Some adjustments to the plan
As I had previously alluded, I spent a lot of time thinking about this layout in the past few weeks. I didn't do much work on the actual model, but that allowed me to distance myself from it and more accurately assess the direction it was headed in.
My first area of concern was the way the modules were mounted to the wall/ceiling. When I first made the modules, I was a bit impatient and took some shortcuts in hanging them from the exposed joists in the ceiling. I don't regret doing this at the time - seeing the modules up and hanging provided a lot of needed motivation to knock out the initial module construction. However, I did intend to fix the mounting situation later on and this proved to be the perfect opportunity. The metal strips were difficult to remove and just looked a bit... how ya doin'... I guess. After trying to remove the modules a few times I realized that this method of hanging them wasn't going to work (metal strips have sharp edges, also a pain to hang them on the screws in the joists). Additionally, I cut the middle two strips a bit too short so they were actually supporting most of the three modules' weight. This, coupled with the small diameter of the screw they were hung on resulted in them tearing a bit - no beuno:
If I was to benefit from the modular construction of the layout, I would want to remove the sections from the wall fairly often to work on them on the workbench. Being able to install and remove the modules by myself was quite important. Here's what we started with:
Pardon my quick drawings... And this was the new and improved wall mounting method:
I can't draw straight lines to save my life, even on graph paper - 4 years of engineering courses didn't teach me that. Anyway, I'm going to be hanging 2x4 frames from the joists. These will have three cutouts on each vertical beam, the top of which will have a wedge notch (similar to a french cleat system)
Each module will have two lengths of wedges attached to the backs of the top valance boxes as per diagram (D).
There will also be cutouts in the beams to accommodate for a hidden run around track behind the backdrop of the modules. This run around will be connected to the front of the layout with curved modules on both ends as seen on diagram (F). This will allow trains to be run in a continuous loop, or as a possible entry point from cassetes or external staging.
The center run around section of track may later be replaced by a motorized train elevator to take trains from the top level to the bottom. I made the wall frames wide enough to support a 33 inch long train on the elevator. Did I mention the plans had room for a second level? Yep! Not going to build it just yet as I'm itching to get a train running, but once I finish up the top layer, the bottom is fair game.
After the slots were cut for both levels of hidden tracks (there is a provision for the bottom level to have them as well) the frames were glued together with the help of pipe clamps and biscuits. This part of the layout is a bit overbuilt I must admit - however I'm not really expecting to move it and the 2x4s were quite cheap as far as building materials go.
At the time of writing I have 2 frames mounted on the wall, along with their respective modules and a third in clamps waiting fro the glue to dry. While mounting the frames I had to install and remove the modules a few times and I am pleased to report that I can easily do it myself. The width of the wedge blocks on the modules allows me to shift the modules sideways and reposition them without having to bear the entire weight of the section. This makes it easy to align the bolt holes that connect the modules together.
I am quite happy with this improvement. The next post should have more info on the track plan, with some important decisions coming up.