I have been agonizing for sometime now as to how, ...or if, I could fit a Walthers steel mill blast furnace into my layout plans. First off I have a real nice one thats all ready built, and secondly it would compliment my Balt city theme on the lower level (and most of us know Balt used to be a big steel town).

So now I think I have found a place for it to sit, but I need help in its orientation and location.


UPDATED: I just recently modified the title of this subject thread, as things have evolved for this corner piece of real estate. Its now a place for a Coke Plant & a Power Plant.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 2
railandsail

Thanks for your encouragement

Thanks for your encouragement Paul.

Several items really please me:
1) The cantilevering of those decks off of the walls (and the horizontal beams) is one of them. When I looked at this photo the other day it made me appreciate my 'metal benchwork',..

28185%29.png 

I have great unimpeded access to my staging decks,...and to the decks above. Granted mine is a little overdone in terms of strength. I was thinking back about how I might modify that construction in these days of big lumber prices,...lighter weight metal extrusions and perhaps foam decks, or foam sandwich decks.  I might add these thoughts to my metal benchwork' discussions, or start a new discussion.

2) I really like the Peco turnouts. With their curved diverging route tracks they really do allow for 'compactness'. Plus as I actually lay the track down I am finding that I can move up to the bigger radius curves offered by the med and large sizes where I had originally 'planned' on the smaller sizes. This makes my curves broader and more appealing.

 


 

Reply 0
railandsail

Broader, Flowing Curves

I'm working at a relaxed pace, so it may appear that I am not making rapid headway with my construction process. But I am trying to really get this track work very correct, as it won't be that reachable at a later date,...at least not without interrupting a lot of things.

Here are 2  situation where I wanted to have as broad of a radius and flowing curves as I might get with my compact track plan,...connecting into the mainlines.

This first photo is of the crossover turnouts that connect the staging access track on the left with the outer mainline. I think this is smooth as one would want for a junction that I expect to use extensively.
20626-1.jpeg 

...viewed from the other end...
age(188).png 

 

 

The second situation is that of connecting the freight yard tracks with the inner mainline,...
20938-2.jpeg 

 


Just for the fun of it I wanted to confirm that fence barrier was spaced correctly to allow for very long cars with long overhangs,..
age(189).png 
 

 

age(190).png 

 

age(191).png 

 

Then here are those long cars coming up (or going down) from staging.
age(192).png 

 

Reply 2
railandsail

Visitors

Had a few more visitors earlier today
age(193).png 
 

age(194).png 

Reply 2
pldvdk

Smooth

Brian,

That track work looks as smooth as any I've seen.  A job well done.

I must admit I was surprised to see the size of the cars you were checking clearances with.  Given the compact design of your layout and the amount of track that you have in your space, I would have expected that you would not be running many cars over 50'-60' long. 

Kudos to you if you're able to use that kind of equipment and everything runs reliably!!

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 0
railandsail

Challenge

I used those long cars in lieu of those long steam engines I hope to run. Didn't want to drag out those steam engines for this sort of check. I figured if these guys can fit, very likely my steam engines will,..then its just a question of if the inline drive wheels of those steamers will negotiate the radi,..that I have tried to limit at a minimum of 24 inches.
 

Perhaps I won't be running that many of those size freight cars, but I do expect to have at least one full train of auto carriers like the big guys. There are a few tracks on the layout that just will not except certain long cars or engines,...and those will be so designated as so.
 

I have one spot on the layout that is extremely tight for such long cars (and passenger cars as well). Its on the very upper level of the helix where the track makes a loop coming back thru the backwall of the main room. I forget the details, but I do recall it was VERY tight,....a real challenge. We'll see if it really works out in the end.

 

 

Reply 1
railandsail

How Tight Are Steel Mill Curves

I saw this recent posting/subject on a steel mill forum,..
https://groups.io/g/STEEL/message/2208

Might be interesting to see what the replies look like?

 

 

Reply 0
railandsail

EAF lighting effects

I hope this link takes one to the specific posting and photos by this gentleman who sought to 'light up' his Walthers EAF model,...

https://groups.io/g/STEEL/message/2233

 

Quote:
Don K
I've been working on a Walthers HO scale EAF.   Added some neopixel LEDs inside the furnace and used some fluorescent acrylic rod for the electrodes.   A small Arduino controls the LEDs ... they randomly flash with different colors (but mostly orange and yellow) to simulate furnace operation. 
 
Attached you will find some photos........
Reply 0
railandsail

Removable Deck Section

I have posted a few photos above of the corner deck piece removed and placed on my outdoor work table (the one that supports the steel mill complex).

That deck piece has a number of turnouts over on the far side (against the wall) that I plan on operating manually with a system of metal rods within plastic tube guides. This would be an extremely difficult construction process were it to be done 'under the layout'. But I can flip my deck piece upside down or on its side to get at both the turnout control system, and eventually the feeder wires. So here are a couple of views of the deck piece lying on its side,..

age(195).png 

 

age(196).png 

BTW, that red channel bar is a piece of hi-strength steel that was added to that 'outer edge' of the 2 x 8 deck plywood piece just to insure dimensional flatness to the steel mill's base. It was a pain in the __ to drill those many holes for the turnout control cables.

 

age(197).png 

 

age(198).png 

 

Sure makes it easy to work on,...BUT

I have experienced a number of irritating dimension and installation problems that is making me think twice about this manual turnout control choice for this corner? Several times I have found myself asking 'why didn't I just install those Peco turnouts with their stock solenoid motors' ??   Oh well too late to change plans. 

 

 

Reply 1
railandsail

Turnout Control System

...a few details of my 'system' under this deck section.

In this photo you will see 2 strips of metal down on the lower rt hand side,..
74111-1.jpeg 
These are channel alum strips that control 2 turnouts each that make up a crossover pair. I had originally tried using a flat steel strip, but was not happy with its flat shape holding capabilities, nor the difficulties to drill the very small holes in its 2 ends to accept those brass tube verticals,...here they are side by side..
74701-2.jpeg 

 

I was able to use some threaded rod and clevis connectors from model airplane supplies to make a clean attachment to the throw-rod/channel.
75054-3.jpeg 

 

NOTE 1: These work very smoothly once I got everything centered up properly,...but that took a little doing as my actual install location didn't want to match up with my mocked up location. It was only off by less that 1/16" on one of the pairs, but that was enough to cause binding. I was beginning to think I had a couple of Peco turnouts with slightly different overall lengths from one another. But now I think it was my unequal vision eye sight that is causing me problems (cataract surgery with two different focal lengths).
 

NOTE 2: At the point where my staging access track joins with the mainline track, there is another pair of crossovers,...one std long Peco combined with a dbl-curved Peco. I did NOT try to make a single control rod for this pair, as I learned my lesson trying that in another location on the layout. Rather this pair are operated independent of one another.

 

 

Reply 1
pldvdk

Ingenius

Brian,

Ingenious design!  I love it when railroaders have to tackle a problem on their layout, and come up with cool designs to surmount their obstacles.  That's what makes following your layout construction such a joy!  Great job!

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 1
railandsail

Weirton Steel, great video!

Just ran across this video reference on a steel forum. What a LOT of activity in one video...

https://youtu.be/Z9DwCBkd4p4

 

 

 

Quote:

A very good video picture and sound! Genuine steel works with torpedo cars, slag pot cars, steel slabs cars and locomotives factory. Proper Harter operation!

 

Quote:

Man from the standpoint of an industrial train lover, it just does not get any better than this video. A video feast with as many as 4 movements in the same frame at one time.

 

 

Reply 0
railandsail

Trackage in Steel Mill Scene

Addendum: This is what I imagine most trackage around a steel mill scene would look like (that video above).
I wonder what would be involved in trying to duplicate this appearance? Certainly could not hope to disguise the turnouts in that sort of ' trackage/scenery' ??

I seem to recall John Glabb's group did a pretty good job of it on his dioramas.

Likewise I am wondering about the easiest/cleanest way to model ' concrete buried track' in my two container port scenes (that have some turnouts as well)  ??

 

 

Reply 0
Kelly R. kregan

Although it is a bit labor

Although it is a bit labor intensive I choose plaster again for the streets after trying different products.

In this photo I had not poured the center section between the rails. I found it was much more easier to pour the outside areas, then do between the rails as a separate pour.

Here I am using acrylic wash to weather the plaster.

57708(1).jpg 

Reply 1
railandsail

Plaster

Doesn't that require a substantial amount of sanding to finish it off,...thus a lot of fine dust in the layout room??

 

 

Reply 0
Kelly R. kregan

No sanding at all. I set

No sanding at all.

I set forms in place (strip balsa) mixed the plaster to a thin pancake batter consistency, poured, and leveled while wet. Any fine tuning can be done while the plaster has set but still soft.

Reply 1
railandsail

No, or little sanding

Thanks Kelly. That makes it MUCH more appealing. You have inspired me to look at this idea with new eyes. Wonder if there is a video showing this?

I saw another video where the fellow is laying some sort of foam sheets in the major blank areas, then finishing off the surface areas with plaster,...seems to make some sense not having to use so much 'bulk plaster'. The video itself was not very inspiring (well done), so i did not link to it.

Reply 0
railandsail

Dean Freytag's work recorded in The MILL

Quote:
After a couple years in the works, here are Parts 2 and 3 of The Mill's Special issue series on Dean Fretag's layout. These two issues cover the buildings Dean had on his layout.
Anyone has any problems downloading these files please send me an email at don_csx@hotmail.com.
Take care, Stay Safe, Happy Modeling, and God Bless you all!
 

 

LOTS of photos

 

 

Reply 0
Kelly R. kregan

I didn't make a video but

I didn't make a video but post more pictures on the thread I posted about pouring the streets. Im not sure how to look up my own posts but maybe you can find them here.

Reply 0
railandsail

@Kelly, other post?

Are these some of those other postings you were talking about?

https://forum.mrhmag.com/post/quiet-street-running-12214179

 

 

 

Reply 0
Kelly R. kregan

The post from 2013 was the

The post from 2013 was the same area on a different layout.  I used Easysand because the setup time was much longer than plaster. 

On the current layout I decided to go with plaster and pour in smaller sections.  The streets were formed with strip balsa glued to the homosote with white glue so it can be removed later (ignore the blue tape in the picture).

7_161006.jpg 

I poured the street in sections, outside the rails first. The point throws at the turnouts were protected with thin paper taped in place to the homosote. The paper remains under the plaster and forms sort of a tent over the moving parts.

7_210453.jpg 

Once all the outside the rails areas are complete I ensured all turnouts were operating properly and tested the track.

Sidewalks were formed with 1/16" tall strip wood glued to the top of the fully cured street plaster and used 3/16" to form the outside of the sidewalks. As you pour the sidewalk the white glue releases and the strip balsa form pops off the plaster street without damage.

92869(1).jpg  

I will follow up with more instructions later... I need to go to work

Reply 0
railandsail
railandsail wrote:

Mirror & Fence Backdrop for Steel Mill

I've got a mirror blocking the mainlines behind the blast furnace, and a sheet pile fence behind the EAF.

age(178).png 

 

My sheet pile fence will be either a computer printed out image glued to this new 'plastic wall', or it might even be a new plastic wall constructed of sheet pile plastic.
age(179).png 

age(180).png 

(BTW, did you see the idle/stowage track for one of the steel mill switchers)

 

This fence is high enough to mask even double stack container trains. The pins at intervals stick thru holes in the plywood deck to maintain that curvature. Those vertical pins can be made to look a part of the fence.

age(181).png 


These are the two mainline tracks behind the mirror and fence.

age(182).png 




I was having trouble finding the photo of that storage track i had provided for the steel mill switcher,....even searching my photo storage card. But here it is. I have been trying to provide a number of such stub tracks for my various switchers.
Reply 0
MikeHughes
All that intricate turnout control work under the big section looks amazing.  You must get help to move it on and off the layout to avoid damaging it?
Happy NMRA Member since 2024
Reply 0
railandsail
Yes, my contractor friend stops in and gives me a hand with those big (and heavy) pieces of plywood deck. We go thru a short tutorial on how we will do it, as to try and avoid midstream problems.

But it is sure worthwhile to be able to work on the underside of that deck while out on my carport work bench.
Reply 1
railandsail
railandsail wrote:

Mirrored Power Plant?

Just for the fun of it I thought I might play with the idea of a mirror image on the power plant to see if i could make it, and its piles of coal look larger?

First I just placed a piece of mirrorized tile in the background (please ignore the fact that it has a decorative finish on its mirror). Of course it is reflecting an image straight up my aisle so I had to make an attempt to block a portion of that with just plain white paper folded over a portion of the mirror. 

Then I had to attempt to block out the reflected image of the coke plant,..again with pieces of paper blocking those portions.

Then I wanted to include the piles of coal needed by the power plant,...those plastic tubs.

I was thinking this rather unusual shaped reflective surface might be attainable utilizing mirrorized mylar foil?

DSCF5498.JPG 

DSCF5499.JPG 

I'm now thinking this image of a bigger plant and piles of coal would be better obtained with some sort of artist/photo shopped image pasted on the backdrop.

Perhaps I really need to explore this Affinity Photo technology more thoroughly.
https://forum.mrhmag.com/magazine-feedback-was-ezines-891776
 




Quite far back in this subject thread I was playing with ideas for the power plant and the coke plant that are located back in a corner behind my viaduct bridge. In the past I had taken this particular bridge out and replaced it with another very similar one that had the proper track spacing,...but it was grey/silver in color. Just yesterday I took that newer bridge out to paint it black like this original one.

https://forum.mrhmag.com/post/steel-mill-scene-in-a-corner-now-coke-plant-power-plant-12209837?pid=1331351657

While I had the bridge out I decided to do some more work on those structures back there (power plant & coke plant). One of the primary additions I wanted to make at this time was to construct  'base plates' for those structures so they could be removed as entities in the future for extra detailing work off the layout. In other words I do not have the time at the present moment to do that extra detailing but hopefully will have time after I get the whole layout up and running.

Naturally I am concerned about reaching over that bridge and viaduct structure to do any detailing on those structures behind it. I wanted to attach those two structures each onto a 'base plate' so they could be lifted out to be worked on in a separate area. I had some relatively this stiff plate material I had savaged from my local sign shop. It is a sandwich structure of these alum skins on a foam core,..
0.11" thick sandwich material..
DSCF7943.jpg 



Surprisingly it can be cut with a number of passes with a sharp box cutter. I didn't want the tracks servicing these plants to be mounted on these bases as that might complicate things. So I cut those base plates such that they will 'surround' those tracks that will be mounted permanently to the deck.

DSCF7938.jpg 

DSCF7932.jpg 

DSCF7933.jpg


I also moved the power plant over a bit further from the viaduct in order to possible insert another track ,...I know, I know,...another track!!! (details possibly soon 😵

Reply 2
railandsail
That piece of white base material between the 2 tracks will be made into a 'coke wharf'

I intend to relocate the pump house for the quenching tower to a more center position,  AND likely will make a larger diameter pipe to feed the tower.  Afterall these quenching towers used LOTS of water from what I understand.

The tent like cardboard structures there are just initial ideas for coal piles for the power station. I need to do a bit more experimenting on the mirrored backgrounds,....perhaps some reflective mylar?