railandsail

Special Tunnel Project

I have built my helix structure external to my train shed,...
%2C%20ps.jpg 

 

DSCF2795.JPG 

 

I am now cutting the holes in the back wall of the shed that will allow the trains to communicate between the inside layout and that external helix.

 

(modified the title of this subject thread as it is no longer strictly a tunnel project)

 

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Box Beam cut and channeled

That long piece of box tube has been cut into 4 long pieces that will be utilized on the top and main deck over on the left hand side of the shed. These will support parallel tracks from within the inside of the shed out to the perimeter of the helix.

I might have already begun that installation BUT our weather here in FL has been rather CHILLY (almost cold), and so I have left those holes that need more trimming, closed up for a few days.

Meantime I have been working on the frame work for my lifting bridges at the entrance to the shed. Turns out it is going to be much less of a project than I originally anticipated,...on another subject thread.
 

DSCF3697.JPG 

 

DSCF3699.JPG 

Reply 0
railandsail

Evolving Search for Bridging Material

Quote:

But I believe the discussions here have convinced me to use open-top channel rather than tubes. Brian

Thank you fellows for convincing me to move away from that plastic tube idea I was entertaining.

I next went to that 3" square alum tube that I sliced in half lengthwise to produce 3" channels. These are fine for those 'bridges' that only need to be straight track segments.

But there are a few that need to support curved sections of track. I was thinking of cutting multiple short cuts in their sides that would allow them to bend in a curve. Then I paid another visit to my trusty old metal scrap yard and found some 6" alum channel material. So now my helix bridges are going to be a combination of these 2 type alum channels.

Photos and details coming soon.

 

 

Reply 0
railandsail

6" wide channel material

So here is a photo of that 6" wide channel material I found (I believe it is also an extrusion that is utilized in the 'screening' industry). The photo shows a stock piece on the right, and a segmented piece I built on the left,...for one of those curved track segments I mentioned needing above.
F3804(1).JPG 

 

That segmented channel above is needed for this very upper loop of helix track that snakes between those upright post of the helix circle to enter back into the layout room.
F3834(1).jpg 

 

DSCF3822.JPG 

 

DSCF3832.jpg 

 

F3831(1).jpg 

 

The two tracks under that wider bridge channel on the top are actually two side-by-side 3" channels (one of them carrying that auto-max cars). Those two 3" channels will mate with a single 6" channel once inside the shed. That 6" wide channel will be a 'singular foundation' for the double crossover arrangement just inside,....originally conceptualized here,..
F3662(1).JPG 

Reply 0
railandsail

MULTIPLE trips under that helix structure

Lately I have been fine tuning those bridging decks into the helix structure. It has me making NUMEROUS trips back and forth between the shed's inside wall and the interior of the helix. I haven't counted the trips, but it must be approaching 100 !!......many of them likely not necessary if I was not so forgetful, thus needing to double check my dimensions, and make paper/cardboard patterns for some of those custom track patterns.

It had me thinking back to the photos I posted on another subject thread when I was first considering making the helix even lower in order to accommodate helix tracks down to the staging level. What was the access going to be like?
https://forum.mrhmag.com/post/multiple-staging-areas-access-to-them-perhaps-subloop-in-the-helix-12209513
 

 

Quote:

I'm not convinced.  You haven't said how high off the floor the top of the ring will be.  Once you add the support structure, that distance will be less.  I'm assuming that there will be legs to hold the helix up which you will have to crawl around.

If you crawl under on your hands/knees, you will have to scrunch yourself into a small ball to stand up in the middle of the opening.  And if you slide in on your bottom, you will have to turn yourself into the ball position unless you can stand vertically from your backside.  I don't know anyone who can do that.

 

And we are not getting any younger.

Maxman

 

Quote:

 What if I decided to try to add two loops to the bottom of my planned outdoor helix to take the trains down to the staging level?
 

Would it really be so difficult to access if I were to have to get inside the 'hollow helix structure', to fix a derailment of whatever?...and yes I know I will have to at times.
 

I had a 48" circular metal ring that I placed up on the top of three stacked milk cartons. Why milk cartons,...because it brought the staging track level up to approx the level I was thinking of, So the staging access tracks in the helix structure would be at this level.

Even with this 48" circle I had PLENTY of room to get up inside the helix. Now imagine if my circle is closer to a 60" one (30R helix) I plan on. I am now convinced that I will NOT have to play limbo to get at the interior of this lower helix level.

Hello from the helix
%20ps800.jpg 

 

%2Cps800.jpg 

 

%20ps800.jpg 

 

%20ps800.jpg 

 

I had a couple of old friends stop by yesterday to conduct an 'inspection' of my progress. I told them of my multiple trips to that helix, and the reply was 'it will keep you in shape',...exercise.
 

Thank goodness for a 4x8 sheet of 3/8" thick piece of dense fiber insulation pad that allows me to crawl inside,...under the bottom beams at 38" off the concrete pad.

Reply 0
BlueTrain

this should work

This appears to be nicely tested, Brian!

But then you look fairly fit...
I am using an even smaller 100 cm / approx 40" Helix diameter and I can sit comfortably inside for work...
Given that yours will be outside, I think you have enough additional room.
Interesting Project!

Regards, Carlo Ritter - Switzerland

[H0m DCC] Layout "Rhaetian Flyer": Swiss alpine Meter-Gauge Proto-Freelance RhB+ FO+ zB; test layout, staging and helix operational; currently building 1st scenicked module; W11, Rocrail SW-Control, Roco WLAN controller; CANbus GCA-Electronics; Bemo, Peco + handlaid turnouts
Reply 0
railandsail

Building a metal 'christmas

Building a metal 'christmas tree' in my helix...ha...ha

 

I continue to tweak my bridges between the interior layout and the exterior helix. I began to inspect one particular vertical tube that supported at least 3 of the connecting bridges. What modifications could I make that would improve the situations??

 

My thoughts were if I could cut/trim a notch in that vertical tube in such a manner as to allow the track a bit less curve while negotiating around the tube it would all be beneficial. Rather than cut/trim that tube, how about a combination of L brackets that might provide the 'notch' in the vertical tube? I played around with a number of combinations of configurations utilizing any number of 4, 5, & 6” L brackets. It became a real jig-saw puzzle. I was getting confused with my multiple combinations. I was just about ready to make one particular combination the defining one, when I decided to give it one more inspection.

(didn't take photos of those 'experiments')

 

On my final inspection I noticed that I had NOT taken into consideration re-bolting the upper and lower connections of the tube itself (stupid me),...bolt that vertical tube to the outside of its support ring, rather than the inside. Then make a pair of those L brackets (actually 2 pair now) the intervening members of the 'continuous' vertical tube.
DSCF3846.jpg 

DSCF3841.jpg 


DSCF3840.jpg 


DSCF3842.jpg 

 

RESULTS:
I have effectively moved that vertical support tube outboard enough to make both the double curves feed the dbl-track helix tracks more gentle in curvature. The single track that branches off one of the helix loop tracks that feeds the center peninsula is more gentle in curvature. The very upper helix loop track is also more gentle.
DSCF3847.jpg 

DSCF3844.jpg 


DSCF3845.jpg 

 

PLUS, I have discovered a way to make a new bridge structure for the 3-turnout feeding the lower staging area, out of that 6” wide alum material. It will also snake around this latest vertical tube in a more effective manner. I'm building that today.

Reply 0
Oztrainz

Welcome to "Reactive Design"

Hi Brian,

It looks like you are getting things figured out to suit yourself and your own design criteria. You are getting pretty good at this. 

Please keep the photos coming. There's a few of us watching.  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
railandsail

Latest Bridge to Staging Tracks

I was just looking back at the 'evolution' of this particular bridge.

It started out with these images,..
DSCF2874.JPG 

DSCF2933.JPG 

Then went to this plywood version,..

Wood Roadbed

Yesterday I cut the entrance hole to the shed a bit wider, then cut out my wood roadbed piece (Its hidden under the paper pattern). I also cut out a square hole for the two Peco under-switch machines/controls to be housed in (not shown yet)
 

DSCF2944.JPG 

DSCF2943.JPG 

DSCF2942.JPG 


And now it is built of 2 different sections of alum channel,
DSCF3851.jpg 

F3854(1).jpg 

F3855(1).jpg 

This bridge deck is now much improved in stiffness and weatherability over the wooden one, and it has guard rails on each side. It also is a much thinner design that makes the underdeck control motors more accessible.
DSCF3857.jpg 

I'm happy with the way this has turned out.


 

Reply 0
railandsail

Metal Christmas Tree, once again

Back a page ago I posted,...

Quote:

Building a metal 'christmas tree' in my helix...ha...ha

I continue to tweak my bridges between the interior layout and the exterior helix. I began to inspect one particular vertical tube that supported at least 3 of the connecting bridges. What modifications could I make that would improve the situations??

 

I've since made a few other little changes to what I refer to as my metal christmas tree,   just trying to 'fine tune' these junctions to the helix curves so as to foolproof them as much as possible. I figure the time to 'get it right' is while I have this greater access prior to installing the circular roadbed and tracks.

latest, larger L- brackets
DSCF3911.jpg 

DSCF3912.jpg 

 

where it fits in helix
F3841(1).jpg 

 

smooths out curves that begin the climb for double tracks
F3847(1).jpg 

Reply 0
railandsail

Inner verses Outer Dbl Tracks at 2 different levels

The helix track serving the subterranean staging areas is the larger circle in the helix. There is also a level circular loop of track that begins on that same level, that is inboard of the staging track. The L-brackets that support that diving staging feeder track can not be used to support the level loop of track, so I had to come up with something that would attach to the vertical sidewall post and hold up the inner level loop of track.

At first I thought I might have to affix something to the 'floor piece' of plywood I eventually plan on putting in the helix structure. But the I arrived at a different type of support fixture that would attach to those vertical post and support BOTH the inner and outer tracks,...those white rectangular cutouts glued in place in the photos,...

DSCF3908.jpg 

 

DSCF3909.jpg 
 

Reply 0
packnrat

looks good from here. i guess

looks good from here. i guess you are using metal due to humidity?

as to track cleaning just attach a drag car to a couple trains. only takes a couple nails a small peace of wood, and a couple holes in the floor of the car.

you have switched to all metal wheels right?  maybe try a bit of oil on the top of the tracks?i have not done this but might. mostly dry air here.

Reply 0
Reply