jeffshultz

One of the advantages of being a member of the LD-SIG ( ldsig.org) is going on the LD-SIG layout tour each year during the NMRA convention. This year there was a list of 20 layouts on the list - even discounting the Sunset Valley Oregon System (SVOS) which was open all week, and another layout(s) that was by appointment only, that still left us 18 layouts that we could credibly see in one day. Gentlemen... start your GPS's.

We got to 11 of them, leaving the hotel at 9:30am and finishing up with the last layout at just after 8:30pm.

We started with Ralph Moxley's Ann Arbor Railroad in HO, traveled to Hank Tenwolde's Monson layout, and then to Brian DeVries B&O Buffalo Division layout room, buildings, and plans. Somewhere around then we got lunch. After that we went to the Grand Rapids Model Railroad Historical Society's Pere Marquette Ry. Leaving there it was on to Tim Verburg's Chessie System, followed by a trip to a retirement home where the Riverbend Model RR club has their new semi-FreeMo layout. After that it was on to Wade Griffith's basement for his take on the Burlington Northern. Thom Vanderlip's B&O Grafton Division, features a working "Armstrong" manual interlocking, and from there it was off to Duane Hall's ATSF & Soo Line, which features more staging than I can remember ever seeing. Dan Bergman's spectacular HOn3 Rio Grande Southern was next, and that is a railroad that is article-worthy. We finished up the day at Skip Luyk's Arcadia & Betsey River Ry, which is truly a fine way to end a day.

So... let's start the tour:

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Ralph Moxley's Ann Arbor Railroad

Ralph's layout is centered on the rail-to-ferry interchange in Alberta, Michigan, with the other end of the railroad being Cadillac, Michigan.  

Here is a layout diagram that we were greeted with:

3_resize.jpg 

Ferry operations and the transfer yard fills a central peninsula:

4_resize.jpg 

The railroad features a beautiful open helix:

8_resize.jpg 

The ferry opens up for access to the car decks - the top opens too and is detailed down to the shower heads:

 

0_resize.jpg 

_resized.jpg 

One of the most commented on features was the light baffles that Ralph constructed out of hardboard. Not only did they block the view of any of the fluorescent fixtures above them, but they also bounced the light around so much that it appeared to shine evenly across the layout, with a minimum of shadows:

6_resize.jpg 

 

The central peninsula of Alberta, MI includes a  roundhouse and yard:2_resize.jpg 

Staging is located outside the room in his workroom:

3_resize.jpg 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Back later...

Okay, it's after midnight - the National Train Show starts tomorrow - and there are a lot of product announcements scheduled.

That makes it bedtime - more LD-SIG tour layouts later!

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
kleaverjr

Jeff, Speaking of the National Train Show...

Can you please check out the new Product by Exact Rail announced.  It's a new type of Axle.  Ask them how is this a "better" axle than their competitors such as Intermountain's!

Thanks.

Keep up the great work.  Enjoying the pics of the Convention. 

Ken L

Reply 0
Ron Klaiss Myowngod

Excited to see the others.

What a nice layout.  Great job on the Ferry.

Can wait to see the other layouts on the tour.

Keep Model Railroading!
Ron K
MineMountModels.com
Reply 0
jeffshultz

Hank Temwolde - the Monson RR.

Hank will happily admit that the real Monson was a narrow gauge railroad, but he preferred to do it in standard gauge for reasons that will be explained later. From my perspective it sure simplified his interchange with the Bangor & Aroostook RR.

8_resize.jpg 

As you walk down the stairs into the basement you first see two things - the first is his staging track for the B&A  sticking out of a stair step part of the way down, and the second is this lovely turntable. It's actually an Atlas turntable - he and his wife spend some time in Florida each year, so he takes projects. One of them was to resurface two Atlas turntables with individually cut and stained pieces of styrene. The effect is gorgeous.

1_resize.jpg 

The scenery is pastoral and very autumn. One of the people at the LD-SIG banquet who got to operate on it a day or two ago said that it was very relaxing to run on due to the beauty of the scenery. 

2_resize.jpg 

The main industry, and the reason for the prototype Monson's existence, are slate mines. There are several well detailed ones on the layout.

4_resize.jpg 

Another pastoral scenic element is water, and on the Monson you just want to sit down and drop a line in with the locals.

p_resize.jpg 

I believe this is a wood products firm - possibly a furniture company.

0_resize.jpg 

Our host, Hank Temwolde. I got the idea that the only thing he'd like to change... is the height of the ceiling.

1_resize.jpg 

Geared locomotives... he's got 'em. These are sitting near the enginehouse in Monson.

9_resize.jpg 

See, I told you his reasons for doing it in standard gauge would be explained later.

4_resize.jpg 

It took me awhile to notice the "skirting" on the layout - which should be taken as a compliment. When I finally did notice it, I had to laugh a bit - it's vinyl window blinds, which makes for an attractive vision block, available in many colors, that can easily be retracted out of the way.

5_resize.jpg 

Count me as one of the people who considers Digitrax throttles to be lacking in the user interface area. Here Hank shows how a simple overlay (he uses cut up ID tag holders) on his throttles that simplifies their use by his operators.

6_resize.jpg 

One addition to his ops that seemed to meet with both general approval and amusement was the use of a pair of timers for each operator/crew. One timer counts down the amount of coal you are using, the other the amount of water. Don't reach a water tower or coaling station in time and... "ding" - someone may need to come tow you in, or your relatives may be receiving condolences over your loss in a crown sheet collapse.

0_resize.jpg 

The above is the other Atlas turntable (and they are both controlled via DCC) on the layout. Note the somewhat different truss design. Tracks in back behind the yellow tree go through the stairs to staging.

2_resize.jpg 

Here Hank shows how to cheerfully accept what he can't change... it took me two looks before I was sure there was a pole there.

resize_0.jpg 

A rather odd articulated locomotive on the Monson, according to Wikipedia it appears to be a "Meyer" type. And just to show what Wikipdedia knows, I've been told it's actually a PFM model of a Vulcan Duplex, imported in the early 70s. 

4_resize.jpg 

From weird steam to weird diesel - The Bangor and Aroostook RR was one of the few to buy the EMD BL-2 locomotive.

6_resize.jpg resize_0.jpg 

Additional equipment storage above the staging tracks. Occasionally the Monson is struck by snowstorms, leaving snowdrifts on the track that need to be removed before the day's business can be taken care of....

4_resize.jpg 

The snow drifts can be seen here.... take a chunk of styrofoam, paint it white, sprinkle with Heki "snow" while it's drying - instant snowbank!

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Brian DeVries B&O Buffalo Division

On the paperwork describing the layouts on the LD-SIG tour are two entries: % Complete and % Scenicked. In the case of the B&O Buffalo Division, both of those numbers were 0.

Brian, who is a railroad employee, loves the B&O. And he apparently loves research - he has, or has access too, literally thousands of documents that the railroad used to run itself in the 1950s and 60s. He has conducted numerous interviews with many former employees of the railroad (and possibly some of the industries on it).

He has a lovely finished basement, built to his specifications, with a dividing wall down the middle with two precisely placed, drywall finished holes in the wall.

He doesn't have a stick of benchwork. He has a pile of lumber he bought 24 years ago (on Groundhog Day, he notes).

So far, the N Scale B&O Buffalo Division is almost entirely notional, existing only in a detailed track plan, many custom built buildings, and a fair number of cars and locomotives (some of which are Micro-Trains custom runs) stockpiled against the day that there will be track to run them on.

It was... a little surreal, to tell the truth. Friendly guy, extremely knowledgeable about the area he will model, and without a doubt someone who qualifies as a model railroader.

Anyway, I thought you ought to know that prior to the photos, lest you wonder where the railroad was...

7_resize.jpg 

The layout plan. The yard at the right with the roundhouse is a double-ended staging, with the yard at the very top being a buffer-staging yard, where trains that have completed their trip around the layout can wait until they are needed to be dispatched out of the normal staging yard as an eastbound.

9_resize.jpg 

One of the very nice, custom made buildings that are awaiting a layout.

7_resize.jpg 

Brian actually has the plans for many of these buildings, acquired from the railroad.

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Prof_Klyzlr

Meyer = Vulcan Duplex

Dear Jeff,

That "Meyer" would likely be a PFM Vulcan Duplex...

http://brasstrains.com/Classic/Product/Detail/037371/HO-Brass-PFM-Vulcan-50-Ton-Duplex-Logging-Loco-1967-Run

Happy Modelling,
Aim to Improve,
Prof Klyzlr

Reply 0
Russ Bellinis

Even with the notations on the face Digitrax still looks

difficult to use!  When the modular club was looking into which dcc system to go with, they eliminated Digitrax because of the difficulty in a programming procedure that seemed to involve endless pressing of buttons with one misstep requiring that the operator start over.  I've never seen a Digitrax throttle or tried to use one, but if those instructions are correct, I would think that someone running a Digitrax for the first time at an operating session would find it frustrating. 

Reply 0
George J

If I Can Use It...

If I can use Digitrax (and I can!) anyone can!

If you ignore all the bells and whistles... (pun intended) it is really rather simple to use. While the programming and manual are not user friendly, it is by no means impossible to comprehend. Most programming is a one time thing and can be accomplished by that club member to whom programming manuals are as simple as Dr Seuss books are to you and I.

Selecting an engine (or consist) involves little more than entering the loco number into the throttle and then pushing a button. Consisting locomotives is only slightly more complicated, but still within the ability of your average model railroader.

George

"And the sons of Pullman porters and the sons of engineers, ride their father's magic carpet made of steel..."

Milwaukee Road : Cascade Summit- Modeling the Milwaukee Road in the 1970s from Cle Elum WA to Snoqualmie Summit at Hyak WA.

Reply 0
Dave K skiloff

Disagree, Russ

It took me maybe a half hour from the time I opened the box to my Zephyr to having a train running on the layout.  Now, I did a lot of reading on DCC and had a really good idea what I was doing when I opened it, but I still had not used a DCC system before.  There may be others that are easier, but Digitrax was not difficult by any stretch.  As to programming, I would use Decoder Pro no matter what system I used anyway.

Dave
Playing around in HO and N scale since 1976

Reply 0
jeffshultz

That "Meyer" would likely be

That "Meyer" would likely be a PFM Vulcan Duplex...

http://brasstrains.com/Classic/Product/Detail/037371/HO-Brass-PFM-Vulcan-50-Ton-Duplex-Logging-Loco-1967-Run

 

Yeah, I think that is what Hank called it... I thought he said Vulclain, and it didn't match that at all. Thanks!

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Grand Rapids Model Railroad Historical Society - Pere Marquette

Okay, the Grand Rapids Model Railroad Historical Society has it's home in a depot-like (perhaps it actually was?) building along the old Pere Marquette line, if I understood the explanation clearly.

4_resize.jpg 

8_resize.jpg 

There are more CTC panels in Grand Rapids than anyplace I've ever seen....

1_resize.jpg 

I was beginning to think that car ferries were going to be a common feature of local layouts as well.

1_resize.jpg 

An interesting building, a cut-away of a car dealership.

5_resize.jpg 

Nice little quiet town - at least until the train blasts through.

p_resize.jpg 

Quarry of some sort.

5_resize.jpg 

Nicely weathered hopper in the engine yard.

8_resize.jpg 

The roundhouse....

e_rotate.jpg 

Coal tower in the engine yard.

p_resize.jpg 

C&O BL-2's - the ugly duckling of the EMD fleet. I've seen several model versions this week.

6_resize.jpg 

A sizable yard extends out of the engine tracks.

0_resize.jpg 

Limestone mine - ceiling tile style.

1_resize.jpg 

The cement plant the limestone quarry feeds.

3_resize.jpg 

Rural life. With cows.

4_resize.jpg 

Shipping, receiving, and transfer...and the reason for the cows.

0_resize.jpg 

Beautiful bridge.

Onward to Tim Verberg's unique layout...

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Tim Verberg - Chessie System

This is, in my limited experience, a very unique layout. Mounted to the outside walls of the basement it is a complete 3 loop helix - or a 3 loop "no-lix" if you prefer that terminology.

There is heavy C/MRI integration on the layout - the owner writes his own control programs in VB6.

7_resize.jpg 

When you walk down to the basement you have the option of going left or right. Since there were more people to the right, I went left. The above is what you see.

4_resize.jpg 

This is the connection between the first room and the second (there are three rooms involved). The wyes (which are on the first and third levels, lead to staging.

9_resize.jpg 

I thought there was a lot of staging on this layout.... (then we went to Duane Hall's layout).

0_resize.jpg 

Continuing into room two, the no-lix continues.

1_resize.jpg 

And disappears into the third room.

2_resize.jpg 

Which is very dark, but also contains most of the scenicked area of the layout. Note the use of Red, Green and Blue Christmas lights for lighting.

6_resize.jpg 

Part of the reason for the darkness was revealed when I turned around and discovered that Tim has programmed an entire CTC board in Microsoft Visual Basic 6 to control the layout through C/MRI. The far screen is currently displaying his light controls - he is building his own LED lighting system as well.

2_resize.jpg 

This is one of his LED lighting boards - it is a collection of Red, Green and Blue LED's that combine to create white (or other colors if selectively dimmed) light. It's a technique that has been used in computer screens and in stage lighting for years.

3_resize.jpg 

This structure was lit with the new LED panels and actually looks better to the naked eye than it does here. I don't think you are going to get much heat off the LEDs either, which can be of great benefit to modelers with warm, non-climate controlled layout rooms.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Riverbend Model RR Club - Superior Northern

The Riverbend Model RR club experienced fairly recently that which is the horror of most clubs - the termination of the lease on the space containing their 15 year old, 80% (IIRC) complete layout.

So they went modular, or at least sectional. Their benchwork is based on the FreeMo standard, although some groups of modules may contain internal modules that are not compliant.

And then they set up in a rather unique location - the basement of the Sunset Manor retirement home, where the residents have access to the layout.

They're still in the tracklaying stages - the mainline is in place, but they've only got about 100 of a planned 150 hand-laid (some Fast Tracks, some not) turnouts in place.

7_resize.jpg This  Great Lakes Ore dock and ship greeted us in the hallway as we got to the layout room. I believe it was salvaged from the previous layout.

2_resize.jpg 

Many of the modules use speaker stands for support. The layout is a folded dumbbell shape, with return loops (and staging) at the ends.

5_resize.jpg 

The layout, when complete, will depict scenes from the local area.

1_resize.jpg 

One of the reverse loops - the other has multi-track staging on it.

3_resize.jpg 

This is going to be a large urban area - there is a passenger station in the center background.

8_resize.jpg 

A closer look at the passenger station.

2_resize.jpg 

Staging on the other reverse loop.

7_resize.jpg 

The club has a really neat system for mounting Tortoises...

More to come on this club.

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
George J

Thanx!

Thanx for the all of the updates and all of the photos Jeff!

Great stuff!

George

"And the sons of Pullman porters and the sons of engineers, ride their father's magic carpet made of steel..."

Milwaukee Road : Cascade Summit- Modeling the Milwaukee Road in the 1970s from Cle Elum WA to Snoqualmie Summit at Hyak WA.

Reply 0
jeffshultz

Riverbend Model RR Club - Superior Northern cont...

Okay, back to the Riverbend club. Had to leave for breakfast and then off to the NTS for it's final day.

0_resize.jpg 

This shows how the club uses a prefab module to mount it's Tortoises in 2" foam. The hole is cut with a Roto-Zip that has a PVC pipe attached to it to force the cutting head to stand-off the side of the hole and form a lip. It was sort of demonstrated for me, but I'm not up on the absolute specifics. You do need to know exactly where you want a turnout throw wire, that's for sure.

2_resize.jpg 

And this wonderfully pre-fabbed on the workbench Tortoise is now effectively installed in the foam - it is secured with a liberal application of glue.

3_resize.jpg 

It's still easily accessible if maintenance or adjustment is needed.

That's it for the Riverbend club....

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Wade Griffiths' Burlington Northern Division

Okay... I made it home, but my description of the LD-SIG layouts didn't, so I'm going strictly on memories here. 

This layout is traditional DC with power blocks. Lots of large structures (since that's where the real railroads go). 

5_resize.jpg 

It's a multideck layout - I believe this is a classification yard.. 

7_resize.jpg 

This corner will become a coal mine. The big bucket at the top used to be an O scale model, but by getting rid of some large railings and switching out the cab he turned it into a very large HO scale model. 

0_resize.jpg 

This really doesn't convey the true length of this background/backdrop structure assembly. 

4_resize.jpg 

It's rare to see this distinct of a dividing line between scenicked and non-scenicked areas. 

2_resize.jpg 

I didn't ask, but I do hope that these helix tracks are easily removable in case of future furnace replacement... 

5_resize.jpg 

This scene was tucked away in an upper corner - it just struck me as being a very nice one. And then I noticed the remodeling truck, the moving truck, and the police.... 

6_resize.jpg 

So here you see the plug ins for the walkaround cabs, the turnout controls, the rotary selector switch, and the car routing slip that is hung from a "grip-it" type note holder. Note: if anyone can find these things in small quantities I'd be interested in hearing from you. They appear to mainly be a promotional item available in quantities of 300 and up. 

0_resize.jpg 

Have I mentioned that Wade is into big structures? 

3_resize.jpg 

Rotary unloader for a future paper mill. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
Geared

Updates

Great updates, Jeff. I've enjoyed each of them. Glad to see that you made it home safe and sound.

Roy

Roy

Geared is the way to tight radii and steep grades. Ghost River Rwy. "The Wet Coast Loggers"

 

Reply 0
jeffshultz

Thom Vanderlip's B&O Grafton Division

If this layout wasn't considered a "must-see" layout for the convention, someone missed a bet. The B&O Grafton Division is mostly scenicked and features not only a 4-panel CTC system but a functional mechanical interlocking. 

When you walk into the layout room, you immediately know that this is a well done layout - track lighting, West Virgina scenery, and some complex electronics are among the first things you see:

5_resize.jpg 

Walking around the layout,  you see something that looks like an incredibly complex puzzle - a manual interlocking:

0_resize.jpg 

Interesting thing about the interlocking - the designer worked out the logic on paper before cutting it out in styrene, and it wasn't until he got it put together that he realized that he had made a logic error. Correcting it resulted in notches on 3 of the sliders being too close together - the styrene was too thin for the required strength. Biting the bullet, he put in the "patches" - those blocks you see on three sliders - to reinforce those sections. Entirely by chance he later had an opportunity to look at what I believe was the last mechanical interlocking in service in the US - and found they'd done exactly the same thing for the same reason. 

The layout essentially describes a G shape - starting next to the entry door it goes up the side wall (there are a couple of computers tucked under the scenery immediately in front of us):

7_resize.jpg 

Lots of trees later, it curves around the far wall into Salem, where the interlocking is located. Tucked into the yard is this sweet little B&O signature item:

4_resize.jpg 

The layout continues into (unfinished) Grafton with it's invisible roundhouse and nice looking turntable: 

5_resize.jpg 

Curving around the base of the G, you run into this... I'm wondering if this is the basis of an unusually shaped building, or something more basic:

0_resize.jpg 

Here is another signature B&O item - the Color Position Signal:

8_resize.jpg 

One of the towns on the Grafton Division:

1_resize.jpg 

A little further down it's railroads, bridges, and muddy water:

3_resize.jpg 

I'm a sucker for small-down passenger depots:

5_resize.jpg 

Coming around the top of the lip on the G, a large yard is seen:

5_resize.jpg 

6_resize.jpg 

Passing one dinosaur later:

2_resize.jpg 

You're looking through at door at quite a CTC machine:

6_resize.jpg 

And the reverse loops at the ends of the layout:

7_resize.jpg 

Going back out into the layout room for a second, if it hadn't been for Bruce Chubb's layout the night before, this would have had my jaw dropping to the floor:

2_resize.jpg 

As for operating or just railfanning the Grafton Division... as Ferris Bueller puts it, "I highly recommend it." 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Duane Hall's ATSF & Soo Line

Duane Hall has seen other layouts - and he's noted that they all seemed to have one complaint in common, "I didn't build enough staging tracks." 

Duane decided that on his ATSF & Soo Line layout, that particular phrase would never be said.

 The layout starts innocently enough, with a nice view of the Soo Line side as you descend the stairs:

3_resize.jpg 

Then turning to the right, you see quite the steel mill - and there is a hint of something underneath:

4_resize.jpg 

Continuing a slow spin to the right, you nearly stumble against that most ubiquitous signature of the Grand Rapids model railroad scene: 

5_resize.jpg 

Continuing on with the railroad on the left, you see a double-bascule bridge:

6_resize.jpg 

From there you see a helix neatly tucked into a corner - it's very unobtrusive, which is unusual for a helix. And, you'll find out it's one of two helixes - and there is a spiral tossed in for good measure as well:

7_resize.jpg 

At this point, it's time to get on the floor to figure out exactly what this helix is descending to:

2_resize.jpg 

Okay, now that's a serious set of staging tracks, good enough for any railroad, right? Wrong. It's one of three... (that I counted). Looking around, I see there is a lot more layout to see (wainscoting along the layout's edge seems to be a Grand Rapids signature as well):

5_resize.jpg 

Lots of space for expansion here:

6_resize.jpg 

And just around another corner, here is the second helix (still well hidden) and the spiral:

7_resize.jpg 

Here's another staging yard (there are a few feet of it behind me):

8_resize.jpg 

I decided to take a look at the steel mill again - and realized that the furnaces are going:

2_resize.jpg 

A rather dramatic curve opposite of the steel mill complex:

5_resize.jpg 

And what is beneath it? More staging. Note that it curves off to the right in the distance:

6_resize.jpg 

9_resize.jpg 

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
jeffshultz

Tormorrow...

Skip Luyk's Arcadia & Betsey River Ry - the grand finale.... right now I think I understand what is meant by the term jet lag. 

See you in the morning!

 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
gnryfan

Monson no. 8 engine

That Monson # 8 engine is incorrectly identified.  It's a PFM model of the "Vulcan Duplex" type, imported in the 1970's.

Joe Berger

Great Northern Railway (HO)

Cascade Division

Reply 0
railandsail

Vulcan Duplex

Quote:

 

That "Meyer" would likely be a PFM Vulcan Duplex...

http://brasstrains.com/Classic/Product/Detail/037371/HO-Brass-PFM-Vulcan-50-Ton-Duplex-Logging-Loco-1967-Run

Happy Modelling,
Aim to Improve,
Prof Klyzlr

I had one of those at one time, but sold it off when I thought I might be moving to a very hot humid environment.

BTW, great photos on this subject thread,...that I found when looking for dbl track bascule bridges.

 

 

 

Reply 0
railandsail

Bridge(s) ID ?

 

Quote:

Just found this image
6_resize.jpg 

 

along with a lot of other good images on this site..
https://forum.mrhmag.com/post/the-2012-grand-rapids-nmra-convention-ldsig-tours-12190843

As I look closer at this image, it doesn't appear as though they are Walthers??

Reply 0
Reply