Yaron, I'm late to this, and just need to say your construction techniqes, understanding of this viaduct, and sheer boldness in taking on a project of this scope is way off the chart impressive!
Thank you Paul for your kind words.
This weekend I was all geared up to get at least 2 arches build (minus the pier) and do at minimum a fit test of the two together.
This will become the second arch from the west (Leymone, PA) side of the bridge. In my CAD drawings it's referred to as 'span #1' because coders start counting at zero 😉
I got the grooves in the spandrel wall and the barrel of the arch worked out by doing about 20 passes with a scribe in the cameo at max force and 1/3 of max speed. The string course at the top was fitted for the first time and seats nicely on top of the spandrel wall and the notches matched up with the spandrel wall cross beams / supports.
I had issues with the insert behind the face of the pilaster not properly fitting in between the sides. I had to sand and file way too much material but got them to fit in the end. I'm thinking in the last redraw I did to extend the pilaster towards the top of the pier's cut water I must have missed a "material thickness" or "material allowance" parameter. I shall have to dig into the code to get that fixed.
I'm happy to see that the grooves scribed into the barrel and spandrel wall parts actually line up:
Despite the snafu with the inset of the pilasters, the notch in the pilaster underneath the spring course is properly placed and everything lines up nicely. Don't pay attention to the pilaster face and the spring course bump out on the parapet that aren't parallel: the pilaster is not yet glued together.
The test fit of the pier extensions went well. I figured out the most likely "best" glue order.
I had created wider notches in the inner spandrel wall to help align the two cross pieces used to strengthen the butt joint of the largest cross beam and the pier extension cross beam and when I put the pier extention on, the notches in its three supports didn't fit. Why? I had made an assumption on how deep the notch needed to be. I didn't rationalize their size 😫
After cutting away some material I could ensure the rest of the test fit:
The backside shows that the cutout within the 3 supports don't go high enough. The one fitted in the arch is now the correct height, the one for the neighbor arch is yet to be fixed:
Then it was time to do a clearance fit of the 3D printed "travel rib indent" part:
So I grabbed the nearly 30" long soffit part and placed it alongside the underside of the barrel:
Only to find out that the two of the three supports of the pier extension interfere with the travel rib indent part 😭
The problem is that I can't just cut the interfering portion of the supports out because the indent is close to the entire width of these supports. I can't just omit that part of the support either or the pier will gain instability in the direction of train travel.
So after staring at the problem for a few minutes I came up with a solution. I had to redraw the traveler rib indent part anyways because the field trip to the bridge showed me that the "roof" of the indent is angled, not straight. So why not make the traveler rib indent part a connector piece between the three supports of the upper part of the pier and the pier extension? The supports of the pier end close enough to the indent part that those parts don't need alteration. From the butt joint issues I knew that the three pier extension supports had to be modified anyways. So why not shorten them at the same time so they can fall within the indent 'connector' part? Time to go to the CAD drawing table and whip up a test part and see if this works.
Stay tuned!