railandsail

Special Tunnel Project

I have built my helix structure external to my train shed,...
%2C%20ps.jpg 

 

DSCF2795.JPG 

 

I am now cutting the holes in the back wall of the shed that will allow the trains to communicate between the inside layout and that external helix.

 

(modified the title of this subject thread as it is no longer strictly a tunnel project)

 

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Train Tunnels

I am now cutting the holes in the back wall of the shed that will allow the trains to communicate between the inside layout and that external helix.

(its beginning to look like 'swiss cheese', and I have yet to cut more for the upper deck track....ha...ha).
DSCF3634.JPG 

I have several dilemmas facing me. Naturally I want to place an outer barrier 'tube' of some sort in the most immediate opening thru the wall thickness itself. I'll come up with a nice plastic PVC tube, rain spout material that measures out at 3” wide, by 4.25” deep,...just about correct for a single line HO train to pass through. It even works nicely in that bottom left corner where I have two single lines passing thru the wall parallel to one another, (and in several other locations)...
F3052(1).JPG 

DSCF3635.JPG 

 

On the inside I would imagine these 'tunnels' will end up relatively flush with the interior wall surface. But on the outside I am thinking these tubular tunnels could be extended by as much as 3 feet to meet the roadbed of the helix,...in lieu of flat plywood roadbed with no side protections.
DSCF3632.JPG 


This presents the fact that the trains will be traveling thru these plastic tunnels for some distance, and what happens if a derailment occurs? (BTW this tunnel tube was just laid in there for image purposes, it is not correctly located, nor cut at this point).
DSCF2797.JPG 

 

My thoughts at the moment are that the track that is laid down in each of these tubes would be done so with very special care as to 'flatness' and non-movement. Plus there would be a rerailer installed at either end of these straight sections to further insure that the trains will not derail inside the tube?


Opinions,...thoughts??

 

 

Reply 0
mark_h_charles

reacher grabber tool

Brian,

If you don't already have a reacher grabber tool, you need one for your "tunnel".

 

 

 

Mark Charles

Reply 0
laming

Access...

Brian:

You ARE going to have easy access to that area AND access to the INSIDE of the helix once completed, correct?

If NOT, then I see the potential here for a layout-killing feature: The HF (Hassle Factor) is going to way exceed the FF (Fun Factor) in pretty short order once operational. You will HAVE to have access to all track points IF this layout is envisioned to have a long life span for there WILL be maintenance and other issues to attend to over time on any given section of track. It simply happens in spite of the best designs and intentions.

Best of luck with your layout project!

Andre

Reply 0
blindog10

how long are these PVC tunnels going to be?

Remember, trackwork causes about half of your derailments. Equipment causes the other half. Rough rule of thumb. So it doesn't matter how carefully you lay a given piece of track, you can still have derailments. And if you can't reach them, you're screwed. Mr Murphy _will_ find you. Just sayin'.... Scott Chatfield
Reply 0
railandsail

Have a Reacher

I do have one, but I think it is going to be rather hard to access the ends of a few of those tunnel tubes. That's why I am thinking these need to be 'bullet proof'.

That's also the reason I thought of making those tunnel tubes shorter, ...and just let any derailments fall off the edges.    At least they would be visible.

 

 

Reply 0
railandsail

How Long?

I figure the longest one would be 3-4 feet,...along that outer wall, and containing the single track that feeds the staging areas. It would stretch from the outer rim of the helix track into the shed,..possible at least a foot into the inside of the shed.

That tunnel tube has me most concerned as it will be the most difficult to reach. I have given thought to cutting  some 'relief holes' along the length of these tubes.

 

 

Reply 0
railandsail

Discovered One Interference

I discovered one interference that somehow I missed on my scale drawings. One of the 2x4 studs of the shed, along with a steel diagonal brace in the wall, interfered with the curvature on one leg of my lower loop tracks. So I had to move the tunnel tube over and angle it a bit differently. When I did that it brought my tunnel tube for that track into conflict with one of my helix upright post. I had to segment that particular post, but that should not be a problem when I finish it all up.

DSCF3631.JPG 

Reply 0
Marc

no tunnels

 

Avoid these tunnels, you could try everything you want, sure there is the place where problems will occurs for sure.

I would prefer the old fashionned plywood with safe side glued or nailed on it; which prevent any trains to fall down but allow you easy access to your trains.

Only the entrance of my tunnel are closed, to simulate natural stone walls, the rest is as mentionned plywood with side protection and for sure this help a lot when a derailement occurs in this area.

When I shall be in Canada,  I will use translucid plastic for the sides as a friend do, so you can easily see where the train is derailled when you go Under the modeled mountain.

On the run whith my Maclau River RR in Nscale

Reply 0
Ken Rice

How do I say this politely...?

You're nuts! 

No offense, and I can see the temptation and the neatness of the solution to where to put the helix, but from a practical point of view I think you're asking for trouble.

Derailments will happen.  Dirty track leading to stuck locos in the tunnel will happen. Critters may get in and either expire in a tunnel or leave acorns or whatever in there.  Someone will bump into the helix wart on the outside and if it's not vigorously stabilized and fastened down, it will move, causing alignment issues.  Rain happens, and roof leaks happen, especially at the joint between a lower roof (like the one that will presumably be over the helix) and a wall.

You're going to need a lot of good access from both inside and out to keep that thing working.

Reply 0
Neil Thomas Cadmaster

Could not agree more. This is

Could not agree more. This is an accident looking for an opportunity. Brian, is your middle name "Murphy"?

Neil

Reply 0
railandsail

No Tunnels

Quote:

Marc

Avoid these tunnels, you could try everything you want, sure there is the place where problems will occurs for sure.

I would prefer the old fashionned plywood with safe side glued or nailed on it; which prevent any trains to fall down but allow you easy access to your trains.

So maybe I should really look at doing it similar to the manner I did the helix-to-shed connection for the staging level,....
 

Quote:

Wood Roadbed

Yesterday I cut the entrance hole to the shed a bit wider, then cut out my wood roadbed piece (Its hidden under the paper pattern). I also cut out a square hole for the two Peco under-switch machines/controls to be housed in (not shown yet)
 

DSCF2944.JPG 

DSCF2943.JPG 

DSCF2942.JPG 


F2949(1).JPG 


I'll have to give this new consideration, as the tunnel idea even gives me pause. 

Reply 0
Michael Tondee

Access is paramount

There's no getting around that fact. If I've learned anything in all my years in this hobby, it's that. I applaud your ingenuity, I once thought of doing something similar with staging when I had a layout housed in a small separate building, but don't paint yourself in the proverbial corner. You really have to be able to get to all parts of that helix and the tracks leading to and from it.

Michael, A.R.S. W4HIJ

Model Rail and "mad scientist" for over 50 years.

Member of "The Amigos", Co-Inventor of the A.O.S.T.

I call what I do "An artistic impression of reality" and the Island is "lost" somewhere in the Pacific Northwest, see it here...

The Blackwater Island Logging & Mining Co.

Reply 0
THaag

I did something similar

I did something similar in that I built a small room inside my garage to house my double track helix. I added a door to the room so I have full access to it.  It has been in service for ten years now and works great but full access is necessary and in my case the room also works as a storage too.

One thing to keep in mind is the weather. I live in Pennsylvania and even with the room being insulated and being in my (unheated) garage it does get cold in that room.  This does not affect operations of it but the four holes in the wall that connect the layout room to the chilly helix room does let in a surprisingly amount of cold air.  I stuff the holes with rolled up plastic bags when not in use and have a small heater in the helix room when needed.

Reply 0
railandsail

Access to Bridging Tracks between Helix & Main Shed

I will have relatively good access to most portions on that helix, ...plenty of room up inside the 6 foot diameter . And I will have good access to those bridging tracks on that side of the helix with the staging track bridge,...where the 3 way turnout into staging tracks is located (that side skin of the 'helix box' is removable, and will also have a 'door' opening.

The one area that is questionable for access is that far side that feeds tracks to left wall side of the shed,...both on the lower level deck and the upper level deck. Those bridging tracks are 'outside' of the helix circle, thus not easily accessed from inside the helix circle. Plus that side of the 'helix box enclosure is up against the side of the trailer home. That makes them almost inaccessible from the 'outside'. Those are the tracks that concern me.

DSCF2794.JPG 

 

%2C%20ps.jpg 

Reply 0
railandsail

Idea, alum channel?

Perhaps I need to find some alum channel like these I was considering for my doorway access. It just needs to be 3" wide rather than this 4" wide to fit my helix track spacing and the holes I have already cut into my shed's wall.

F2970(1).JPG 

 

F2963(1).JPG 

 

Why would I be looking at metal channel rather than plywood? Because there are some locations within the helix where the inner loop track passes over the outer loop and this may call for a 'thinner roadbed'. Metal would be stiffer in a 3-4 foot length than plywood.

Have to make another trip to the stores or my metal scrap yard on Monday

 

Reply 0
Wazzzy

I have been watching your

I have been watching your build. Truly thinking out side the box by adding onto the storage shed to house the helix. When the outer skin is put onto the helix addition, pay special attention to the direction of the metal ribbings & flashing to prevent water from leaking into the helix area. You should be able to eliminate 99% of rain water leaking into the helix housing extension.

Since the helix housing will not be 100% moisture proof, you might have a bit of condensation inside. If you are heating the main shed, you could put small fans (think computer cooling fans) in the pass through holes (blowing warm air into the helix housing) when not operating your layout. This will force warm air into the helix housing and help mitigate moisture issues.

 

Alan Loizeaux

CEO Empire Trackworks  (Empire-Trackworks.com)

Modeling ON30 DRG

Husband, Father, Grandpa, Retired Military, Conductor / Yard Master Norfolk Southern, Owner Empire Trackworks (S, SN3, On3, On30, On2, HOn3, O 2-rail & others)

Reply 0
Al Carter tabooma county rwy

Cut The Top Off The Gutters?

Brian,

How about cutting the top off the rain gutters, except maybe the short distance where they actually pass through the walls.  This would effectively make them a "trough", providing easy access from above.  Or, if that would weaken the length too much, leave a couple of spots where the entire "tube" is intact, to help stiffen it, but still give access from above to most of it, for rerailing or cleaning purposes.

I know you are in Florida, and I know it is nice and toasty warm most of the year, and humid, but during the winder it know it can get down to freezing.  With the metal structure, metal sides, etc., aren't you going to have a condensation problem to deal with?  I remember many years ago I had an aluminum canopy for a pick up that had just that problem, and I lined it with some sort of fabric sold for that purpose.  Just an idea....

Al Carter

Reply 0
ACR_Forever

Brian

I continue to worry about your project, but I will assume for the purpose of this note that you will continue.

Tunnel Access - for two purposes, derailment resolution and track cleaning (let's set aside physical repair for a minute).

To remove derailed rolling stock, simply push it through the tunnel and out the far side.  This requires that you maintain a straight line-of-sight through the tube from at least one end, but it will work - to the detriment of detail parts, but that's a cost of "doing business" this way.

To clean track, you'll need a yardstick and a tennis ball to give you a cleaning head that you'll be able to apply pressure with.  The ball mounts on the end of the stick (put a hole in one side, push the stick through, run a screw through the ball into the end of the stick?), you wrap a cleaning cloth soaked in your favorite solution around the ball, tie it off with an elastic, string, whatever.  That lets you reach in to the middle of the tube and clean the rails.  (cue rants from others about graphite, etc. etc. here).  Come to think of it, this looks like a ramrod for an old cannon, and would also serve to push derailed cars out the other end.

All of this is do-able.  However, to mount your rail in a 4' tube, you'll need to secure the rail to something through the tube.  I'd use caulking to secure flextrack to a length of plywood for that, so you can ultimately remove the track segment and replace it, should you need to, which addresses my physical repair reservation, above.  Screw both ends of the ply down, and hope like heck it doesn't arch upwards in the summer heat and humidity?  Maybe to avoid distortions like that, screw down the helix end, but make the other end 'floating', and ensure that the ensuing expansion doesn't distort track in the train room?  

All of this is do-able, to my mind, but are very likely to give you fits.  While none of it is pain I would inflict upon myself, we all have different pain thresholds.  I still believe you're flirting with Mr. Murphy bigtime, but hey, it's your hobby.  

Good luck!

Blair

Reply 0
railandsail

Ken's concerns

Quote:

You're nuts! 

No offense, and I can see the temptation and the neatness of the solution to where to put the helix, but from a practical point of view I think you're asking for trouble.

I knew I was going to encounter 'challenges' with this external helix idea, but there was just not many options to not placing it inside the shed. So I decided to tackle the job and make it work. There was an early time when I was considering to have the helix half-in, half-out of the shed's wall. I quickly decided against this idea (thank goodness), and that decision has been reinforced recently when contemplating these connector tunnels.

 

Quote:

Derailments will happen.  Dirty track leading to stuck locos in the tunnel will happen. Critters may get in and either expire in a tunnel or leave acorns or whatever in there

I really thought I could make those relatively short STRAIGHT tunnel tubes bomb proof for most of those concerns, except the critter situation (and we do have a lot of those geckos down here in Florida). 

So you fellows have convinced me to look at new solutions.

Quote:


Someone will bump into the helix wart on the outside and if it's not vigorously stabilized and fastened down, it will move, causing alignment issues. 

That is not a problem as I have built it very stable.

Quote:


Rain happens, and roof leaks happen, especially at the joint between a lower roof (like the one that will presumably be over the helix) and a wall.

I have that all solved,...and proven out. It has been built and covered now for 2-3 months of very rainy weather. Absolutely no leaks. I put a good metal flashing between the back wall section of the shed and the roof of the helix structure.

 

 

Reply 0
railandsail

Communicating Air

Quote:

Tom Haag

I did something similar in that I built a small room inside my garage to house my double track helix. I added a door to the room so I have full access to it.  It has been in service for ten years now and works great but full access is necessary and in my case the room also works as a storage too.

One thing to keep in mind is the weather. I live in Pennsylvania and even with the room being insulated and being in my (unheated) garage it does get cold in that room.  This does not affect operations of it but the four holes in the wall that connect the layout room to the chilly helix room does let in a surprisingly amount of cold air.  I stuff the holes with rolled up plastic bags when not in use and have a small heater in the helix room when needed.

I don't think I need to worry so much about cold air, but more so with hot air. I have noticed quite a bit of air getting forced thru those tunnel holes when the wind is blowing. Of course I do NOT have a bottom piece on the helix structure yet, so the wind can puff up into the helix volume and enter the tubes.

The helix will eventually have a bottom piece to keep out bigger gritters, etc. And the bottom piece will have a trap door (long one) in it for access up to the inside. That 'floor' will also be handy to set things on when doing any work up inside the helix.

A friend also supplied a very powerful, small fan that I will likely use to help with air communication. I do have both AC and heat in the shed itself.

 

 

Reply 0
railandsail

How about cutting the top off

Quote:

How about cutting the top off the rain gutters, except maybe the short distance where they actually pass through the walls.  This would effectively make them a "trough", providing easy access from above.  Or, if that would weaken the length too much, leave a couple of spots where the entire "tube" is intact, to help stiffen it, but still give access from above to most of it, for rerailing or cleaning purposes.

I thought about the Al, but I think that act of cutting off the tops would weaken the plastic troughs too much.

Yesterday I discovered an ideal piece of box-shaped alum that I could cut in half length-wise to make 2 lengths of troughs. Its a 3x3 inch of alum they use a lot here in FL as vertical columns to support carports. It is only 1/16" thick and has a bit of a wavy ridge surface on the outside (for rigidity), and a smooth surface on the inside for laying flat track. Turns out I had 2 long lengths (10-11 feet) of this material up unit a few months ago when I gave it away to a neighbor so they could repair their carport damaged in last hurricane. Oh well, have to pay another visit to the metal scrap yard or a contractor's excess cut-offs.
DSCF3645.JPG 

DSCF3646.JPG 

 

 

Quote:

I know you are in Florida, and I know it is nice and toasty warm most of the year, and humid, but during the winder it know it can get down to freezing.  With the metal structure, metal sides, etc., aren't you going to have a condensation problem to deal with?  I remember many years ago I had an aluminum canopy for a pick up that had just that problem, and I lined it with some sort of fabric sold for that purpose.  Just an idea....

Al Carter

Surprisingly I have not had condensation in my helix at this point,...maybe because of my decent foam insulation piece I put the the roof? (I have had condensation on my metal carport roof that is just single thickness of alum)

 

 

Reply 0
railandsail

Blair's concerns

Quote:

I continue to worry about your project, but I will assume for the purpose of this note that you will continue.

Tunnel Access - for two purposes, derailment resolution and track cleaning (let's set aside physical repair for a minute).

To remove derailed rolling stock, simply push it through the tunnel and out the far side.  This requires that you maintain a straight line-of-sight through the tube from at least one end, but it will work - to the detriment of detail parts, but that's a cost of "doing business" this way.

I thought about this solution, ...for those few times I might experience a derailment in that short piece of STRAIGHT track. And yesterday I was looking more closely at my situation and saw that it could be done depending on how I made the connection of those tubes at their helix end.

But I believe the discussions here have convinced me to use open-top channel rather than tubes.

 

Quote:

To clean track, you'll need a yardstick and a tennis ball to give you a cleaning head that you'll be able to apply pressure with.  The ball mounts on the end of the stick (put a hole in one side, push the stick through, run a screw through the ball into the end of the stick?), you wrap a cleaning cloth soaked in your favorite solution around the ball, tie it off with an elastic, string, whatever.  That lets you reach in to the middle of the tube and clean the rails.  (cue rants from others about graphite, etc. etc. here).  Come to think of it, this looks like a ramrod for an old cannon, and would also serve to push derailed cars out the other end.

I got a kick out of this reply. We do have lots of cannons here in old town St Augustine, so I thought it was appropriate.

I like the tennis ball idea.

 

Quote:

All of this is do-able.  However, to mount your rail in a 4' tube, you'll need to secure the rail to something through the tube.  I'd use caulking to secure flextrack to a length of plywood for that, so you can ultimately remove the track segment and replace it, should you need to, which addresses my physical repair reservation, above.  Screw both ends of the ply down, and hope like heck it doesn't arch upwards in the summer heat and humidity?  Maybe to avoid distortions like that, screw down the helix end, but make the other end 'floating', and ensure that the ensuing expansion doesn't distort track in the train room?  

I was thinking of various methods that might be used to attach the track to the inside of that PVC tube, but now I will not have to worry about that, I'm going in a different direction.

Reply 0
railandsail

Box Shaped Alum for 'Helix Bridges'

Quote:

Yesterday I discovered an ideal piece of box-shaped alum that I could cut in half length-wise to make 2 lengths of troughs. Its a 3x3 inch of alum they use a lot here in FL as vertical columns to support carports. It is only 1/16" thick and has a bit of a wavy ridge surface on the outside (for rigidity), and a smooth surface on the inside for laying flat track. Turns out I had 2 long lengths (10-11 feet) of this material up unit a few months ago when I gave it away to a neighbor so they could repair their carport damaged in last hurricane. Oh well, have to pay another visit to the metal scrap yard or a contractor's excess cut-offs.


I paid a visit to my trusty old metal scrap yard today, and WOW, I discovered a piece of that alum extrusion. And not just a short piece, but rather an 11.5 foot piece. I shouldn't need that much of this piece, so if anyone else might be looking for alum bridge material let me know. I'll be cutting it up into shorter pieces.

DSCF3659.JPG 

 

DSCF3660.JPG 

 

These are the carport support columns I spoke of as to their use here in FL,..
DSCF3661.JPG 


 

Reply 0
railandsail

Square Tubing

Square Tubing Bridges
 

Originally when I found the PVC rain pipes I found that their 3” width worked out well for my desired center-to-center distance of the tracks exiting the helix. So I was pleased that the replacement 'alum channel bridges' of 3” width would also maintain this same separation.

 

I have 3 situations where I need this 3” center-to-center distance between the parallel bridges,..
1) on the right hand side where the two mainlines rise up 4” to enter/exit the helix

F3635(1).JPG 

DSCF3633.JPG 

 

2) on the left hand side where I have 2 parallel tracks enter/exiting at both the lower level and upper level decks.

F3052(2).JPG 


At both of those deck levels on the left hand side, 3 out of the 4 tracks must drop down from flat level by 1/2” by the time they reach the back wall,...
a) the staging access track at the lower level,
b) both tracks on the upper level.
These alum bridges will allow for this by providing a nice gentle sloping 'flat surface' for the track all the way from the helix circumference to the deck plywood inside.
DSCF3666.JPG 

 

DSCF3670.JPG 


 

 

I was having some concerns about those 2 tracks at the upper deck level,...because I wanted to locate a modified double-cross over arrangement there.
DSCF3663.JPG 

 

So I did a little mock up using 3 med radius Pecos and 1 dbl-curve Peco. Since I had not yet sliced the 3” box beams in half, I used some other slightly wider width alum channels I had for this image. But the basic idea is there.
DSCF3662.JPG 


The 2 box beams are on the left, ...and when cut down will provide 2 channels like those shown on the right. The upright 'web' between the two channels will be shaved down where needed for the 'crossover track piece'.

 

 

Reply 0
Reply