michaelrose555

This is the sixth version of the Georgetown & Allen Mountain Railroad. 

Michael

The Breitenbach - Rosenheim Railroad V4

Reply 13
jeffshultz

Yikes!

Take care, rest up, follow your doctor's and your wife's instructions.... 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
railandsail

burst blood vessel in the

Quote:

burst blood vessel in the knee. It just happened without me hitting something or falling or what else

Wow, never heard of such a thing. Hope your doctor figures out what happened.

I have heard that blood vessel ruptures in the legs can be life-threatening. Get well soon, and keep us up on details.

 

 

Reply 0
michaelrose555

Wow, never heard of such a

Quote:

Wow, never heard of such a thing. Hope your doctor figures out what happened.

I have heard that blood vessel ruptures in the legs can be life-threatening. Get well soon, and keep us up on details.

Well, I'm still alive... So far it's mostly just an inconvenience. I'm just not made for lying on my back and not doing anything. But the knee is improving, the swelling is going back and hopefully I'll be able to walk again next week.

Reply 0
kleaverjr

I can appreciate...

...having to be in bed not doing anything and being frustrated over it.  It's been the story of my life for the last 9 months! But we need to hold onto hope that things will improve and when they do we can return to the activities we enjoy   Hope you recover quicker than I have! 

Ken L. 

Reply 0
ctdahle

Architecture is my delight, and putting up and pulling down, one

Speaking of his home, Monticello, which was under construction for 40 years, Thomas Jefferson said, "Architecture is my delight, and putting up and pulling down, one of my favorite amusements.”

I think you, Sir, are the Thomas Jefferson of model railroads and I admire the way you are willing to put up and pull down, refusing to be satisfied with merely adequate when you envision a higher degree of perfection. I stumbled over your dueling rail lines more than five years ago, along with the Coast Line, and the Ruphe & Tumbelle. It has been just within the past month that I've made it to the present day with each. All have delighted me. But yours has kept me moving in the correct direction several times.

I'm not presently building a model railroad, rather my project is the restoration of a derilict, but historically valued home (Not far, I might mention, from the 1:1 Cumbres and Toltec which I hope to model when the house is done.)  As I "pull down and put up", I've frequently hesitated to tear apart repairs that, though working well enough, were poorly made in the past, but then I think, "Michael Rose would not leave this so." When I pull it down and put it right, I never regret the repair, only the hesitation.

In any event, I hope you quickly recover, and continue to enjoy and share the "putting up and pulling down" regardless of which side of the Atlantic becomes your home.

Reply 0
michaelrose555

My left knee is still about

My left knee is still about 30% bigger than the right knee but that's a big improvement. According to my doctor it might take another 2-3 weeks for it to completely heal. But... that doesn't stop a determined model railroader!

Somehow over the last few days I managed to add a piece of track here and there (don't tell my wife) and now the mainline goes all the way across the layout room:

 

Reply 1
michaelrose555

I screwed down a few sheets

I screwed down a few sheets of 1/2" plywood where Barnesville and Rickstown will be. Next I will fire up the laser to make a lot of roadbed.

 

 

 

Reply 0
michaelrose555

I have started to lay down

I have started to lay down roadbed at Barnesville today:

 

Reply 0
michaelrose555

More roadbed at Barnesville

More roadbed at Barnesville today. I have to say, working in N scale is much more fun !

 

 

Reply 0
michaelrose555

The roadbed at Barnesville is

The roadbed at Barnesville is complete:

 

 

 

 

Reply 1
michaelrose555

I've prepared the ground for

I've prepared the ground for the Georgetown passenger station. Tomorrow the work will start.

 

 

Reply 1
michaelrose555

The weather was pretty bad

The weather was pretty bad all day long so I couldn't do any yard work today...

Instead I had the laser up and running so I could lay out roadbed for the Georgetown passenger station:

 

 

 

 

 

Reply 1
michaelrose555

Today I added the spurs at

Today I added the spurs at the east end of Georgetown:

...at the west end:

...and at the harbor:

 

Reply 1
michaelrose555

I finished the roadbed at

I finished the roadbed at Rickstown today as well:

 

 

Reply 1
eastwind

task board

For HO, you used two layers of task board. Looks like for N you are using one, is that right? I guess you don't need as high a profile. 

You were saying at the start how this was only going to cost you a few sheets of plywood because you have the benchwork and track already, but what about the cost of task board? I looked at the stuff once and I think you must be spending a small fortune on task board. Does it come out cheaper per foot of track than cork? (assuming the laser cutter is a sunk cost not factored in).

You can call me EW. Here's my blog index

Reply 0
michaelrose555

I'm guessing there is about

I'm guessing there is about $300 worth of taskboard in the roadbed. Not bad for a layout of this size.

Reply 0
michaelrose555

I've prepared the ground for

I've prepared the ground for Gustavsburg:

 

Reply 0
michaelrose555

I have started to work at

I have started to work at Gustavsburg:

 

 

Reply 0
michaelrose555

I have finished the

I have finished the Gustavsburg roadbed and connected the branch line to Rickstown as well. As of today all the roadbed work is done!

 

 

 

 

 

Reply 1
Dave K skiloff

Woohoo

Track laying time!  Can't wait to see some trains run.

Dave
Playing around in HO and N scale since 1976

Reply 0
michaelrose555

I went to my boxes of stuff

I went to my boxes of stuff to find a few items that I want to use again on this layout. Here is my scratch built mill that has survived both the G&AM V4 and V5:

 

 

 

...and here are the two bridges at Georgetown from the V5 layout:

 

Reply 1
Larry of Z'ville

How long does it take

For the laser to do an average section?  You have a lot of unique sections.  Do you integrate the laser with a digital representation of the layout?  Everything always fits perfectly.  It is hard to imagine that your freelancing.  
like Dave, I can’t wait to see your trains run again.

So many trains, so little time,

Larry

check out my MRH blog: https://model-railroad-hobbyist.com/node/42408

 or my web site at http://www.llxlocomotives.com

Reply 0
michaelrose555

Larry, Each piece of roadbed

Larry,

Each piece of roadbed takes about 2-3 minutes to engrave and cut out. The laser does not work with my Anyrail CAD program directly. The way I do it is I create different pieces of rail in Anyrail like for example a 30 degree curve with a 1500mm radius and then I create the roadbed piece for the laser in  my mechanical CAD program. Over time I created a library of track and roadbed pieces that I use to  design my layout and that I can then have the laser produce. It has no choice but to fit .

Reply 0
Neil Erickson NeilEr

Getting exciting!

I realized that your posts were not showing up in my “Recent” tab so it seemed time to check in. You always seem to do more in a day than I could accomplish in a week. Maybe it is the fact your office is right next door? You also have a lot of experience and the tools to do this part of the construction. 
 

The idea of getting trains running automatically fascinates me to no end. The fact that you do electronics all day may make this seem like work but, in the end, it is about enjoying the trains. I encourage you to consider getting to this point before attacking scenery and building cities and towns. There is always time to imagine and build once the trains are running. 
 

I’m loving this layout above all the others you have built and hope that you find it as enjoyable. 

Neil Erickson, Hawai’i 

My Blogs

Reply 0
michaelrose555

I’m loving this layout above

Quote:

I’m loving this layout above all the others you have built and hope that you find it as enjoyable. 

I do as well. This is the 6. attempt at doing this right and every step of the journey was important and necessary to arrive where I'm at now. I don't regret any of those failures because every time I learned an important lesson.

Reply 0
Reply