ssagrawal

Hi all,

I'm considering a renovation for my classification yard, and I haven't seen much coverage in the yard design literature I know of about the following question. I'm curious what you all think:

For a classification yard on a fairly large model railroad, would you rather have a smallish number (say 5) full train-length class tracks, or double as many (say 10) class tracks which are half a train length?

I think a large share of recent, cutting-edge plans I have seen lean toward the smallish number of full-length class tracks. My intuition says though, that more, relatively small class tracks might be useful for building + blocking trains by destination, and then a train could be easily assembled when it's time to put it on an A/D track. And, as is often the case, my intuition might be hogwash.  

What do you all think?

A broader question

This question naturally segways into a broader discussion about how real railroaders do it, as well as what's feasible in a model railroad yard. Some sub-thoughts are:

a) Do real railroaders do extensive blocking of road freights? If so, is it practical / fun / nice to do so on a model railroad?

b) I recall reading that there is more complexity to building a real train than meets the eye. For example, for a train with conventional head-end power only (not DPU), I recall something about how loads should be biased toward the front, and empties toward the rear. Assuming that's true of the real railroads, would it be fun, or simply going too far, to model complexities like that?

I guess both those sub-thoughts might influence the best class yard setup.

Reply 0
AzBaja

I would rather have more

I would rather have more tracks of less length for classification,  but for staging tracks should be full length for your trains.

I can always double over blocks across two small classification tracks and then assemble into a full length train latter.

with less tracks for classification but longer.  I can put 2 or more blocks on one track and dig them out when needed.

for an example La Grange on my layout has 6 classification tracks. but I have more than 6 trains leaving La Grange

I use 4 of the tracks to build the next 4 upcoming trains on my call sheet,  the 5th track is For Next Switching and the 6th track is For Tomorrow.

As one train is moved of my call sheet. This frees up one of the 4 yard tracks.  I can add/build new trains on that freshly open track..

I put cars on the For Next Switching that are not in the current list of trains I'm building but are coming up real soon on the call sheet.

I put cars on the For Tomorrow track that have just departed and will not be built tell the next day.  

The entire thing works like a Rolodex as your slowly move trains out and the next trains in etc.  It might sound complicated but it is very easy to follow once you get the hang of it as one train is moved off the list another replaces it. 

La Grange also has 2 A/D tracks and Siding #2 for 2 extra tracks plus a 3rd that can be used to swap blocks with trains that are not a final destination for La Grange

AzBaja
---------------------------------------------------------------
I enjoy the smell of melting plastic in the morning.  The Fake Model Railroader, subpar at best.

Reply 0
David Husman dave1905

Yards

Quote:

For a classification yard on a fairly large model railroad, would you rather have a smallish number (say 5) full train-length class tracks, or double as many (say 10) class tracks which are half a train length?

More longer is better.  

That not being an option, more shorter is more versatile, you have more options and you can always double out of two tracks.  A lot of it depends on what you are classifying and how many blocks you have.

Quote:

a) Do real railroaders do extensive blocking of road freights? If so, is it practical / fun / nice to do so on a model railroad?

If you are talking post 1970's then all through freights are "blocked", but you have to understand what "blocked" means and how the railroad defines blocks.  In a prototype train, there can be 100 cars each going to a different destination, all jumbled together and the train will be 100% "blocked".  That's because real railroad blocks tend to be broader than model railroad blocks.

Model railroad blocks tend to be more or less "station order", one block per station on the train's route.

On a real railroad, on a through freight a block is a group of cars that will be handled together from one yard to the next place the cars will be switched or an interchange.  A couple examples from the MP/UP from the 1980's-1990's. 

On the MP, every empty grain hopper on the Gulf Coast, picked up an EMCH block (EMpty Covered Hopper) and was sent to Osawatomie, KS.  At Osawatomie, the cars were switched into grain trains, cars that were bad order or shouldn't be in that service or were for a specific elevator would be switched and unit grain trains were built and sent to specific elevators in the midwest for loading.

Likewise cars for practically every gateway to the eastern roads from Memphis to Chicago that was loaded in Texas and Louisiana picked up a NLRK block (N Little RocK).  They were all funneled into the yard at N Little Rock, reblocked and switched by individual gateway and block  A train with one block would come into the yard, the blocks on all the cars changed and trains with a couple dozen blocks went out.  Most through freights only had one to three blocks.  All of those blocks were for other switching yards or interchange (which really is a just another switching yard, just on a different railroad.  Very few cars went to a local yard where switchers spotted the cars at industry, virtually no cars were spotted at industry directly from a through freight.

Quote:

b) I recall reading that there is more complexity to building a real train than meets the eye. For example, for a train with conventional head-end power only (not DPU), I recall something about how loads should be biased toward the front, and empties toward the rear. Assuming that's true of the real railroads, would it be fun, or simply going too far, to model complexities like that?

Sorta kinda.  A lot depends on era.  For the last 30 years railroads have operated on something like a "20-20" rule, it varies between railroads, but the general idea is that you can't have a "block" (a continuous string) of 20 or more empties directly ahead of a "block" (a continuous string) of 20 or more loads.  There are also restriction on long and short cars together and how many light  cars (empties) you can have right behind the engines.  There are all sorts of rules about placement of helpers and DPU's, how much tonnage ahead of them, long cars ahead of them, empties directly ahead of them, etc.  All those rules are usually in the "system special instructions" or the train handling rules for the railroad.

(Disclaimer:  Railroads are really bad about using the same name to mean different things.  "Block" is one of the worst.  It has dozens of different meanings depending on context.)

Also in blocking trains, when possible the railroads arranged the blocks in the train to put blocks that predominately carried loads ahead of blocks that predominately carried empties.  For example if a train from Houston to San Antonio carried a block of San Antonios and a block of Laredos, you would most likely put the Laredos ahead of the San Antonios, which is counter intuitive since Laredo is past San Antonio.  However it makes sense because the San Antonio block would be filled with empty gons and hoppers going back to the quarries around San Antonio, but the Laredo block would be heavy with loads going to Mexico.  The train wouldn't be switched "load-empty", but eh order of the train blocks would tend to put more loads on the head end.

On a "modern" railroad (computerized, post 1980's) when the person reporting the switching of the train creates the switch lists to build the train, the computer system will give them warnings of all the various placement violations, that way they can either change the switch lists, or make plans to correct the errors.  When they try and report the train consist, if there are errors, it will notify the person making the consist so they can correct them.  If a train goes by a AEI scanner and finds placement errors it will notify the corridor manager/asst chief dispatcher so the dispatcher can be notified to tell the crew to correct the errors.  If its the first reader out of the yard, it also sends an error message to the terminal director/asst superintendent, so they can handle with the yardmaster to find out why they sent out a train with a placement error.

One of the projects I worked on right before I retired was validating and streamlining the 300+ error messages for all the combinations of hazardous placement, train placement, train make up, tonnage make up, no billing and bad order movement errors out there.

This is in addition to the systems that measure whether the right cars were put on the right trains on the right day in the right block.

But that's the real railroad.  Model railroads don't need to worry about 99% of that stuff.  Model railroads need just enough stuff to make the operators think, but not enough that it becomes a burden.  Most model yards do good to get the right cars on the right train in the right order, maybe throw in a some simple hazmat rules (hazardous loads can't be next to the engine or caboose) and a unique twist or two (e.g. stock cars or reefers have to be on the head end) just to give a feel of things.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
Ken Rice

Capacity

I think the most important thing for a model rr yard is to have enough capacity to hold the largest number of cars that should ever be at the yard at any given time and still leave a decent margin of empty space.  When a yard gets too full, what should be simple quick moves end up taking far longer and it bottlenecks the whole rr.

Capacity is kind of independent of the more short tracks / less longer tracks tradeoff.  Ideally you want as many tracks as you’ll have different blocks, and each track should be large enough to hold the most cars you expect to see in the yard at the same time for each block.  Reality is never that generous though.  With shorter tracks where you end up having blocks split across tracks, possible with some tracks having several different partial blocks on them.  With longer tracks you end up having multiple blocks on the same track.  It’s not that hard to deal with either of those situations as long as you don’t get too short on space.  If you do end up short on space a yard can become like a 15 puzzle.

So I’d say figure out the most cars you’d expect to be in the yard at any one time, add 25-30% to that, and make the yard whatever combination of short/long tracks you can to get at least that much capacity.

Reply 0
ssagrawal

Reach and double-ending

Thanks for all the thoughts! Dave, thank you in particular for your very detailed thoughts on how the real railroaders do it - this perspective is invaluable!

One more thought to throw in is the limits of reach for a model railroad operator. I suspect 10 class tracks + 2 A/D and a main might be pushing the practical limits of reach for uncoupling etc.

So perhaps an algorithm for the decision is: 1) go as many tracks wide as you can without violating reach, and 2) make each track as long as it can be, to maximize capacity.

One more related question - double-ending

How much value do you all feel there is to a double-ended class yard vs single-ended, when only one end has a true yard lead and you anticipate switching from that end only? I currently have a stub-end yard, and in this rebuild, I am contemplating adding a ladder to the far end, beyond which the main proceeds immediately into staging. I'd imagine only using it for the occasional move ... maybe to pull a car out from in-deep, or let a local freight out the "back door" ... but really, I think I'd just be adding the ladder for visual appeal and "correctness"s sake. It would mean losing some yard length to accomodate the ladder (though let's say I could make it up by adding a couple extra tracks), and it would increase maintenance complexity.

Reply 0
AzBaja

Wasted space unless you are

Wasted space unless you are moving trains out of both ends of your yard,  I have a double ended yard on my layout and never switch from that end.

You need to decided if you want to follow a prototype exactly or make a function operational layout.

What works for the prototype does not always work for a home built layout used for operations.  The Real Railroads run 24/7/365.  Most model railroads run 3 hours once or twice a month.  What seems to work on full size can become a complete disaster on a home layout.

You better plan on making sure what you build or plan to build is actually functional for your needs.   Do not build a 20' long yard that is an exact copy (Track for track but short by over a mile) of the real railroad and not in include the 3 miles of track that lead into it do to space concerns,  then when it is all done, you realize that you have no head room to pull out full length trains like they do in the real yard.  Yard in real life is run by 2 crews at night and 3 during the day.  On his layout he expected to do the same thing in a 3 hour period and did not take into account that you have 6 people trying to work the yard all standing in the same place as well as one road crew trying to leave and another trying to enter.  That is 10 people total trying to fit in 1 area.  Now the entire thing is all bound up as he only has as around 15 feet of track at the yard entrance.  Bowl of Bran Flakes with extra Fiber will not fix this problem.

AzBaja
---------------------------------------------------------------
I enjoy the smell of melting plastic in the morning.  The Fake Model Railroader, subpar at best.

Reply 0
Chris VanderHeide cv_acr

Capacity/Usability

Quote:

I think the most important thing for a model rr yard is to have enough capacity to hold the largest number of cars that should ever be at the yard at any given time and still leave a decent margin of empty space.  When a yard gets too full, what should be simple quick moves end up taking far longer and it bottlenecks the whole rr.

Keep in mind a yard can be 25% "full" of cars and be "full" for the purpose of arriving new trains or making new blocks.

5 long tracks isn't as useful as 10 short ones if you have 7 destinations to sort cars into blocks for, plus allowing for some tracks for arriving trains and unsorted cars.

Reply 0
Alex Wood AlexW

A few thoughts

Great posts so far on this topic. I'd agree go single-ended except for an A/D track or two. Make sure that your train lengths make sense throughout the layout. Building 20 car staging tracks is pointless if your sidings can only handle 10 car trains. You could use two yard tracks to build a train if needed, but keep that in mind when designing.

As for blocking, you could use the NS method of putting a few empties on the front of a 215-car monster, derail it on Horseshoe Curve, and then do the same thing again because they didn't learn from model trains, physics, or their own experience.

Modeling the modern era freelanced G&W Connecticut Northern

Reply 0
David Husman dave1905

Double ended tracks

Double ended tracks serve two purposes:

  1. They allow an engine to escape from from a train/cut that pulls into a track.
  2. They allow the track to be switched from either end of the yard.

The question becomes:  do you have either of those needs?  If you do, add double ended tracks.  If you don't, then single ended will work.

In my original Wilmington yard I had essentially 2 "double ended" tracks plus the main.  I had the main, the runner, and #1 which was double ended.  The yard had 4 stub tracks.  Later I decided to make track #2 double ended on the south end, originally to use it as an extra arrival track track, option 1 above.

However as I worked with the yard I changed the use.  I had a lead switcher on the north end that had to classify inbound trains, build outbound train and an industry job that worked all the industries in the Wilmington area.  With the yard being single ended, the lead switcher also had to dig out and hand cars to the industry job.  That overloaded the lead job.  I changed the operation by putting the industry cars in the double ended tracks, #1 and #2.  Then the industry job could work those two tracks from the south end of the yard.  That leaves the lead job just switching inbounds and building outbounds.  I could possibly have the industry job switch the inbound trains, since all the inbound cars were going to places they serve, but the industry job needs to spend most of its time switching industries, not in the yard.  Making that change helped the fluidity of the yard more than having the flexibility of an extra AD track.

An overview of the yard from the N end.  There is an inbound train to switch on the runner (the cut with the caboose on it.)

osoyard.jpg 

The  double ended tracks at the south end.

swilm.jpg 

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
ctxmf74

Length versus width?

   It really depends on your space. If you have the luxury of long walls then a longer yard might look better. If you have a short space then you probably will need more short tracks. This should be considered as part of the picking a prototype or creating a freelance themed layout. Modelers have to compromise 99% of the time so best to recognize that from the start. I only had about 12 inches of width available for the yard on ,my current layout so i went with 4 longish tracks, not ideal but it works.....DaveB

Reply 0
AzBaja

La Grange Yard

 

Yard Lead for La Grange Yard.  The Red Pin is the point you need to make your cut to clear the turnouts in the yard body before you run out of yard lead.

448441_n.jpg 

 

743635_n.jpg 

I recently added 2 more yard body tracks, so now La Grange has 5 main yard tracks and 1 TOFC.

La Grange grew as the layout grew,  the original 3 tracks could not keep up,  Removed one of the 2 TOFC tracks and replaced it with 2 main yard body tracks and at this point I'm not running much TOFC traffic so the TOFC track does extra work as the 6th yard track.  I prefer when operating to put my 2 Refer Blocks PFE & PEX on the TOFC track so I can pull the block that is needed and add it quickly to the PFE or PEX train sitting on the siding (S-2) using the the pair of GP9 yard switchers.  Just split the train at the crossover on S-2

176040_n.jpg 

The 2 A/D tracks are double ended and the siding S-2 off the main has a small crossover so it can be used as an A/D or more for a place to swap car blocks with transfers running past La Grange.

416208_n.jpg 

AzBaja
---------------------------------------------------------------
I enjoy the smell of melting plastic in the morning.  The Fake Model Railroader, subpar at best.

Reply 0
Mark Mathu

Our Club's Main Yard




Our fairly-large club railroad has a blended approach; at our main division point we have two half-length double-ended yards "A" and "B" (seen on the right side near and far in the photo below) and three full-length double-ended yard tracks (center of the photo).  The three full-length tracks on the left side of the yard are the arrival/departure tracks, and the mainline bypasses the yard on the far left of the photo.

This has served us well during operating sessions.  We typically assign two crews to work the yard.  The adjacent aisle is 4 feet wide.

Our club's track plan is here, and the yard you see in the photo is "Fleming Yard."  The other major freight yard "Ottawa" which serves more as a base for local patrols and also handles overload work when our major industrial area of East LaSalle" gets clogged.

FULLSIZE.JPG 
 

Reply 0
ssagrawal

Some intermediate synthesis

These are some real nice ideas, guys! Thanks for all the ideas and helpful photos! Synthesizing a couple more observations so far (though please keep the ideas coming!):

a) Refining the algorithm for lots of half-length vs. fewer full-length class tracks:

Perhaps the algorithm should be refined as 1) go as many tracks wide as you can have at least as many tracks as you have "blocks" (however a block is defined in your context), while maintaining operators' reach, and 2) make each track as long as it can be, to maximize capacity.

b) Double-ended-ness

Double-ended-ness can be useful both for engine-escapes, and for potentially having a second switcher.

With regard to a second switcher: the switchers at each end might have specific tasks: for example, the second switcher might be assigned to make up locals, whereas the first switcher might be assigned to make up blocks for road freights in either direction. Another setup could be: one switcher assigned for RR-West trains and the second for RR-East trains.

To this end, it might even make sense to do a hybrid: have some double-ended tracks (e.g. in the local / road split, have enough double-ended tracks for all of your local blocks, so that the second switcher can work them) and some single-ended tracks for the first switcher.

If incorporating a second switcher, it's important to consider the practicalities of having so many operators crammed into one spot.

Applying these lessons to my railroad ...

Our discussion has revealed to me that I'd need ~10 class tracks ideally - 3 blocks for RR-West, 3 blocks for RR-East, and 4 for locals. That's a bit tough on reach, but probably doable.

In my particular setup, the biggest challenge with adding a second switcher is that the yard lead would have to be on a hidden curve, which sounds like a recipe for operational disaster.

Reply 0
Alex Wood AlexW

Double-ended yards

This is an interesting discussion on double-ended yards. I hadn't thought of having a second switcher working the other end. I wouldn't be so worried about the 1:1 scale operators as much as how to coordinate activities between the two switchers so that they're not waiting for each other as one digs out a car and the other needs to dig out another car from the same cut from the other end. It depends on the traffic flow as to how this would be coordinated. It would work best if you have the space to put a yard lead on either end by paralleling your main out in both directions.

The hybrid approach is cool if you don't mind using a LOT of turnouts. In the space, I'd probably just do long tracks, and save the cost of additional turnouts, at the trade-off of some flexibility. If you have the space for yard leads on both ends, you could treat a long double-ended track as two short single-ended tracks if/when necessary, although that would get a bit confusing having two different directions of operations going at the same time.

The practical limit for HO reach is usually about 24", or about 10 tracks. Anything beyond that and it's going to be tough, unless you go for a double yard with the mains running through the middle and separate yard leads, and provide access from both sides, truly giving you two independent yards. That requires a lot of space though.

Modeling the modern era freelanced G&W Connecticut Northern

Reply 0
David Husman dave1905

Two switchers

Quote:

I wouldn't be so worried about the 1:1 scale operators as much as how to coordinate activities between the two switchers so that they're not waiting for each other as one digs out a car and the other needs to dig out another car from the same cut from the other end.

Three  common options for having switchers at both ends of the yard are :

One end is inbound and the other is outbound.  One end is the classification job and the other is the "trim" job, that builds outbound trains.  One puts cars into the tracks and the other takes cars out of the tracks.  The only time the class job has to worry about the trim job is when the trim job is in one or two tracks it is pulling to build a train. 

One is eastward, one end is westward.  This works if there is a lot of through business and not as much local business.  With through business cars going eastward inbound will continue eastward outbound and vice versa.  There will be very little interaction between the "sides' of the yard.

A variation combining both of the above is one end switches through freights and builds locals, the other switches locals and builds through freights.   This is good for a layout that is a terminus or has a lot of locals and industry jobs originating.  Most of the cars inbound on through freights will go to locals out of the yard and most of the cars going back on the locals and industry jobs will go outbound on through freights.

Quote:

It would work best if you have the space to put a yard lead on either end by paralleling your main out in both directions.

Yes if you are going to be switching on both ends you need leads on both ends.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
Ken Rice

Cherry picking

Quote:

how to coordinate activities between the two switchers so that they're not waiting for each other as one digs out a car and the other needs to dig out another car from the same cut from the other end.

If you’re cherry picking cars in a yard, you’re not operating it very efficiently.  Generally you want to pull the whole track and classify it once.  Asside from being able to handle more trains faster, another benefit of doing it that way is you don’t need to access the middle of the yard, you only need to be able to reach the ladder end and car enough into each track to uncouple a bit past the clearance point.

Reply 0
David Husman dave1905

Cherry picking part 2

I also discourage "cherry picking" as a way to build trains or classify cars  Nothing is more frustrating to have to build a train where the cars are scattered over a half dozen tracks and you have to go on a scavenger hunt to find the cars.

There are prototype cases where trains are built by "cherry picking".  The first is a local where there is a track or tracks of cars for industries and the industries order in specific cars.  The second is a storage in transit (SIT) yard where cars are held until billed. 

In this yard, there are 1000 covered hoppers filled with hundreds of types of plastic.  Every day chemical companies receive orders for plastic from their customers and bill out loads of plastic going to them.  Then every evening, a switch engine goes into the SIT yards and digs out the 50 or 60 cars billed outbound among the 1000 cars in the yard.  Cherry picking on steroids.  What the crews do is print out a lists of the 30 tracks and then use those lists to figure out which tracks they need to go into and where in the tracks the pulls are.  After that its just switching them out.

SIT.jpg  

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
Virginian and Lake Erie

Something I have not seen

Something I have not seen mentioned yet. The spoke and hub. One should design the yard for the job it will need to do. The spoke and hub works because a lot of trains arrive at a small chunk of time. All of the trains are broken down and made into new trains that have cars going to the same place. Now if you’re going to have eight fifty car trains coming in to be broken up and put into eight new trains going to customers you are likely going to be happiest with one track for each train. And it would be best if it was at least as long as the train.

Reply 0
Minetrain

Short vs. Long Classification Tracks

The one limiting factor that no one seriously touched on was PHYSICAL SPACE in the layout room.  Your statement of 5 long tracks vs. 10 short ones means that your 'yard' or whatever needs to physically be 2X as wide.  Is it physically possible?

Is there enough space in the room for that?  Does that mean less aisle space?  What amount of layout structural modification is needed.

I mention this because our club is trying to deal with this same issue.  We have to widen a 15' length of the current layout structure (steel house framing studs and joists decked with 1/2" 5-ply plywood, topped with 2" foam insulation) to accomodate an additional 6 - 8 long yard tracks, where there are already 2 "mains" and 3 class/storage tracks in a 18" space.  The modification will make the 15' long x 20" wide 'dog-bone' shape into 20' of straight run about 32" wide.  Cantilevering out the steel joists will be the major problem, due to the track and turnout busses and other wiring already installed. 

Plan wisely, and be careful.

Minetrain

 

Reply 0
AzBaja

needs to physically be 2X as Long, Is it physically possible?

Or you need to make the space 2x longer than you have room area,  I can make my yard wider and give up a few inches of aisle width,  but it is Physical imposable to make any of my yard tracks longer.   

Well not fully true I have two spots that I could punch holes in the wall to make the yard longer. 

I can run the yard tracks out of the east wall over my neighbors swimming pool.  This will make it nice for out door summer events.

or

I can attempt to go into the no go zone and go south into the wifes bed room.  Then see what it is like to sleep on the couch.

Longer is not always an option and most people do not have hanger space sized layouts

AzBaja
---------------------------------------------------------------
I enjoy the smell of melting plastic in the morning.  The Fake Model Railroader, subpar at best.

Reply 0
Westbound

The Smaller Yard Preferred

My previous model railroads had single ended yards, which were not satisfying. Now I have one double ended yard which works very well. Each track is numbered - as on the prototype - with the first 2 able to hold full length freights (that's locomotives, ten cars + caboose). The remaining 3 (tracks 303 - 305) hold progressively fewer cars. I work the yard from near the mid-point and use power switches with the controls for both ends at hand. And I don't use paperwork.  

If I had10 tracks in my yard or even more it would be difficult to identify the track I wanted to enter or leave without counting from one side before throwing the proper switch (come on guys with large yards, you know you are often counting!). This is what modelers must contend with that the real railroad does not. On the real thing, switchmen have track lists and can easily find their track and cars on ground level where switches are nearby, well known to them and switch-stands numbered. If you must have a yard with 10 or more tracks, guess it would be better to work that yard from an end where all switches are visible.

 

 

Westbound

Reply 0
Prof_Klyzlr

Quoting for Reference

Dear MRHers, 

Quote:

There are prototype cases where trains are built by "cherry picking".  The first is a local where there is a track or tracks of cars for industries and the industries order in specific cars. 

He said it, can't take it back now...
(Proto-Nook-ians, start your engines....) 

Happy Modelling,
Aim to Improve,
Prof Klyzlr

Reply 0
Prof_Klyzlr

Found it...

Dear MRHers,

Quote:

The second is a storage in transit (SIT) yard where cars are held until billed. 

In this yard, there are 1000 covered hoppers filled with hundreds of types of plastic.  Every day chemical companies receive orders for plastic from their customers and bill out loads of plastic going to them.  Then every evening, a switch engine goes into the SIT yards and digs out the 50 or 60 cars billed outbound among the 1000 cars in the yard.  Cherry picking on steroids.  What the crews do is print out a lists of the 30 tracks and then use those lists to figure out which tracks they need to go into and where in the tracks the pulls are. 

it%20SIT.png  

Happy Proto-nook Switching,
Aim to know which track you're building your train on, _before_ you "pull and shove",
Prof Klyzlr

Reply 0
Reply