Yaron Bandell ybandell
This blog will serve as a place to show the progress of my build of the Philadelphia & Reading bridge over the Susquehanna river in Harrisburg, PA.

Build Highlights:
  • Bridge over the Susquehanna river, Harrisburg, Pennsylvania, USA
  • Bridge consists of 51 concrete arches
  • One plate girder bridge
  • Dual track
  • Dual track crossing underneath on west side
  • 0.7% grade
  • No compression
  • Building both dual tracks to Free-mo module standards
  • Main bridge arches, pilasters and piers to be scratch build from 20-thou and 40-thou styrene sheet
  • Main bridge pier cutwaters to be 3D printed
  • Handlay code 83 track on Central Valley Model Works tie strips
  • Fast tracks #10 switches for cross overs
  • Include Free-mo Modular Signal System plus signal heads.
Bridge Background:

A Philadelphia and Reading bridge, now part of Norfolk Southern crossing the Susquehanna river in Harrisburg, PA.

In this Google Earth image you can see the bridge is the one closest to the Interstate 83 bridge:
[Google_Earth_01_1080px]

The complete bridge by an unknown photographer:
[P%26R%20Bridge%2043]

An aerial close up photo by an unknown photographer:
[P%26R%20Bridge%2040]

Originally this bridge was built with only 46 concrete spans in 1924. Each span plus corresponding pier structures measures 76'-3" in length. Each concrete arch measures 66', while the piers are 11’-6” and 9’ wide. There is a reason the piers alternate between these two widths. This bridge was build by replacing an existing bridge in place. The old bridge had spans of 152’-6” wide. The wider piers of the new bridge encased the original bridge’s piers, while the narrower piers were purpose build. At a later date five spans were added on the east side, giving the bridge a total of 51 concrete spans.

An elevation drawing from the west side of the bridge as found in Railway Age 69 volume 21:
[PRSusquehannaBridge-RailwayAGe69-21-002]

In this same Railway Age issue, a detail view of the west side part of the bridge was found:
[PRSusquehannaBridge-RailwayAGe69-21-004]

The pier encasing process is shown in this photo published in Railway Age 73 volume 23:
[PRSusquehannaBridge-RailwayAge73-23-004]

On the west side the mighty PRR crossed with two tracks under the first concrete arch, while the Northern Central crossed with three tracks under the deck girder bridge.

To date, only the PRR tracks (now also Norfolk Southern) still cross under the  bridge as can be seen in this photo by an unknown photographer:
[P%26R%20Bridge%2034]

On the East side there is a pair of cross overs that are protected by signals.

The bridge measures nearly 3,960' in total length, which includes these 51 spans and a 69' plate girder bridge on the west side. Without compression in HO scale this equates to 45'-6". Now convert this all to 14 similar sized module sections for ease of build and transport and you’ll end up with a nearly 50’ long Free-mo module.

The aim is to build the bridge as it looks in the current time frame: the 51 arches, the Northern Central tracks are gone, but the PRR tracks are still there. The PRR track will be modeled such that the module can also be used as a 26” long double track Free-mo module if a setup can’t accommodate the full 50’ bridge.

I'll update this thread with pictures of the various build activities when they occur with the intend to create a more detailed article for publication at a later date. Enjoy!

-Yaron.
Susquehanna Bridge Build | My Personal Website | Capitol Free-mo

Reply 25
Tim Bowser NCR-Boomer

The Free-mo Standards should be treated as the baseline, where the module *must* meet these minimum points to be considered for inclusion in a setup.  Variations beyond the minimum, unless they directly conflict with the intent of the Standard, shouldn't be a point of contention.

In my own case, my first three modules are Free-mo compliant, but they will be part of an issue with height at Amherst if they move from their assigned spots in James' current plan.  That's due to my misinterpretation of the 50" rule when I built the legs for "Brown's Yard" and "Locust Road".  They will reach above 50", but barely settle to 49.5". 

My latest build, the multi-segment "Capitol Curve", took the lesson to heart, plus some.  I borrowed the NE Corridor Historical Society's design for legs, added an option for casters, and now the "Curve" can drop to 40" NMRA module height, all the way up to the Free-mo maximum of 62".  Just set the length, install in module leg socket, and go. 

Is it Free-mo compliant?  By strict interpretation,  it could argued that no, the legs are not compliant because of the fixed-height casters.  My take on it is that the legs on the Free-mo frontier (end plate), with their adjustable feet, meet the intent of the Standard.  The rest of the legs, with casters, are aids in setup by allowing just two people to move a 30-foot module anywhere in the planned space.

You can see the "Curve" being repositioned in a 'Blink, and you might miss it' bit in this timelapse of Capitol Free-mo's October setup at Timonium MD, in the "Cow Palace" building.

Yaron, consider the mid-module castered legs for your project.

Tim Bowser
Capitol Free-mo participant
Speed-mo neophyte 😉

Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 3
Yaron Bandell ybandell
NCR-Boomer wrote:
My latest build, the multi-segment "Capitol Curve", took the lesson to heart, plus some.  I borrowed the NE Corridor Historical Society's design for legs, added an option for casters
Tim, the casters is for sure something I'm interested in. Can you show what type you used and how you mounted them? Either some photos, links to your source, or in person at the Amherst show?

Also, what method / specific equipment did you use to create the slits in your legs? I have a test set for my Evergreeenvalley Road module and it was an ordeal to route the slit with the Dremel router bit I used. So I was going the drilled hole at set interval with an ability to +/- 2.5"-3" fine adjust at the top of the module instead.

Edit: Oh, I forgot to mention that I agree with regards of the compliance on the Free-mo standard. I think standard S2.9 is too strict in its wording because of the screw feet reference and the missing of the words 'at least' thus technically and officially limiting the continuous adjustability to only +/- 1". But yeah, we know the intend so we ignore that fact, but it really should be updated.
Reply 2
Tim Bowser NCR-Boomer

Yaron,

I can get a few photos later to illustrate the leg mods.

The casters (and optional threaded screw feet) are used with nut inserts in the end of the leg.  The link is to the inserts I use for "Stull" module sets, both for the threaded screw feet, and the carrier retainer screws.

To cut the leg slots, I used a router table with a 1/4" straight bit.  One of the table panels on my Ryobi BT3000 converts to a reasonably useful router table.  In a pinch, I can see setting up a Harbor Freight "Bauer" trim router with a bolted on fence, use that to cut the slots.

It's no problem dragging a leg or two to Amherst for discussion.  See you there!

- Tim B.

Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 3
Alex Wood AlexW
Exactly, although many Free-mo modules are build with legs that are adjustable more than the +/- 1". At Amherst the keystone module will be set at 51.5"-52" with the nearest return loop about 50' away ending up at a height of only 48". So I'm not worried about the grade at all on my module. Plenty of exhibition spaces today have floors that aren't anywhere near level and my legs have that extended adjustability. Combine this and it could actually benefit a setup in such space.


I just realize that depending on how you interpret the spec, a module that goes DOWN to NMRA or other modular systems at 40" might be a Free-Mo module, as it would have one Free-Mo end, and the non-Free-Mo end just wouldn't be considered an end in Free-Mo specs. Not that it really matters, such a module would work, and Free-Mo modules have been used in many non Free-Mo layouts, like with S&SSNC.

Modeling the modern era freelanced G&W Connecticut Northern

Reply 3
Yaron Bandell ybandell
I finished up another test cut tonight. This will be the 3rd assembled test span from styrene. I took a quick "family" picture with all 51 styrene  components needed to build a single span. Technically only 41 because this picture contains 4 full pilasters.

[20230120_222237]

I didn't get to the glueing stage, but I did perform a test fit and paired it with test #2:

[20230120_225050]

The next two closeups show how I intend to join the two half piers together.

[20230120_225117]

There is some extra styrene sticking upwards that is too be a glue tab attaching to the internal spandrel walls. Glue tabs for the cross beam will be made of some rectangular shapes that I'll have the die cutter cut/score as well.

And the closeup of the joined pier halves:

[20230120_225134]

Eagle eyed readers will notice that the two half piers are of differing sizes. That's because test #2 was put together incorrectly.

Every fourth pier this join method needs to be made from heavier duty styrene than the current 20-thou I'm using and with more slop. This will allow the set of 4 arches from the neighboring module to slide in and be more resistant to pulling apart.

So far this dry fit only uncovered one mistake that'll be an easy fix: some slots should be cut to the edge of the component.

I think the next full cut will be the final cut test before creating a single four span section.
Reply 10
ChuckS Chuck Stuettgen

Yaron,

That is some impressive engineering!

BTW, I just realized I never thanked you for your detailed reply to my questions about your experience using the Silhouette  - Thank you!

Chuck S.

"It's a hobby not a race."  What I tell people when I'm asked when my layout will be finished.
[GFRR_Logo_small]
Reply 3
Yaron Bandell ybandell
That is some impressive engineering!

BTW, I just realized I never thanked you for your detailed reply to my questions about your experience using the Silhouette  - Thank you!

Chuck, thank you for the kind words and my pleasure on the Silhouette experience sharing.

Talking about that experience:
The Cameo 4 Specifications indicate you can cut materials up to 3mm (approx 1/8") in thickness.  How thick a piece of styrene have you tried / been able to successfully cut?
Last night I setup and used a new 60 degree blade to cut the two barrels and bridge top deck pieces out of 40-thou styrene. I set the blade depth to nearly 40-thou just because the blade can extend that far out of the holder. I successfully ran my half force, half speed initial score run I always do before going full force and higher speed multiple passes. However when it was almost done, I noticed that my Cameo didn't like this blade depth and material thickness: it couldn't lift the blade up enough off of the substrate, so all the moves with the blade "up"actually still ended up dragging the tip and making "random"score lines. Not even sure if a Cameo 4 wouldn't have this problem since the lift distance on the carriages aren't a listed specification.

I ended up working around this issue by chucking that ruined piece of 12x12 40-thou into my scraps bin, thank God for not paying Evergreen prices 🙂, and retracting the blade to only just a little over 20-thou depth like I had on my previous runs with the 30 degree blade.

Reply 5
ChuckS Chuck Stuettgen
Yaron,

Thanks again for sharing your knowledge!   I'm saving all of your posts for when I pull the trigger on a Cameo 4.

Chuck S.
 
"It's a hobby not a race."  What I tell people when I'm asked when my layout will be finished.
[GFRR_Logo_small]
Reply 3
Tim Bowser NCR-Boomer
As promised earlier in the thread, the NE Corridor Society module leg, and the modification I use with my "Capitol Curve" Free-mo module.

Leg-Base-Detail.jpg

The primary modification is the use of threaded nut inserts, in concert with threaded stud glides and casters.  The glides, or feet, are used on the Free-mo "frontier" ends of the module, to provide a more precise adjustment for height between modules.  Casters are used on the rest of the leg sets, to allow the entire 14-foot diameter, multi-part module (up to 7 segments at present) to be repositioned by just two people.

For my sets, I've used M8x1.25 threaded inserts, as I have a ready supply of 2" non-marking casters from the local Harbor Freight.  Glides can be picked up from Amazon, McMaster-Carr or Grainger; I happened to find a handful of suitable glides in IKEA's "second chance" section at the College Park store.

NECHS-Leg-Mod.jpg

The leg itself is pretty much as-is from the NECHS plans.  1/4-20 carriage bolts, washers and wing nuts from Tractor Supply fix the two slides together.  From experience at four setups so far, I'll be changing the lower wing nut to a preset nylon locknut, tensioned to allow a smooth slide with slight friction.  Working two wing nuts to change height gets to be really tedious.

And, that's it!

Tim Bowser
Capitol Free-mo
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 6
Yaron Bandell ybandell
NCR-Boomer wrote:
The glides, or feet, are used on the Free-mo "frontier" ends of the module, to provide a more precise adjustment for height between modules.
So the glides are there only for the fine tuning of the height at Free-mo ends while on the intermediate sections you fine tune with the adjustable legs only?
NCR-Boomer wrote:
The leg itself is pretty much as-is from the NECHS plans.  1/4-20 carriage bolts, washers and wing nuts from Tractor Supply fix the two slides together.  From experience at four setups so far, I'll be changing the lower wing nut to a preset nylon locknut, tensioned to allow a smooth slide with slight friction.  Working two wing nuts to change height gets to be really tedious.
If I understand this correctly, this change to the use of nylon locknut is primarily driven because of the need to do fine tuning of the intermediate sections of the module with the two sets of nuts/bolts on each leg? And that being a pain in the rear?

I was planning on continuous adjustability at the top of the legs of +/- 2" or more and coupling that with approximate adjustment by the legs in a similar fashion you have done. So I think I could get  casters for all the legs and could move the whole bridge module by myself:

https://www.amazon.com/gp/aw/d/B07YZKW1ZS/

Or:

https://www.amazon.com/Skelang-Replacement-Bookcase-Computer-Capacity/dp/B09ZV1B7VV/

I could mount them on my 2x1 based legs with these L or U bracket and not have to worry about how to mount the threaded nut. I totally see the massive advantage of being able to easily move this giant by only investing an extra $140 or so on this build.

Great food for thought Tim. Thank you!
Reply 3
Tim Bowser NCR-Boomer
So the glides are there only for the fine tuning of the height at Free-mo ends while on the intermediate sections you fine tune with the adjustable legs only?


Correct.  Once the frontiers are leveled and attached to their neighbors, then I go through and fine-tune the intermediates.

If I understand this correctly, this change to the use of nylon locknut is primarily driven because of the need to do fine tuning of the intermediate sections of the module with the two sets of nuts/bolts on each leg? And that being a pain in the rear?


Yes.  During the October Timonium setup, I found myself leaving the lower wingnuts loose, to the point they were vibrating even looser with work being done on the modules.  Eliminating the loss altogether, by swapping Nyloks for the lower wingnut, will simplify adjustments on the intermediate legs.

So I think I could get  casters for all the legs and could move the whole bridge module by myself:

https://www.amazon.com/gp/aw/d/B07YZKW1ZS/

Or:

https://www.amazon.com/Skelang-Replacement-Bookcase-Computer-Capacity/dp/B09ZV1B7VV/

I could mount them on my 2x1 based legs with these L or U bracket and not have to worry about how to mount the threaded nut. I totally see the massive advantage of being able to easily move this giant by only investing an extra $140 or so on this build.

Great food for thought Tim. Thank you!


You're welcome!

Only thing I see with those casters is the unnecessary brakes.  With the frontiers sitting on glides, the assembled module is held in place without the use of caster brakes.  One or two of those things with a brake unknowingly set, and you might end up breaking an intermediate module joint when trying to reposition the unit.  Cautionary thought.

Regards,

Tim Bowser
Capitol Free-mo
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 3
Yaron Bandell ybandell
NCR-Boomer wrote:
Yes.  During the October Timonium setup, I found myself leaving the lower wingnuts loose, to the point they were vibrating even looser with work being done on the modules.  Eliminating the loss altogether, by swapping Nyloks for the lower wingnut, will simplify adjustments on the intermediate legs.

Only thing I see with those casters is the unnecessary brakes.  ...  One or two of those things with a brake unknowingly set, and you might end up breaking an intermediate module joint when trying to reposition the unit.  Cautionary thought.
Great points to consider. Thanks for the elaborations.
Reply 3
pldvdk
Yaron,

You always impressed me with your comments and advice as you helped me develop the track plan for my layout. 

Little did I know how deep your talent goes. Now I do though with this project. Nothing to be said other than I am in total awe!

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 3
Yaron Bandell ybandell
pldvdk wrote:
Little did I know how deep your talent goes. Now I do though with this project. Nothing to be said other than I am in total awe!
Thank you Paul for your kind words. Seeing and interacting with your design and build blogs is one of the reasons I got my build juices flowing resulting in this.

So the below is the result of creative juices flowing over the past weekend. I did a lot of double checking and correcting a whole bunch of incorrect measurements in my drawings. While working those corrections, the below design I shared in the previous update wasn't sitting right with me.

The problem is the butt joint between the upper upright cross beam piece and the lower cross beam. It needs some stabilizing as you can see in the below picture:

[20230123_091406]

The easy way was to just cut a few rectangular pieces of styrene and glue those on. But then I thought: how do I ensure I position those pieces correctly each and every time? And I don't want to cut 8 or 16 pieces for every single pier as with 51 spans and thus 52 piers that would result in gluing 400+ or 800+ pieces of styrene. So there must be an easier way.

So this is what I came up with, only 4 pieces and easy to install and keep in place while glueing:

[20230123_091350]

I calculated where in the upper slots (in the tall pieces in the middle of the above picture) I could widen the slots enough to slide in 2 pieces of styrene to act as joiners. Put together, it looks like this (with a test upper cross beam piece installed):

[20230123_091507]

A closeup of the side of the butt joiners:

[20230123_091540]

I think this will work. Any thoughts?
Reply 7
Yaron Bandell ybandell
No physical build updates because of a trip to the Amherst Railroad Hobby Show in West-Springfield, MA this past weekend. But that did mean we passed Harrisburg, PA on the way back during daylight hours: bridge excursion detour!

During the excursion you get to see interesting details like this:

Pier #46 was build in 1920:

[DSC_9501]


The south-east side (facing the dam) was build in 1922:

[DSC_9484]

Take a guess when the north facing side was build in?







If you guessed 1923 you'd be correct:

[DSC_9508]

This last image also shows a bracket. This bracket is on each pilaster's top on the North-west facing side. I'm guessing at some point in time there must have been (red?) marker lights on these brackets to warn for the damn located just south of the bridge?

You can also readily see the incline of 0.7% of the birdge. Just look at the location of the Arch rib traveler indents and their location compared to the top of the cutwaters in the following two images:

South-east / Dam facing side:
[DSC_9482]

Also note none of those brackets on this side of the bridge, while on the the North-west facing side. Yup, 45+brackets...

[DSC_9566]


And since the Harrisburg side has a park going straight underneath the bridge, you can easily take pictures like:

[20230130_152852]

And easily get exact measurements on those Arch rib traveler indents by just walking up to them with a measuring tape:

[20230130_152910]

And get shots of bridge pieces that nobody normally cares to post online, but that are needed to complete my build:

[20230130_154943]

And then the big conundrum rears it's ugly head as well. I've not mentioned it until now, but these 100 years have not been kind to this concrete structure. Look at the Leymone side of the bridge. Many parts of the parapet have been replaced by metal railings:

[DSC_9583]

On the Harrisburg side, pieces have been replaced by wood and sheet metal and other forms of safety structures, while concrete rebar is visible as well:

[DSC_9497]

Even the tops of some of the cutwaters have heavily chipped concrete:

[20230130_153459]

So, what to do? Build the bridge in a near immaculate state in the early stages of it's lifespan? Or build it to how it roughly looks to date, and try to replicate some of the deteriorating concrete parts of the overall structure?
Reply 6
Prof_Klyzlr

Dear Yaron,

Am I right in thinking that Piers 8 and 10 from the left in the below pic have extra-height bases?
(The darker-weathered base sections reach up further?)

Also, amazing how relatively-flat the water is, and how the dark "shadow line" around the pier base makes it look like the bridge piers are sitting on the water surface rather than the water running around the piers... ;-)

[DSC_9566]

Quote:
So, what to do? Build the bridge in a near immaculate state in the early stages of it's lifespan?
Or build it to how it roughly looks to date, and try to replicate some of the deteriorating concrete parts of the overall structure?
I know which "end result" effect I'd choose, but "Rule 1" is in full effect...
(Hint: for ease of construction, cutting all the parts consistently and thus forming a "clean and new" version is easier and faster.
However, once all-together and proven/tested-working electromechanically,
going-back and doing a "beat it up, cut out sections, and fill with wood/steel-railing patches" 2nd pass or "re-detailing" is always an option... ;-)    )

Happy Modelling,
Aim to Improve,
Prof Klyzlr

Reply 2
Yaron Bandell ybandell
Prof_Klyzlr wrote:
Am I right in thinking that Piers 8 and 10 from the left in the below pic have extra-height bases?

(The darker-weathered base sections reach up further?)

Yes, those 2 cutwaters are indeed taller and fatter/wider than any of the other cutwaters on the bridge. The rest of the piers are one of two sizes: wide, due to the encapsulation of the original bridge piers; or narrow, when it was a completely newly build pier.
Prof_Klyzlr wrote:
Also, amazing how relatively-flat the water is, and how the dark "shadow line" around the pier base makes it look like the bridge piers are sitting on the water surface rather than the water running around the piers... ;-)
Yes, amazing how nature can sometimes help us with the water effect. Since I'm going to have to create about 55 sqft of water effect, calm water like this lends itself perfectly for a few coats of clear polyurethane as the base for water. And a thin layer of modge podge for a limited riple effect. Any other method would nearly break the bank and/or cause the need for careful pouring of water effect material and guarding against leakage.
Prof_Klyzlr wrote:
I know which "end result" effect I'd choose, but "Rule 1" is in full effect...

(Hint: for ease of construction, cutting all the parts consistently and thus forming a "clean and new" version is easier and faster.
However, once all-together and proven/tested-working electromechanically,
going-back and doing a "beat it up, cut out sections, and fill with wood/steel-railing patches" 2nd pass or "re-detailing" is always an option... ;-)    )
You are reading my mind, Prof!
Reply 2
Bshoop
Regarding the "cut waters" on the piers, yeah, we get some pretty massive and potentially destructive ice chunk flows all down the Susquehanna roughly every year around March/April. They've destroyed/undermined bridges down the valley several times. I'm kinda surprised some of the "cut waters" aren't in worse shape!
If you look past the PRR Cumberland Valley bridge in the pic below, there's even a train on the PH&P bridge (there's always a train on the PH&P bridge) as a bonus! I-83 bridge is past that. Harrisburg... the city of bridges.

Screenshot_20230131_212037_Google.jpg
Reply 4
Yaron Bandell ybandell
Bshoop wrote:
Screenshot_20230131_212037_Google.jpg
Yeah, surprised that the cutwaters / piers don't show more damage because of that. Most of the deterioration seems to come from water infiltrating cracks that then freezes and breaks off chunks of concrete. Think frost heaves.
Reply 3
Yaron Bandell ybandell
So it's been a while since I last updated this journal. With all the new information I gathered by stopping at the bridge when coming home from the Amherst model railroad show I had to revise my CAD drawings in some areas. Things like the placement and size of the travel rib indents were studied and altered.

As part of these studies a side track started as well. I noticed that the signal on EB track #2 has 4 lights while the one on EB track #1 only has 3. So what aspects can that track #2 signal display? Deliberations can be read in a separate thread: https://forum.mrhmag.com/post/what-aspects-can-this-prototype-signal-display-12561869 . While Green/Flashing Yellow/Yellow/Red is the most likely aspects it can show, we're not yet 100% sure this is correct.

While making revisions to the CAD drawings I also decided to generate the lines where the V grooves on the barrel, the (outer) spandrel wall and the soffit would be. These will be converted to a separate layer after importing into Silhouette Studio before die cutting the components and marked as 'scribe only' lines. The few hours it took to create these lines in the CAD drawing will save hours or even days of manually scribing these lines after the spans have been assembled.

The below picture shows those grooves on the barrel, the spandrel wall and the soffit of where the concrete was formed via separate castings:

[20230130_153459]

The soffit component not only got the scribe lines, but it also got two hole placements for the 8" drain pipe. Spans 1-45 have a single drain pipe, but the location is on the EB side of the arch for spans 23-45, while it's on the WB side of the arch for spans 1-22. Since I don't want to do difficult if-then-else constructs in my CAD drawing file, I'll simply remove the drain hole that isn't needed when I'm importing a a specific dynamic span drawing into Silhouette Studio.

The final, and most radical change was the split of the CAD code file into a static file and dynamic file. This will make it simpler to generate each specific CAD drawing and reduces the amount of time spent in Silhouette Studio software composing the object placement for cutting out of the various thicknesses of styrene.

This is what the static drawing looks like in LibreCAD, ready for export to SVG format:

[20230218_span_static]

The reason for having a dynamic CAD file component is because the bridge is on a 0.7% incline. Thus each of the pilasters across the 51 spans has a different height. With parameterization in the CAD input file, I can draw the objects once and with a simple parameter change it generates those objects specific for, say span 1:

[20230218_span0dynamic]

In the above you see the wide pier & pilaster components on the left, the narrow pier & pilaster components on the right while the massive soffit is in the bottom middle.

Compare this with the dynamically generated span specific components for arch 46:

[20230218_span45dynamic]

The zoom level and the placement of the components in the above screenshot are the exact same as the one used for span 1. But you can see the pilasters and soffit are a lot smaller (less tall).

For grins I placed the soffit of span 1 behind that of span 46. The purple lines are part of span 1 with span 46 hiding the rest of span 1's soffit lines. The yellow lines are the scribe only lines and the blue circles are the drain hole locations (only one should be cut depending on which span we're cutting):

[20230218_soffit_span2vs45]

I'm getting really close to a test cut and fitting of two side by side arches. Some minor tweaks on the soffit and pilaster side components tomorrow and that should be it.
Reply 6
Yaron Bandell ybandell
Not much work done over the weekend due to the Band Boosters running the high school concession stand for 4 days in a row. I've never popped this much popcorn in my life: 50lbs....

But I did get to cut some of my 30-thou and 40-thou parts and played with scribe in my Cameo and scribing by hand of the V groove in the barrel and spandrel walls.

Here you can see the barrel component overlaid on the spandrel wall. The spandrel wall pieces were scribed by the Cameo then scribed more by hand. The barrel pieces have only had the Cameo scribing process done. I think I'll have to up the amount of passes on the scribing by a few and I think I'll call it good.

[20230227_092538]

With all the white, it's hard to see the grooves, but they are there:
[20230227_092538_detail]

Now the most important thing I learned was this: orientation, orientation, orientation.... of components in the cutting file. As you can see the spandrel wall on the top was cut with the wrong orientation. You can see how the barrel doesn't properly overlay like it does for the other one below it overlaying its spandrel wall.

Normally it's not a problem, you turn the object around and voila, done. But when you have one side scribed, yeah, you can't flip it around to get the correct orientation. In this case the orientation of the narrow and wide pier. So I had to flip the object around in my cutting file and will be cutting a few more spandrel walls before I can start the next test assembly.
Reply 5
Bshoop
Slightly off topic, but the last time I was in Harrisburg, after getting off at the 2nd St. exit from I-83E, and following 2nd St. into Harrisburg, the Reading's (PH&P) old bridge that goes above 2nd St. is still painted black and says "Reading Lines". Sweet.
Reply 3
Yaron Bandell ybandell
Bshoop wrote:
Slightly off topic, but the last time I was in Harrisburg, after getting off at the 2nd St. exit from I-83E, and following 2nd St. into Harrisburg, the Reading's (PH&P) old bridge that goes above 2nd St. is still painted black and says "Reading Lines".
It's amazing how long fallen flag logos stay on bridges. On the big bridge the Reading logo is cast into the concrete in several places, so hard to remove, but for the 2nd St. bridge it's painted on... I'm thinking that the 2nd St. bridge is just barely beyond my module, so no need to model it.
Reply 2
Mnemonic
Yaron, I'm late to this, and just need to say your construction techniqes, understanding of this viaduct, and sheer boldness in taking on a project of this scope is way off the chart impressive!
Reply 4
Yaron Bandell ybandell
pschmidt700 wrote:
Yaron, I'm late to this, and just need to say your construction techniqes, understanding of this viaduct, and sheer boldness in taking on a project of this scope is way off the chart impressive!
Thank you Paul for your kind words.
 
This weekend I was all geared up to get at least 2 arches build (minus the pier) and do at minimum a fit test of the two together.
 
This will become the second arch from the west (Leymone, PA) side of the bridge. In my CAD drawings it's referred to as 'span #1' because coders start counting at zero 😉
 
I got the grooves in the spandrel wall and the barrel of the arch worked out by doing about 20 passes with a scribe in the cameo at max force and 1/3 of max speed. The string course at the top was fitted for the first time and seats nicely on top of the spandrel wall and the notches matched up with the spandrel wall cross beams / supports.
 
I had issues with the insert behind the face of the pilaster not properly fitting in between the sides. I had to sand and file way too much material but got them to fit in the end. I'm thinking in the last redraw I did to extend the pilaster towards the top of the pier's cut water I must have missed a "material thickness" or "material allowance" parameter. I shall have to dig into the code to get that fixed.
 
[20230305_140843]
 
I'm happy to see that the grooves scribed into the barrel and spandrel wall parts actually line up:
 
[20230305_140805]
 
Despite the snafu with the inset of the pilasters, the notch in the pilaster underneath the spring course is properly placed and everything lines up nicely. Don't pay attention to the pilaster face and the spring course bump out on the parapet that aren't parallel: the pilaster is not yet glued together.
 
[20230305_140824]
 
The test fit of the pier extensions went well. I figured out the most likely "best" glue order.
 
I had created wider notches in the inner spandrel wall to help align the two cross pieces used to strengthen the butt joint of the largest cross beam and the pier extension cross beam and when I put the pier extention on, the notches in its three supports didn't fit. Why? I had made an assumption on how deep the notch needed to be. I didn't rationalize their size 😫
 
After cutting away some material I could ensure the rest of the test fit:
 
[20230305_140922]
 
The backside shows that the cutout within the 3 supports don't go high enough. The one fitted in the arch is now the correct height, the one for the neighbor arch is yet to be fixed:
 
[20230305_140933]
 
Then it was time to do a clearance fit of the 3D printed "travel rib indent" part:
 
[20230305_141802]
 
So I grabbed the nearly 30" long soffit part and placed it alongside the underside of the barrel:
 
[20230305_134124]
 
Only to find out that the two of the three supports of the pier extension interfere with the travel rib indent part 😭
 
[20230305_140538]
 
The problem is that I can't just cut the interfering portion of the supports out because the indent is close to the entire width of these supports. I can't just omit that part of the support either or the pier will gain instability in the direction of train travel.
 
So after staring at the problem for a few minutes I came up with a solution. I had to redraw the traveler rib indent part anyways because the field trip to the bridge showed me that the "roof" of the indent is angled, not straight. So why not make the traveler rib indent part a connector piece between the three supports of the upper part of the pier and the pier extension? The supports of the pier end close enough to the indent part that those parts don't need alteration. From the butt joint issues I knew that the three pier extension supports had to be modified anyways. So why not shorten them at the same time so they can fall within the indent 'connector' part? Time to go to the CAD drawing table and whip up a test part and see if this works.
 
Stay tuned!
Reply 9
Reply