Please give me some feedback on these three options for my staging level (31" above the floor); or if there is another option I did not consider.

#1

 

#2


 

 

#3

One square is 1 ft. Train lengths are ~7-8 ft. although I could probably run longer through trains.

The staging track will be connecting to the double track helix (one end to the inner and the other end to the outer loop in #1 and #2). Potentially I will double track the connections between the ends of the staging and the helix so they connect to both loops, and also put cross-overs in between.

For added functionality, the peninsula will serve as a turn-around loop so the trains can be re-staged easily. I'm also thinking to add more track to the peninsula for additional staging (either stub- or double-ended) as seen below, with different track densities. This is based on the idea that there's never enough staging track... 

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
David Husman dave1905

Staging

Hard to say for sure without knowing how you intend to use them.

#1 is better than #2 because the switches are easier to see and reach.  #3 is only better if you want stub ended staging.

#5 or #6 are essentially the same and are better than #4 unless you want stub end staging.  With #5 or #6 I would add connections between the staging yard lead next to the wall and the inside staging track on the staging yard on the other side of the wall.  That would give you a reverse loop option on each staging yard.

In any case I would say NOOOOOOO on the interior leads, on a staging yard they are nothing but a potential complication and derailment opportunity.  

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
Virginian and Lake Erie

1 for staging on through

1 for staging on through tracks, stub ended staging on center is much longer and useful body tracks. eliminate the double wye and have a single wye for turning trains on the inner peninsula tracks. You only need one place to turn the trains and it can be separate from the storage tracks. Running the wye in the center of the peninsula will allow the broadest radius and the fewest frogs to be crossed by a train using it. Also skip the double slips in the other storage yard it will save you a great deal of trouble and expense.

Reply 0
trainzluvr

Thanks for your replies. I

Thanks for your replies. I intend to use them as real staging tracks so operators would not be manually switching turnouts - it would be automated to some extent (the dispatcher might take trains in/out; assign them and let the operators do that, or ultimately have a computer do it).

Is there a huge drawback in going stub-ended, aside from having to reverse the trains?

@Dave, is this what you meant by connecting leads through the wall?

Also, what did you mean by "In any case I would say NOOOOOOO on the interior leads, on a staging yard they are nothing but a potential complication and derailment opportunity."

@Rob, I added the double-slips for flexibility, so trains can cross to any track. What considerations do I need to have in mind if I just have these long uninterrupted tracks, and trains are set behind each other? Obviously they need to be placed in order they leave the staging, and I need to put some isolation points, maybe half-way, but what else?

When you say to use a single wye, this track would have to go along the side of one of the walls, but would it come around at the tip of the peninsula or would it be stub-ended?

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
Virginian and Lake Erie

Trainzluvr, you will likely

Trainzluvr, you will likely only have two trains on one track and with dcc no issue at all. If you want the second train you will need to move the first train and then back it back into the staging track. You should have no issue backing trains of the length you are contemplating.

Reply 0
David Husman dave1905

Also, what did you mean by

Quote:

Also, what did you mean by "In any case I would say NOOOOOOO on the interior leads, on a staging yard they are nothing but a potential complication and derailment opportunity."

On drawings #2 & #3 you drew a line of double slips crossing the entire yard, creating an interior lead (a lead inside the yard).  

"NOOOOOOOO" means  "hell no, don't do that".

"They are nothing but a potential complication and derailment opportunity" means that they are nothing but a potential complication and derailment opportunity.  People have trouble trying to figure out lining one double slip that's out in the open.  Burying a string of them in a staging yard would be a gut wrenching nightmare.

 

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
ACR_Forever

Stub staging

Given any reasonable option, I wouldn't stub a staging yard(but yes, it's an expense, in $ and space).  If your two peninsula yards fit all the trains you desire (i.e. the number of trains, and the length), that's great.  Your blue X is one option.  You could move it to the left, to the top of the ladder on each side (this might make the X easier to access, from inside the loop); or, you could continue the blue X legs towards the wall on the right, entering the opposite ladders near the right hand wall via a turnout.  Up to you - if your drawing is accurate, you can easily put one more turnout in each of those spiral ladders.

That crossing in the wall will need to be bullet proof, as it's in the worst place - you'll have access issues.  But to me, its worth the pain if you can get it right, as the flexibility of turning any train, any time is sweet.  You'll have to work out an electrical interlocking that permits only one yard to route a train through the return loop.  I wouldn't count on operators to reliably arbitrate who's using the X at any given time...

You might also consider whether you want to open out the base of that peninsula.  In my mind, I see a triangular dead zone that might be best used as a pop-up; your X might be located in that opening, allowing better access.  I can't sketch it right now, but if you want to explore this, ask and I'll sketch something up tonight.  What you're doing in the decks above might be impacted, though.

Blair

Reply 0
Neil Thomas Cadmaster

Double ended staging yards

Double ended staging yards are always going to be superior to stub ended yards. It is going to give you more flexibility in how you stage and also for some people how they operate. I really do not see a need for the "through the wall crossover" when you have a return loop at the end of the blob. 

Also Dave is right stay the hell away from double slips. Too confusing for most even when they are is sight. In a staging yard they would compound issues very quickly.

Neil

Reply 0
jimfitch

Double ended staging yards

Quote:

Double ended staging yards are always going to be superior to stub ended yards. It is going to give you more flexibility in how you stage and also for some people how they operate. I really do not see a need for the "through the wall crossover" when you have a return loop at the end of the blob. 

Also Dave is right stay the hell away from double slips. Too confusing for most even when they are is sight. In a staging yard they would compound issues very quickly.

Agree with all of the above.  Double ended is tons more flexible.

I did a staging yard similar to picture #1 as follows:

Other end:

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
David Husman dave1905

Subwaywatching

Making staging, especially hidden staging as simple and foolproof as possible, minimizing the number of switches involved and making the route into a staging track as short and direct as possible is always a good idea.  

One thing that I find that takes away from the "suspension of disbelief" of a layout is having to spend a large amount of time staring into a staging yard trying to figure out where my train is, is it moving, is it going in the right track and is it still on the rails.  Its like railfanning a subway.  That is especially bad when the staging yard is at a really low level and people are kneeling on the floor, peering into a darkened void in the fascia.

Having to wye your train and shove into a staging track is a valid option but if you can keep the train crew from having to do it will enhance the operator's experience.  Maybe do all the shoving between sessions?  

You have to live with your space and sometimes the arrangement is necessary to support other goals, but its not optimal.  With the modern LED tape lights, there is no reason the leads of a hidden staging yard can't be well lit so you can see engine numbers, switch arrangements, track numbers, etc.

One of my favorite designs for stub end staging is what I call "Bowtie" staging, two stub end staging yards facing in opposite directions.  A train departs staging yard A and runs around the layout, pulling into staging yard B as a straight away move.  Then between sessions the owner just backs the train out of B into A, a straight shove back and the train is facing the right way and ready to go.  Works especially well for open top unit trains.

Bowtie.jpg 

That also brings up the point that different types of trains work well with different types of staging.  Double ended staging (or bowtie) works great for open top loads.  General manifest and passenger works well with a stagin yard on a balloon loop.  With unit trains you want the loads in one direction and empties in the other (in the vast majority of cases) plus double ended yards allow unit trains to be recycled during the session.  For manifest and passenger trains it might be more important to have something return from where it was sent.  Last session I sent engine 1234 to Anna, so this session we would expect it to return from Anna.  If that's important then staging on a balloon loop or stub end staging with a balloon loop or wye might work.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
jimfitch

I agree with keeping staging

I agree with keeping staging as uncomplicated as possible.  I had a 3-way turnout, pictured above, which jammed after I had built the 2nd level above it and had to cut a large access hole in the bench-work above to remove and fix it.  Next time around I plan to avoid the 3-way and stick with standard #6 turnouts and minimize the use of curved turnouts if I can help it.

As for the bow-tie staging, is the main advantage of it over double ended that you can accomplish the same things as double ended but in less space?  I'm having trouble seeing the advantage of bow tie over conventional double ended.

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
David Husman dave1905

Bowtie

It can lengthen your visible space.  In the Bowtie, only the two main track switches need be visible and the "unique" main line run is all the way to the middle of the staging.  With double ended staging the main line run "ends" at the staging yard switches on either ends.

Bowtie has has advantages in depth since, for the same staging capacity it is half as wide and twice as long.  For the same reason, for the same number of trains, the ladders will be shorter and simpler than with a double ended yard.  With the drawn staging yard I can stage 4 trains with 4 switches.  With a double ended yard I would need 8 switches, 4 on each end.

Yes, its not for every occasion, but its a handy tool if the situation presents itself.  I generally prefer double ended staging, but if you have a narrow shelf and need stub staging, its an alternative.

 

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
trainzluvr

Here's a composite of the

Here's a composite of the ideas mentioned earlier, made into an entire lower (staging) level:

I've added the cross through the wall, but my concerns are turnouts highlighted in red as they form S-curves. Not sure how to go about it as there's only so much space to make a ladder that fits.

Also, at the bottom I included the "Ready Tracks" where trains can be pre-staged before they climb the helix to the middle level, or descend from the upper, waiting to enter the staging.

I still believe that I should add those double-slips into the main staging area at the top and split the tracks in half for more operability.

The way I envisioned it is that people would not be manually operating any turnouts on this level. There's no subway effect, no bending over to see where the train is, etc. There would be a utility touch screen(s) where an operator could select the train and that's all they need to do. The system would arrange the turnouts for it to depart/or arrive, whichever is the case.

Could someone please draw this "Bowtie" track arrangement into the layout - I'm having a hard time visualizing how to fit it without wasting too much space on the ladders. Below is a blank lower level tabletop (click for full size).

Thanks everyone!

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
HVT Dave

S-Curves

In my humble opinion the S-curves that you seem worried about are a minor issue compared to the bucket of worms you would open with double-slips in the main staging.  See previous comments from some very experienced railroaders above.  You have asked for and received some excellent advice.

If you want to stage more trains simply park one behind the other on the same track.  

And, when you added the cross thru the center divider you created a reverse loop situation that now needs to be dealt with.

Good luck on whatever you decide to do.

Dave

Member of the Four Amigos

 

Reply 0
ACR_Forever

Simplify it

Remove the switches at A, A' and C, C'; remove the tracks at B, B'.  They'll be hard to get to, impossible to maintain.  Yes, this means the tracks from A to D' and A' to D are single use only, but I think it's worth it.  And yes, you have an electrical reversing issue you'll need to work through, but it's conceptually pretty simple, with those turnouts removed. 

Stay away from the double slips.

What is your clearance above the  various ladders?  As I've said before, anywhere you have restricted access clearance you can expect that you'll be working to maintain that trackwork the most.  At a minimum, build your staging yard and run the heck out of it, debugging all alignment and derailment issues until it works flawlessly before you bury it.  Also, mock up the intended poor access areas, and try to imagine maintaining that trackwork.  Mock it up AT THE HEIGHT IT WILL exist.  There are some heights that work better than others, and it's person-specific.

My new layout has the staging daylighted to eliminate or reduce as many of these issues as possible.  Not built yet, but it will be.

That X through the wall is going to need access, if you can.  As for your 'S' curves, they exist in most conventional ladder arrangements.  Your plan has many more than you've indicated - trace the track flow through several of the turnouts in the E area for example.  What turnouts are you using?  I wouldn't worry too much about them if you're using #6 or bigger. 

 

Blair

a_opt_4a.jpg 

Moderator note: resized graphic.

Reply 0
David Husman dave1905

Bowtie on the plan

I would replace the "top" staging yard with a bowtie. Drawing not to scale.  Concept only.

Bowtie2.jpg 

This does a couple things good.  It gives you the shorter staging tracks without the double slips and complexity.  Takes fewer switches and they can all be "normal" switches instead of curved switches.  You will need compound leads on the switch leads.

This does a couple bad things.  You lose the ability to stage a really long train.  You will have to restage all the trains between sessions.

Another alternative is the "mirrored" yards.  They can handle longer trains, but require a "saw" (back out of green, pull forward, back into blue) to restage while the bowtie is a straight shove.  They also can have a less complicated lead, that while is longer, actually wastes less space.

Mirror.jpg 

I personally would be going toward the original plan without the double slips.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
trainzluvr

It's true - there's A LOT of

It's true - there's A LOT of curved turnouts in this staging plan. I wish there was a way to get rid of them but it appear due to the nature of the space (only 12 ft. on the narrow side of the room) there's not much room left for turnarounds.

Could this be simplified as I now feel that the peninsula is pretty complex with all those turnouts, despite simplifications made from Blair's suggestions. It seems my #4 design with stubs might be better even though it's stub-ended, the trains could be reversed through a simple 3-way turn move, just like cars.

I also made versions with the "bowtie" design, per dave1905's drawings.

I don't know whether compouding the ladder is better than the standard one, although tracks look shoter in it:

This lower deck is at 31" above the floor while the middle deck above it is at 43", so there's 12" top surface to top surface (or 3 loops on the helix at 4" each).

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
ACR_Forever

The problem I'm having

is further assessing what you need without any frame of reference for the rest of the RR.  Forgive me, but could you point to a thread where you've described the upper, visible layout?  Number of trains, division point or mainline running, industrial district, it makes a difference.  What's your operating vision?  While in most circumstances "more staging is ALWAYS better", it may overwhelm the layout it supports.  Your available space makes me think we could be trying to do that.

Thanks

Reply 0
Wazzzy

I agree that an overall upper

I agree that an overall upper (visible) track plan would be helpful to understand your goals.

I counted 23+ tracks for staging in your latest drawing. That is a lot of storage!

How many trains do you expect to be operating on the upper level at one time?

What is the maximum train length expected to have operated?

How long will it take one train to complete its operations before returning to staging?

How many trains do you expect to operate during a run session?

How often do you plan on having operating sessions?

These answers should provide a staging goal.

There have been many options given to provide staging for long and short trains. Whatever staging is planned, test test and test again before making access difficult.

 

Alan Loizeaux

CEO Empire Trackworks  (Empire-Trackworks.com)

Modeling ON30 DRG

Husband, Father, Grandpa, Retired Military, Conductor / Yard Master Norfolk Southern, Owner Empire Trackworks (S, SN3, On3, On30, On2, HOn3, O 2-rail & others)

Reply 0
trainzluvr

Just had a moment of epiphany

by realizing that I could curve the track around on the left side. This makes all the key tracks on the right longer by moving the "bowtie" ladder to the left. DUH!

This design looks much neater and the benchwork on the left does not need to be as deep. I made all the curves 26" and could probably make them larger but is it necessary, none of this is visible?

@smithbr ... my (ever moving target of) Givens and Druthers is at  https://trainsluvr.com/2017/11/givens-and-druthers/

I do not have a full vision for everything, more like glimpses. As staging will be hidden once middle level is in place, I'm trying to "future proof" so that whatever changes happen above, below could accommodate, if that makes sense.

I had devised my LDE locations and sizes, based on the 2 x train length formula, although they are open to change as most likely locations of industries+people traffic will dictate where things are.

   

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
HVT Dave

More questions

Have you considered how you would handle the reverse loop if/when you put the cross thru the center divider on the peninsula? 

From your Givens and Druthers it appears that you are using the Z21 command station and planning future automated running.  What are your plans for detection?  What software are you considering for automation?  Is signalling planned?

BTW your lower level bench work looks pretty nice. 

Dave

Member of the Four Amigos

 

Reply 0
jimfitch

When I look at the bowtie in

When I look at the bowtie in the layout drawing, it looks like average train length is greatly reduced vs the original double ended drawing. That might be a deal breaker if staging long trains is a priority.

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
trainzluvr

Automation, train length, peninsula complexity

@HVT Dave

I was thinking of using  Digikeijs or ESU modules for all digital control. I chose Roco Z21 as it appears to be a next generation platform, able to interface with any protocol/bus, and it includes RailCom support.
Have I known that Digikeijs DR5000 station was available at the time I would've bought it since it also has similar features. I'm actually thinking to sell my Z21 and get DR5000 instead, just to have all components from the same vendor, although it doesn't really matter.

For signalling and automation, I was first looking at TrainController. Then I actually found a really nice (and free) application called Railroad Automation which is right up my alley, because it offers event binding and scripting, and has an API to top it all. And it does everything: routes, blocks, tracks, signals, turnouts, senors, etc...

@jimfitch

You are right, and come to think of it, parking trains behind each other is not a big deal when a bonus is extra long tracks. Although, any longer trains might generally end up being through-trains, since my A/D track is only 12 ft. long (in the current yard design). The "bowtie" still has very long tracks, longest being 15 ft., which is 2x the length of my planned train length.
I guess it comes down to complexity and cost and, based on what everyone said here from their experience they prefer neither. 

I will revise (simplify) my design today by going back to long tracks curving around the left side, and see how that looks. I also want to reduce complexity in the peninsula - or should I get rid of that portion altogether?

They way I see it, if I build it and not use it, won't be a problem. But, if I don't build it and need it later, then it will be a taxing job to add it in.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
dark2star

ten people - twenty answers

Hi,

if you ask ten people...

Looking at your original graphics I'd prefer the right-hand ladder on #2 as an average train will have less turnouts to reach its track. For the left-hand ladder I agree it should be on the front.

Having those center crossovers as in #2 might be nice for just a couple of tracks but maybe not for all of them. Maybe tracks 2-4 (counting from the front)?

As for the "overflow staging" (options 4-6) I'd consider stub-ended staging (again with the compact ladders as in #5). Which would mean longer staging tracks and less turnouts. However it would also mean you'd have to reverse some trains into your regular staging before you run them. (edit: this would be the "bow-tie" section?)

There are many different answers and it depends a lot on how you plan to operate your trains... Do you have passenger equipment which can run both forward and backward? Do you plan to operate "overflow staging" or rather just "live staging"? How does your layout connect to your staging (maybe you can run all of your staging in just a single direction)?

Have fun!

Reply 0
jimfitch

ten people - twenty answers

Quote:

if ask ten people... twenty answers

Yes,  that is pretty typical of model RR forums; and why it's often difficult to get to a clear answer.  Best you can do sometimes is get a rough consensus.

Using double slip switches on #2 plan would allow some flexibility to stage some shorter trains in the staging but doing the entire line across would be expensive and double slip switches can be a bit challenging to wire properly for electrical.

The next design phase for me since I have the main track plan roughed in is to design my staging, which will more or less be like #1.  I plan to maximize storage and staging below the yard at the bottom of the track plan, and left wall and some of the right:

D&RGW focus late 70's thru early 80's west of Grande Junction CO.