michaelrose555
I'm doing it again. I blame my wife.
 
MRH: Michael has decided to get off social media, so he has turned down his photo server, essentially deleting all the photos on this thread. We’re locking the thread to allow for the possibility he may someday relent and turn the photo server back up, restoring this thread's photos.

Michael

The Breitenbach - Rosenheim Railroad V4

Reply 14
Michael Tondee
This is German HO again, right? I'm sorry Michael but I lose track sometimes...😎 At any rate, following along as always and looking forward to it!

Michael, A.R.S. W4HIJ

Model Rail and "mad scientist" for over 50 years.

Member of "The Amigos", Co-Inventor of the A.O.S.T.

I call what I do "An artistic impression of reality" and the Island is "lost" somewhere in the Pacific Northwest, see it here...

The Blackwater Island Logging & Mining Co.

Reply 2
michaelrose555
Michael T. wrote:
This is German HO again, right? I'm sorry Michael but I lose track sometimes...😎 At any rate, following along as always and looking forward to it!

Sure is. And don't worry, it sometimes feels like I have lost track long ago and never found it again...
Reply 2
trainzluvr
Subbed.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
michaelrose555
I'm still working on the plan for this layout so I can't show it yet. But whatever I come up with I need staging so that's where I started today.

[2022_11_21_01]


[2022_11_21_02]


I even wired the turnouts to their decoder boards!
Reply 5
Neil Erickson NeilEr
This is exciting. I love the smell of electrons in the morning. 

Neil Erickson, Hawai’i 

My Blogs

Reply 4
jeffshultz
I won't mention that 4-letter acronym Joe invented, but it looks like you're getting a start on the "run it as you build it" philosophy. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 3
michaelrose555
jeffshultz wrote:
I won't mention that 4-letter acronym Joe invented, but it looks like you're getting a start on the "run it as you build it" philosophy. 

It's not like I can't learn something even at my advanced age...😉
Reply 1
eastwind
What turnouts and flex are you using this time? I would have guessed Tillig, but I didn't know they used solenoid type switch machines.

You can call me EW. Here's my blog index

Reply 2
michaelrose555
eastwind wrote:
What turnouts and flex are you using this time? I would have guessed Tillig, but I didn't know they used solenoid type switch machines.

I will use Tillig code 83 for all of the visible track. In the staging yards I use PIKO code 100 because it's less expensive and because they have these simple switch machines. They are very reliable.
Reply 2
michaelrose555
The first staging track is complete:

[2022_11_22_01]


[2022_11_22_02]


[2022_11_22_03]
Reply 8
michaelrose555
I installed 3 block detector modules. Never done it before...

[2022_11_23_01]
Reply 4
trainzluvr
Are you also going to have the shorter start/end sections on each staging track so trains can be stopped automatically?

Might need couple of additional modules then...😃

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 2
michaelrose555
trainzluvr wrote:
Are you also going to have the shorter start/end sections on each staging track so trains can be stopped automatically?

Might need couple of additional modules then...😃

Yes, it's all going to be wired for automated staging, and no, I have enough detectors (16 per module for a total of 48).
Reply 3
michaelrose555
Now we have 2 staging tracks and they are both wired up to the block detectors!

[2022_11_24_01]


[2022_11_24_02]


[2022_11_24_03]
Reply 11
michaelrose555
After eating a lot of turkey I laid more track:

[2022_11_24_04]


[2022_11_24_05]
Reply 6
michaelrose555
Another 2 staging tracks have been added:

[2022_11_25_01]


[2022_11_25_02]
Reply 7
michaelrose555
Two tracks a day seems to be the rate I'm going now:

[2022_11_26_01]


[2022_11_26_02]
Reply 8
trainzluvr
Two tracks a day seems to be the rate I'm going now:


LOL, except that some people's layouts are as long as one of your staging tracks. 😂

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 2
eastwind
Still doing all the detection wiring as you go?

You can call me EW. Here's my blog index

Reply 3
michaelrose555
eastwind wrote:
Still doing all the detection wiring as you go?

Oh yes, it's all wired already. I'm soo proud of myself 😁...
Reply 5
eastwind

Oh yes, it's all wired already. I'm soo proud of myself ðŸ˜...


Me too!  

You can call me EW. Here's my blog index

Reply 2
saddlersbarn
Why not stop at 6 staging tracks for now and build the layout proper?
If you still like the layout in 2 months time, you can always add more staging.
Just a thought. Good luck.

John
Reply 2
michaelrose555
Why not stop at 6 staging tracks for now and build the layout proper?
If you still like the layout in 2 months time, you can always add more staging.
Just a thought. Good luck.

John

I don't like leaving stuff unfinished so I'll just keep going.
Reply 2
michaelrose555
I only added one staging track today, spent too much time with the wife...

[2022_11_27_01]


[2022_11_27_02]
Reply 7
Reply