Yaron Bandell ybandell
This blog will serve as a place to show the progress of my build of the Philadelphia & Reading bridge over the Susquehanna river in Harrisburg, PA.

Build Highlights:
  • Bridge over the Susquehanna river, Harrisburg, Pennsylvania, USA
  • Bridge consists of 51 concrete arches
  • One plate girder bridge
  • Dual track
  • Dual track crossing underneath on west side
  • 0.7% grade
  • No compression
  • Building both dual tracks to Free-mo module standards
  • Main bridge arches, pilasters and piers to be scratch build from 20-thou and 40-thou styrene sheet
  • Main bridge pier cutwaters to be 3D printed
  • Handlay code 83 track on Central Valley Model Works tie strips
  • Fast tracks #10 switches for cross overs
  • Include Free-mo Modular Signal System plus signal heads.
Bridge Background:

A Philadelphia and Reading bridge, now part of Norfolk Southern crossing the Susquehanna river in Harrisburg, PA.

In this Google Earth image you can see the bridge is the one closest to the Interstate 83 bridge:
[Google_Earth_01_1080px]

The complete bridge by an unknown photographer:
[P%26R%20Bridge%2043]

An aerial close up photo by an unknown photographer:
[P%26R%20Bridge%2040]

Originally this bridge was built with only 46 concrete spans in 1924. Each span plus corresponding pier structures measures 76'-3" in length. Each concrete arch measures 66', while the piers are 11’-6” and 9’ wide. There is a reason the piers alternate between these two widths. This bridge was build by replacing an existing bridge in place. The old bridge had spans of 152’-6” wide. The wider piers of the new bridge encased the original bridge’s piers, while the narrower piers were purpose build. At a later date five spans were added on the east side, giving the bridge a total of 51 concrete spans.

An elevation drawing from the west side of the bridge as found in Railway Age 69 volume 21:
[PRSusquehannaBridge-RailwayAGe69-21-002]

In this same Railway Age issue, a detail view of the west side part of the bridge was found:
[PRSusquehannaBridge-RailwayAGe69-21-004]

The pier encasing process is shown in this photo published in Railway Age 73 volume 23:
[PRSusquehannaBridge-RailwayAge73-23-004]

On the west side the mighty PRR crossed with two tracks under the first concrete arch, while the Northern Central crossed with three tracks under the deck girder bridge.

To date, only the PRR tracks (now also Norfolk Southern) still cross under the  bridge as can be seen in this photo by an unknown photographer:
[P%26R%20Bridge%2034]

On the East side there is a pair of cross overs that are protected by signals.

The bridge measures nearly 3,960' in total length, which includes these 51 spans and a 69' plate girder bridge on the west side. Without compression in HO scale this equates to 45'-6". Now convert this all to 14 similar sized module sections for ease of build and transport and you’ll end up with a nearly 50’ long Free-mo module.

The aim is to build the bridge as it looks in the current time frame: the 51 arches, the Northern Central tracks are gone, but the PRR tracks are still there. The PRR track will be modeled such that the module can also be used as a 26” long double track Free-mo module if a setup can’t accommodate the full 50’ bridge.

I'll update this thread with pictures of the various build activities when they occur with the intend to create a more detailed article for publication at a later date. Enjoy!

-Yaron.
Susquehanna Bridge Build | My Personal Website | Capitol Free-mo

Reply 25
Yaron Bandell ybandell
 
Oh. Mea Culpa.
 
Chuck S.  
Chuck, no worries! You're not the first and won't be the last person to be corrected. I literally can't count the times I've had to tell people during shows: "no this isn't the Rockville bridge, that bridge is 8 miles up stream and is a stone masonry bridge this is a cast concrete bridge...". All while we're standing in front of the bridge with the module name tag within easy view 🙂
Reply 3
CN6401
I don't know about that Guiness Book of World Records entry - there was this Freemo module(s) in Kansas City:
 
[IMG_2690]
Jeff, Andy Moniesko (I think thats how its spelt) he passed away two years ago. He used to be a member of our group, "Model Railroading Live". The bridge is over 25 feet long and is made of MDF!
Ralph Renzetti (CN6401)
Weathering - A Touch of Yesterday (FB)
NMRAx on YouTube
Reply 5
Kelly R. kregan
Chuck, no worries! You're not the first and won't be the last person to be corrected. I literally can't count the times I've had to tell people during shows: "no this isn't the Rockville bridge, that bridge is 8 miles up stream and is a stone masonry bridge this is a cast concrete bridge...". All while we're standing in front of the bridge with the module name tag within easy view 🙂
I have not had a chance to see it in person yet but wanted to shout out that this is so amazing, great work!
Reply 3
Yaron Bandell ybandell
I have not had a chance to see it in person yet but wanted to shout out that this is so amazing, great work!
Thank you Kelly. Next opportunity to see the module will be at the National Train Show in Novi, MI on July 19&20. After that it'll be the October GSMTS in Timonium, MD and most likely the Big-E/Amherst show in West-Springfield, MA in January.
Reply 2
Yaron Bandell ybandell
I had just told @thewizard1 that there were likely no updates until after the Amherst and Timonium shows at the end of January 2026. But lo and behold, inspiration struck and i built a thing I hadn't built in at least 35 years: a turnout.
 
The bridge has two crossovers at the Harrisburg side called "CP Front St". I think the turnouts are like #20s or so, but I'm afraid at that shallow of an angle I'll have equipment dropping into the gap at the frog. So i decided to settle for some puny little #12s instead.
 
My first Fasttracks template guided #12 came out pretty darn good. It passes the NMRA Mark V gauge and my test Athearn freight car.
 
Here is a picture of the bugger:
 
20251221_200157.jpg
Reply 10
thewizard1
Looks great they kind of fun to build IMO.
The only thing I have mastered in life is how to spend money
Reply 3
Yaron Bandell ybandell
And since I'm making surprise updates, here are a few pictures of the bridge at Amherst this past January 2025:
 
20250126_144157.jpg
 
20250126_144405.jpg
 
20250126_145454.jpg
 
And at Timonium February 2025:
20250202_102557.jpg
 
And at NTS 2025 in Novi, MI:
20250720_140739.jpg
 
20250720_135535.jpg
Reply 13
blindog10
Looking forward to seeing it, and you, at Springfield in late January. Good grief, that's only five weeks away!
 
Scott Chatfield
P.S. does the bridge rate its own booster?
Reply 2
Yaron Bandell ybandell
Looking forward to seeing it, and you, at Springfield in late January. Good grief, that's only five weeks away!
 
Scott Chatfield
P.S. does the bridge rate its own booster?
Typically a booster is placed on one side of the bridge (mostly the "low" Harrisburg side) so the booster can feed +/- 50ft in either direction of the bridge.
 
Yeah crazy that it's only 5 weeks till Amherst. See you there!
Reply 2
thewizard1
That bridge is just so impressive it almost defy s words!
The only thing I have mastered in life is how to spend money
Reply 2
Yaron Bandell ybandell
That bridge is just so impressive it almost defy s words!
It's always funny to see the reaction of those who like to run long trains after they have build a massive train on the layout. They'll run up onto the bridge and then realize that their train is completely on the bridge and there is still space left on the bridge for more cars.
Reply 6
Rick Beatty hbgatsf
I really wasn't going to comment on this but I can't help myself and I am sure I will catch some flak for it.
 
I can appreciate the work that went into producing this model but keep coming back to the question - why? I have spent a considerable amount of time fishing in the river under this bridge (as well as the Rockville bridge up the river) and there really isn't anything spectacular about either other than historical interest. Is the main purpose to be able to see very long trains stretched out? There isn't much scenic opportunity to that portion of the river unless you want to add the old stone bridge piers that are in the water on the west side or the Dock Street Dam that is just a little farther downstream. The best you could do if you did add the dam would be to have River Rescue pulling a drowning victim out of the water.
 
Maybe it has something to do with modules that I don't understand.
Rick
Reply 2
Yaron Bandell ybandell
 
Rick, no worries about catching flak for asking questions. In fact, the 'why?' question is one of the most frequently asked questions I get during a show.
 
The initial answer I typically give is 'Because I can' or 'Because the Free-mo standard allows it'. The deeper answer is that I like seeing long trains run across big bridges.
 
So why this particular bridge? With the bridge I originally was targeting to build (the Nicholson Viaduct, a 22ft long HO-scale bridge) was already being built by another Free-mo modeller in the upper mid-west. So I had to look at other bridges. For ease of building and hiding any seams due to it needing to be transportable, I felt it was important that it was a cast concrete bridge. And obviously, it needed some interesting features beyond being fairly long.
 
I stumbled upon the Cumberland / PRR bridge in Harrisburg, PA first. This PRR bridge had a connector to the Port Road Branch on the Lemoyne side that would complicate building it. But the Philadelphia & Reading right next to it looks very similar, had no complicated connector tracks, and had a small and constant grade.
 
The alternating width of the cutwaters combined with the grade created a special look that I liked when you look alongside the bridge. I calculated that the bridge would be about 45ft long and would fit with the abutments etc on eight 7ft long modules for a total of 56ft of module. I considered shortening it a bit, but I knew that the venues our Capitol Free-mo group sets up at could handle such a long module. I also realized that the module when build would be one of the few Free-mo modules that incorporate an actual grade that ends at the endplate. Grades at the endplate is a very uncommon part of the standard utilized by people.
 
So taking all these items together for what would normally be a ridiculous idea to do on a home layout suddenly became a possibility and a technical challenge. On top of that it would showcase that modules can be build in sections and any space restrictions in your home doesn't really matter.
 
I hope that the above conveys my motivation on why I'm building this model?
Reply 12
Rick Beatty hbgatsf
I hope that the above conveys my motivation on why I'm building this model?
Yes, and I suspected a big part of the answer would have to do with seeing long trains. While I can appreciate accepting the challenge of the project it just seemed to me that it was too devoid of scenery to justify the effort other than the long trains. Since I have never been involved in a modular display I won't pretend to know anything about it but I guess that format is the only way this works, and I will admit that it is more interesting than a very long straight section of trackage in the middle of nowhere.
Rick
Reply 2
Ken Rice
I hope that the above conveys my motivation on why I'm building this model?
I half expected you to give the opposite answer to the mountaineering question - obviously you had to build it because it wasn’t there (yet).  😉
Reply 3
Yaron Bandell ybandell
it was too devoid of scenery to justify the effort other than the long trains
I don't think the module will be devoid of scenery as every single inch will have scenery applied to it 😉 No but seriously: I think I do understand what you're trying to say: there is not a whole lot of interesting scenery to be seen as there is just so much "plain water" and the repetitive bridge arches on a big part of the module. So maybe even kinda boring. Some would say that this space occupied could have been used to place a module with more engaging scenery instead. All valid points.
 
On both the Lemoyne and Harrisburg sides there will be more interesting scenery opportunities of trees and buildings etc. But that will have to wait until the bridge superstructure itself is closer to being finished. I'm also debating on what things I can do on the river to break up its monotonous feeling. Maybe some jetskiers, kayakers, fishermen, etc. Maybe even animated slaloming around some of the bridge piers.
 
In the end the module is trying to depict a realistic prototype scene like many model railroaders are trying to do on their railroad / module. Mine happens to be a large bridge that's uncompressed, in a 56ft long module format, and has 91sqft of water scene 🙂
Reply 5
Alex Wood AlexW
Free-Mo as a standard is basically asking for two things:
  1. Tiny Midwest towns, grain elevators, and cornfields.
  2. Bridges.
Yaron built the largest bridge anyone has to date on a Free-Mo module, maybe on any type of module. The thing is, there are hundreds and hundreds of modules at large train shows in various layouts, some stand out with high levels of detail, others with lots of locomotives, Yaron's stands out because it's one of the largest. Personally, I like seeing variety at train shows, whether a small highly detailed On30 layout or a single module larger than many of the layouts.

Modeling the modern era freelanced G&W Connecticut Northern

Reply 2
Yaron Bandell ybandell
Free-Mo as a standard is basically asking for two things:
  1. Tiny Midwest towns, grain elevators, and cornfields.
  2. Bridges.
I think this is not specific to the Free-mo modular standard but all modular standards: people tend to want to create signature scenes or dioramas on their module to show off. Depending on the module group structure this then results in either a mish-mash of modules and scenes (loosely knit group of like minded people) or a highly cohesive set of scenes (structured modular club).
 
Most people that join a modular group are pushed towards building a simple module first, with simple scenery, just to get the hang of building a module and to be able to quickly get to the 'belonging to the group' point. This is what drives a lot of flat midwest-looking modules with corn fields or simple grass landscapes being built. Once the initial module is built the next module typically gets the more involved or complex scenery, which often happens to be a bridge scene.
 
To me there are two great things about modular model railroading in general:
  1. You can build signature scenes without it needing to fit in your layout room. It only needs to fit in your method of transportation (anything from a Fiat 500 to an 18-wheeler or school bus) and the event venue
  2. You get to meet, inspire, and share with a large geographical area of people your module by bringing it at public (and private) events
A great bonus for me is that with Free-mo / Speed-mo / Sipping & Switching Society events the layouts are always different. Yes, they can seem like a mish-mash of scenes, but I can run (long) trains, I can do operations, and at the next event it's all different!
Reply 6
cdguenther
Typically a booster is placed on one side of the bridge (mostly the "low" Harrisburg side) so the booster can feed +/- 50ft in either direction of the bridge.
 
Yeah crazy that it's only 5 weeks till Amherst. See you there!
Foo! I'm out two weeks for Christmas, so I only have three weeks to get my stuff together!
Reply 2
Alex Wood AlexW
I think this is not specific to the Free-mo modular standard but all modular standards:
I agree with most of what you're saying, but my point was that the Free-Mo standard with a single centered track and no backdrop just begs for bridges, cornfields, and grain elevators more so than NMRA-style modules with backdrops that look more like double-track eastern mainlines.
anything from a Fiat 500 to an 18-wheeler or school bus
I bet in Free-MoN you could get a small module in a Smart Car! Gordy got his into checked airline luggage, which should really be called Fly-MoN.

Modeling the modern era freelanced G&W Connecticut Northern

Reply 1
Yaron Bandell ybandell
I bet in Free-MoN you could get a small module in a Smart Car! Gordy got his into checked airline luggage, which should really be called Fly-MoN
I bet I could put "Wedge of Gouda" in checked luggage: it's a 4" tall, 26" wide module with 7" and 6.25" wide fascias holding a 116R and 118R curve...
more so than NMRA-style modules with backdrops
Yes, the NMRA style modules and to a certain extend even the S&SS modules with the double mainline and the 3rd track are slightly more restrictive in building certain types of dioramas compared to the Free-mo / Speed-mo modular standard.
Reply 4
Alex Wood AlexW
Yes, the NMRA style modules and to a certain extend even the S&SS modules with the double mainline and the 3rd track are slightly more restrictive in building certain types of dioramas compared to the Free-mo / Speed-mo modular standard.
They each lend themselves to different types of scenes. The backdrops can be advantageous in more mountainous scenes. Backdrops really only work at the 40" height, or maybe 45" with shorter backdrops, otherwise the people disappear behind the layout, which I find to be isolating, as then it's harder to talk to the people inside the layout.

Modeling the modern era freelanced G&W Connecticut Northern

Reply 1
Yaron Bandell ybandell
This weekend was the start of the last push of adding details to the bridge before it all gets packed up and transported to West-Springfield, MA on Thursday. I got the 3D printer fired up and created the final bunch of parts for the parapet on the top of the bridge.
 
Here we see the first of three 8-arch sections of bridge gaining it's parapet:
20260117_172234.jpg
 
Then we turn it around and do the other side:
20260117_181717.jpg
 
Then we prepare the next parapet parts for the second 8-arch section while the glue on the first one sets up:
20260117_205858.jpg
 
Once the parts are prepared, we test fit and then start gluing them. I had to make more styrene glue as I ran out in the 1oz bottle and noticed my refill stash in the mason jar had solidified. 20 minutes later, I was high on MEK fumes and ready to glue some more after stirring bits and pieces of styrene into MEK to make a new glue stash.
 
This is the first side of the second 8-arch section gaining it's parapet:
20260117_215434.jpg
 
Did you know that 7' of bridge gets pretty heavy when adding close to 150 clamps? Yeah, I had forgotten about that... Always makes for some nice gymnastics to turn it around to work on the opposite side:
20260117_222649.jpg
 
And then we do it all one more time for the third 8-arch section:
20260118_134500.jpg
 
A drone shot from a different angle:
20260118_134529.jpg
 
Today I'm trying to finish up putting on the pilasters of arches 42 through 45 and adding the pilasters. This would mark a milestone as only the pilasters between the various bridge sections will need to be created. I know that will need some special considerations to be engineered.
 
Before work I added two of the six pilasters:
20260119_084129.jpg
Reply 13
KingCoal
Amazing!
Reply 2
jeffshultz
Do you do this often enough that having a lazy susan handy for spinning service would be a good idea?

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 1
Reply