Ivan I

It goes like this: I want a model railroad. I'm going to build one. 

1(1).jpg 

Ten years have gone by and numerous designs have been dreamt up, but none of them stuck - except for this one. Join me, as I stumble along (often blindly) in my journey to build a modular N Scale shelf layout. I'm looking at the Port of Long Beach / Los Angeles areas as my prototype inspiration, focusing on the Pacific Harbor Line operations around 2005-2010. 

kPlan(3).png 

Reply 8
Ivan I

Did someone say INDUSTRIES?

So in terms of operations, Section C will most likely be what makes or breaks this layout. Ignoring the possibilities of a second level devoted to an intermodal port scene, Section C is where the PHL makes its money. My first step was to gather as much information about the places PHL serves as possible. This was made fairly easy by the customer list they have on their website. Starting with this, I went to google maps and started finding the places, noting their size, immediate surrounds, number of tracks and other interesting features. While doing so, I also stumbled upon a few other businesses that looked like they were served by rail, all along PHL trackage, so it wouldn't be too much of a stretch to include them on the list. By the time I had finished, I had 43 industries in my spreadsheet. If you are interested in it, I have included it in the link below:

https://drive.google.com/file/d/0B7f3MzEtNPMKUEtkM0VPVnAySEk/view?usp=sharing

Paring it down a bit, I knocked off the intermodal areas and other "large" industries like oil refineries. Here's the list of that I was left with:

iesSheet.PNG 

Applying more filters, I reduced the list of industries to the ones that appealed to me... Some of them picked because of an interesting commodity, others due to size and number of tracks, and some due to the interesting juxtaposition of industry and nearby residential areas. I think it  would be neat to have some houses and cozy small businesses, if only on one or two street corners.

esSheet2.PNG 

I'm going to need to take the list down to 1-3 industries depending on their size. Since they more or less have to be on Section 3, they will have to coexist well in close proximity. I'm not sure if I need to design Section B before C to determine the number of tracks and space available for Section C, or if Section C needs to be determining factor in how the middle module gets arranged. Regardless, here are some satellite shots of the more interesting industries on the list:

lMilling.PNG 

This area contains a group of three relatively small yet varied industries, and borders a residential area and the Alameda Corridor... hmmm... Didn't UP run the Big Boy on the AC? 

onMarine.PNG 

Above you see Ancon Marine - their loading yard borders a fairly nice residential area, and seems to have a nice range of rolling stock possibilities. Certainly less compact than the industries in the previous image, but still a viable option.

orsCargo.PNG 

Contractor's Cargo is just a neat industry to model... It's only got one track, but is that a schnabel car I see? They move oversize loads, so I'm not sure this would be feasible on my small-ish layout. Figured I'd include it. Also has a short stretch of street running.

anchoLPG.PNG 

Rancho LPG is the smallest of the petroleum facilities and is surrounded by some nice trees, grass and a Home Depot... paying homage to the place where I got most of the materials for this layout. Also, tank cars look cool in my humble, uneducated opinion. Still probably too big for Section C.

USBorax.PNG 

If I was to pick one and only one industry for Section C, I would pick the US Borax plant. There are a lot of tracks and most are in tight corners. Covered hoppers are fun to weather, or so I've heard. So many choices, so little time, space and money. Sigh. The model railroader's dilemma. Here's to not having this layout turn into a spaghetti bowl of track.

 

Reply 1
Ed Kapuscinski

Happy to help! I'm an

Happy to help!

I'm an SW junkie myself, having have grown up with them in Philadelphia. 

Modeling "Early Conrail" in the winter |Visit: Conrail1285.com | Join: TheCRHS.org
Reply 1
Bremner

MTL parts....

If you email Micro Trains, you can place an order for just the truck frames....or you can buy all of the body parts for the SP SW1500 

am I the only N Scale Pacific Electric Freight modeler in the world?

https://sopacincg.com 

Reply 1
Ivan I

Wings and more things

Ed,

Thanks for the offer - I may be shooting you a PM or two in the future if you don't mind. I'm from the philly suburbs myself (currently writing this post from across the street from city hall) so I've got a soft spot for them as well.

As for track planning, I've been using google maps and their measuring tool to convert landmark sizes to N scale. This helped me determine how much I needed to compress things in order to fit my modules and how things would fit. More on the track plan in a later post. 

Even without a finished track plan, there was still plenty of work to be done on the modules. I sanded, painted and glued the hardboard fascia to the left and right wings. Then I drilled the mounting and wire access holes so they could be mounted to the ends of the straight modules. I'm happy with how these turned out - they offer me a good bit if room and make the layout look a lot nicer.

6_235530.jpg 0_190651.jpg 

Regardless of the trackplan, I knew I needed to adjust the straight modules in order to implement the hidden run around track (that may later become the site of the train elevator to the second level). I would have to replace the current (cut down 2x4) pine braces that connected the top and bottom boxes of each module with lower profile sections of 0.5" thick ply. At first I had some concerns about the loss of rigidity with the new design so I made the plywood pieces 4 inches wide. After installing one of them, it turned out to be more then sufficient.

0_193437.jpg 

With the previous design, the pine braces were 1.5" thick - the new plywood braces are slightly under 0.5". This leaves me with about 1" of room behind the module to run a single track. Assuming I use a 1/8" thick hardboard guard rail on the outside of the track, this leaves me with 7/8" for the track itself, which is wide enough for my widest well cars with some room to spare. This area will be a simple straight track, so I don't have to worry about overhang in turns or derailments. 

Reply 1
dats475

Hello, I've been following

Hello, I've been following your excellent thread. I'm also living in northeast area and trying to model LA in N scale. Your thread is very inspiring for "remote location modeler" like me. I just want to say thank you for sharing your ideas! I wish I had woodworking skills of yours.... Dats
Reply 1
Ivan I

Thanks for the compliments!

Dats,

Thank you for the nice comments, I'm glad people are enjoying the thread. I'm largely doing this to document the process and to have somewhere to look to measure progress, so it makes me really happy to see others check in here as well. It serves as nice motivation to keep me going through the unsavory parts of the layout construction process. I checked out your blog and I must say I'm a bit jealous of your layout - it is very well executed and looks to be quite fun to run on. The videos are pure gold as well. As for the woodworking skills...

I consider myself lucky in that regard because I started early. At around 5 my dad let me work by his side in the workshop in our basement, and by 8 I was saving up the money I earned walking dogs and mowing lawns to buy used power tools. Never really cared much for TV or video games, so most of my free time and money was spent in the shop learning. I'm 23 now and plan to move out from my parents house in a year or two, but I have a sizeable collection of tools that are mine so I don't have to start from scratch. These resources allow me to build my modules in a very specific way - one that should ensure their longevity and ease of operation.

Speaking of the modules, I finished up the modifications on Section A to mount the hidden tracks. I added inch-tall spacers between the vertical supports to close off the gap that would result between the tracks and the back of the module. 

1_172330.jpg 

While the glue was drying on the module, I started work on the tracks. I had some scrap pieces of .5" thick plywood lying around so I laminated them together to remove the warping and add some thickness. This would become the 7/8" wide platform for the hidden tracks.

0_190638.jpg 

After that dried, I glued on a 1/8" thick hardboard guardrail to keep the trains from hitting the ground in the unlikely chance that there is a derailment. 

0_203340.jpg 

After letting the glue dry, I painted the plywood and the inside edge of the hardboard with grey primer to seal it and provide a uniform surface to work with when installing the track. In order to keep the ends of the tracks affixed and aligned, I made plates out of a PCB the same thickness as the ties on the code 80 flex track. I made sure to cut a large isolation gap between the two sides.

0_230815.jpg 

Then I cut off the first three ties from the flex track and soldered the PCB plates to the rails. In doing so, I made sure the rails were properly spaced. 

0_231258.jpg 

A quick mockup of the hidden tracks - gluing tracks and wiring feeders up next!

0_232145.jpg 

Reply 1
Ivan I

So here's something I came up with...

So I've spent close to a year "working" on this layout and I haven't had a track plan. With the benchwork construction coming to a close, it was time to assemble my list of wants and needs, pile in the research done about the operations in the area, and then try to fit everything in the space available. Ooof. Sounds like a recipe for your typical layout planning disaster. I started out with paper and pencil, because I wasn't too comfortable with any CAD track programs (yet).

3_013541.jpg 

From that point, I needed to be sure I was using the correct minimum radii and the proper angles on the turnouts, so it was off to the computer to learn SCARM. At first nothing made sense (I'm coming from using the adobe CS suite and Solidworks) but after watching a few tutorials I realized that everything was way simpler than I was used to. Four hours after downloading the program, I had this:

rackPlan.PNG 

Then I exported the drawing and opened it up in Adobe Illustrator (which felt like coming home after a long trek in a foreign land) and got to work turning things into vectors. I also made a few minor changes to some of the tracks so they would better match the prototype:

rackPlan.png 

Then I added roads, bridges and structures - all of this was done on separate layers so I could toggle between them to see the information I needed.

rackPlan.png 

Combining the two and adding some labels, we have what can be considered a (somewhat refined) rough draft of our layout (clicking on the image to expand it will yield something a bit more readable):

rackPlan.png 

Here's the part where I get to explain myself and my poor life choices. Well, actually I just explain the features of the layout. The minimum radius is 12" - most of the tight industrial switching will be done with the SW1200s and they look at home on those curves. Yard tracks have #6 handlaid turnouts, while the reversing loop has #8s to accommodate the intermodal unit trains that will need to be pulled from the yard and around the loop to the hidden train elevator and down to the lower level. The four turnouts near the industrial area in Section C (the rightmost rectangular module) will be #4.5s which seems fairly close to the tight tracks seen in the prototype. A total of 14 turnouts for the top level seems... doable for my budget. I have hand laid 2 #8s  and 2 #4.5s already and I find the process very rewarding and enjoyable. 

If you haven't been keeping up with the blog and are thinking - sigh, another idiot loop layout - well, I tried to focus on operations but I guess I chickened out. In the end I still want to have the option to space out and stare into my imaginary miniature world while a train runs around in circles. Granted, I will definitely want to have the option to do some switching and learn more about car classification systems and way bills in the future. The reversing section is there because I will need to turn around large trains coming from the lower level, and it increases my layout's operating potential without looking too obvious/out of place.

Enough about technical specs - let's look at some features. In Section A (leftmost rectangular module) we have the open air engine facility (A) with four tracks to display some of the colorful PHL fleet. Below that there is a 5 yard track, with enough space for 33" long trains. This is the planned length of the train elevator, and therefore the longest train length for the layout. The regions marked (M) are still undedicated - I'll figure out what scenery goes there when the tracks are down and trains are running. Near the top you have the reversing loop connecting to the hidden loop track through the fascia via #8 switch. I'm going to have to test this area a LOT to make sure it functions reliably - derailments here will be a PITA to manage. 

Section B is pretty open in terms of track - just the reversing section and the main loop. I removed many of the tracks from the prototype scene (the dual bridges are now single track, not double) to make the area a bit less cluttered and save some room for scenery. Building (B) is the marina office and building (C) is the barge restaurant. I think it will be fun building the boats for the marina and is should give the layout the distinct Long Beach feel. Up top, area (L) will most likely be a fenced off simulation of refinery operations of some sort. Obviously I can't fit an entire facility in there, but a some pipes and storage tanks + a photo background should hint at the industry. The one thing I'm not entirely sure about with Section B is the elevation needed for the twin bridges crossing over the canal and road. I think I should have enough room to get that elevation in between switches... otherwise we might need to get a bit creative.

Section C is where the industries are on this level. The large buildings marked (G) are warehouses, the lower of which may have a loading dock for boxcars (still haven't decided, as cars left here would block the reversing loop) The area marked (H) is Cargill Milling, which produces sugar and syrups. Across the street is (I) which is PCCR USA which produces polymers and plastic pellets. Next to that are two non-rail served industries, Foytt Shipping and Auto (J), and Toro Pallets (K). The upper left side of the module contains some residential/commercial houses. This close proximity to industry was a neat aspect that I wanted to carry over from the prototype. (D) will be houses and garages, fenced off. (E) is a small used book store named Kat's Corner - I'm adding that for my girlfriend who does her best to understand my eclectic hobbies and supports my trains addiction. She's a fan of books and book stores so she gets one on my layout. (F) will be a small cafe or diner. 

So that's the plan. See any issues or possible improvements? Please speak up! Want to draw up your own? Please do, the template is on the previous page. This is the first time I've designed anything train related so I'm only pretending to know what I'm doing, and quite poorly at that.

Reply 1
Bill Brillinger

Oh No!

It's a loop!  (lol.  Theres nothing wrong with that.)

I like your plan Ivan. Nice and simple.

May I suggest in the industrial area, move the turnout that services I and J across the road to allow more cars to be spotted here.

img.png 

I look forward to seeing your build of the train elevator. With your metal and woodworking skills, I'm sure it will be first class.

humbs-up.jpg 

Bill Brillinger

Modeling the BNML in HO Scale, Admin for the RailPro User Group, and owner of Precision Design Co.

Reply 1
Ivan I

A few adjustments

Thank you for the suggestion Bill - I agree. It will also be an interesting exercise, modeling a turnout in the street.

I talked to my friend Will from Penn State today and showed him the track plan and he had a few suggestions from an operations standpoint. I added a run around track to the bottom bridge, taking the yard off the main loop and providing space to do some light switching without clogging the main loop. I also added an industry track to one of the warehouses. Sure this increases the rail density of that area, but it's definitely a plausible configuration and it adds another industry. The switch orientation also adds for some more interesting switching maneuvers which will probably help keep me satisfied when I'm operating the layout.

kPlan(1).png 

Thanks to all the advice so far, I'm starting to like this plan more and more!

Reply 1
Bill Brillinger

added switchback

with the added switchback, I'm thinking you'll want a run around somewhere near the industrial area too.

I would place that turnout so that it's points are not in the pavement, but perhaps just before it.

Bill Brillinger

Modeling the BNML in HO Scale, Admin for the RailPro User Group, and owner of Precision Design Co.

Reply 1
Neil Thomas Cadmaster

I'm with Bill on the two

I'm with Bill on the two tracks going into Bld. K. I would slide the turnout to the left to clear the road then instead of two tracks at that bld have the diverging track curve to either parallel the road or run it in the street and then curve across the road into the "yard" of bld. K.

 

Neil

Reply 1
Ivan I

1 or 2? Both?

ryTracks.PNG 

Thanks for the suggestions gents! Bill - track (1) is my idea of a possible runaround. It would replace the diverging track in industry (i) and allow the locomotive to circle around a cut of cars in the industry tracks using the main loop. I think this is what you were suggesting? Learning on the fly here.

Neil - Track (2) is what I assume was your suggestion? (just pretend that the current diverging track is no-longer pictured, I had to leave it in the drawing to illustrate option 1) I'm not sure how I feel about it, I'll let it sink in and contemplate things. That area is starting to get pretty track-heavy, which makes for fun ops but also tends to degrade the overall esthetic (in my admittedly inexperienced view of things). Hmmm.

I appreciate the help guys, I really do! This is an area where I'm not as confident in my abilities (because it's my first venture into layout design) and your suggestions make this a lot more fun. 

Reply 1
Neil Thomas Cadmaster

My vote would be for the

My vote would be for the adjustment to track 2 going to ind K but to leave the reversing loop out of it. If you have it in for as you say a run around it could not be left as an industry track. I think the area would be better suited as the turnout with the straigt leg going to ind J and the track 2 going to ind K

Concern over track density v scenery; Run the switchback track into building G Larger building with inside track could be reefer loading/unloading or chemical. Look around that area and I am sure you'll find a prototype. If not there look at the LAJ trackage. 

Neil

Reply 1
Eugene Griffin EGRX

Great plan

Hello,

Have you considered placing a small run around to the left and right of the main switch for the industry area?Maybe starting it in front of the right hand building G and ending on the left of the street near building F. This run around would only need to be large enough to hold all possible cars for the left hand building G trailing point siding.

Alt1.jpg 

Track (2) , wow, it has great potential to model street running and maybe adding another siding close to building H, not sure if there is an exact match for this on the prototype, however, one of the shown prototype pictures seems to hint at this.

Track (1), hmmmmmm.

It's a shame that the run around track on the bottom bridge means the bridge no longer follows the prototype pictures, would have been a great feature model from the prototype. Have you considered placing the runaround switch on the opposite bank of the river before the bridge and adding a yard lead that terminates at the river or maybe crosses the center road?

Alt%202.jpg 

Great thread, hope you continue to post.

Thanks

Eugene

 

Reply 1
Bill Brillinger

Getting The Run Around

Ivan, I would not do #1. It will be tedious in operation and it kills of one of your industry spots.

Here's my suggestion, and I like the street running idea too

rackplan.png 

Bill Brillinger

Modeling the BNML in HO Scale, Admin for the RailPro User Group, and owner of Precision Design Co.

Reply 1
ctxmf74

"Here's my suggestion, and I

Quote:

"Here's my suggestion, and I like the street running idea too"

  I like Bill's suggestion. I'd try to move the siding farther to the right so cuts of cars on it won't block the road. The right turnout could be moved to down near the mainline and the left turnout to the edge of the road( and if more length needed move the road left a bit). The street running is a nice touch, the corner of the H building near the turnout could be nipped off for the curve ,then run down the centerline a ways and curve into a building at the K site. Addition of a wye off the street spur could also let the track on the left side of building J run parallel to the left wall of the building and leave a single spur for the I area.....DaveB

Reply 1
Bill Brillinger

Round and Round

Good point Dave B... Let's make the run around long enough to leave a good sized cut on either side.

plan%202.png 

Bill Brillinger

Modeling the BNML in HO Scale, Admin for the RailPro User Group, and owner of Precision Design Co.

Reply 1
Eugene Griffin EGRX

Long Run Around

With a shorter run around, as with Bill's first sketch, the industry switcher should be able to complete all switching without entering the main loop.

With a longer run around, the industry switcher must occupy the main.  Operationally interesting for the industry switcher, if you are considering a continuously running main line train.

 

Eugene

Reply 1
ctxmf74

"With a longer run

Quote:

"With a longer run around, the industry switcher must occupy the main."

    Yeah, The run around turnout could be placed on the side track near the right end of building G so the switcher can stay off the main. I don't know if keeping the "main" clear would matter in a switching district, I guess it depends on the individual location........DaveB 

Reply 1
Ivan I

Some thoughts and an update

Here's what I've come up with based in your input so far:

yTracks1.png 

Since the double bridges are elevated (bridges need 1.1625 inches clearance from the top of the roadway) there needs to be a grade leading up to them. At the moment, the length of the grade is about 11 inches, making it 10%... not good. Time to shift some things around and scale the bridges a tad:

yTracks2.PNG 

Now we're at a grade run of around 20 inches, so it's down to 5%... still a tad high but it should be manageable now (I think). Worst case, I add some elevation to the road running between buildings (D) and (G) and extend the grade another 3 inches. As for looping the yard lead up parallel with the canal and returning the bottom bridge to a single track - the new track wouldn't have enough room to fit longer trains (25+ inches long) so I think I could sacrifice a bit of prototypical accuracy in the scene. You may have noticed the double bridges are a double tracked main in the prototype - I simplified it down to one track on my layout to save space, and I didn't really have a need for the double tracks operationally. I don't know, still on the fence about that one.

So the diagram above is the current plan - in light of the new changes, any further suggestions? Sorry if I missed any that were given previously, there were quite a few.

 

Reply 1
Neil Thomas Cadmaster

If you need 1.1625" between

If you need 1.1625" between the road and bottom of the rail bridge then why not consider dropping the elevation of the road some (slope down away from the front of the railroad) if your able to drop it .58125 just over 1/2" then your reducing the needed grade on the double bridge?

Neil

Reply 0
Eugene Griffin EGRX

Never enough space

Could the industry run around be on the upper bridge? Returning it to the prototypical appearance.

Still great looking plan and will enjoy seeing it's construction.

Eugene

Reply 1
Ivan I

Starting to settle

Neil,

Good point about the elevation - everything is relative. I'm sure I can play around with road heights to lower the grade. I'm thinking I'll cover the modules with 1/4" craft foamboard (the cheap white boards you get at the dollar store) so it should be easy to introduce small elevation variations where needed. It will also help bury the ties a bit when I do grade crossings and street running.

Eugene,

I think I'd prefer to keep the run around closer to the industry tracks, so the engine doesn't have to travel to the adjacent module in order to swap ends on a cut of cars. Besides, I don't think I would have turnouts on the grade leading to the bridge, so that makes that option quite limited. I have thought of that route before (it was my first idea) but it didn't really appeal to me at the time.

I think I'm starting to settle on the plan I have - I may make some small changes here and there, but for now I'll go with the plan outlined below. Thank you all for the help - this is a much better plan than what I had started with. As always, if there are other suggestions, I will consider them.

n%282%29.png 

In terms of physical progress, I left off having soldered together long runs of track for the hidden main loop straightaway - now it was time to solder feeders and mount the track to the back of the modules. I glued the track to the plywood bed using liquid nails and then screwed the plywood "ledge" to the back of the module.

1_202138.jpg 1_203315.jpg 

I'm going to add some styrene pieces near the ends that act like rerailers (modeling them on the Atlas grade crossing pieces) to make the transition smoother from module to module. I'm also going to have to add some sort of cover or roof over these hidden tracks - I hung the module up once to test for interference between the new addition and the mounting rails (happy to report there was none) and a bunch of crap from the wall and ceiling fell on the tracks.

1_204353.jpg 

One finished, two left! I'll have to connect the feeders to a track bus in the future (I haven't run the bus yet). I'm planning to add occupancy detection for each section (current sensing for the blocks, optical for the points of the hidden turnout). In the meantime, I did a quick experiment with Google Streetview and backdrops. I "went" to the Pier A engine facility site, which no longer exists and took a screen grab of the area and printed it out, no fancy processing or settings. I was just curious if this would be a viable method for me to get backdrops and it seems to be pretty good. Naturally the items in the foreground would need to be removed or minimized. The slight blur due to low res streetview photos seems to be working in my favor - it makes the eye focus on the model and just works towards adding atmosphere to the scene. I'll have to experiment with this a bit more, but for now it's definitely a viable option for my backdrop.

2_183438.jpg 

Reply 1
Oztrainz

Seconding Neil's idea

Hi Ivan,

Some height-saver and grade-flattener ideas for the higher bridges,

Neil has offered - put a dip in the road - now provided the bottom of this dip stays a bit above river level, you have a dip that might need depth makers when the river is up and the river backs up though the lower level street drains. Another scenic cameo?

Another idea allied with the dip is to reduce the height of the bridge pylons and fit the bridge with "restricted height clearance" signs and "High Vehicle Detour" signs.  Add warning light to the bridge. Plenty of that goes on in the real world. It kind of says the tracks were here first and the road was shoe-horned later. Growth in road vehicle size over the more recent years has caused the restricted height problem.

If you add these 2 ideas of sinking the road as low as possible and reducing your abutment height as low as acceptable, then you should be able to get well under 5% (1 in 20). 

As for road vehicles, they can pull a 5% = 1 in 20 easily and go to grades like 12,5% (1 ni 8) or 17% (1 in 6) for short distances. Some "Steep Dip - Trucks Engage First Gear" signs also might add to the scenery.

The trade off would also be in the height of the bridge over the river - I'm not sure if you are planning any barge/tug traffic, but they might have to be fudged to fit the bridge. Navigation and channel markers would be an additional feature to add to this bridge if you are planning barge traffic   

I'm not sure how much experience you have working with modular sections. Some tips for working with getting your tracks across module joints:

Use PC board to secure your tracks at the module joint as shown in the next photo.

This both protects the rails at the module joint and gives you a secure anchor point for your tracks as they jump the module joint on each side of the joint .

There are some additional tricks to working with this method that give almost bulletproof alignment across the module joints. If you want to go with this method, we can discuss further on this thread or maybe elsewhere on te forum if you wish. 

 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 1
dkaustin

More street running....

I am not a layout planner, but I have an idea.  It has to do with the comments about street running.  Just thinking that you could add another turnout on the street.  Put it in right after the curve where the track begins to run straight down the middle of the street.  Lay track up the street in the opposite direction to the building across the street from building G.  That would allow your switcher to reverse direction to head back up the street to the building across the street from G.  You will end up with a diamond crossing too.  It the building across the street from G has a loading dock outside, parallel to the street, the street running track could swing off the road when it gets to that point.

I hope the description above makes sense.

Den 

n1910(1).jpg 

     Dennis Austin located in NW Louisiana


 

Reply 1
Reply