Yaron Bandell ybandell
This blog will serve as a place to show the progress of my build of the Philadelphia & Reading bridge over the Susquehanna river in Harrisburg, PA.

Build Highlights:
  • Bridge over the Susquehanna river, Harrisburg, Pennsylvania, USA
  • Bridge consists of 51 concrete arches
  • One plate girder bridge
  • Dual track
  • Dual track crossing underneath on west side
  • 0.7% grade
  • No compression
  • Building both dual tracks to Free-mo module standards
  • Main bridge arches, pilasters and piers to be scratch build from 20-thou and 40-thou styrene sheet
  • Main bridge pier cutwaters to be 3D printed
  • Handlay code 83 track on Central Valley Model Works tie strips
  • Fast tracks #10 switches for cross overs
  • Include Free-mo Modular Signal System plus signal heads.
Bridge Background:

A Philadelphia and Reading bridge, now part of Norfolk Southern crossing the Susquehanna river in Harrisburg, PA.

In this Google Earth image you can see the bridge is the one closest to the Interstate 83 bridge:
[Google_Earth_01_1080px]

The complete bridge by an unknown photographer:
[P%26R%20Bridge%2043]

An aerial close up photo by an unknown photographer:
[P%26R%20Bridge%2040]

Originally this bridge was built with only 46 concrete spans in 1924. Each span plus corresponding pier structures measures 76'-3" in length. Each concrete arch measures 66', while the piers are 11’-6” and 9’ wide. There is a reason the piers alternate between these two widths. This bridge was build by replacing an existing bridge in place. The old bridge had spans of 152’-6” wide. The wider piers of the new bridge encased the original bridge’s piers, while the narrower piers were purpose build. At a later date five spans were added on the east side, giving the bridge a total of 51 concrete spans.

An elevation drawing from the west side of the bridge as found in Railway Age 69 volume 21:
[PRSusquehannaBridge-RailwayAGe69-21-002]

In this same Railway Age issue, a detail view of the west side part of the bridge was found:
[PRSusquehannaBridge-RailwayAGe69-21-004]

The pier encasing process is shown in this photo published in Railway Age 73 volume 23:
[PRSusquehannaBridge-RailwayAge73-23-004]

On the west side the mighty PRR crossed with two tracks under the first concrete arch, while the Northern Central crossed with three tracks under the deck girder bridge.

To date, only the PRR tracks (now also Norfolk Southern) still cross under the  bridge as can be seen in this photo by an unknown photographer:
[P%26R%20Bridge%2034]

On the East side there is a pair of cross overs that are protected by signals.

The bridge measures nearly 3,960' in total length, which includes these 51 spans and a 69' plate girder bridge on the west side. Without compression in HO scale this equates to 45'-6". Now convert this all to 14 similar sized module sections for ease of build and transport and you’ll end up with a nearly 50’ long Free-mo module.

The aim is to build the bridge as it looks in the current time frame: the 51 arches, the Northern Central tracks are gone, but the PRR tracks are still there. The PRR track will be modeled such that the module can also be used as a 26” long double track Free-mo module if a setup can’t accommodate the full 50’ bridge.

I'll update this thread with pictures of the various build activities when they occur with the intend to create a more detailed article for publication at a later date. Enjoy!

-Yaron.
Susquehanna Bridge Build | My Personal Website | Capitol Free-mo

Reply 25
Yaron Bandell ybandell
No, I don't do it often enough to warrant having a 7 foot diameter area with a lazy susan in it's center 🙂
 
Jeff, will you be in Amherst this coming weekend?
Reply 1
jeffshultz
Jeff, will you be in Amherst this coming weekend?
Sadly no, by the time it became an option I had another vacation scheduled for the week following.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 1
Yaron Bandell ybandell
Sadly no, by the time it became an option I had another vacation scheduled for the week following.
We'll be missing our MRH roving reporter!
Reply 1
Nick Santo amsnick
See you soon! Looking forward to seeing the new upgrades!!!

Nick

https://nixtrainz.com/ Home of the Decoder Buddy

Full disclosure: I am the inventor of the Decoder Buddy and I sell it via the link above.

Reply 2
Yaron Bandell ybandell
This is the 4-arch piece that is currently the last section of the bridge. The cutwaters were atatched to the pilasters. The pilasters were then attached to the spandrel wall.
 
After the glue had set, I flipped the whole structure upright and did a test fitting of the parapets. Or as I call it: the pr-e-clamps-ia event...
 
20260119_205449.jpg
 
Here we are halfway into developing a severe case of e-clamps-ia:
20260119_210904.jpg
 
And here the bridge section entered a state of full blown e-clamps-ia:
20260119_212131.jpg
 
Now to let this cure.
 
The entire bridge now has parapets across the (currently) 42 feet length of bridge. Five more arches are in the process of being created. These five arches will house one of the #12 crossovers and will bring the bridge up to 45-ish feet in length.
Reply 11
jgush32
I had the opportunity to meet Yaron and to see his bridge in person this past weekend at the Great Scale Train Show in Timonium, MD.
 
If you have the chance to see this bridge in person, please take advantage, as it is quite incredible.
 
Thank you Yaron for taking the time to talk and discuss future plans for the bridge.
Joe
 
MRRCY
Reply 4
pldvdk
Yaron,
 
As many times as I've seen your bridge on this thread, my jaw still drops and hits the floor! That in itself is a reason to build it!
 
Perhaps like you (albeit on a much smaller basis), I love it when people see the Pokey 3.0 for the first time, and you get to see the glint of wonder and amazement in their eyes. That's very satisfying as a layout owner, and I'm sure it's no different for you as a Free-mo module builder!

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 6
Yaron Bandell ybandell
If you have the chance to see this bridge in person, please take advantage, as it is quite incredible.
Joe, thank you for your kind words. It was great to meet up yesterday in Timonium.
 
Perhaps like you (albeit on a much smaller basis), I love it when people see the Pokey 3.0 for the first time, and you get to see the glint of wonder and amazement in their eyes. That's very satisfying as a layout owner, and I'm sure it's no different for you as a Free-mo module builder!
Paul, absolutely. It's really cool to see people walk up to the bridge and just get mesmerized by its sheer size. It's also fun to be asked "who makes this kit" like once or twice a show 🙂
 
Since I've been busy traveling to two shows these past 2 weekends, I'd thought I would share two long videos (no narration) I created of the Free-mo layouts the bridge was part of. Enjoy!
 
The New England Free-mo layout at the Amherst show in West Springfield, MA:
 
The Capitol Free-mo layout at the GSMTS in Timonium, MD:
Reply 4
Yaron Bandell ybandell
For those who wonder how the bridge gets transported to and from an event: it's via a 5x8 U-Haul trailer. YouTuber 2Railz made a timelapse of me loading the bridge up into the trailer after the February 2026 GSMTS in Timonium, MD. Enjoy!
 
Reply 9
Steelcowboy
For those who wonder how the bridge gets transported to and from an event: it's via a 5x8 U-Haul trailer. YouTuber 2Railz made a timelapse of me loading the bridge up into the trailer after the February 2026 GSMTS in Timonium, MD. Enjoy!
 
That's pretty cool
D.B. Frank
Every choice has a consequence....
"Now choose life, so that you and your children may live.." (Deuteronomy 30:19B, NIV)
Reply 2
John B acsxfan1
Every Timonium show I'm amazed at the scale of it .. That's an awesome project. I've also asked myself "why" but I always come up with the same answer -- "why not" .. Those layouts we drag to the show are there for a couple of reasons - our own fun, but also to give the visitors something to see other than table after table of stuff for sale and just maybe inspire some new blood into the hobby ..
John B, Modeling the Maryland and Ohio Railroad (Protolance) ex Western Maryland East Sub in N Scale from Baltimore to Hagerstown.
Reply 2
kleaverjr
I hope you will return to Timonium in April as I am scheduled to be a vendor at the show then! Looking forward seeing this awesome display!

Ken L
Reply 3
Yaron Bandell ybandell
I hope you will return to Timonium in April as I am scheduled to be a vendor at the show then! Looking forward seeing this awesome display!

Ken L
Ken, yes I'll be there with the bridge. I already have my hotel room reserved at the show hotel. We'll be at the North Hall of the Cow Palace as usual.
Reply 2
Yaron Bandell ybandell
I've also asked myself "why" but I always come up with the same answer -- "why not" ..
John, thank you for your kind words. I get asked that "Why?" question a lot and I often answer laughingly "Because I can". The real answer is a lot more nuanced of course. But in the end we model what we think we can accomplish. In this case it's a lot of repetitive work for creating the bridge and a lot of thinking about engineering solutions to problems in order to be able to lug that massive model to various places 🙂
Reply 2