railandsail

I have been agonizing for sometime now as to how, ...or if, I could fit a Walthers steel mill blast furnace into my layout plans. First off I have a real nice one thats all ready built, and secondly it would compliment my Balt city theme on the lower level (and most of us know Balt used to be a big steel town).

So now I think I have found a place for it to sit, but I need help in its orientation and location.


UPDATED: I just recently modified the title of this subject thread, as things have evolved for this corner piece of real estate. Its now a place for a Coke Plant & a Power Plant.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 2
railandsail

Coke Wharf?

I think because of my limited space. I'm going to model my coke wharf as just an image on the backdrop along/behind that in-coming coal track. In other words the quenching car moves over to that other track to dump its freshly quenched coke, then returns to the coke oven receiving track for a new load.

The physical coke transportation hoppers just 'appear' on the layout from wherever. But perhaps they can be a part of the image on the backdrop.

 

 

 

 

Reply 0
David Husman dave1905

Backdrop

Actually you could have the whole coke plant as a flat/backdrop, because the only "rail" movements are the inbound coal and the outbound coke.

A coke plant would be the PERECT loads in/loads out industry.   Put a coke plant on a reverse loop, with a backdrop cutting across the loop.  On the inbound side, the hole in the backdrop is hidden by the rotary dump building, the center of the loop is whatever you can fit of the ovens, and the loop comes back out under the loading tipple for the coke.  Loads of black granular stuff in hoppers in, loads of black granular stuff in hoppers out.

Coke.png 

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
Oztrainz

Coke wharf reply

Hi Brian,

Quote:

I think because of my limited space. I'm going to model my coke wharf as just an image on the backdrop along/behind that in-coming coal track. In other words the quenching car moves over to that other track to dump its freshly quenched coke, then returns to the coke oven receiving track for a new load.

That can't work because the wharf is linked to the Hotcar Track. The Hotcar has a straight shot - from catching the oven to the quencher, then to the wharf, and then back to catch the next oven. It does not swap sides from the front to the back of the battery 

Have a look at 

ianCoke4.jpg 

If you are worried about space -the coke wharf could be only 1" to 2" deep with the conveyor to the screens about another 3/4" deep. This gives you all the operations scenically in under 4" of width plus 2 track widths at the Screens. 

Remember this is where we started from 

ianCoke2.jpg 

and we've simply swapped the coal in track to the benzol track, and moved the quench tower to over the hotcar track (where it should be).  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
railandsail

Hotcars are usually

Quote:

Hotcars are usually restricted to each oven battery but they can be shared between batteries while the adjacent battery's hotcar is down for maintenance. This is not ideal because it slows down the pushing rate of both oven batteries. At Port Kembla we had 6 separate oven batteries all lined up on the one hotcar track. In the mid 1970's #2 Battery was dead, but the hotcar from #3 Battery ran through to either #1 or #4 battery. Another part of the trainee's duty was to be the "observer" when this happened.

Hotcars are very specialised pieces of equipment. The driving locomotive is electrically powered by live rails under the side of the coke bench. The actual catching wagon has an angled deck on it and is robust enough to take having several thousand gallons of water dropped on every 10 minutes or so when the coke is being quenched under the quenching tower.  The hotcar does a simple yo-yo run - catch the oven as it is pushed in a nice even thickness layer/move to under the quencher tower/quench the coke/move to the coke wharf and drop the quenched coke onto the coke wharf/close the coke drop doors on the hot car wagon and move to where the Extractor is set up for the next push/repeat until the end of shift. It sounds easy, but it isn't.
John Garaty

Am I correct to assume that this particular 'hotcar' setup was somewhat unique to those plants you worked at?

The reason I ask is that I thought I had seen some operations where another type of locomotive moved those hot/coke cars, ....rather then the electric ones that might be restricted to the collecting/quenching track,...maybe even a diesel loco??

 

 

Reply 0
railandsail

Reverse Loop

Quote:

 A coke plant would be the PERECT loads in/loads out industry.   Put a coke plant on a reverse loop, with a backdrop cutting across the loop
Dave

Interesting idea, but I do NOT have room for a loop of track out back of my coke plant corner.

 

 

Reply 0
steve ackerman

Quench cars

From every mill I have seen or read about the quench car seldom, if ever left it's single track.  Many were self propelled.  

Reply 0
railandsail

Just for the fun of it, and

Just for the fun of it, and to explore my curiosity I went exploring and found these,..


the Netherlands


Westfalia

(Coke oven locomotives were specially built with high cabs so that the driver could see over the coke oven car)

 


 

 

 

 

 

Reply 0
railandsail

Walthers Kit with Larry and Quenching car

Apparently Walthers did produce another coke kit that included additional details

Reply 0
Oztrainz

Hotcar Design 101

Hi all,

how you move the hotcar wagon to catch the hot coke can can be achieved by different means. These days you might not even have a dedicated locomotive unit with or without a driver. Some of the methods that have been used to move the hotcar wagon are:

  • 415V 3-phase electrically powered locomotive powered by live rails under the coke bench edge. This method was used on all 6 batteries at Port Kembla. Each of the Port Kembla batteries has an A and B unit like one of the Walthers model battery (see the Westfalia unit photo - the electrical collector gear is on the other side of this locomotive).
  • Electric locomotive powered from overhead wiring (as shown in the Solvay Coke #2 photo) 
  • Diesel or other I/C powered locomotive (see the Dutch hotcar)
  • It is just within the realms of possibility of using a dedicated steam locomotive being used to move the hot car, but by the time this type of vertical coke oven design came into use, electrical options were far more reliable than using a steam locomotive. #1 battery at Port Kembla dated back to the 1930's. I've never seen anywhere a photo of a steam locomotive on hotcar duty on this type of oven battery, but...
  • Electrically powered winch hauling the catching wagon with no locomotive (seen on a Youtube of a relatively recently commissioned battery). 
  • With advances in computer control, the last option becomes possible, as does remotely controlled operation of any of the locomotive-propelled options but with no driver onboard.  

If you do have a driver on board the hotcar, the cab has to be high enough so that the driver can see the hot car wagon during the push, quench and dump operations. So in most cases the hotcar locomotives are a tailored design to match the battery design, rather than being an "off-the-shelf" railroad locomotive propelling a specialised catching wagon. 

For a locomotive-propelled hotcar, the "catch" is always done propelling the catching wagon, even if it is a "pull" back to the quencher tower. This is also done so that the hotcar driver can see how the coke is landing in the catching wagon. If the coke is too thick on the tilted deck of the catch car and the quench operation is only partially successful, then the quality of the coke can be badly affected. Poor quality coke can give the blast furnace a bad "tummy ache".  

That'll do for this post,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
railandsail

New Wharf Location

Okay as I looked thru a lot of those photos today I did see a lot of wharf locations right off that hot track. So now I propose to put a wharf right along the coke collection track (the white slab in these photos). And I will add a new track down to that wharf to pick up the cooled off coke. Don't know that I will detail that loading procedure yet.

DSCF5493.JPG 

 

DSCF5494.JPG 

I debated as to whether to provide that additional turnout for the hot track itself, but since I have enough turnouts I though I would go ahead and provide it.

 

 

Reply 0
railandsail

Viaduct Modification

I was playing around with the Coke Plant and the Power Plant, and their trackage yesterday, and took note of my need to have a portion of the viaduct be removable for decent access. So I took the time yesterday to make that a reality. I picked out several distinctive dividing points along the viaduct to make joint locations. I will now be able to lift out that one section (along with its stone facial decoration) in order to gain access to these 2 plant areas in the corner.

 

 

Reply 0
Oztrainz

If you use a conventional diesel switcher locomotive

Hi Brian,

If you use a conventional diesel switcher locomotive to move the hotcar wagon then having a switch leading to the hot car track could make operational sense because it allows you to easily swap out the diesel switcher for maintenance purposes as required.

There is a hard limit in how long you can hold coke in an oven before you destroy the coke by overcooking it. That's one of the reasons why you have 2 of all the machines on a real coke battery. So that you can continue pushing and charging ovens if a machine has a major breakdown that takes days to fix, You can push the ovens empty and hold them on gas for a short while (probably a week or 2 at the most) without structural damage to the ovens. But these type of ovens actually rely on the coal charge inside the oven to maintain the structural integrity of the battery.

A suggestion - you need a way of lifting the coke at the bottom of the coke wharf (baseboard height) and raising it to above wagon height for loading. One of those 2 coaling plants you have at  https://forum.mrhmag.com/post/older-style-wooden-coaling-towers-12215758  could do the job. Fabricate a conveyor structure (as discussed previously) along the coke wharf edge and extend it to the right and into the coal elevator part of the coaling plant.

If you re-purpose the Maine Central one, the conveyor goes into the side of the bit of the tower with the "7 Up" sticker. If you raise the conveyor from the end of the wharf you should be able to clear the roof of the small shed and have the conveyor structure join at above the height of the stair access. Conveyor belts can climb pretty steeply at about 25% to 30% grades. Or you can mimic the angle used by the conveyor on the other side of the battery to give you an indication of how long closed conveyor structure you need. 

Remember this conveyor doesn't have to be fancy -  a simple rectangular tube of cardboard or styrene can do the job. Again use the conveyor structure leading up to the top of the Larry Bin on the far side of the battery for guidance of size.              

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
railandsail

Mirrored Power Plant?

Just for the fun of it I thought I might play with the idea of a mirror image on the power plant to see if i could make it, and its piles of coal look larger?

First I just placed a piece of mirrorized tile in the background (please ignore the fact that it has a decorative finish on its mirror). Of course it is reflecting an image straight up my aisle so I had to make an attempt to block a portion of that with just plain white paper folded over a portion of the mirror. 

Then I had to attempt to block out the reflected image of the coke plant,..again with pieces of paper blocking those portions.

Then I wanted to include the piles of coal needed by the power plant,...those plastic tubs.

I was thinking this rather unusual shaped reflective surface might be attainable utilizing mirrorized mylar foil?

DSCF5498.JPG 

DSCF5499.JPG 

I'm now thinking this image of a bigger plant and piles of coal would be better obtained with some sort of artist/photo shopped image pasted on the backdrop.

Perhaps I really need to explore this Affinity Photo technology more thoroughly.
https://forum.mrhmag.com/magazine-feedback-was-ezines-891776
 

or this stacking technology..

Cell phone tucked into tight space on layout

Sat, 2020-03-21 16:45 — Rick Sutton

iPhone XS, Camera Pixels focus stacking processed with Helicon Focus and Affinity Photo.

-750x741.png 

I've got a few places I could utilize some images like this.


 

Reply 0
railandsail

Coke Conveyor

Quote:

A suggestion - you need a way of lifting the coke at the bottom of the coke wharf (baseboard height) and raising it to above wagon height for loading. One of those 2 coaling plants you have at  https://forum.mrhmag.com/post/older-style-wooden-coaling-towers-12215758  could do the job. Fabricate a conveyor structure (as discussed previously) along the coke wharf edge and extend it to the right and into the coal elevator part of the coaling plant.

I rather doubt they would have used a wooden structure for such a potential 'hot job' of lifting coke?

How about something like this on the back edge of the coke wharf?

 

...also found on this cement plant model

Reply 0
railandsail

Ariel View of Coke Plant

This fellow makes some nice drone videos of railroad sites,..
 

 

...another video of his on this same plant,..

 

 

Reply 0
railandsail

Scrap Steel for Electric Furnace

I've decided to include my walthers electric arch furnace in my steel mill scene,...to be put in the place of that allied rail rebuilders structure there in the center of this photo,..

https://forum.mrhmag.com/post/steel-mill-scene-in-a-corner-now-coke-plant-power-plant-12209837
 

So my delima at the moment is do I just eliminate that diesel engine service building next door, and maybe put some plies of scrap steel that might be used by that furnace?

 

Quote:

John Garaty
Iron ore went into a blast furnace with coke and limestone and became iron. From there the iron went into one of the following, Bessemer furnace, open hearth furnace, or basic oxygen furnace and became steel. From there it went to ingots or a continuous caster and from there was shaped into useful things in rolling mills.

Generally an electric arc furnace used lots of scrap steel to make steel.


I was trying to find some photos of such an image on the internet, but I don't seem to find many (any)? Seems as though most modelers do not include these piles of scrap steel.

 

 

Reply 0
railandsail

Redoing Track Plan for Electric Furnace and Freight Yard

I posted this today in another subject thread, but it really should have been posted under this subject thread,...

Redoing Track Plan for Electric Furnace and Freight Yard (the ever-changing track plans !!)

I just finished cutting and mounting my alum-trim/deck-edge supports for the upper decks and mounting those LED tube lights into them. I had to get a little creative to increase the lengths of those 5 foot alum extrusions into 6'+2” long ones while retaining the open slot to contain those LED tubes,...and still be stiff enough to provide that very straight edge. (last 2 photos)

This project has brought me closer to laying tracks on all three layers, first the lower staging deck, then the middle main deck, and finally this upper deck. That staging level at the bottom is very straight forward and already totally planned out.

But the middle deck with its steel mill and freight yard was still unfinished in my mind. Originally I was not even going to include the electric furnace, but rather a modified rail rebuilder structure there.
14904-1.jpeg 

Then I put the electric furnace in place of rail rebuilders

14948-2.jpeg 
I had also contemplated 2 locations for the diesel service building, ….then most recently just eliminate it all together.

I had also not figured out how my freight yard tracks were going to terminate (and or exit) down at that end. I needed to do something about this. These are my current experiments, ....how to provide for a ladder of turnouts for my yard tracks...
15114-3.jpeg 
(just so happens I was able to re-include the diesel service building along the edge of that yard exit ladder)

15201-4.jpeg 

So I moved the electric furnace over just a bit, and now need to figure out the best track plan to service it??

15248-5.jpeg 

Reply 0
railandsail

Steel from Iron Ore

Reading back thru some of this subject thread I ran into this from Rob in Texas,...

Quote:


https://forum.mrhmag.com/post/steel-mill-scene-in-a-corner-now-coke-plant-power-plant-12209837

Iron ore went into a blast furnace with coke and limestone and became iron. From there the iron went into one of the following, Bessemer furnace, open hearth furnace, or basic oxygen furnace and became steel. From there it went to ingots or a continuous caster and from there was shaped into useful things in rolling mills.

Generally an electric arc furnace used lots of scrap steel to make steel.

That is a great over simplification but will possibly give you more information than you had

 

In my original track plan I displayed a lot of track connections between the blast furnace and the rolling mill. Perhaps I need to do a whole new look at this situation, and make the primary connections between the electric furnace and the rolling mill ??.....(going to cause lots of consternation)     HELP!

 

 

Reply 0
railandsail

Perhaps some ideas over on

Perhaps some ideas over on this page,.
https://forum.mrhmag.com/post/latest-industrial-area-harrisburg-12204534
 

Reply 0
railandsail

Have to check and see if this

Have to check and see if this interior image matches mine,..

100_4796.jpg 

 

100_4798.jpg 

Reply 0
railandsail

EAF, BOF furnaces

Steel mill subject thread with photos and descriptions
http://empcccc.sourceforge.net/Train_Steel_Mill.html

Quote:

brief excerpt,...

  • Electric Arc furnace (EAF) - Basic Oxygen Furnace (BOF) .... both have a lane for bottle cars and ladles to be lifted into the furnace. 2 lanes in front the outside is for incoming scrap steel and the other is for outgoing ladle cars. The EAF has ingot cars to go into the first door of the mill.
  • The BOF is scratch built with clear acrylic walls and roof to see everything. It has a movable crane to lift ladles up and dump into the furnace. The crane also lifts scrap buckets to dump into the furnace. Above the furnace is a tower that has the Oxygen lance and a bucket to dump sundry items that are not mass dumped in by the scrap bucket or ladle. There is a scrap sorting area next to the furnace and cars moving scrap around
Reply 0
railandsail

Wonderful video on steel

Wonderful video on steel mill, .....and at this particular time frame a look at the arc furnace, (with rolling mill right behind it). The furnace bld is built with an open side so interior is very visable, and there are 3 tracks entering the building.

https://youtu.be/YgltMfmFZp4?t=1007

and another explanation of a BOF furnace...
https://youtu.be/YgltMfmFZp4?t=1550

rolling mill...
https://youtu.be/YgltMfmFZp4?t=1777

another view of tracks feeding an arc furnace...
https://youtu.be/YgltMfmFZp4?t=2270

 

 

Reply 0
railandsail

These arc furnaces can be

These arc furnaces can be rather noisy, spark flying places..

https://youtu.be/yL-Orx3ZSE4

I'm still looking for a video of how they empty to bottle cars of molten iron into the arc furnace process?
And it appears as though the track on which they arrive into the building, and is under the furnace vessel itself.

I did find this big collection of a variety of steel making photos,..
https://stock.adobe.com/search?k=ladle%20furnace

Reply 0
railandsail

Puzzle

Been playing with this new track plan (and the connecting freight yard tracks for several days now,....sort of like working a puzzle.
 

...mid-point with something like this
73520-1.jpeg 

 

Yesterday I ended up with this. Have to do some tweaking on this today...
73744-2.jpeg 

This provides for;
1) next to the aisle, two tracks for the slag cars, one for arrival, one for departure ,...(maybe this should be reduced to a single track so that the whole blast furance would move over to provide for better supply side details??)
2) 2 tracks for loaded bottle (torpedo cars) to get filled, then be either delivered to remote facility, or some of it over to electric furnace next door
3) 2 tracks for supplying the blast furnace
4) 2 tracks for the electric furnace to send hot steel ingots to the rolling mill
5) 1 track, and a holding track along side of building for supplying scrap steel to the electric furnace
6) several tracks from the rolling mill to hold finished product waiting to be shipped out

 

 

Reply 0
railandsail

What is this add-on structure?

This is one of the photos I took of a steel mill scene when i visited the York, Pa  model railroad club a number of years ago. I'm wondering what is that orange tank structure at the rear of the steel making furnace?

York%204.jpg 

Reply 0
Reply