railandsail

I have been agonizing for sometime now as to how, ...or if, I could fit a Walthers steel mill blast furnace into my layout plans. First off I have a real nice one thats all ready built, and secondly it would compliment my Balt city theme on the lower level (and most of us know Balt used to be a big steel town).

So now I think I have found a place for it to sit, but I need help in its orientation and location.


UPDATED: I just recently modified the title of this subject thread, as things have evolved for this corner piece of real estate. Its now a place for a Coke Plant & a Power Plant.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 2
railandsail

Steel Mill Cars

While I was looking in my cargo trailer I also wanted to see what I might have in terms of cars.
1) 4 Walthers hot metal car kits (torpedo shaped)

2) 3 Walthers Slag cars

3) 2 Pollack cars by State Tool & Die

plus I might have a couple of built cars somewhere.

Not a real big inventory, BUT thank goodness I have these. I went on line and it appears these steel cars are getting gold-like prices, ....and getting harder to come by??

 

 

Reply 0
Rick Beatty hbgatsf

Within the past month I got a

Within the past month I got a couple of the Walthers hot metal cars that were released last year.  I have the three pack from the original run but only built one to check dimensions and clearance.  While very similar there are a few differences between the kits and the RTR models.  Once they are in service I doubt if anyone will notice the difference.

Rick

Rick
Reply 0
railandsail

unloding hot metal torpedo cars

Quote:

Brian,

May I suggest you invest in a copy of the above captioned book produced by US Steel. There are several volumes depending on the era. I have IIRC, a 1953 and a 1964 volume. Each is about 1300 pages.

MAKING, SHAPING, TREATING of STEEL

If you shop carefully you can find good copies in the $25 range, or less.

-760x394.jpg 

 

 

Found myself looking back thru this rather extensive subject thread this morning,  and I recall that I had  lots of trouble early on with details about the unloading of the not metal 'torpedo cars' into the electric furnace plant.

Even this figure posted by gmpullman did not show this detail?

 

 

Reply 0
railandsail

gas plant that supplied ‘The Steel’ with oxygen ??

Quote:
ToddGriffith

‘95 was my last year as the manager of the gas plant that supplied ‘The Steel’ with oxygen through a pipeline under the Lehigh River.  We also supplied them liquid nitrogen and argon.  I didn’t get into the steel plant very often, maybe only 4 or 5 times per year, and cameras were forbidden so I never got any pictures.  I left that job since it was obvious that steel making in Bethlehem was going to go away.  
 

I have huge respect for the steel mill modeling community out there.  I continue to be fascinated by the scale of steel making operations and how well they are represented in some club layouts that I have seen.  In the back of my mind I have considered doing a gas plant.  It is mainly storage tanks, distillation column, compressor building, and interconnecting piping.  But in a way I think I am too close to the subject and could never be satisfied with the modeling compromises I would be forced to make, if that make sense.

Todd

Todd, do you think that big orange tank structure I saw modeled out back of the York Club steel furnace had anything to do with an oxygen supply to their steel furnace??
https://forum.mrhmag.com/post/steel-mill-scene-in-a-corner-now-coke-plant-power-plant-12209837

Reply 0
Yaron Bandell ybandell

Torpedo cars in picture

Brian,

You are correct of the missing torpedo cars. This is because the diagram simplified the operations to a single "inline" process contained within the same large building. It shows they tap directly from the furnace into a ladle. The ladle then gets picked up by a ladle crane and emptied into ingot mold sitting on mold cars.

If the ingot molding is in a different part of the plant and hot steel needs to be transported a distance between buildings then torpedo cars would be used. The torpedo car loading would be where the ladle sits under the spigot of the furnace in this picture. Then in the ingot molding facility instead of there being a furnance spigot it would be a torpedo car unload spot instead where the torpedo car would feed/empty into the ladle.

Reply 0
ToddGriffith

Orange Tank

Brian - I doubt that orange tank structure was intended to represent an oxygen tank.  It is too small to represent a gas oxygen tank (aka ‘bullet’) and which I’ve never seen in a vertical orientation. I suppose it could be a big liquid oxygen tank but typically a mill would only use liquid oxygen for cutting/scarfing and other small jobs, and then only if the gas oxygen wasn’t available.  It is too expensive to vaporize the large quantities of liquid oxygen that would be needed in a BOF.  If my memory serves me, a typical heat at the Bethlehem Steel BOF in the ‘90’s used about 500,000 standard cubic feet of oxygen in about 20 minutes (you steel guys can jump in here and correct me if I’m way off) which is just about the same as a tanker truck load of liquid oxygen.  It would be really hard to vaporize that much liquid that fast.

I speculate that the orange vessel could be some sort of scrubber or wash tower where gas flows up countercurrent to a liquid (water?) flowing down. I’ve seen that in various industrial applications but I’m not sure of anything like that in a steel plant.

Todd

Reply 0
Rick Beatty hbgatsf

Brian - The York club is not

Brian -

The York club is not known for prototypical models.  Look at how they represented the highline.  
 

I suspect that is something that they had laying around and someone decided it would look good in that spot. 
 

Rick

Rick
Reply 0
railandsail

Oxygen Supply?

You don't think it could have anything to do with an oxygen supply for that steel furnace?

As I understand it some of those furnaces use electricity, and some use gases to generate the big extra heat required??

 

 

Reply 0
railandsail

I've been in a bit of a down

I've been in a bit of a down mood lately with work on my railroad,..just the blahs of track laying and wiring. So I decided to detour just slightly and do some prep work on some of the structures in those areas where I am currently laying track.

In the steel mill area I have this rolling mill structure I bought used from an estate sale. Its floor piece had been detached from the structure itself. I decided I wanted to maintain it in this form such that I could remove the upper portion at times in the future to add additional details to the interior,..in other words fasten down the base piece, and be able to lift the upper portion off.

age(163).png 

 

First I needed to do a little repair work to that base piece. It was splitting in several areas, so I decided to add reinforcements in several areas (white polystyrene strips)
93522-1.jpeg 

93613-2.jpeg 

There are numerous wall supports jutting down to where they had been glued onto that base structure. Fortunately they had been detached somewhat cleanly before I got the structure. But they still needed their very ends cleaned up with file and sand paper in order to fit back down cleanly. And there remained their fragile nature. I decided they all needed some sort of rigid reinforcement added to them.

 

On the end pieces that were quite a bit wider, I first thought of gluing wood coffee stirs to their backside,..but I would need to first double up those starbucks coffee stirs. Wait a minute, I just discovered some bamboo skewers I had,..and bamboo is very stiff for its size. Glued them in with good wood glue.

Now, how about this spindly plastic I-beams sticking down, ....and so vulnerable. What could be small in cross-section and stiff,....how about music wire. Yes I glued pieces of music wire into one side of those I-beams. Real close inspection I'm sure would be faulty, but in a grimy rolling mill (to be added) I think this will not be noticed.
93729-3.jpeg 


93814-4.jpeg 

I should have used some other type of glue for those music wires

 

Now I need to clean out those old rail slots, so i can get new rail pieces in there clean and straight.

 

 

Reply 0
MikeHughes

Possible cure for down

Here's a possible cure for down ... in-depth industries!
Have you seen the “new” Kalmbach publication on 28 Industries?  

noticed it fresh in the stand at the magazine rack at Walmart yesterday.   There are all sorts of steel and paper mill goodies, plus stock yards, fruit processors, ice loading, freight houses, you name it ...  I stayed awake way too late last night reading through it. 
 

42B270B.jpeg 

Happy NMRA Member since 2024
Reply 0
railandsail

Blast Furnace Track Alignment?

This appeared recently on the 'STEEL' forum. I never took a really close look,...has anyone else noticed this misalignment??

 

Quote:

My blast furnace is from Walthers first run and was assembled over 20 years ago.  It was then put in the location that would eventually be the mill until I got around to finishing that area.

I am finally working on it and have started to lay out the track.  I had never noticed that the openings below the cast floor were not the same size and that the pour openings are not centered.  If I center the track in the middle opening this is how it lines up, which doesn't match the opening in the bottle car:



If I move the track almost to the support columns it is better, but is there a reason it would need to be that far over?





The opening on the right side is smaller but has the same problem, although not as bad:





There really isn't room there to move the track over.

As I look at pictures of completed structures on the internet it seems most, if not all, have ignored this problem.  Has anyone here noticed this?  Is there a reason it was made this way?

Rick

Reply 0
railandsail

Metal Barrier Fence

Looking for ideas,..graphics....

In the corner of my steel mill scene i have my mainline tracks making a large radius curve behind the mill components. Naturally I want to hide the mainline trains from the mill components. The blast furnace (to the left) will have a large mirror behind it hiding those mainline trains, ...and making it look like 2 blast furnaces and 2 highline tracks in a row.

I need to isolate the electric furnace from the mainlines and I am thinking of some sort of metal barrier fence. I mocked up this plastic barrier real quick to get the idea across. In fact I think I could make use of this flexible plastic material and paste a computer image of the metal barrier/fence on it?

Can anyone suggest a good looking image??

age(164).png 

 

BTW, the 'door openings' in the rear of the electric furnace will have mirrors of their own to make the car inventory on those tracks appear more substantial.

 

 

 

 

Reply 0
Rick Beatty hbgatsf

Brian - what are you using

Quote:

85834-3.jpeg 

Brian - what are you using for track center spacing on the double track on the right side?  It looks like your rolling stock is going to be pretty close to the walls.  Did you test clearances?

Rick 

Rick
Reply 0
railandsail

Under

Under construction/mock-up,...so tracks are not laid yet. Look at the pencil lines to get a better idea.

Additionally the turnouts on those 2 tracks has changed,...to be explained, coming up

 

 

Reply 0
Rick Beatty hbgatsf

Yes, I saw the lines.  What

Yes, I saw the lines.  What is the track center dimension?

I am working on this right now.  If I use 2.125" for centers I have 0.58" from the wall to the rail.  I have a straight shot so I am pretty sure that will be fine.  I put a bottle car on a track and I seem to have enough clearance on the side but I was thinking about dropping down to 2.00" track centers. 

Rick

Rick
Reply 0
railandsail

Track Spacing/Configuration in EAF

I have been rehabilitating my used EAF just lately and one of the first items was to bulid a 'base plate foundation' for it. Naturally this meant I needed to firm up my tack configurations in there. I had long held a desire for the switcher engine to be able to not only access the metal scrap delivery track (far right), but also access the ingot track (center track).

So I got out my selection of turnouts to see if that was possible in this limited area. Here is what I came up with,..
age(167).png 

 

That scrap track on the right has a 'track centerline to inside edge of the building's beam' of 7/8" distance. Because I sought to utilze that Roco 3-way WITH its motors (and also just because of the geometry of the turnouts), I ended up with a 2+1/8" spacing between those 2 tracks on the right. It could have been as little as 1.75" as I understand it for minimum freight yard spacing.
 

BTW, my spacing for the torpedo car delivery track (on the left)  is 1+1/8" track C/L to inside edge of beam.

I figure that 3-way may look a little out of place, but it was the only way I could fit the compact track plan in there,...along with a small radi (double radius) Peco turnout. I will now be able to bring that switcher engine into the EAF to deliver ingots to my rolling mill, AND be able to take some of those hot ingots out to a remote (imagined) rolling mill of a different type.

 

 

Reply 0
Rick Beatty hbgatsf

Brian - Are you planning to

Brian -

Are you planning to put a floor in the EAF?

Rick

Rick
Reply 0
railandsail

Floor in EAF

Yes, I'll explain shortly.

I have a number of buildings that have track in them and ideally need flush floors. I've seen where many folks in the past have used some sort of spreadable plaster to get this effect,...but I didn't want that mess. Plus I wanted to be able to subsequently pick the building off of the layout to do some extra detailing it in the future.

So I really needed to go ahead and install the track down permanently and set the building down over the track(s). I've chosen to do that with 2 layers of plastic sheet material. The bottom layer of the structure's floor is approx the thickness of the ties of the track, and it is cut out in the shape of the whole track. Thus when the building gets set back into place this 'track slot' cut into the structure's floor determines that the building goes back onto the layout in its same exact location.

The top layer of plastic sheet gets cut out to cover the outer edges of the ties and mates up to the actual railhead of the track.

At this moment I am using some vinyl material that came from old slated window shades for that bottom layer. I believe it is a PVC material. For the top layer I am using some thinner plastic sheet of an undetermined material. I believe I will change this over to some .040" styrene.  That will be the same material I will use to fill in the centers of the tracks (between the 2 railheads).

This may turn out to be a nightmare to cut out the top layers that follow the exact railheads especially where there are NOT straight tracks?

93416-1.jpeg 

 

93506-2.jpeg 

 

93555-3.jpeg 

 

 

Reply 0
railandsail

EAF, Electric Arc Furnace structure

Here is a building that I was NOT even going to include in my steel mill scene originally. First I thought I would not have room for it, and secondly it was in a bit of disrepair (the interior components were loose, some overhead beams were detached and/or broken. And the whole thing had a bit of a lean to that was not normal).

As I learned more about the subject of making steel, and not just iron, my thoughts changed to 'can I put this thing in my plans' ? Funny thing is now I am spending quite a bit of time on rehabilitating the structure, and actually making it a working part of my railroad.

Rehabilitation:
This building came to me as part of an estate sale, so it was already assembled. The first step was to un-glue the existing structure, so I could get things rearranged and realigned. Fortunately it had been glued together with some sort of glue that left the joints a bit brittle, and thus broke apart in an organized manner along the original kit parting lines. Then I just had to clean up those parting surfaces with files and sand paper,....(the flimsy roof trusses were the toughest).
 

The foundation of the building was a bit out of square. I suspect the original kit came with a foundation sheet of plastic, but mine did not have that piece, so I needed to construct one. But wait a minute, I needed to determine the track plan for mine,... that looked like it was going to be different than the original kit. Mine was set up similar to the original kit where the torpedo car delivery track was on the right hand side,...

age(169).png 

I needed that torpedo track over on the opposite left hand side,..
13722-1.jpeg 

I had also had problems understanding how Walthers had expected the torpedo car would unload to a ladle. The gentleman above had improvised his own unloading detail with a floor depression for the ladle on its side, ..but I rather doubt that is how it might be done. I have provided a 'pit' for my ladle(s) to sit in while getting hot metal poured into them (not the correct car in this photo, but you get the idea)
13827-2.jpeg 

Torpedo Car Unloading

 

Now the original raised platform for the electric furnace that set over the torpedo track had to be moved to the opposite side. But when doing so the spout from that furnace would be too close to the back of the building, and that support wall needed to be rearranged. I eventually had to cut the floor of that elevated furnace off, then place the cut off on the opposite end to space things out more correctly,...
13953-3.jpeg 
14022-4.jpeg 

14114-5.jpeg 

 

The overhead crane also needed some readjustment (replacement). We couldn't have the crane operator sitting up over that VERY HOT torpedo car, so the crane cabin has to be put on the opposite side,.... Not only that but I am seriously considering placing 2 cranes in that building,..like this fellow did

Photos of aberdeen furnace
Electric Furnace & Rolling Mill
28118%29.png 

 

age(170).png 

 

(to be continued)

Reply 0
railandsail

Here is my semi-finished EAF.

Here is my semi-finished EAF. It still has some of its temporary wood cross bracing that both keeps things in square and holds up part of that center flooring until the furnace structure gets bonded in permanently.

90003-1.jpeg 

The flooring is only the first layer. The track hugging second layer will be added later, then the furnace platform will be glued in.

The door openings in the rear will be covered with small mirrors that will make those tracks and cars on them appear more expansive. More lighting will be added, and perhaps a bright flashing one to look like splashing liquid steel.

There will likely be at least 2 locomotives working the steel mill. One will be bringing scrap steel gondolas to the scrap piles just outside the EAF, and will also be bringing cut up scrap to the supply track inside the EAF. That loco will also be able to access that center track that moves the loaded ingots or cradle cars of hot steel to the rolling mill. The rolling mill(s) could be that one on my layout, OR some of those ingots or covered cradle cars might be taken down that access track on that side to be delivered to another off-site rolling mill of a different type. 
 

The other steel mill loco will be working the other tracks of the mill, primarily the blast furnace,...to include bringing in its raw supplies to the highline tracks, removing the slag cars to their dumping area, and moving the torpedo cars to the EAF.

Lots of potential activity in a relatively small area, and a variety of different cars and several locos.

 

 

Reply 0
railandsail

Mirror & Fence Backdrop for Steel Mill

Mirror & Fence Backdrop for Steel Mill

For the past several days I've been working on ideas/details of my backdrops for the steel mill corner.

1) Mirror for Blast Furnace
I had already decided I was going to do some sort of mirror arrangement to make it look like I had at least 2 blast furnaces in a row. Two of my concerns were the width of that mirror, and the 'straightness' of that mirror.

a) I wanted that mirror to reflect the high-line tracks to suggest multiple car loads of raw materials coming to the blast furnaces, but I wanted to limit its reflection of the EAF next door.

age(173).png 

age(174).png 

 

So I limited its width to just even with the outer highline track. In this mock up the mirror would look to need cutting in several segments to clear that upper deck. But I think I can solve that by making the mirror a pure rectangular shape that fits into a slot I will make in the plywood upper deck, then cover a portion of the reflective surface up there with either a paper image or paint of some sort.
age(175).png 

age(176).png 

 

b) As I was playing with this mirror idea I was also looking to determine how exact I need to be to get the mirror perfectly perpendicular to the tracks and deck of the steel mill. Turns out I really need to be as exact as I can get it, or otherwise the tracks distort off straightness and elevation in their reflection. That means I need to trim the upper deck plywood deck very exact, as it will be supporting the upper portion of the mirror. And I already re-cut the lower track segments so they would allow for straightness, while ending right at the mirror surface to look truly continuous.

Here you can see the distorted elevation of the track,..
age(177).png 

 

BTW, I do realize that this is NOT the recommended method of employing a mirror,..being that I can see my own image in it when seating in certain aisle locations. But it is the best I can come up with to give me that 'second blast furnace' image. Plus I hope that the bast furnace image will just overpower my reflection.

 

 

Reply 0
railandsail

Mirror & Fence Backdrop for Steel Mill

I've got a mirror blocking the mainlines behind the blast furnace, and a sheet pile fence behind the EAF.

age(178).png 

 

My sheet pile fence will be either a computer printed out image glued to this new 'plastic wall', or it might even be a new plastic wall constructed of sheet pile plastic.
age(179).png 

age(180).png 

(BTW, did you see the idle/stowage track for one of the steel mill switchers)

 

This fence is high enough to mask even double stack container trains. The pins at intervals stick thru holes in the plywood deck to maintain that curvature. Those vertical pins can be made to look a part of the fence.

age(181).png 


These are the two mainline tracks behind the mirror and fence.

age(182).png 

Reply 0
railandsail

Now Deeper into that Corner

That whole steel mill scene is located on a 4x8 sheet of plywood that fits over in that corner of the room, and being 4 foot deep at much of the area it made it very difficult to get to the mainline tracks and crossover turnouts back against the wall.
 

So the solution is unbolt it from its steel beam framework, and move it out onto my work bench in the carport so I can work on those rear tracks,..

age(183).png 

 

And that also allows my access to the staging deck underneath it in order to finish up the last section of my staging tracks,..

age(184).png 

 

age(185).png 

Reply 0
railandsail

Strange Audience

I also had an interesting audience join me today,...seems this bird wanted to make friends with my fake one I brought back from Thailand and placed out near the tree in the front yard...

age(186).png 

 

age(187).png 

Reply 0
pldvdk

Cool

Brian,

That's really cool how you can unbolt sections of the layout and move them outside to work on.  Quite ingenious if I do say so.  

Speaking from personal experience, I think building a small layout with lots of track in a limited area is much more complicated than a larger one where things are more spread out. You do a wonderful job though of tackling those complexities and working out great solutions.

Always enjoy watching your layout come together. Keep the posts coming!

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 0
Reply