trainzluvr

Please give me some feedback on these three options for my staging level (31" above the floor); or if there is another option I did not consider.

#1

 

#2


 

 

#3

One square is 1 ft. Train lengths are ~7-8 ft. although I could probably run longer through trains.

The staging track will be connecting to the double track helix (one end to the inner and the other end to the outer loop in #1 and #2). Potentially I will double track the connections between the ends of the staging and the helix so they connect to both loops, and also put cross-overs in between.

For added functionality, the peninsula will serve as a turn-around loop so the trains can be re-staged easily. I'm also thinking to add more track to the peninsula for additional staging (either stub- or double-ended) as seen below, with different track densities. This is based on the idea that there's never enough staging track... 

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
trainzluvr

@dark2star - new drawings

I have two "sketches" to show, _wip3 is newer than _wip2.

In _wip2, Yard 2 has not been connected to the Green Line (outbound) yet (not sure how yet), but offers a nicer train movement from Yards 3 and 4 (Yard 3 outbound and Yard 4 inbound simultaneously, but not in reverse).

In _wip3, all yards are connected, but Yard 3 and 4 share the outbound connection, while Yard 3 can go outbound simultaneously as Yard 4 is inbound.

 

Not sure which one is a better option to proceed with. I'm kinda trying to accomplish a number of things:

  • use pre-made track geometries instead of having to hand-lay it
  • reduce the complexity of trackwork as much as possible, while keeping things moving
  • maintain 24" minimum radius (this one is very tough in my narrow space and might require hand-laying turnouts)

Thanks for the overly long posts, they explain things better.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
dark2star

Starting to like it even more

Hi,

looking at your latest updates, I think Yard 1 is perfect. It will serve you as outbound yard, however it is only connected to the outer helix track in the outbound direction - the "interlocking" was slightly more flexible in your previous version.

For Yard 2 to serve as your inbound yard, the right side of the yard needs to be connected to the red line. Otherwise your trains from yard 2 (inbound) won't get to yard 1 (outbound).

As for yards 3 and 4 - I like the right version better - it is simpler. Anyway, both serve fine. From an operations point of view, those yards serve two purposes. Mainly they are about storage. For which you might want the trains reversing into the yard tracks (which means trains enter and leave the yards via the green line). To a smaller extend they serve as overflow for the inbound yard, pulling the trains right into the yards 3/4 from the red line. The trains stored as overflow need to be reversed upon departing the yard.

Yard 5 is more for storage for less-used trains, but the way you tied yard 5 into the red line seems to be perfect. Arriving trains will always reverse into the yard and will be ready for departure right away.

In summary:

  • look at the interlocking at the bottom of the helix - I did like it better in the previous version,
  • connect the right end of yard 2 (arriving) into the red line,
  • then you should be fine.
  • Anyway, print your track plan and use colored pencils to run "virtual" trains through all of the staging yard. Have trains arrive from the helix (your choice if the helix is bidirectional or not), run them trough receiving, storage and departure yards. Check what happens if there is a second "virtual" train somewhere... And find out which tracks you have to keep free of stored trains (hint: red and green lines). Also check where trains are running in opposing directions on the same track - which you want to avoid.

As you've drawn it (with the two modifications), I think you'll get the optimum use out of your storage level. Trains will always run "helix - red line - green line - helix." You can have trains following each other closely.

I think the reversing move into yards 3, 4 and 5 will be okay, especially with that nice receiving yard (2). Which allows you to do re-staging at a convenient time. Should there be a train in there that is in the wrong orientation, just reverse it back into the red line and run it to the departure yard (1) prior to its departure, so again, no extra moves for re-staging other than one short reverse move into or out of the stub-ended yard.

Have fun!

Reply 0
trainzluvr

Update

I worked some more on the plan, although today I started having a feeling that all of this looks way too complicated...but how to simplify/optimize?

I removed the Yard 5 for now, as I'm not too sure if it makes sense to keep it or not. I cleaned up the helix interlock as well as made a connection to the inbound (Red) line for Yard 2 on the right side.

I also re-adjusted Yard 1 and Yard 2, shortening the former and lengthening the latter so that they are close to equal.

Yard 2 still does not match Yard 1 in length - is that going to be a problem?

As I wrote before, I'm trying to build all of this with off-the-shelf turnouts. I'm still bemoaning whether I should hand-lay my own turnouts as I can't see the real savings in doing so when it will cost time and effort (~1 hr per turnout).

The benefit would be more cleaner and nicer track arrangement, that fits the space with correct diverging radii, lengthening the key tracks...

All of the above track is PECO Code 100, which I believe is the most robust and cost effective solution.

I'm still open to other ideas as well, how to utilize the space in the lower right for example. Once the middle deck goes up, it will become harder to work on this lower deck ( < 12" clearance).

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
dark2star

Very nice

Hi,

yes, I think that's a very effective staging yard(s). You'll have lots of storage and there isn't any overly complex track work. Traffic flow through the staging yards is straightforward. By running trains one-way around the yards you'll get a lot of trains through there.

If you want to scratch build a few turnouts, you can do the ones that give you the most improvement in track geometry, but that's an option you can decide on.

Remember to install a light at the crossover at the foot of your helix, so you can easily inspect departing trains. A set of rerailers would also be useful there and it seems you have the opportunity to put them between the crossover and the helix?

As for the corner for yard 5, it should be fairly easy to retrofit later on. The only change to the tracks is the addition of a single turnout. You can leave the bench work away right now. Create some templates for the bench work if you feel it may be helpful and check if there's an easy way to attach the supports to the wall/floor. If you need the yard at a later point in time, you'll be ready for it. You can build the track outside the layout room and put the finished panels in, avoiding working in a narrow space below the layout.

One final question remains: Do you like the design? Do you feel confident it will serve your needs?

Have fun!

Reply 0
ACR_Forever

if you

want to improve yard 2, maybe play with a ladder in which each switch is placed at the diverging leg of the former, which naturally forms a curve (You've done this, sort of,  at the throat of yard 4).  You may not have room to fit this in, though, given the rest of the geometry on that curve on the right hand side.  It won't improve the yard much, however, it's just one thing I always look at when I see a compound ladder like what you've drawn terminating in a single track which then curves around - the curve is more easily formed with the switch ladder.

As for Yard 5, put in the switch that leads to it now, but don't lay it.  With the switch in place, you'll be all set to add the yard if you decide it's necessary.

As for handlaying, a hidden staging yard isn't the place  to learn this art.  Build it with Peco 100s, check all the guaging, ensure the track is bulletproof.  Run it for a winter, even if you just put a slab portable yard above it as the "layout".  With 12" clearance, you don't want to be doing anything extensive once the upper deck is in place.  Trust me.  Your eyesight and manual dexterity will never be any better than it is right now, so work on the staging while pretending the upper deck is in place, to ensure it's even practical.  My staging in my previous basement was an achilles heel that eventually doomed the layout.  My new staging yards will be in a separate room, with 16-20" separation (30", 46", 62") to ensure they won't become another headache.

Blair

Reply 0
trainzluvr

Another update

After incorporating your suggestions, here's another update:

Yard 2 looks neater now, although I still might go back and move the middle ladders to re-adjust the track lengths between Yard 1 and 2.

I put the Yard 5 back in and also added the Atlas re-railers at the base of the helix. Also added the correct helix shape and track radii.

I altered the throats of Yard 3 and 4 with a use of a double-slip switch as it shortens the throat and does the same job. But the curves are kinda wonky in that whole area, and the crossing between the two yard approach tracks is...interesting, to say the least. I fear there would be issues in that whole area due to polarity reversals which might not be solvable even with fast electronics because of how short all those tracks are. I'm not really sure at this point.

Your suggestions are appreciated, as always.

EDIT: Whether I like the design or not...well I like aesthetics and beauty, and this design both has it and lacks it in some spots. Symmetry is lacking due to tight aisle curves for example.
Is the design workable, I don't know. Will it serve the needs - I sure hope so. Many tracks are 150% of the planned train lengths, which should allow for longer pass-thru trains and increased capacity.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
eastwind

I hesitate

I hesitate to comment at all because I have basically zero useful experience, and because it seems you're nearly converged on a plan, but it looks to me like you've got a double slip switch right in hole in the wall between yards 3 and 4. What I've read on here is that those double-slips are nothing but trouble, and you've put it in a particularly hard-to-service location, so that seems contra-indicated. 

Some questions:

Are you making it a requirement that two trains be able to simultaneously enter or leave yards 3 and 4? Do you need that capability?

Would it be sufficient if the green line is the only way into yard 3 and the red line is the only way into yard 4? 

Is continuous running a requirement? (where a train comes down the helix, runs around the green and red lines and then right back up the helix without having to stop or back up)? Because if you're concerned about aisle width, you could just make the peninsula a stub yard and add a wye that backs into yard 5 to turn trains around (but that eliminates the continuous option). I think you had such a wye earlier but dropped it because you didn't need 2 ways to turn trains around. Even if the peninsula has a loop on the end for your main level, not having a loop on your staging level might give you more hip room in the aisle. 

You can call me EW. Here's my blog index

Reply 0
trainzluvr

All good observations

eastwind,

never underestimate the power of observation. It does not need experience but a "keen" eye, and many times experts might miss most obvious things that people who are not experts would point out right away.

I am by no means an expert either, and I believe in what I said above. More eyes means more ways to look at things, and work out potential problems before something is committed into real world.

A number of people here said that double-slips could be trouble, but I do find them convenient to use due to lack of space. Even prototype will use them (extensively) where the track arrangement dictates it (we have dozens of double-slips here in our Union Station in Toronto) despite the costs needed to maintain them.

I will re-think my choice of that double-slip in the peninsula wall, it's a real unfortunate location, and the space is tight.

Yard 3 and 4 offer simultaneous in and out only when a train is leaving Yard 3 and another entering Yard 4. The opposite does not hold because the tracks cross. I don't know how to resolve that, and I never thought about it being a requirement, more of a happy coincidence that this happened at the first place.

I have been following dark2star's advice where Green line was outbound and Red line was inbound.

Could Yards 3 and 4 connect to their respective lines only? Yes, but then Yard 4 couldn't end on the outbound track until the helix crossover, blocking the inbound track for a long period of time. Similar event would happen for Yard 3, except that it would have to cross the entire ladder for Yard 2.

Perhaps this could be solved with a double-crossover before the Yards 3 and 4, although at a first glance, it appears that geometry would have to be hand-laid because it curves. All of this needs more contemplation before a final commitment as clearly there could be issues and potential for better solutions.

Regarding the loop in the peninsula, I would not gain much by removing it on this deck, as I have 2 more decks above it that require a loop around at the same or larger radius.

Thanks for the comments and don't hesitate to post more.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
ACR_Forever

could you

resolve some of your yard access issues by elevating one set of yards, e.g. 2/4, by 4"?  If you really desire cleaner access, that might be one way to achieve it, and in the process reduce the number of switches required. Maybe try raising the pair and eliminating all interconnects between that pair and the rest, then consider what interconnects you desire and work at producing them with ramps at appropriate locations?

Just a thought.

Reply 0
dark2star

Got nothing to add to your latest drawing

Hi,

I got nothing to add to your latest drawing. All the connections are there to access all of the yards easily and quickly.

While I agree the right side connections (between yards 2, 3 and 4) are somewhat less than elegant, they'll serve. The position of the double slip switch "inside" the wall is not perfect, however you could just pull that (and possibly an adjoining switch) to the top of the wall. I'd imagine that the twin connections between yard 3 and the green line plus the twin connections between yard 4 and the red line are probably not necessary. If you keep either, you can probably drop the other. However having both yards connected to the red and green lines is good.

I think there's a clear route for trains into and out of every yard track, even taking into account that some trains need to be turned. You should be able to group turnouts in a way that controlling them is a matter of selecting the red or green line and selecting the yard track (independently).

Finally, as Eastwind mentioned, there might be a car length to gain from yard 2's right throat, but that will not change the rest of the operations. It will mean an hour or two with your track planning software, however.

There's always a detail to optimize. I found that you have to get the overall design right before optimizing the details, otherwise you'll end up over-optimizing one thing at the cost of others... Now you've got the overall plan, trust your feelings as to "aesthetics and beauty" - this kind of feeling is usually a good one

I'm glad you seem to like it overall, and I think you'll have a staging level that will serve you well.

Have fun!

PS: I just took a look at some of your earlier designs. It's an interesting change that took place... You've marked the arrival and departure lines (red and green), you've worked on traffic flow and the peninsula tracks got lengthened. But remember it's your railroad and you have to like it.

PPS: I wouldn't be surprised to see some more changes between your latest drawing and the yards you're finally building. It would be interesting to see the result of what you're building

Reply 0
ctxmf74

Density /complexity?

  This looks like way too much staging for the room size, even considering a double deck layout above. Where are all those trains gonna go and how will you create any realistic scenes if the room is crammed full of track? The only thing this brings to mind is a big city commuter operation with lots of short trains on close headway. I couldn't find the actual layout plan so maybe it is a city? .....DaveB

Reply 0
trainzluvr

Handlaid turnouts; density...

I am still contemplating to handlay some turnouts, strategically along the right side. The default PECO curved turnout (30+60") does not have a matching geometry to my space and I need tighter curves than what it offers, as my aisles are only so wide.
Walthers has some nice curved turnouts, but good luck finding them nowadays, although they are pretty long and take much space, too.

If I use handlaid turnouts I should be able to avoid using double-slip switches in the throats of Yard 3 and 4. What I want to avoid is spending hours upon hours making turnouts.
Contrary to what people keep saying, there's no monetary savings in making them yourself. Everyone seems to be forgetting the time spent on each one (~1 hr), and unless they are retired and have nothing else to do, 1 hr is pretty expensive to spend building a turnout for an average working person.

The top two decks will not be big city commuter operation, though I have been thinking about having couple of commuter trains to add to the mix.

Regarding the track density, not all yards will keep the trains: Yard 2 is an inbound yard and would not be at capacity as it needs to receive trains at any time. Yard 3 and 4 could potentially be at capacity at the start of a session, with Yard 1 having couple of trains lined up to go, and ready to receive a sequence of trains from Yards 3 and 4, for outbound traffic.

My ultimate goal is to automate staging functions so that a computer (AI) can handle all inbound and outbound traffic without humans having to guess where should a train go and line switches up. That is why I'm planning to use computer vision and RailCom+ there, and elsewhere on the layout. I believe adding a feedback from the engines will make the operation more realistic, if not easier to operate on my own.

I'm going to post an update soon to the latest drawing that uses FastTracks curved turnouts, for more critique.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
trainzluvr

Update using handlaid turnouts

Here's what's possible while using a dozen handlaid turnouts from FastTracks:

There's no weird track work; all yards are double-ended, except for Yard 5 which is up in the air anyway. Yard 3 has an extra key track and I might downsize that to 5, just like Yard 4.

To be honest, there's a lot of track everywhere, yet if I don't build it now, I probably won't get a second chance after a deck is put above it...

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
dark2star

Interesting

Hi,

it's interesting how you converted yards 3 and 4 to double-ended Anyway, you seem to like that better, so it is the better choice for you.

I'm happy to see how you're keeping the directional running (inbound on red, outbound on green) which will keep your access tracks running.

With this concept you don't really need arrival and departure yards, however you can still designate arrival and departure tracks in yards 1 and 2 should you need them.

This is a very straightforward design which should be easy to operate and to explain to guest operators.

Talking about computer-izing the yards, you might want to consider putting more smaller track blocks into the red and green lines. Which means installing feeders and isolating rail joiners. Once you add detection to those blocks later, you can have the computer running trains closely behind each other automatically. You'll need one free block between two trains, which means the more blocks the closer they can run.

Have fun!

Reply 0
railandsail

Computer Run Trains?

Just to add my observation on 'computer run trains'.

This is a hobby that I don't want dominated by computers. I really DO NOT want computers running my trains,....I want to run them myself,...with my own throttle control, and horn and whistle controls, etc

Too many computer controls as it is, and big brother(s) are taking some of that away from our individual control. Look what a mess they are making of simple internet search for info,...first you have to look at what they want you to look at,...ads,ads,ads for multiple pages....."where is the beef"

...just saying....
 

PSsorry for the interruption to you fine subject thread)

 

 

Reply 0
trainzluvr

Double-ended yards, computers, etc.

@dark2star

I can't really say I'm dead set on the last design with all double-ended yards. I thought that it would be interesting to see what can be done with hand-laid turnouts, and yes it looks great that trains can re-stage automatically, but I lost the long storage tracks, on an average 3-4 ft. on each which is significant.

At this point I'm trying to weigh out the benefit of re-staging vs. having an ability for longer trains than the planned 7 ft. I'm thinking some middle ground could be found - build a few selected turnouts by hand to allow me to fit everything better into the space, but keep the stub-ended yards 3 and 4 as storage for incoming/outgoing trains.

As I mentioned before humans will ultimately not be doing any labouring here, even during the op. sessions I intend to have operators simply select the train from the roster and have the "system" deliver it to one of the ready tracks in Yard 1 for them.

Winter is coming and my ability to work outside to cut wood etc. diminishing fast as well so I am really itching to get going on this. Otherwise I will spend the next 4-5 months going back and forth in my head on how to perfect this or that, etc. instead of actually building something that will be usable but not perfect.

I still need to figure out power circuits and isolation for blocks, train detection and such. No prior experience with any of that...

 

@railandsail

I really want the same thing, except that I believe computers can help me get there and make life easier.

Most of the time I will not have a crew of operators ready to show up just because I want to run some trains. I am building a living system, for myself first, and I will not be one of those people who has their train empire sit idle as a museum piece, only to be seen or used once a month, or less.

That's where the computers come in - if I can programmatically automate as many tasks as possible, then I can choose whichever task I want to operate myself and dedicate all the rest to the computer. I believe it is possible to automate everything with the current advancements in machine vision and artificial intelligence.

What I can't automate is the human aspect of the hobby - the comradery, so that part will remain. People will still come over and play...err...operate trains with me.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
dark2star

Detection and automation

Hi,

I do understand your "itch" to get going - I'm in the reverse situation right now. I'll need to be building some cabinets very fast once the current work on our house is done, however I have to wait for the work to complete before doing anything. The cabinets will include space for my layout...

As for power and detection, I'd guess you'll choose some DCC-based solution at some point in time. But no matter what you choose, you can figure out how close power/detection blocks need to be spaced now.

  • The storage tracks are pretty clear, they should be blocked so that the trains are clear of the fouling point once they are completely inside the block. You can look at the overhang of your equipment and put the block limits (isolating rail joiners) e.g. 1 inch inside the storage tracks from the fouling point.
  • If you want to do serial storage (two trains on one track) you should split your storage track accordingly.
  • The yard ladders themselves are easy, too. They should be a single block per yard ladder, including the connected tracks just past the fouling point (see storage tracks).
  • The "interlocking" (crossover) at the bottom of the helix might need some thinking so you can split it in order to have trains on both the red and green lines simultaneously, but not block the whole red and green lines and helix if a train is crossing over.
  • The running tracks (red and green lines) are less obvious. You could do long blocks (from yard ladder to yard ladder). However that limits how closely trains can follow each other - remember you need at least one empty block between trains. The shortest sensible block would be one single piece of flex track - use isolating rail joiners on all four corners and attach feeder wires to the flex track itself. The answer will be somewhere in between. A good compromise could be "half the typical train length" or "one full typical train length"...

Anyway, for all the power/detection blocks, just pull the feeder wires below the layout. You can attach them directly to the staging level's main bus right now and split them into power/detection blocks later on. As such, rather put in too many feeders, they're easier to bundle than they are to retrofit. Consider using screw-type connectors to tie the feeders into the power bus, that will make any changes and retrofits easy. You'll have access to the underside, won't you?

As for computer control, I lean both ways. I don't really want computers in there, however I want some automation. I don't want to blink the level crossing by blinking a switch... Anyway, I understand your wish to just select a train and have it ready in a minute... Take small steps and you'll get there.

Have fun!

PS: if you are going for computer running, you might want to make sure that the middle and end of a train can be detected reliably - the end for the computer to know if a train is clear of a fouling point and the middle so that blocks shorter than a train are detected as occupied if a train is over them. As such, the smallest block in your system will be the deciding factor on how many resistor axles (or such) your trains will need.

Reply 0
trainzluvr

More decisions to make...

Hi,

I have a number of decisions to make and I'm kinda split on which way to go, so I'd like some feedback please.

Questions:

1. Build Yards 3 and 4 as double-ended or not?
2. Use pre-made turnouts, or hand make them to custom size?
3. Where to tap off the helix for the main railroad decks / directionality of the railroad / Classification yard position?

Rationale:

1. If I go with stubbed yards 3 and 4, then I have an option to store and run longer trains there (~2 ft. longer). Albeit, they wouldn't be able to fit in the outbound Yard 1, nor in most of the tracks in the inbound Yard 2, and would have to go back to their respective yards. Also, there would be a lot of pulling in and out of yards to re-stage the trains.

If I go with double-ended, then the trains will most likely fit across all yards, they just wouldn't be up to 12-13 ft. long. On a plus side, all the trains could re-stage automatically and there would be no pulling in and out of yards to do that. Automating such a setup would definitely be much easier, too.

2. If I use pre-made turnouts, I'd have to mix Code 100 PECO track and Code 83 Walthers curved turnouts for example. On a plus side I won't have to make any myself, while on the minus, Walthers are kinda long and the track might have to be filed to adjust to them (not a big deal I guess) and they aren't a perfect fit for space, but still better than PECO curved.

If I hand make turnouts, I can build whatever suitable geometry I need for the space and everything will fit nicely, plus I would use Code 100 rail to match. Minus would be that I need to build 10 or so of them, either by using CVT Turnout Ties or FastTracks QuickSticks, and I need to get at least tools for filing points and frog rails.

3. In all of my drawings, the helix turns clockwise and the track would tap off to the middle deck from lower left and go along the left wall into the main classification yard. As it would come out 1" below the middle deck, it would need to climb up to mate with that deck somewhere on the diagonal wall left of the helix.

Upon leaving the middle deck, the track will have to dip down left of the swing gate to merge with the helix, while climbing up 1" to tap on. Once again it would leave the helix and have to climb up 1" to mate with the upper deck somewhere along the diagonal wall on the bottom left. Only when leaving the upper deck would it go straight across the swing gate and connect into the inner helix track, to go back down to staging.

This means that directionality is changing from the staging deck to the middle deck, and is then maintained middle deck to upper deck. It also means that the upper deck might require another yard to served it, as the main Class. yard would be too far away.

Is this a problem for operations and operators in general?

If I was to instead cross the swing gate first upon reaching the middle deck from staging, the railroad would remain "true" without trains changing directions (all the way until reaching staging). The train would then have to traverse the middle deck before arriving to the main Class. Yard, do its thing there/if any, continue the journey up the helix to the upper deck, traverse it and then head down to the staging on the inner helix track.

Tapping on and off the helix would be easier, too, as it would happen at the correct deck heights for both decks, except for the journey back from upper deck to the inner helix track (needs to climb a bit).

If I don't go directly to the main Class. yard from staging, the yard is essentially dividing my railroad in half, and could serve both decks equally. Trains travel: staging, helix, middle deck, main Class. yard, helix, upper deck, helix, back to staging.

On the other hand, if I go from staging into the main Class. yard, I might need another (smaller) yard on the upper deck, while the trains travel: staging, helix, main Class. yard, middle deck, helix, upper deck, helix, back to staging.

Is it important for the trains to directly go into the main Class. yard from staging (lower deck to middle deck) and why? What is a more realistic, believable journey?

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
ACR_Forever

out of the blue,

Have you explored the mirror arrangement, now that you've evolved the layout so far?  If not, try 'rooting' the peninsula to the left, and running pretty much the same staging as depicted, but along the right hand side.  I'm just speculating that it might give you longer tracks in the two primary yards.  Yard 5 might be impossible to implement, but hey, it's not much more than space-filler.

Blair

Reply 0
Reply