railandsail

I have been agonizing for sometime now as to how, ...or if, I could fit a Walthers steel mill blast furnace into my layout plans. First off I have a real nice one thats all ready built, and secondly it would compliment my Balt city theme on the lower level (and most of us know Balt used to be a big steel town).

So now I think I have found a place for it to sit, but I need help in its orientation and location.


UPDATED: I just recently modified the title of this subject thread, as things have evolved for this corner piece of real estate. Its now a place for a Coke Plant & a Power Plant.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 2
ACR_Forever

Reference material

Hi John

Are you, or is anyone, aware of a reasonable reference source for describing the ebb and flow of steelmaking in the 1970's?  My longterm goal is to build a mill on a 6' x 18-20' peninsula in my layout room.  It's at the end of my construction plan, so it isn't 'fully hatched' yet, and I'd like to have a process that is reasonably realistic for my location and timeframe (even though to model the prototype, I'd have to use my whole basement).  The prototype is Algoma Steel, Sault Ste. Marie, Canada.  The mill takes in ore, sinter, limestone, coal, etc. and produces sheet, rail, tube, slab, and other steel products, though I've never seen a process sheet for Algoma that would itemize the ins and outs; some of the above may not be appropriate for my era, but i can live with that.  The items I've read in our hobby press (Freytag's book, others) tend to be long on buildings and track arrangements, but a tad thin on the processes that drive the whole shebang.

regards

Blair Smith

Reply 0
railandsail

Need more Knowledge & collect more images/links

Thanks John & Blair,
I was also concerned that the rolling mill could accomplish all of this receiving molten steel, AND producing finished product.

I'm also unsure as to the differences in the two steel cars,...the bottle car and the slag car. I have samples of both.

Guess I really do need to do some more reading on steel making before I decide on a final 'scene'. Of course my biggest problem is I have such limited area to recreate even some reasonable symbolism of the actual process and structures required.

I think I am going to continue collecting images that I might review and select portions of to do my final 'scene'. Meanwhile I will reserve this corner area as a blank until I have more time to learn and collect ideas. I need to get back to planning a number of other areas of my RR.

Reply 0
railandsail

Rolling Mill,...images

Just found this morning on this forum,..

Yes, I know you can't see it - - but this is what management wanted and I delivered. Lights in the roof of the building would help; however, my suggestion of skylights and interior lights was rejected for the time being. The problem with building interiors is that they are not readily seen to be fully appreciated. I can understand why many do not go to any great lengths to detail interiors - especially industrial ones like this mill.

 

Nice work on the mill and building

I'm sure i've worked there sometime in the past  You always knew when the the mill was rolling - you could "feel" it down the whole length of the building. If it was quiet something had broken - The overall structure for the building is spot on as is your comment about skylights.

Just a suggestion for the building, if I may - some signage perhaps?

add a sign above the door, something like "SLAB MILL" or "SLAB MILL A" that identifies the track door. This doesn't have to be fancy, just black block letters on a white or yellow background for visibility. (print with a laster or inkjet printer, seal the paper, weather to taste, glue to thin styrene and attach to wall above door opening.

Most tracks into rolling mill or service buildings would probably have swing gates (fabricated from pipe) across the tracks that prevent the train from entering the building before the building is ready to let it in - so perhaps a red/green traffic light as well mounted on the landing to the left of the door (makes for easy access for maintenance)? (butcher a set of road traffic lights is the quick way to do it).

Other signs at every major door - safety hat and boots (were onsite since before I started in the 1970's, eye protection and ear muff signs arrived onsite later (mid-1980's or so?). These days these OHS signs are blue on white but initially out here they were black on yellow. 

Give yourself a pat on the back for a job well done, 

Regards,

John Garaty
Unanderra in oz

Reply 0
railandsail

Metal Works

I had found this quite a while back and thought it might make a good addition over to the right of the blast furnace as shown,....

 

pboard02.jpg 

Reply 0
railandsail

Helpful Explaination, Steel Mill Arrangement

...from Model Railroader forum site
 

Quote:
Posted by HHPATH56 on Wednesday, February 17, 2010 1:25 PM

Note that the Blower Engine House is on the front left.of the first photo. It provides compressed air to the Blast Furnace,(to raise the temperature to the melting point of iron ore). So, it must be close to the Blast Furnace. The slag is directed to the slag ladle cars through troughs on the front side of the blast furnace. The molten slag is poured into a slag pit, where it solidifies and is scraped up and dumped into dump trucks, for processing into ballast, or other materials. The ladles are open topped, therefore, the slag pit cannot be located very far from the Blast Furnace. The molten iron passes down troughs to be emptied into "bottle cars". The bottle cars, then carry the molten iron to the Rolling Mill, where the iron is poured into molds to form (pig iron) ingots, which are then formed into wire, tubing,or sheets, and formed into coils, that are then loaded onto flat cars, to be transported to fabrication plants, which may be far from the Steel Mill complex. The basic ingredients fed to the Blast furnace are iron ore, scrap iron, coke, and limestone, which are sorted and carried up a ramp to dump into a pit, and then carried by the conveyor buckets, (on the far side of the Blast Furnace), to be dumped into the open top of the blast Furnace. The finished products are often stored in warehouses, (awaiting purchase orders). Since the operation of a Blast Furnace is a continuous process, the ingredients must be brought in on a specific time table, by rail, ferry, or ore boat. Note the two Hulett Unloaders, that unload iron ore pellets, from the ore boat docked in the harbor. Piles of iron ore, scrap iron, coke, and limestone are stored near the Blast Furnace. The last photo shows some of the dozen tracks that are associated with the steel mill. Click on any of the photos to enlarge them. Then click on the photo series to the left, to view more of my layout Note that the bottle car and slag car ladles can be made "tipable" by using a razor saw and an axle of some kind. "Silly Putty" capsules fit exactly into the slag car ladle,and are of the right orange color. . This vastly compressed HO Steel Mill complex occupies an area of about 3' x 6' Use the Internet to view past and present steel mills. Peach Creek Shops has great videos of Steel Mills Type in Dean Freytag Bob Hahn

 

 

More interesting material from that same discussion
http://cs.trains.com/mrr/f/11/t/169279.aspx

 

 

 

 

Reply 0
railandsail

interchange capability in a steel plant, not just in-plant movem

 

Quote:
Posted by EM-1 on Saturday, February 20, 2010 2:01 PM

Having grown up and spent most of my life in a steel making town, I see a tremendous amount of interchange capability in a steel plant, not just in-plant movement.  Aside from huge several times per week shipments of coal/coke, raw ore/Taconite, limestone, scrap steel, and other materials used in the manufacture of steel, there are also finished or raw products going out.  In my home town, there is steel coil, pipe, bar, billet, bloom, sheets, and slabs.  When things are going smooth, the plant has also sent out torpedo cars of molten iron/steel.  There is also a traffic in the slag that is a by-product of the process.  Right now, with the blast furnace bank on cold shut-down, the plant recieves several torpedos per week of molten steel.

Then, since there is also constant maintenance and updating, plants frequently recieve shipments of chemicals, machinery, even structural steel for new buildings. replacement components for the mills' machinery.  New and rebuilt machinery and parts are brought in, and worn machinery and parts are shipped out for scrapping or rebuiding.  And don't forget the firebrick that lines the inside of the furnaces and cars.  Even things like trucks for the in-plant cars and even rebuilt engines and traction motors for the on-site railroad that functions in the plant.  And since buildings in a plant complex are huge, and cost a plant a significant amount in property taxes, when a building is being obsoleted, often an immediate priority for the maintenance function is to tear it down to get it off the taxable inventory, thereby generating need to get excess scrap, especially the concrete and non-ferrous materials out of the property.

Operationally, think of the rules governing interchange, such as here in town, rights of the C&O and NS to pick-up/drop-off cars on plant property and the rights of the Lake Terminal to pick-up/drop-off cars in the C&O or NS yards.  Even the timing of this operations to match plant schedules to the supplying railroads.  Especially the co-ordination required with the very limited time available to either recieve or send out torpedo cars of molten steel to or from another plant in the corporate web.  Especially since there might be something like maybe 6 hours at most from the time a hot metal car is loaded till it has to be at the recieving site to dump before the load frezzes and turns the car into so much scrap metal?

And in today's intermodal world, there is a large amount of truck traffic from the mill to local specialy shops where tube and sheet products are taken by truck to local specialty treatment shops and then their finished product shipped out by truck and train.

We don't have the Hullets any more.  The last one was taken down about 10 years ago since almost all ore boats are now self-unloading, just like we almost never see a tug boat, as just about all Lake Freighters now have bow and stern side thrusters to let them manuever in the  rivers by themselves.  Used to be fun watching the 2 or 3 tugs working a 600 or 700 foot boat around the 5 river bends to get to or from the plant.  Doing maybe 1 - 3 mph. Now, a 900 to 1000 foot boat neatly sails down river about 4 mph right down the center of the channel without a sign of effort.  With tugs, the Bascule and swing bridges sometimes had to be open for as much as ten minutes. Now it's rare to see them open more than 5.

If one has the room, a steel plant complex can be a very large revenue and traffic generator for a pike.

And if you can swing it, the way a night time sky lights up when the furnaces are being teemed or slag dumped, as well as the blue and yellow flares from hot gasses from various stacks on the plant can be very impressive!

 

Hmmm, waterfront involvement ....no, no, I just don't have the room , but I am going to have some water and bascule bridges nearby ,....and I do have a nice C&O (or was it B&O) tug boat model unbuilt

 

 

Reply 0
Oztrainz

Hi Blair, Brian, and

Hi Blair, Brian, and all

Previously Blair asked:

Quote:

Are you, or is anyone, aware of a reasonable reference source for describing the ebb and flow of steelmaking in the 1970's?  My longterm goal is to build a mill on a 6' x 18-20' peninsula in my layout room.  It's at the end of my construction plan, so it isn't 'fully hatched' yet, and I'd like to have a process that is reasonably realistic for my location and timeframe (even though to model the prototype, I'd have to use my whole basement).  The prototype is Algoma Steel, Sault Ste. Marie, Canada.  The mill takes in ore, sinter, limestone, coal, etc. and produces sheet, rail, tube, slab, and other steel products, though I've never seen a process sheet for Algoma that would itemize the ins and outs; some of the above may not be appropriate for my era, but i can live with that.  The items I've read in our hobby press (Freytag's book, others) tend to be long on buildings and track arrangements, but a tad thin on the processes that drive the whole shebang.

I've had a quick look around and and have found a few links that might help you to make sense of the steel industry from a process-flowchart view of the industry - Some links to stuff from the American Iron & Steel Institute

A map of who does what in North America -  https://www.steel.org/-/media/doc/steel/policy/member-states/amm-steel-producers-map-2018.ashx?la=en&hash=E07E05F73CF2B67381AF97058651FA55CA99D240 Algoma is listed as ON6 in Ontario in the Canadian listings.

A detailed slideshare of just about every process involved in the iron and steel industry  https://www.slideshare.net/knayan33/steel-process-flowlines 

As to the ebb and flow of the North American iron and steel industry, I can only state from where I sat, it appeared that the US steel industry had a lot more political and tariff protection than we had in Australia in the 1970's and 1980's. 

You did ask, but some of this is going to be personal observation of political factors as well as technical factors that affected the global iron and steel industry, especially as viewed from my little part of it in Australia. In the 1970's and 1980's  in Australia, the iron and Steel Industry was "owned" by BHP. (Broken Hill Proprietary Ltd) and I was part of the BHP's largest integrated steelworks at Port Kembla near Wollongong in Australia. The annual steel output would have been about 5 to 6 MTPA (million tons per annum). This was very small beer indeed when stacked up against the North American output. 

But to understand the 1970's and 1980's in steel we need to take a step back to the end of WW2. 

To set the scene geo-politically for the steel industry, in simple terms, at the end of WW2:

  • The US had ramped up its production for wartime requirements and had a lot of relatively new blast furnaces and open hearth steelmaking shops with spare capacity once the shooting stopped.  
  • The UK steel industry was stuck with a lot of pre-WW2 plant that were relatively small plants and relatively inefficient when compared to some of the US plants. Some of it had been damaged during WW2, but it was largely reliant on its own ironstone and coal as the key raw materials.  
  • The Russian steel industry survived after a lot of manufacturing was moved beyond the Urals and the their major Donetsk Basin area in the eastern Ukraine was relatively untouched after the battle of Stalingrad in 1943.  
  • Germany, much of the rest of continental Europe, and Korea and Japan had their iron and steel industries largely destroyed. 
  • India also had a fair-sized steel industry, that was largely unaffected by war damage
  • The steel industry elsewhere (including Australia) was relatively insignificant. 

Gamechanger 1 - Politics

On both sides of the iron curtain, political imperatives drove the rebuilding process. The US had the Marshall Plan that largely subsidised the rebuilding of the German and Japanese steel industries. The Soviets had their version as well that rebuilt the steel industry in eastern Europe. I don't know how the South Korean steel industry got started/restarted, but I'm betting that there was some political money behind it. Korea slides under the radar, but they now have some seriously large steel plants (Hyundai and POSCO are just 2 of them).

The UK steel industry didn't get much if any of a look at any of this available funding. It had to rebuild and modernise itself, just like us in Australia.      

Gamechanger 2 - the LD Process (Basic Oxygen)

In 1952 the Linz-Donawitz process (now known as the Basic Oxygen Steelmaking process) was perfected in Austria. In less than a year 250,000 tons were made in relatively small steel converters. Previously it took almost 24 hours to "cook' a melt in an open hearth furnace. Depending on the size of the BOF vessel and the amount of oxygen available, with a BOF you could make the same amount of steel in under 1/2 the time, but in smaller lots known as "heats". The LD process has one significant disadvantage - it can't work with a 100% cold scrap charge. An open-hearth furnace or electric steel furnace can work with 100% cold scrap charge, but both are far more efficient with a "drink" of molten iron from a blast furnace. 

In the mid 1950's at Port Kembla, we had just commissioned a new blast furnace (#4) that could and did break 5000 ton/day. At the time it was the largest blast furnace in the southern hemisphere and the British Commonwealth by a considerable margin. To go with this was a new open-heath with 4 x 350 ton furnaces and 1 x 540 ton furnace. Again these were large steelmaking furnaces to supply a new strip and plate mill for the burgeoning Australian domestic market. The LD process rendered this new steelmaking shop almost obsolete overnight, but it would be almost 20 years before Port Kembla got its BOS steelmaking shop. At Port Kembla each of the 3 BOS furnaces can produce 300 tons of steel in under 30 minutes with 2 furnaces running simultaneously. 

In the US, like Australia, the open-hearth shops had to make enough steel to allow them to be written off the books before a new basic-oxygen shop would be built. The ability to have tonnage oxygen available also meant that the efficiency of the existing open hearths could be improved by injecting oxygen into the open heath through lances in the roof. We had several furnaces modified this way at Port Kembla. That reduced the melt time by about 1/3 from the open hearth, but it also delayed the uptake of the newer technology. 

Gamechanger  3 - The continuous caster   

While the initial patents for continuously casting steel date back to the 1850's. It took about another century for this technology to mature. Previously all steelmake had been by ingot route, where liquid steel is poured into cast iron moulds, allowed to solidify, the cast iron moulds are stripped, leaving a solid block of red-hot steel. This ingot is reheated and then rolled to a thinner, longer steel slab 

Yields from liquid steel to finished slab for ingot route ran at about 85% at best, whereas from the slab caster the yield could be better than 99% when averaged over a "casting sequence" of multiple heats from the steelmaking shop. In the late 1980's I had the job of scheduling the first +100 heat unbroken casting sequence. In the years since, at Port Kembla, there have been several instances where the casting machine ran for more than 1000 heats continuously at about 300 tons/heat.  For ingot route, those 15% losses during rolling ended up as scrap and went back to the furnaces for re-melting. With a scrap price of about $50/ton and a finished steel price of better than $500/ton, if you haven't got a slab caster, then you've lost +$400/ton on each of those scrap offcuts.  

Advances in continuous casting technology and metallurgy have led to the next gamechanger

Gamechanger 4 -  the mini-mill with thin-strip caster

This production system uses 100% cold scrap charge, an electric-arc steelmaking shop, with a thin-strip caster and a downstream rolling mill Effectively this cuts out the intermediate slab stage and goes direct from liquid steel to finished steel coil. These are the current "sports car" of the industry, producing relatively small amounts of steel in a more energy efficient manner, but the integrated steelworks with the blast furnace/steelmaking shop/rolling mill is still the less glamorous "furniture van", that does the heavy lifting. But if you have enough sports cars?? 

Gamechanger 5 - the rise of China/India

This started from the late 1990's and is outside Blair's period. I don't intend to go there. 

There are several likely several other factors that I've missed or have deliberately stayed away from that could include:

  • More stringent anti-pollution requirements that apply to some countries and not others - the additional cost/difficulty of retro-fitting this gear rendering some plants unprofitable.
  • the reasons behind the break-up of US Steel and why they went unprofitable for steelmaking 
  • The rise of USIMINAS in South America 
  • tariff-protection
  • dumping (selling below cost to get market share) on various markets.   

Any or all of these could have had an impact on Blair's chosen prototype. That'll do for this post    

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
ACR_Forever

John

Thank you profusely for taking the time to pull together what is, to me as a rank neophyte in steel making, an incredibly confusing and complex topic.  Applying it to my chosen prototype is still problematic for me, but at least I can begin to sort out what they did/do, vs what I have room for.  Thank you, again.

Regards

Blair

 

Reply 0
railandsail

Steel Plate & Coil Production Flowchart

I found this chart interesting.

%20ps750.jpg 

 

If you want to see a larger image, have a look here,...
http://www.steels-supplier.com/processing-technoloy/production-process/

Reply 0
railandsail

Steel Scene in the Corner

I've come to the conclusion that I just can't hope to give the real steel industry ANY chance of a fair representation,...I just don't have the real estate on my small layout. So even while I have a number of the Walther's steel kits (already built and weathered by another modeler), I must make a selection of what I can use.

Here is portion of the layout we are talking about,...the freight yard scene down to the steel mill, etc

0Mill(1).jpg 

 


ps750(2).jpg 

 

Naturally the iconic blast furnace must be included. I've located this along the inner edge of the shelf/deck just to the left of the entrance to the shed.
ose%20up.jpg 

 

On the aisle side I've provided a little bit of a set back from the very edge by including 2 tracks for slag cars, bottle cars, etc. On the opposite side I've provided for two tracks to feed the blast furnace with its raw materials including coke, limestone, ore, scrape, etc. I could not get those 'feeding tracks' out of the other end of the blast furnace (my yard end), so I thought why not just load them up with a few representative loaded cars and make it look like they were fed in from the other end,...the mirrored end.

 

In both cases these tracks will appear to be more extensive and extend into the backdrop due to the mirror that I will place at the rear of the blast furnace. This mirror will not only make those tracks appear to be much more extensive, but will also make it appear that I have TWO blast furnace in a row. It will also conveniently hide the double mainline tracks behind it.

0furnace.jpg 


furnaces.jpg 

 

The double track bascule bridge across the shed's entrance, just behind my blast furnace and off to one side  should also contribute to the 'industrial image' of a steel mill along a waterway.


 

In the end we need some product out of the steel mill. The rolling mill will be my solution. We have lots of freight cars available that are carrying rolls of steel, steel pipe, steel plate, etc, etc. I'll utilize the Walthers kit as well, likely fashioned up something like this one that appeared on the York model rr club layout I visited long ago,....
York%201.jpg 

 

York%202.jpg 

 

York%203.jpg 

 

York%204.jpg 

 

ll%20end.jpg 
 

Too bad I can't make the rolling mill longer, but I need to keep the building short, and not too big, so I can get those 5 five tracks (2 around the sides, 3 inner ones) on the ends of the building to neck down to 3 of the yard tracks.
 

One of those tracks also feeds a 'fabricator' of steel parts,...that is represented by the 'rail rebuilder kit' from Walthers with the addition of a outdoors overhead crane out front. This structure could alternately be that Vulcan manufacturing kit from Walthers. I just happen to run across this image and thought it added to the 'industrial image' I'm trying to establish there.

e%20side.jpg 

 

 


 

 

 

So there you have my idea for an abbreviated steel mill scene.

 

I also have a few 'steel mill working diesels' I could distribute around those tracks, along with the slag and bottle cars.

Reply 0
railandsail

Steel Fabricator

Quote:

 One of those tracks also feeds a 'fabricator' of steel parts,...that is represented by the 'rail rebuilder kit' from Walthers with the addition of a outdoors overhead crane out front. This structure could alternately be that Vulcan manufacturing kit from Walthers. I just happen to run across this image and thought it added to the 'industrial image' I'm trying to establish there.

r%20shop.jpg 


Just found this old clipping I had saved from years ago of a custom detailing of that Walther's kit,..etailing.jpg 

 

So I think my 'fabricator' could be one that built and repaired steel railroad cars and steam engine parts.

Needs to have a small foundry on one side to account for the smoke stacks added to that one side of the original kit, and to account for some of those big parts on the steam locos.

And it might be nice to have a damaged (or newly built) B&O wagon-top caboose, or B&O wagon top box car out front, or along the side.

Reply 0
railandsail

Compress and Compromise

.....from another forum....

Quote:
railandsail
So there you have my idea for an abbreviated steel mill scene.

We're all pretty much in the same boat, Brian. Compress and compromise. Here's a small look at my electric furnace and blast furnace in the background. To the right you see I have background photos of the distant mills, way far off yonder.

E_furnace2 by Edmund, on Flickr

I could have devoted my whole basement to one steel facility and still have to leave much of it under-represented. You'll just have to accept the notion that you are at the edge of the plant and the rest of the facility is — over there, somewhere.

IMG_6717 by Edmund, on Flickr

Part of my operation includes four Hulett ore unloaders which take up a considerable amount of space in themselves:

Hulett_fix2 by Edmund, on Flickr

Are you considering sound effects? Green Frog has a CD of steel mill sounds that can help set the mood. When I have visitors I play it for a little while at a low level. It helps to "set the scene".

http://www.greenfrog.com/bgaudcd_56016.shtml

I copied mine to a cheap little MP3 player hooked to cheap amplified computer speakers under the layout. Fun and tacky, but I like it.

Good luck, Ed

Reply 0
railandsail

Cross Reference

I may have to return to this discussion when I get to the point of fixing up the pre-built steel mill and rolling mill I purchased to use on my new layout. Meanwhile I am still struggling with the final placement of the blast furnace scene.
https://forum.mrhmag.com/post/interesting-track-plan-tupper-lake-faust-junction-12208132

 

 

Reply 0
Lancaster Central RR

You could skip the mill and model the interchange

I don’t need a steel mill but I just realized my railroad would carry all those raw ingredients for making iron/steel.

More hoppers for the fleet.

I hadn’t realized that Baltimore had that much of a steel industry, I thought I would need a route to Pittsburgh for a logical destination for Lancaster county limestone. 

Lancaster Central Railroad &

Philadelphia & Baltimore Central RR &

Lancaster, Oxford & Southern Transportation Co. 

Shawn H. , modeling 1980 in Lancaster county, PA - alternative history of local  railroads. 

Reply 0
railandsail

Baltimore's Sparrows Point

Quote:

I hadn’t realized that Baltimore had that much of a steel industry

Quote:

https://en.wikipedia.org/wiki/Sparrows_Point,_Maryland

Steel was first made at Sparrow's Point in 1889 by the Maryland Steel Company, a subsidiary of the Pennsylvania Steel Company. By the mid-20th century, the Sparrow's Point waterfront plant was the world's largest steel mill, stretching 4 miles (6 km) from end to end and employing tens of thousands of workers

Images

Reply 0
Tim Bowser NCR-Boomer

Sparrows Point

That was Baltimore and Dundalk in the early 60's.  Bethlehem Steel, Kennecott Copper, the shipyards and drydocks, the smoke and fire seen at night across the harbor.  It was Pittsburgh on the water.  It's all gone.

I grew up just blocks from Memorial Stadium, my dad worked as a welder, machinist and craftsman in the industry.  I drive past the area now, and none of it makes sense.  Endless stretches of bare ground, where vast mills used to stretch to the skies.  The railyards are shadows of their former selves, or have disappeared under redevelopment.

Name an Eastern railroad, they had a terminal there, or wanted in.

 

 

 

Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 0
railandsail

Lighting Effects

I like some of these,...

Quote:

Simulation of hot metal in a cast house

Here is a more detailed description of how I did it, also published on Yahou Group STEEL

bf.jpg 

bf_002.jpg bf_003.jpg 

Simulation of hot metal in a cast house

My initial blog dates from may 15th and this is a followup showing in a bit more detail how I did it.  I also published it on Yahoo Steel Group, but I prefer MRH which is much more simple to do.

I started off by searching for the right led in the smallest size (3.6x2.8 mm). Result: a led with a light emittance of 900 mcd (=Iv), If = 50 mA max and Uf = 2.1 V, yellow. Manufacturer Dominant, SMD led PLCC2.

 

Simulation of hot metal and slag in a blast furnace cast house

I am modeling in HO. Currently experimenting with using leds to simulate the flow of hot liquid in a cast house.
 The results thus far are shown in the pictures. 

Reply 0
railandsail

my ever-Relocating Steel Mill

When I look back over this subject thread I have to get a little chuckle.

First my mill was placed in the lower right hand corner,

Then it moved to the upper right hand corner.

Then it moved to the lower left hand corner.

Then for a brief 3-4 days it was experimented with moving it to the upper deck on that same left hand side.
DSCF4227.JPG 

 

Now it has been firmly decided to put it back down on the lower deck on the left hand side,...and include the electric furnace that I thought I would not have room for.

DSCF4202.JPG 


DSCF4307.JPG 



 

Reply 0
Virginian and Lake Erie

So to convert the iron into

So to convert the iron into steel are you planning to use a Bessemer converter, basic oxygen furnace, or an open hearth?

Reply 0
railandsail

Electric Furnace, and Mon Con steel making railroad

Electric furnace offered by Walthers.

I still don't really know that much about the various process involved in making steel.

This past weekend I visited a small train show over in Deland FL, and on a table out front someone had left a small number of 'Trains" magazines. I picked up 3 of them and found them mildly interesting,

But today I was visiting my other small storage shed and spotted a box full of various train mags. I grabbed one of them on top, also a 'Trains' mag of Aug 2010. Boy was it interesting!!.

It had a great story and pictures of railroading and steelmaking, titled Mon Con Memories. It also had a great rail diagram of the Mon Con steel maze. ...Monongahela Connecting Railroad

It was written by a fellow Robert A Simon, who became the 'engineer of the track' for 2 huge steel making operations.

I haven't finished reading all of it yet, and I'm not sure it could be accessed on the internet. But it looks to be a fascinating story.

Reply 0
Virginian and Lake Erie

Steel from iron ore. This

Steel from iron ore. This will be very simple and in many cases an over simplification. There are a couple of good books on the subject. One from Walthers, and one from Kalmbach. There are others but these two cover things well from the perspective of a modeler.

Iron ore went into a blast furnace with coke and limestone and became iron. From there the iron went into one of the following, Bessemer furnace, open hearth furnace, or basic oxygen furnace and became steel. From there it went to ingots or a continuous caster and from there was shaped into useful things in rolling mills.

Generally an electric arc furnace used lots of scrap steel to make steel.

That is a great over simplification but will possibly give you more information than you had. There is some more detailed info in my delving into the past blog link below. There is a photo of a blast furnace and some other structures that are part of the steel industry. Also it is possible to not model all aspects of the operation and still be prototypically accurate as some places sold just iron to other companies, or bought steel and made it into something else. Those books cover the process in much better detail than can be done in a post or series of blog entries.

After seeing your plan for your layout you might represent the rest of the mill on a backdrop with a steel mill photo back drop on part of your layout.

There are lots of ways to do this for folks that have less than enough space to model the entire industry.

Reply 0
railandsail

Two interesting Videos on Steel

Happened across these 2 interesting videos on steel making this morning,
 

https://youtu.be/A89-5VfFsAA
this one from a fellow DJTrains that uses a drone to make really good videos
 
https://youtu.be/vuiJyWAW2Pk
this one about the Ford plant that had its own steel making complex,....the whole process from ore to coils of steel.
Reply 0
Bessemer Bob

Questions, please ask

Brian, 

If you have any specifics please ask, been working in multiple facilities for the past decade plus. 

 

USS Mon Valley, Great Lakes works. Now gone Warren plant, and Mingo Jct plant. 

 

Also in the process of working the details out for my mill based layout. 

 

Fellow steel modeler, 

 

Bob

Think before you post, try to be positive, and you do not always have to give your  opinion……

Steel Mill Modelers SIG, it’s a blast(furnace)!

Reply 0
railandsail

Steel Mill Modeler

@Bessemer Bob,

Thanks for your offers to help.

I must correct any impressions that I am a 'steel mill modeler'. I do know that many persons have been drawn into this particular and specific aspect of the hobby. I was living in the Balt/DC area at the time I got back into the hobby, and I often visited John Glabb's brass shop in Laural Md. He and a few friends became very interested in steel mill subjects and modeling when Walthers first introduced those kits.

I was also fascinated that a retailer had gone that far with such a big kit(s),...so much so that I bought the series of kits with thoughts of using them on some future layout of mine. That 'future layout' kept getting put off further down the road, and as I reevaluated I came to the conclusion I would not have that big of a layout, so I sold them off.

A few years ago as I began to get some ideas on my new layout plans, I happen to run across some assembled steel kits on ebay or somewhere. When I inquired about them the question of postage cost and potential postage damage came up. Eventually I made a deal on them where the seller who visited FL on a winter basis would bring them down in their vehicle. OK, I bought them.

When it came time to plan my new layout I said I need to utilize at least the blast furnace, since it is an imposing structure and very much associated with the city of Balt.  I've considered a number of locations for my steel mill complex, and how extensive it might be,....at this time I've been able to fit 3 of the structures in, and that's pushing it. I do not think I will be able to give a true representation of that industry, but i believe sitting next to my entrance door, in that corner of the layout, it will impart the image I am trying to make. And hopefully some use of mirrors will make it appear even larger.

LED lighting would also make it come alive,..molten metal etc.

 

 

 

 

Reply 0
railandsail

this corner real estate

 Quite a number of industries/structures have been considered for this corner piece of real estate. Most recently I had moved 'Allied Rail Rebuilders' out of that very corner, and out to an open field in front of the bridge portion of the stone arch viaduct.


My intention was to pursue placing a power plant scene in that corner location, building flat of that power plant against the backdrop , image of big coal pile on the backdrop, then electrical distribution structure out in front of the plant. (and maybe 3 smoke stacks).

Oops, .....this morning I unpacked and was taking photos of the coke structures that were part of that steel mill scene I bought a few years ago. I figured I might as well sell this structure off as there is no way I would have room for it down near my steel mill. I had never really looked at one of these coke plants that closely, nor considered utilizing one on my layout.

BUT I got to thinking, that being another coal consumer, would this structure fit into that corner along with the coal fired power plant?....just maybe? It is a pretty interesting structure that could stand on its own rather than being directly attached to the steel mill.

So here is a little mock-up I did,..

DSCF5021.JPG 

 

DSCF5022.JPG 

 

DSCF5024.JPG 

 

DSCF5023.JPG 

 

I'm liking it,...even while I will be accused of 'too much' in a small space

Reply 0
Reply