railandsail

I have been agonizing for sometime now as to how, ...or if, I could fit a Walthers steel mill blast furnace into my layout plans. First off I have a real nice one thats all ready built, and secondly it would compliment my Balt city theme on the lower level (and most of us know Balt used to be a big steel town).

So now I think I have found a place for it to sit, but I need help in its orientation and location.


UPDATED: I just recently modified the title of this subject thread, as things have evolved for this corner piece of real estate. Its now a place for a Coke Plant & a Power Plant.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 2
Bessemer Bob

Coke

Brian, 

 

Very common for coke to be produced at a different site then the blast furnaces. 100% prototypical!

Think before you post, try to be positive, and you do not always have to give your  opinion……

Steel Mill Modelers SIG, it’s a blast(furnace)!

Reply 0
Oztrainz

Question??.

Hi Brian,

How serious are you about getting that corner to look like a real coke oven? There are a couple of placement errors in your photo that can be relatively easily fixed. If you want to add coal deliveries and coke away I have a couple of suggestions that might help. Some of it will be some relatively easy custom build or re-purposing of some of the kits that I know you already have on hand, They will also be some relatively easy custom-build rolling stock to make.

I spent my first 6 months in the steelworks around one of these beasts. I got to know what went where and why pretty quickly. 

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
railandsail

Thanks John for that offer to

Thanks John for that offer to help. Here are my thought processes.

 

It was only recently that I decided to see if I could locate a coal fired power plant on my layout. Turns out I have 3 different un-built kits. I was looking around the web for photo inspirations,...like this
%20ps700.jpg 

ps700(1).jpg 

 

Perhaps the whole plant didn't need to be included, but rather a flat of just ½ or 1/3 of the building with stacks and coal piles imaged on the backdrop, then the electrical substation out front (several kits I already have).

Point is that this is still the primary 'industry' I will locate in this corner.


It was only when I unpacked the coke plant to photo and place for sale that I began to consider using it. What if I didn't get a decent price, or offers period? Could I make use of it? Why not over near the coal power plant?

 

When I looked at the traditional layouts of this coke facility I knew I could NOT space it out as it should be. I would have to make it as compact as possible. That meant placing it as close as possible to that one wall, and even utilizing only one of the conveyor ramps. Even the uploading/drenching track ends just after its housing (no room behind the coke plant).
 

The structure I have does have a lot of mini-bulb red lights in that face that is outward facing (representing fire hot) , and it also has a goodly number of overhead lamps on the upper deck. This should contribute to its look way back in the corner. And the smoke stack should look like this,..
F1917(1).jpg 

 

In fact I would like all of the 'stacks' in this corner look like this (one for coke, 2 or 3 for power station)

 

 

 

 

Reply 0
Oztrainz

Coke Ovens 101 for Brian

Hi Brian,

Have a look at the next 2 photos 

Photo1 showing a new coal delivery track. Keep an eye on the area labelled "Bench".

ianCoke2.jpg 

Key points

  • rotate the whole Quench structure 180 degrees so that the Quench tower over the Benzol Track is over the Hot Car track. The quench tower's sole reason for existence is to quench hot coke moved from the ovens by the hotcar before the coke burns away to nothing.
  • a new Coal-In track - given the number of ovens and that it takes 16-24 hours to cook an oven of coal for pushing as coke and at about 20 tons/oven, then its feasible we can have a short Coal-In Track that takes about 2 by 100-ton cars of coal at a time several times daily that would meet the oven's requirements and not take up much space. 
  • a Coke-Out track
  • The Benzol track can be fitted with a high-level tank-loading platform  for loading out by-products such as Benzol, Napthalene, Toluene, etc.A photo of a By-products plant can be pasted on the backscene.  

The next photo show the location of some of the new structure that would tie it all together.

Coke%203.jpg 

New structures

  • Gate - to isolate the hotcar track from the rest of the layout. Hotcars are usually captive to the battery. We can go into the finer points their design later. 
  • Wharf - Ideally this should be long enough to "catch" multiple loads of coke dumped by the hot car. However we could get away with a short wharf of about 2-3 hotcar lengths.
  • Dump - on the Coal-In track simply a corrugated iron roof and sidewall to cover a non-visible hopper and conveyor belt that feeds across to the other conveyor that heads up to the coal bin above the battery
  • Tanks - small concrete pondages that allow any coke fines in the runoff quench water to settle out before the surplus quench water is returned to tanks in the top of the building next to the quencher. About 4/5 of the quench water doesn't escape as steam and is recycled to the quencher tanks. 
  • Quench stack - not shown - This is a large diameter stack that allows steam to escape from the quencher (for HO think about the size of the cardboard cylinder in a roll of hand towel) This is adjcaent to the concrete quencher structure, where-ever you can fit it in. 
  • Screens - ideally there should be 2-tracks out, one for "small" and the other for "lump".  The lump feed goes to the blast furnace highline and the smalls go to domestic markets (foundries/household use etc) or are used as feed at a sinter plant.  One of the coaling tower kits could be re-purposed as the screens. Your unused conveyor runs from the wharf to the screens.    

That ought to do to get your thinking started,

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
ACR_Forever

Great information, John!

This helps flesh out ideas about my own Steel Plant layout  - should it ever come to pass.

Thanks muchly

Blair Smith

Reply 0
Bessemer Bob

My 2 Cents

Just tossing out an idea. 

Coke works are giant facilities in the process of steel production. These plants often have a foot print much large then a blast furnace complex. In any scale it can be a challenge to model the coke making process. Add to it the Walthers kit is very basic. Attention to bi products and coke handling are not included in the kit and even from a coal handling side the kit is lacking. So what to do?

Here are my two cents. If your space was my space I would attempt to capture the "feel" of a coke works. 

I would pick a small part of the process that would add to the overall operations of the layout. Possibly coal delivery or coke shipments. In the region I am from most coking coal is delivered by barge. This could allow you to focus more of coke out operations. 

If you orientate the battery up to the wall the use of a mirror will make the battery look larger, quench car, quench track and quench tower can all be on the back wall. As John stated thats an isolated operation.  I would position the quench tower just past the end of the battery, then a small section of track for the warf screen at the end of that track. From there by conveyor the coke would go to the loading tower where you could load your coke trains for a trip over to the blast furnace. 

Bi-products is a whole other animal that takes up tons of space, Johns idea of a photo backdrop would at least give the look of that operation off on the back side of the coke works. 

 

Ok so that was more like 10cents then 2....

Think before you post, try to be positive, and you do not always have to give your  opinion……

Steel Mill Modelers SIG, it’s a blast(furnace)!

Reply 0
railandsail

Imagining Visual

Thanks guys for your suggestions.

Bob, I guess I'm going to have to do a rough sketch of what you are suggesting as I don't even know enough of the nomenclature of the parts to draw a mental image of what you are suggesting? You wouldn't have such a sketch would you??

Please remember that the necessary structure I would like to image in that corner is the power plant first, and if I have room, then the coke plant. Of course either of these are extensive enough to need backdrop images in addition.

 

 

Reply 0
railandsail

Fantastic Video on Steel Mill Subjects

I've been accused of trying to stuff too much track and scenery into too small of an area   (10 lbs in 5lb bag )  ,

...but perhaps this gentleman could be accused of the same.


https://youtu.be/YgltMfmFZp4?t=2246

If you like steel mill modeling you really own yourself a look at this FANTASTIC video of steel mill modeling
https://youtu.be/YgltMfmFZp4

Sure gives folks an idea of how the USA produced all that steel that was needed to build that huge amount of war material and vehicles needed for WWll  ,...not for just against one enemy, but 2 enemies spread across the world. WOW !!

Reply 0
railandsail

Pusher Side vs Coke Side ?

Quote:

Congratulations, that is one of the most realistic coke pusher or ram models I've seen. Does you ram have a V-dub motor or similar??

Why a V/W motor?? If you lost power to the ram and the ram beam was in the oven doing a push, then you needed a way of extracting the ram beam before it got too hot and started to bend. On the 2 rams attached to the coke ovens at Port Kembla that I worked in in the early 70's this capability was performed by a V/W motor and gearbox mounted beside the ram beam under the ram cabin. This drove a pinion that engaged with the rack on the ram beam. This had enough torque to pull the ram beam back out of the oven.  

The side of the battery with the rams was always "Pusher Side" as opposed to "Coke Side" (with the Door Extractor and Hot Car), but the individual machines were always "# Ram" on the intra-battery radio. Sometimes on higher production rates, we had 2 rams in action, one pushing ovens and the other one doing the levelling after the oven was charged after pushing.  

It was one of my jobs as the battery trainee to check and start these V/W motors on each ram once a week. In the 6 months I was on the battery we never had to push an oven with the V/W motor, or pull the ram beam back using the V/W motor. That includes the day I accidentally chopped all power to the battery, but that's another "war story" that has nothing to do with rams or pushers.    

Regards,

John Garaty

Hi John,

I'm trying to update my original mock-up of my coke structures to be more complaint with your knowledge. I ran across this posting of yours. So I'm sure you can tell me the answer to one of my questions,....which side of the Walthers kit is which?

My kit has some lights of some sort embedded in each of the ovens on the side with the big tube running across that side?? I assume those were there to indicate a burning flame?? Would that be the input side or the exit side?

Does that make sense?

Big  pipe (manifold) I spoke of
44755-1.jpeg 

 

Reply 0
railandsail

Coke Collecting Car(s)

Would the coke collecting cars be specialized cars that would never go on a delivery trip?...or might they take to coke over to the steel plant after quenching (perhaps in pairs) if the plant were close by??

Reply 0
Oztrainz

Coke oven answers

Hi Brian,

if its got the coke collecting car (hotcar) and its tracks with the quencher chamber, then that is the "coke side" . If your model has the ram on it, then that's the "pusher side".

The big pipe with the yellow arrow is the gas off-take main This took the gas and other compounds liberated during the coking process off to the by-products plant for separation into gas, sulphate of ammonia, benzol, toluene, tar and other compounds. On all the batteries at Port Kembla, this gas main was on the coke side, but I can think of no real engineering reason why this should be so. 

As far as light coming from the battery, on the coke side the only light would come from the oven that was in the process of being pushed. The door extractor machine that runs along the coke bench beside the hotcar track on the  has 2 purposes. The first is to take out  the coke side oven door prior to pushing and then to re-install the cokeside oven door after the oven is pushed. The second purpose is to insert the coke guide into the oven after the cokeside door is removed. The coke guide forms a hollow channel the height and width of the oven that carries the coke across into the hotcar while the oven is being pushed. The will be a continuous red/yellow glow from the oven that can be seen while the coke guide is in place or when the extractor moves clear of the oven after the push so any spillage can be cleared from the bench before the extractor moves back in to re-install the oven door.

The oven also has to be "taken off main" before the doors can be removed from either side for pushing. This involves "lifting the lid" and doing some other stuff on the vertical standpipe that feeds across to the gas off-take main (with the yellow arrow). While the oven is "off main", there is usually flame coming from the top of the standpipe. The oven "goes back on main" after both oven doors have been re-installed after the oven has been pushed and the oven has been charged and levelled. 

Usually there is very little light from the pusher side, even when the door is out for the push because the ram and its equipment gets in the way. As soon as the pusher side door is removed, the ram beam is inserted just into the oven, The front of the ram beam is used to support the face of the coke in the oven before it is actually pushed, but this also prevents a lot of light form escaping from the oven..After the push, the ram beam comes back into the ram and the tall vertical face of the front of the ram beam would probably be only about 5' to 10' back from the oven edge. Any coke spillage is quickly shovelled back into the oven before the pusher side oven door is replaced. 

Hotcars are usually restricted to each oven battery but they can be shared between batteries while the adjacent battery's hotcar is down for maintenance. This is not ideal because it slows down the pushing rate of both oven batteries. At Port Kembla we had 6 separate oven batteries all lined up on the one hotcar track. In the mid 1970's #2 Battery was dead, but the hotcar from #3 Battery ran through to either #1 or #4 battery. Another part of the trainee's duty was to be the "observer" when this happened.

Hotcars are very specialised pieces of equipment. The driving locomotive is electrically powered by live rails under the side of the coke bench. The actual catching wagon has an angled deck on it and is robust enough to take having several thousand gallons of water dropped on every 10 minutes or so when the coke is being quenched under the quenching tower.  The hotcar does a simple yo-yo run - catch the oven as it is pushed in a nice even thickness layer/move to under the quencher tower/quench the coke/move to the coke wharf and drop the quenched coke onto the coke wharf/close the coke drop doors on the hot car wagon and move to where the Extractor is set up for the next push/repeat until the end of shift. It sounds easy, but it isn't.   

If you have 2 rams in action on a battery the hot car becomes "the weakest link" in how quickly you can push ovens. This is another reason why the hotcar stays on its assigned battery. If there is only one ram operating on the pusher side (most usually) then the ram becomes the weakest link, which is why the ram driver is the top paid operator on the battery.  

I hope that this helps you to make some sense out of what your Walthers kit represents.   

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
railandsail

walthers structure & coke wharf

Quote:

if its got the coke collecting car (hotcar) and its tracks with the quencher chamber, then that is the "coke side" . If your model has the ram on it, then that's the "pusher side".

The Walthers structure does NOT have any of the tracks on either side of the battery, and it has no rams, so its not identifiable in that sense.

 

Quote:

The big pipe with the yellow arrow is the gas off-take main This took the gas and other compounds liberated during the coking process off to the by-products plant for separation into gas, sulphate of ammonia, benzol, toluene, tar and other compounds. On all the batteries at Port Kembla, this gas main was on the coke side, but I can think of no real engineering reason why this should be so. 

I believe I saw a few other photos that also reinforce the idea that the 'pipe side' is the coke side. So I will just go with that.

 

Quote:

The hotcar does a simple yo-yo run - catch the oven as it is pushed in a nice even thickness layer/move to under the quencher tower/quench the coke/move to the coke wharf and drop the quenched coke onto the coke wharf/close the coke drop doors on the hot car wagon and move to where the Extractor is set up for the next push/repeat

What is the 'coke wharf' ?
I'm assuming it has something to do transferring the coke from the quench/hot cars to regular cars for transport to the steel mills??

 

 

Reply 0
railandsail

All-purpose Spur

I've been playing around with finishing out this track plan back in the corner that contains my power plant and my coke oven. Bisecting that corner I have a mainline spur that runs down the entire right hand wall and makes a sweeping curve in under the viaduct bridge to a slip switch that feeds the peninsula businesses. At the moment I see spurs off of that track for other sidings including 1) coal for the power plant, 2) coal for the coke plant, 3) coke quenching/extraction track, AND 4) another all-purpose spur. This is a spur that runs right along the backside of the viaduct.
e%20spur.jpg 

 

I had originally thought this spur might be used to bring my large transformer moving cars into for crane installation to the power plant.

But now I see many more uses for this spur. It might be a holding track for many coal and coke related cars servicing this area. It might also be a holding track for a few switcher engine(s) servicing these industries, AND those switcher(s) might also serve to push 'cuts of cars' into the peninsula tracks,...per Dave's suggestion, put the switcher spur on the pusher end of the cut.
https://forum.mrhmag.com/post/baltimore-wharf-area-municipal-piers-docksider-locos-12214366

 

 

Reply 0
railandsail

Coke Plant Coal vs Power Plant Coal

Question arose in my mind,...am I to assume that the quality of the coal used to produce coke is different than that used by power plants??

Reply 0
railandsail

Coal-In for Coke Plant

I have moved my quenching structure out from the wall, and aligned it with the quenching car track. Now that new coke can be cooled off by quenching, and furthermore perhaps a few hours sitting on one of several spur tracks back there. DSCF5473.JPG 

Now that track over near the wall can become my coal-in track? I would image that the conveyor that goes up to the coke plant's coal reserve could be picking that coal up from a grated area at the end of that spur (where that cardboard box is),...or perhaps it could be a covered drop off ? .....
DSCF5479.JPG 

That would give the coke plant its own supply of good quality coal, and alternately provide a holding track where quenched coke cars might rest for some period of time?

 

BTW I think I need to eventually get something like this for that side of the coke oven,..
ed%20out.jpg 

Reply 0
railandsail

Coal-In for Coke Plant

How about if the drop off point for that coal-in was a vertical coal tower that accepts the coal cars, then delivers the coal to the coke terminal via a conveyor from the bottom of its coal bin (which is above the coal cars themselves).

DSCF5480.JPG 

...something like this (with the drenching tower moved out of the way for the photo-op)
DSCF5492.JPG 
I would have to provide an opening in that lower segment (silver portion) of that coal tower.

 

 

 

Reply 0
railandsail

Repairing Walther's Power Plant

I've been neglecting my power plant kit that I purchased used some time in the past. It's actually pretty well done, and includes the interior. But its roof was terribly warped,...
DSCF5442.jpg 
DSCF5474.jpg 

 

The roof was made of plastic with a sandpaper covering. I wondered if I might heat it up while clamped to see if I could straighten it out. But that didn't work,...
DSCF5481.jpg 

DSCF5482.jpg 

 

I then began to think about what material I might use as a backing plate,....but then it dawned on me, why not make a new roof. I looked at the idea of plastic, but then hit upon the idea of thin metal like the type I used for the base of my roundhouse,...
DSCF5483.jpg 

DSCF5484.jpg 

 

Now I just need to add the sand paper and the vents to that roof.
DSCF5485.jpg 

 

DSCF5486.jpg 

 

I've also decided I need to raise it up a little back there so it shows a bit better,..(3/4"?, like it was on some sort of mound?)
DSCF5487.jpg 

Reply 0
David Husman dave1905

Coke plant

By the way, neither of the tracks you have at the coke plant would ever be used for cars that would operate on a railroad.  Both of those tracks would be used for equipment that ONLY operates in the plant and there would be only one piece of equipment on each track.  No railroad equipment would be spotted on either of those tracks in a real coke plant.

What happens in a coke plant is that inbound hoppers of coal are unloaded (rotary dumper)  and the coal is conveyored to the top of the ovens and loaded into them.  There are two or three tracks next to the ovens.  One on one side and one or two on the other side.  On the single track side there is a machine that runs along the ovens and has a huge ram on it.  It unlocks the oven door and then rams the cooked coke out of the oven.  On the other side there will be a car like the one in the picture above.  There is either a car that unlocks and opens the other side of the over and routes the coke into a dump car or else the car is a dump car and outlet chute combined.  In either case, once the coke is pushed out into the dump car it is taken under that concrete tower in your model and "quenched", doused with thousands of gallons of water to cool it down  for the yellow hot thousands of degrees coming out of the oven to a couple hundred degrees where it can be handled.  It is then dumped in a pile to finish cooling then later the cooled coke is loaded into hopper cars to be shipped out.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
Oztrainz

Details and responses

Hi Brian,

Ok, the pusher side and ram is not being modelled (other side of the battery and can't be seen between the battery and backscene - so we don't have to worry about modelling the ram ) 

Time to have a closer look at the coke side of the battery. My feeling is that you only have part of the Walther's coke ovens kit - some of the bits are missing - like the Extractor that runs on rails on the coke side bench - so yes you will have to fudge something like the Extractor you posted in the photo a couple of posts ago. It needn't be as detailed as that one because these beasts were almost fully enclosed, but it does need to extend the full height of the oven doors for about 6 to 8 ovens long, The only bit that you need to be reasonably accurate with is the tall rectangular coke guide that channels the coke across the bench and into the hot car - That's the bit around the foam that is shown in your Extractor photo above. In simple terms, the dimensions of the coke guide should match the door dimensions on one of  oven doors. That will be close enough for a non-functioning scenic model. 

Time to have a look at a video to show coke side operations - I'll paste the important time codes after the video

At 0:02> 0:05 - steam plume from quench tower

At 1:00> 1:15 - ram on pusher side (not being modelled- so ignore) 

At 1:15> 1:17 - concrete coal bin for charging coal to charger on oven top (You'll need to fudge a charger for the oven top too but we can cover that later if we have to)

At 130> 1:40 - pushing the oven with hot coke landing into the hotcar wagon after passing through the coke guide on the Extractor.

At 1:40> 1:50 - quenching the coke - steam plume from the quench tower

At 1:52> 2:05 - hot car arriving back with load of quenched coke 

At 2:05> 2:25 - hot car dumping quenched coke onto coke wharf deck

At 2:25> 2:33 - the now empty hot car heads back to extractor to catch the next oven to be pushed 

At 2:34> 2:50 - gates at coke wharf opened to allow quenched coke to slide down onto a conveyor belt behind the gates. The conveyor belt takes the quenched coke up to the screens for sizing.  

Modelling all this need not be all that hard:

Hotcar wagon: A Lifelike #8591 side-dump car will give you a good start - Add a sheet of stryrene from the top of one long side to the bottom of the other. This gets you the sloped deck. Add about a 1/4" fence around the top of the 3 sides away from where the slope sheet meets the top edge.  

Hotcar locomotive - If the hotcar is non-operational, then any small "dead" locomotive could do the job. If you wish to make the hot car operational, then a separate timer circuit with stopping zones under the quench tower and at the coke wharf should give you a basic flavour of coke side operations.   

Door Extractor - has already been covered above.

Hotcar Track - raise the hotcar track so that the top edge of the hotcar wagon is just below the height of the bottom of the oven door. This gives you the height to include a coke wharf

Coke Wharf - A simple hand-scribed sheet can be used to represent the diagonal iron tiles on the wharf deck. At the hot car track the height of this sheet is set just below the yellow hopper side. This hides the "underneath stuff" of the cheap Lifelike car. For your model, this deck only has to be as long as the Lifelike side-dump car (plus a bit if you have room).The lower edge of the deck can be at baseboard level. Add the wharf to the end of the battery furthest from the quench tower.  

Coke Wharf gates and conveyor - The coke wharf gate and conveyor cannot be seen from usual viewing angles, so a vertical steel back wall and a corrugated roof that of about a scale 12' width could do the job. 

Coke Screening plant - re-purpose one of the 2 coal loading plants you have spare. You only need 2 tracks under it. The track closest to the battery will be for coke fines going to a Sinter Plant. These fines are too small to be used in a blast furnace. The other track is for larger-sized coke that goes to the blast furnace gantries and the raw materials storage bins. The battery I worked on had a coke screening plant that loaded coke wagons.

Coke Wagons - Coke is a lot lighter than coal so dedicated coke wagons had extended sides to carry more coke before maxing out the wagon's weight capacity. These were simple plain extensions of about 3' to 4' high added to the top of standard coal hoppers.

Quenched coke conveyor - runs from the end of the coke wharf up to the side of your coke screening plant. Use the other conveyors on the kit as a guide to the size you need..Maybe some bracing piers to support the conveyor? Or not? The conveyor to the top of coal bin above the charger deck is unsupported. it is higher and longer than this conveyor would be 

Coal-in point - can work as you have suggested - punch a hole through both sides of the lower silver part of that structure and you can extend the track behind the battery and use the extra length to "disappear" more than one loaded coal wagon at a time.  

As for equipment on the battery, in the real world there would be 2 of everything  - chargers, rams, extractors and hot cars running on their own dedicated tracks The "spare" machines would be parked on track extensions  just clear of the ovens proper. Once you light up a coke ovens battery you cannot shut it down for long periods without it falling to bits. Once a battery starts to fall to bits, in simple terms, then it's a full demolition job and a humungous amount of money to build a new battery. You really don't want to go there just because the one-and-only machine on the battery of whatever type broke and was unfixable. 

Ok that'll do for this post,            

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Thomas Wilson pandwvrr

Blast Furnace alternate

I would keep the blast furnace and instead of coke plant put in a pig caster such as was at Sloss. The pig caster would have to be scratchbuilt. The hot metal goes into a sub or at Sloss they had a special hot metal car that was loaded with hot metal it dumped into the pig caster and the pigs cooled by the time it go to the end and dumped into gondolas. This is a narrow area and the pig caster was narrow with only the head house larger. Maybe you could use the coke plant somewhere else. The problem with the coke plant is that you need a coke loader, coke wharf and a pusher. This all takes up room. I have included a areial view of my coke plant. I used to work in one on the batteries and in coal and coke handling. Look at my web site under Union RR pictures for more pictures of my steel plant.dsc07267.jpg dsc07266.jpg oresized.jpg caster66.jpg 

Tom Wilson

Pittsburgh and West Virginia RR & Union RR

Web Site: pwvrr.webs.com

Reply 0
railandsail

WOW

Wow, lots of new coke info added,.... I've got some reading to do.
 

BTW, Tom Wilson I visited your site briefly and saw this photo of a 'coke wharf'. I had previously ask what it was?? still not sure?

 

I also noticed that you moved to Orlando back in 1998,..are you still here in Florida?

I'm in St Augustine.

Reply 0
Thomas Wilson pandwvrr

Coke Wharf

Coke wharf is where the coke is dumped after going and getting quenched It is dumped and it slides down the brick to the gates at the bottom. Then the gates are opened at about one and a half at a time onto the conveyor belt. Some of the coke is still red hot and has to be hand quenched with a water hose. Used to do that job when I first went into the mill. This is the finished scene. The quenching car is above the wharf. Walthers is coming back out with them in the coke kit. Yes I still do live in Davenport near Orlando.ke_wharf.jpg 

Tom Wilson

Pittsburgh and West Virginia RR & Union RR

Web Site: pwvrr.webs.com

Reply 0
railandsail

Thanks, great pic of coke

Thanks, great pic of coke wharf.

My coke plant model was purchased assembled, and had no pusher or collector, nor tracks to roll them on. So I'm not sure if any of these items were in the original Walthers kit,...but I don't believe they were??

BTW, I do have that distribution fixture that ran across the top, just in a separate box, not unpacked yet. And that did come with the original kit.

 

 

Reply 0
railandsail

Coal-In for Coke Plant

Quote:

a new Coal-In track - given the number of ovens and that it takes 16-24 hours to cook an oven of coal for pushing as coke and at about 20 tons/oven, then its feasible we can have a short Coal-In Track that takes about 2 by 100-ton cars of coal at a time several times daily that would meet the oven's requirements and not take up much space. 
John Garaty

I recall reading this, and it had me wondering if a rotary dumper could be justified for this relatively small volume.

Not that I would have any room for such an item?    .....perhaps if the coal-in was being shared with the power plant operation??  (sold mine a long time ago)

 

 

 

 

Reply 0
Oztrainz

Re - Rotary dumper

Hi Brian,

a rotary dumper is probably on overkill, If your coal is arriving in quad-hopper or similar bottom-dump wagons, then all you need is a simple shed big enough to keep the rain/snow off while unloading the wagon into a pit below the tracks. Then its only a short conveyor ride for the incoming coal to the top of the Larry Bin coal storage..

All relatively easy to model,  

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Reply