big ol installation in the basement, so I don't know if I want to risk drawing their ire when if I suddenly start adding another level below the current modules. When I move out, I anticipate the house to be fairly small and my girlfriend has a lot of books (so trains and bookshelves would be contenders for prime real estate). Hmmm... so much to think about...

Here's what I think I'll do:

I'll build the top level to have the engine facility, small yard and small industries. I'll make provisions in the plans for a single track 40" long elevator behind one of the modules and keep the elevator mechanism on the back burner. As I work on the top section I'm bound to learn a lot of lessons so I'd rather keep it simple. If things progress as expected, I should have a nice switching layout on that level that I can enjoy when I just want to run trains. 

Adding a lower level would be fairly simple at that point. The lower modules would look like an 'L' from the side - essentially the same construction as the top modules, just missing the top valance box. This level could then accommodate a large intermodal facility (animated cranes, loaders and trucks anybody?) This would be a good challenge a few years into the future when I'm a bit more comfortable with the basics of model railroading (laying track, operating turnouts, ect). Then I'll be able to really get creative with animation and controls on the bottom level while still having an operational top level to enjoy when I'm stumped with whatever technical challenges the intermodal scene throws my way.

TLDR; We're building a single level layout for now, but planning for a double decker if the top level is a success. Intermodal capabilities can wait till then. Let's get good at the basics first.

Reply 1
ctxmf74

"We're building a single

Quote:

"We're building a single level layout for now, but planning for a double decker if the top level is a success. Intermodal capabilities can wait till then. Let's get good at the basics first"

    That's a very wise decision. The second level option will always be there as a backup plan if you finish the first level and want to build more and the longer you wait to build it the better your skills and the state of the art in controls and method will be so it would end up a better layout later. Just having the idea there as a future way to get an intermodal terminal is enough for now.....DaveB

Reply 1
Ivan I

In the meantime...

I took a few breaks while building the benchwork and thinking about the trackplan to play with some engines. Now, you may be thinking, where did you get PHL locomotives from? The answer to that question is one of the reasons I am modelling the line - you can't just buy them stock, you have to patch, repaint and kitbash if you want a roster like the one PHL was sporting in 2005-2010. Since my budget is pretty tight, I scoured Ebay for suitable base models and picked up a Rock Island SW8 (incorrectly listed as an SW9, sigh) for $45 shipped. Coupled with a basic $16 digitrax decoder, it would be the perfect first engine for my PHL fleet. The prototype is pretty beat up and used, so it means that I can experiment and mess up a bit and still have the result resemble the real thing. Speaking of which...

a2feec_o.jpg 73790800.jpg 82679200.jpg 

I decided to model PHL 37... though I had enough photos from 32, 35, 36 and 38 to make quite the fleet. Interestingly enough, all of the engines are different in their details - some don't have class markers, others don't have ditch lights, varying horn configurations, ect - which should be interesting to model. Here's what I started with:

3_153637.jpg 

90% alcohol did a nice job in removing all of the paint and decals so I was left with a fresh canvas:

3_223622.jpg 

Then it was on to the electrical components. I took apart the frame and remade the contact tabs for the motor. These were then wired with leads made from an electromagnetic de-coupler spool:

3_231314.jpg 

Everything was mounted back in the frame and the digitrax decoder was placed in the nose area. Don' worry, it will be isolated form the frame later on, this was just put there for photo's sake:

3_234020.jpg 3_235654.jpg 

For the pickups on the trucks, I was planning to solder armature wire directly to the tabs coming off the trucks. After a series of tests, this proved to be more reliable than wipers and less finicky to set up. Next up: Cosmetic changes!

Reply 2
Ivan I

Adding Details

And so, the first things to change was the number of stacks... The ebay seller had listed the engine as an SW9 yet when I got it it was an SW8... one stack. I let the seller know what they had an error in their listing, but the price was really good and I was satisfied with the condition of the model so there was no conflict. I was adding custom details anyway, so making another exhaust stack wasn't a huge deal.

4_001700.jpg 4_003226.jpg 4_005251.jpg 

Next up were some cab details. In my prototype photos I noticed that the lower left window on the back of the cab was covered up to accommodate the engine number. Additionally I added a small platform for where the horn was (now moved closer to the bell on top of the engine). This was fun as it convinced me that N scale wasn't so bad for small details... I could still add them without having to use a scanning electron microscope during assembly. 

4_231455.jpg 4_233206.jpg 4_233632.jpg 

Reply 1
Russ Bellinis

I noticed that you are modeling 2005-2010.

I retired in 2006, and the last time I was around the PHL was probably 2003 or 2004.  I know PHL made a deal with the So. Cal. Air Quality Management District (a cooperative effort between Los Angeles, Riverside, San Bernardino, and Orange Counties) and the EPA to replace the fleet with low emission diesels and gensets.  All of their new stuff, like the locomotive in the first pic is painted in the old Santa Fe zebra stripe scheme.  The light blue switch engines were left over from the old Harbor Belt Line that was bought out and renamed the Pacific Harbor Line by the new owners.  The new owner is some sort of railfan who likes classic railroad color schemes.  When I worked near their engine terminal, they had an ex-S.P. low nose Gp9 painted in fresh black widow scheme.  They also had an old S.P. tunnel motor still in faded bloody nose.  I don't know when or if the conversion to low emission diesels and gen sets has been completed.  They had a leased gen set in dark green in use when I was there, but I don't know if it is still in use or has been replaced.

Reply 1
Ivan I

More details...

Russ - according to my research, it seems like the PHL has updated their entire fleet to tier 3/4, at least those that are currently in service. As for the older engines, I'm basing much of my modeling efforts on this list - it's neat seeing the history of each engine:  http://thedieselshop.us/PHL.HTML

Not much doing in terms of layout, but the engine is progressing along. I added grab irons and class marker lights to the front of the engine. The hand grabs are made from enamel wire taken from EM decoupling coils. I made the marker lights from standard pins. I chucked them in a drill and filed down their heads. Then I cut the heads off, leaving about 1/16" long shaft so it would be easy to glue it onto pre-drilled holes on the front cowling.

5_004547.jpg 5_005925.jpg 

The next step was adding the horns - these were relocated from the cab to just behind the radiators. These are also made out of modified pins and styrene.

5_025936.jpg 

I bought some conrail blue floquil at the LHS and was really excited to start painting, as evidenced by the second stack. First up were the walkways and handrails. I used a microbrush to apply CR Blue, Grimy Black and Reefer White - for the first time painting locomotive "things" I think it turned out alright. Just need to touch up a few areas now.

5_022542.jpg 

Then I brought out my Harbor Freight airbrush and sprayed the body and the cab.

5_142027.jpg 5_131549.jpg 

Reply 1
Silverwood

PHL

PHL is a great proto choice -  I had the same idea, and have a fair amount of info on PHL.

Just in case, if you don't have this map PDF, grab this;

http://www.anacostia.com/sites/www.anacostia.com/files/assets/PHL_timetable_map.pdf

 

There was an article about PHL in TRP  (http://trpmagazine.com), but I'd have to hunt down the specific issue.   I think it was circa  2003.

 

 

Reply 1
Ed Kapuscinski

PHL 37 Trucks

This is a great thread.

I wanted to mention to you that, since you're doing #37, you can get the proper Flexicoil trucks from Micro-Trains. They did them for their SW1500s, but they're interchangeable. 

Modeling "Early Conrail" in the winter |Visit: Conrail1285.com | Join: TheCRHS.org
Reply 1
Ivan I

Trucks!

Thanks Ed! These are the sort of details I don't even know exist. What's a flexicoil truck? Wikipedia to the rescue! As I said, I know very little about locomotives and trains compared to most on this forum - I just like modeling and try to base what I do on the prototype. It's awesome to learn stuff like this along the way. For my future reference, the link to the trucks is here:  http://micro-trainsline.com/nscale/ntrucks/00302510

Thanks for the help, and if you spot anything else that seems like obvious knowledge to the average modeler, please speak up! Chances are, I don't know about them or their significance.

Reply 1
Ivan I

Adding stuff and things...

Don't worry, we'll get back to the layout soon enough, I've had some breakthroughs in the planning stages and I'm feeling a bit better about the plan for this layout... more on that later. Shoutout to the MRH staff for featuring this blog in one of their emails, it's an honor and great motivation to keep things going.

Where were we? Right, paint. In my rush and excitement to put some paint down, I forgot the window shades, so those were cut from styrene and added to the cab.

5_135638.jpg 5_140651.jpg Then for another quick shot of blue, followed by some weathering. I was going for the beat up, sun bleached, soot covered engines that were present in most of the prototype photos around 2003-2006.

88c001_o.jpg Some grimy black and india ink washes helped achieve the effect... I'm happy with it as a first effort, but there is a LOT of room for improvement. Some weathering powders should help. I'm fairly new to this painting and weathering thing, so it's very exciting.

6_171319.jpg I couldn't resist putting it on a bit of test track and have it pull some rolling stock:

6_212958.jpg 6_213055.jpg I'm pretty happy with that I've got at the moment - I'm sure I'll look back at in a few years and grimace as to how cruddy it looks, but that'll just mean I've gotten better and had a lot of fun learning. I guess it's time to start thinking about putting together some decal sheets for my PHL roster...

Oh, some other details! Air hoses! I was surprised these were left off the original model, but they were pretty easy to put in. I'll have to paint them black and weather them next.

709a38_o.jpg P8170009.jpg P8170010.jpg 

Reply 3
dnapper

Pacific Habor Lines

Believe it was in one of the MR special issues of Model Railroad Planning.  Artocle had some history along with several plans drawn as part of an LDSIG "contest".

David

Reply 1
steitzj

Ivan's layout

Ivan:  Good prototype - if you don't have much space, a switching layout will give you much more "play value" than mere "idiot loops."   That said, you might want to design in at least one continuous loop for break-in testing, even if part or most of it is hidden track.

Also since you mentioned portability, please check out the NMRA and NTRAK modular standards.  You aren't building modules, but you probably want to build sections, and the framework guides for modules might be useful to balance durability and weight in your sections.  

Good luck!

John Steitz

NVNTRAK

T-trak Div.

 

 

Reply 1
tufenk

Led Strips

Dear Ivan,

Take care when soldering the led strips, since each strip drops some voltage due to the thin layer of PCB inside. Solder then in paralel, not in series!

Great work, go ahead!

Guilherme... from Brazil.

Reply 1
Ivan I

Thanks for the comments!

Thank you for the comments guys! 

David - I'll have to look into the archives and see what I can find on that article.

John - Funny you should say that. The past few days, I was really tired after work and would just sit in front of my modules and dream of what I could put on there. I slowly came to the realization that while I enjoy switching operations, there will be times when I just want to sit there and vegetate, watching a train doing "idiot loops". I was thinking of making half of it hidden... and then you posted my thoughts exactly. I'll have to expand on this in the next post with a rough track plan and a better defined idea of the overall design of the layout. I'm pretty excited about these developments. As for the NMRA and NTRAK modules, I drew my initial inspiration from them for my current design. After spending this past weekend working on the modules, I have a few modifications that will make it easier to remove them one by one.

Guilherme - each module is wired in parallel to the power supply. Each module contains slightly less than one full strip of leds, divided into four sections, so I am wiring those back together in series (because that's how they were when they were all one strip). In this application, I don't think the voltage drop is as much of a concern, as it would be if I was using multiple 5m long strips wired together.

 

Reply 1
NScaleRic

Speaking of soldering...

Hi Ivan,

I am captivated by your work...great stuff!  In your blog section about adding lighting, you mentioned you use an Aoyue 937+ soldering station.  What temperature do you use for soldering the SMDs?

Thanks,

Ric

Modeling the Northwestern Pacific RR in N scale (some day, that is...)

Reply 1
Ivan I

Some adjustments to the plan

As I had previously alluded, I spent a lot of time thinking about this layout in the past few weeks. I didn't do much work on the actual model, but that allowed me to distance myself from it and more accurately assess the direction it was headed in.

My first area of concern was the way the modules were mounted to the wall/ceiling. When I first made the modules, I was a bit impatient and took some shortcuts in hanging them from the exposed joists in the ceiling. I don't regret doing this at the time - seeing the modules up and hanging provided a lot of needed motivation to knock out the initial module construction. However, I did intend to fix the mounting situation later on and this proved to be the perfect opportunity. The metal strips were difficult to remove and just looked a bit... how ya doin'... I guess. After trying to remove the modules a few times I realized that this method of hanging them wasn't going to work (metal strips have sharp edges, also a pain to hang them on the screws in the joists). Additionally, I cut the middle two strips a bit too short so they were actually supporting most of the three modules' weight. This, coupled with the small diameter of the screw they were hung on resulted in them tearing a bit - no beuno:

2_173811.jpg 

 If I was to benefit from the modular construction of the layout, I would want to remove the sections from the wall fairly often to work on them on the workbench. Being able to install and remove the modules by myself was quite important. Here's what we started with:

3_211237.jpg 

Pardon my quick drawings... And this was the new and improved wall mounting method: 

3_211314.jpg 

I can't draw straight lines to save my life, even on graph paper - 4 years of engineering courses didn't teach me that. Anyway, I'm going to be hanging 2x4 frames from the joists. These will have three cutouts on each vertical beam, the top of which will have a wedge notch (similar to a french cleat system)

2_141704.jpg 

Each module will have two lengths of wedges attached to the backs of the top valance boxes as per diagram (D).

2_174329.jpg 3_215039.jpg 

There will also be cutouts in the beams to accommodate for a hidden run around track behind the backdrop of the modules. This run around will be connected to the front of the layout with curved modules on both ends as seen on diagram (F). This will allow trains to be run in a continuous loop, or as a possible entry point from cassetes or external staging. 

2_155904.jpg 

The center run around section of track may later be replaced by a motorized train elevator to take trains from the top level to the bottom. I made the wall frames wide enough to support a 33 inch long train on the elevator. Did I mention the plans had room for a second level? Yep! Not going to build it just yet as I'm itching to get a train running, but once I finish up the top layer, the bottom is fair game. 

After the slots were cut for both levels of hidden tracks (there is a provision for the bottom level to have them as well) the frames were glued together with the help of pipe clamps and biscuits. This part of the layout is a bit overbuilt I must admit - however I'm not really expecting to move it and the 2x4s were quite cheap as far as building materials go.

2_165635.jpg 2_184154.jpg 

At the time of writing I have 2 frames mounted on the wall, along with their respective modules and a third in clamps waiting fro the glue to dry. While mounting the frames I had to install and remove the modules a few times and I am pleased to report that I can easily do it myself. The width of the wedge blocks on the modules allows me to shift the modules sideways and reposition them without having to bear the entire weight of the section. This makes it easy to align the bolt holes that connect the modules together.

3_215627.jpg 

I am quite happy with this improvement. The next post should have more info on the track plan, with some important decisions coming up.

Reply 1
Ivan I

Soldering Temps

Ric - thanks for the kind words! 

For SMDs I run the iron at 346-356 degrees. This is with a fine cone tip. 

The wires bigger than 14 guage get a bigger chisel tip running between 360 and 420 degrees.

Reply 1
pierre52

I'm impressed

Ivan for one so young, you have already amassed an amazing array of skills.  Those are some very clever ideas that you have come up with. Wedge interlocks are brilliant but just be careful keeping the posts level. (Ask me how I know this). 

Loving your work and looking forward to further updates.

Peter

The Redwood Sub

Reply 1
apd1004

Nice craftsmanship

I am also impressed at your craftsmanship in building your benchwork, models, and electrical. I get the vibe that a large part of the enjoyment of the hobby for you is coming up with your own designs for things and fabricating parts and systems from scratch. A lot of people don't have the ability to do that or at least to do it well but it seems to me you have found a niche.

Myself, I would have just went with metal shelving brackets and a couple of hollow core doors as a base and then got to the trains. That being said, you are going to get a million "suggestions" on what to do but in the end your layout is yours and If "over-engineering" is what makes you satisfied, then I say go for it. 

Keep up the good work and lets get to some track laying and operation. Modern port and intermodal terminal operations are seldom modeled because it is difficult to represent their size on a shelf, but I'm curious to see what you come up with.

Cheers

Jeff Leslie

My Crooked River Rails blog:  http://crookedriverrails.blogspot.com/

Reply 1
Ivan I

So... Progress!

Thank you for the kind words, gentlemen! It's always neat to see people posting on the blog (and seeing the view counter rise after every post I make). On some days it's what gets me in the mood to work on the layout after work. 

Peter - I made sure everything was square and level when putting up the 2x4 frames. I'd clamp them in place, verify with a level, hang the module, verify again, remove the module, screw the frames to the joists, hang the module and bolt it to the rest of the sections, then check the level again. Sounds repetitive but it all went really quickly and painlessly. I took a lot of time in making sure my cuts and joints for the frames and modules were accurate and it really pays off when I have to align things.

Jeff - You make a very good observation. I definitely could have done this stage a lot faster, however I had a certain look and functionality in mind and I enjoyed the build process immensely. It's true, I love building things more than operating trains, though I have a serious itch to run something right now. As for the port/intermodal dilemma... I'm devoting a 24"x138" area (the entire second level) to an intermodal port scene and I'm still adding a whole lot of selective compression. It just makes you appreciate how massive these operations are in real life.

However, I'm not really thinking about the second level design just yet. First I have to get trains running on the top level. Putting up the final module was a step in that direction. 

4_184948.jpg 

Looks familiar, doesn't it? Yep, I definitely was at this point a few weeks ago, but I'm a lot happier with the execution this time around. Ignore the splash of blue on the rightmost backdrop - I was just messing around with sky colors and that one was a bit *too* blue for my liking. That will most likely be a post in itself. More photos of my new domain:

4_190200.jpg 

That photo made me notice how uneven my backdrop was in the middle module... should be a fairly easy fix. After hanging the last module, I started working on the rounded end modules. I'll call these the "wings" for now. These add 14" of width on each side and extend 1.5" past the backdrop to connect the hidden tracks behind the layout to the front ones. I rounded off the outside corners with a 12" radius for esthetic purposes. I don't think I'll add a backdrop or valance to these sections, and will most likely leave them with minimal scenery - though this might all change when the rest of the layout looks nice and I hate how the wings look. We'll see.

4_194932.jpg 4_220807.jpg 

Reply 1
Michael Duckett

Led Strips

Lessons learned.  Buy the non-waterproof ones.  Cheaper and easier to fix.  Tend to fall off of wood.  Good idea on the super glue at the ends.  I stick them to aluminum strips for better heat dissipation.  Longer life between failures of individual leds.  Don't daisy chain strips, wire them in parallel.  I have also just threaded the ribbon into those plastic tubes that you use to protect florescent light bulbs.  That worked also.  Been playing about with heat dissipation.  They appear to like being in free air or being attached to something heat conductive like metal better than wood or plastic.

Power supples.  Hack an old PC power supply.  They are free.  Plenty of power.

Reply 1
Ivan I

RE: Led Strips

Michael,

All sound advice. I got a very good deal on the waterproof ones so I grabbed them (I had used them extensively for the past 8 years on my quad and hexacopters and I was very happy with their performance). I don't find that my LEDs heat up that much over the 2-4 hour period during which they are on. These are the large LED chips, not the standard size you usually get so maybe there's a difference. I like the plastic tube idea, I might have to play around with them as diffusers if I find my strips draw too much attention to themselves. If I find mine start overheating, I'll have to look into mounting them in some aluminum U channel.

Definitely have some experience hacking PC power supplies (did it for my CNC machine, RC battery charger, desktop power supply). If you're on a tight budget I definitely recommend going that route. I however, was lazy and just opted to pay $25 to get a new one.

Thanks for the advice!

Reply 1
Ivan I

A man a plan a canal panama

(^^^for those who aren't familiar with palindromes, look them up, they're cool)

What I meant to say is we're in the track planning stage! Hooray! 

...and this is where I admit I am hopelessly outclassed by everyone on this forum. With that said, I'm opening up the floor for suggestions. I've got a quick design I sketched on the train this morning (good old SEPTA commute into Philly) that I sort of like but also have no idea how well it would work. Here's the benchwork for the top level:

rackPlan.png 

For those of you following along at home and wishing to contribute, I've included a link to a PDF that you can draw on. 3 opportunities for plans per page, because I'm indecisive and have no idea what I'm doing. Feel free to have a go and show me your take. 

https://drive.google.com/file/d/0B7f3MzEtNPMKMGVHbENUNWI4Qmc/view?usp=sharing

So here's what I had envisioned:

The main purpose of the Left Wing and Right Wing is to connect whatever tracks are on the front of the module with the single hidden track running behind the backdrop. This would probably be a 10-12" radius curve. The wing modules are 14" x 25.5" Their other purpose would be to extend any yard or industry tracks to give me more room for rolling stock, but this is a secondary purpose. As mentioned in a previous post, these will start out with minimal scenery - just enough to look presentable. 

Section A would have the Pier A open air engine facility and part of the adjacent yard. I'd like to have 3-4 tracks for the engine facility and then whatever will fit of the yard. I'm envisioning the yard tracks being located closer to the front edge of the layout and the engine tracks towards the back.

Facility.PNG 

Section B would be where I include a water feature and a bridge, to serve as a scenic break between the engine facility and the industry/s in Section C. My first instinct was to look at the Badger Avenue Lift Bridge... but I'm not sure I would be able to compress it effectively enough for it to look normal on my layout.

Satelite.PNG erAveISO.PNG 

Uncompressed, the span is the same length as one module and I don't really have the room for that. The other option is a location northeast of that, where three/four bridges converge over a smaller (canal?) waterway, there is street running, a barge restaurant and a marina... looks really fun to model.

ridgeMap.PNG Satelite.PNG nnel_780.jpg 

It's just a bit daunting trying to figure out where to fit all the tracks, how things will connect and what can be removed to simplify things (so my layout doesn't just turn into a spaghetti bowl). I'm not terribly confident in my layout design skills to know what I can get away with and still capture the essence of the scene, and get some operational value out of it.

Section C. This is where I plan to have the industry(s?) and have some fun switching. I've got a separate post coming up for that one, so for now I'll just say that I'd like there to be 2-5 tracks serving 1-3 industries.

Reply 2
Reply