DJH4d
Hi all, we've been working on this for over a year and now I think we finally have enough to show what we've gotten done. This started back in 2017 as an inside joke, but it took on a life of its own. I bought a lot in Middle Tennessee and built a 100' x 53' pole barn home with a 100' x 40' shop area. These are know as "Barndominiums". The shop area was finished out with climate control and will be used as a train room. We're modeling the ATSF/BNSF Southern Transcon from Willows Springs, IL to Vaughn, NM. We may continue west, but that's not for sure yet. The years modeled are 1990 - 2006.

Anyway, l will be posting a series of updates over the next few weeks to show our progress. We also have a Facebook group for those who use it. Starting with the building, these are from Oct/Nov of 2020.

Thanks for looking,
-Dave
Capture.jpgfsadfasd.jpgggsdff.jpg
Reply 19
DJH4d
Since we're using a standard (to us) design for bench work, we made a jig that allows us to put already cut pieces of lumber in place and screw them together to make the required section of bench work. This greatly speeds up the building process!
asdfasdfd.jpg

Everything has to start with something and here's where we started. This is on the west end of Willow Springs and following the wall west. Most of the layout has 3' wide bench work, but there are some 2' sections with the drop to the staging yard being 1' wide.
gasgsdfds.jpg

It didn't take long to get the bench work on the wall built. Right now, it ends at NR junction, which is just outside of Emporia, KS. The drop you see in the bench work is for the bridge over the Illinois River at Chillicothe, IL.
gasgasdsdf.jpg

We jumped over to the other side of the wall and built the staging yard. We had to do this this because we had to get the grade between this and the main level worked out before we could continue bench work at NR Junction. We're painting the bench work for the staging yard black as it's supposed to be "off the layout". The bench work of the rest of the main level will be painted white while the second and third level will be painted sky blue. You may notice that there's a print out of the track plan on the bench work. We bought a HP T-210 printer and have been printing out sections of the layout to help us figure out the dimensions of the bench work. It really helps when laying out complex curves.
hsdhsdfg.jpg

Print out doing its thing.
sdhsdhdfg.jpg

The wye at NR Junction.
shsdhsdf.jpg

Thanks for looking,
-Dave
Reply 8
CandOfan
That jig idea is excellent, I'm stealing it 😃

Modeling the C&O in Virginia in 1943, 1927 and 1918

Reply 1
laming
Good heavens... you guys are a production machine in action!

Will the first op session be ready before Christmas???

😂 😂

Andre
Reply 1
trainzluvr
Seeing how all these pieces are falling together must be bringing a lot of satisfaction, no?

My question is, are we looking at old benchwork photos here, because based on the OP, this work had started few years back then?

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 1
Terry Lovell RailfanTerry
The bench work was started on September 15, 2021 almost one year ago

Santa Fe all The Way

Reply 1
trainzluvr
The bench work was started on September 15, 2021 almost one year ago


So we are catching up then - there must be a lot of progress made since, judging by the pace things were being built...

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 1
ctxmf74
     Might need more legs on those 3 foot wide runs as you'll spend a lot of time leaning and climbing on it to reach the rear :>😉  .....DaveB
Reply 1
DJH4d
laming wrote:
Good heavens... you guys are a production machine in action!

Will the first op session be ready before Christmas???

😂 😂

Andre


We've already had two running sessions. I'm working at getting everyone caught up with the progress we've made over the past year.

-Dave
Reply 2
DJH4d
trainzluvr wrote:


So we are catching up then - there must be a lot of progress made since, judging by the pace things were being built...


Correct.

-Dave
Reply 1
DJH4d
Road bed is complete all the way from Willow Springs, IL to NR Junction. Here, it consists of 2 main lines and two yard leads.
sdfgsdfgfg.jpg

Going the other way, here's the first part of the wye at NR Junction. This is where the staging yard access the layout. We have to get the road bed to the staging built before we can continue west from here. Why do we have to wait? Because we want to get the staging yard built first before we continue the main level. That way we're not crawling between the two levels while working on track. From here, it looks like it's going to be somewhere around a 1.5% grade to the staging yard.
hsdhsdfdfs.jpg

Looking the other way at NR Junction. The drop to the staging yard starts about 2/3rds of the way around the curve.
hsdhsdfgfgf.jpg

Looking at the drop to the staging yard. The road bed is cut and glued together, just need to get it mounted on risers to get the proper incline.
gsdgsdfg.jpg

While all that is going on, we're also working at gluing down cork and track. This is the yard ladder at Willow Springs.
hsdhsdfgfgsh.jpg

The cork reached all the way to the IL river. It would go further, but we ran out and have to wait till more arrives in the mail.
jdfjdfgjdfg.jpg

That wraps up this update. Comments and complaints are welcome.

Thanks for looking,

-Dave
Reply 7
Kent Smith GN Cascade
Looking awesome , Dave. Thanks for documenting, I am eagerly following along to watch your railway unfold.
Kent Smith - Great Northern Railway Cascade Division 1955 HO
Reply 1
laming
DJH4d wrote:


We've already had two running sessions. I'm working at getting everyone caught up with the progress we've made over the past year.

-Dave



LOL!

Y'all don't mess around!


Re: Pics...

Instant funk.

Yours is bigger.

😂  😂  😂  😂


erdnA
Reply 1
p51
I don't have the words. Three levels in a space that size? Wow, just WOW.

I can hear it now:

Model railroader: "Okay honey, I'm heading out to run trains on Dave's layout"
Model railroader's wife: "Fine, just be home by supper and don't get any ideas, because you're never going to get a building that size!"
Lee Bishop

[35532433422_1a63689aeb_n]

My Flickr website with layout photos

https://forum.mrhmag.com/post/etwnc-stoney-creek-branch-12197690?&trail=25

2687 miles and many decades from where my layout takes place.

You can NEVER have too much detail or too many trees on a layout.

Reply 1
DJH4d
Hi all, here's where we were around the beginning of the year. While the focus was on the staging yard, work continued on the track work.

The roadbed for the staging yard had its risers installed and now makes a smooth transition between the staging yard and the main level at a 1.5% grade. The cork was glued in shortly afterwards.
sdgsdfgfd.jpg

Roadbed coming off the wye at NR junction. The other leg of the wey can be seen starting on the left.
dfghdhdfghfg.jpg

The bottom of the grade for the staging yard. One track goes into the yard ladder while the other bypasses and makes a reversing loop on the other end.
jdfjdfghg.jpg

While the the cork was being installed, track continued to grow east from NR Junction. It will eventually meet the track working west from Willow Springs.
jdfjgdfg.jpg

Once all the cork was installed, the roadbed and bench work for the staging was painted black. That's yours truly hard at it.
dfhdfhdfg.jpg

The end results.
dfjdfgjdfg.jpg

Thanks for looking,
-Dave
Reply 9
Lancaster Central RR

WOW that’s a huge project. You have the motivation and help to pull it off. 

I can’t wait to see the finished product. 

Lancaster Central Railroad &

Philadelphia & Baltimore Central RR &

Lancaster, Oxford & Southern Transportation Co. 

Shawn H. , modeling 1980 in Lancaster county, PA - alternative history of local  railroads. 

Reply 1
migalyto
Wish I was your neighbor!!!
If it's a good idea, go ahead and do it. It is much easier to apologize than it is to get permission.
- Admiral Grace Hopper
Reply 1
DJH4d
With the bench work about 95% complete, we printed a template of the yard ladder to aid us in laying out the staging yard.
kfgjhghj.jpg

The staging yard with cork laid and painted. We still need to paint the rest of the cork, but we're not far from laying track.
fsdhdfgdfg.jpg

On the other side of the aisle, the bench work for the main level started to take shape while the wall was painted white. We had to wait till the staging yard roadbed was finished so we knew how high to build the next level so it would clear double stack cars.
dhdfhfgh.jpg

Thanks for looking,
-Dave
Reply 4
DJH4d
migalyto wrote:
Wish I was your neighbor!!!


Are you in the middle Tennessee area?
dfghdfghg.jpg

-Dave
Reply 1
migalyto
No, I'm in Northern Illinois. Looks like this thing will be an absolute joy to operate on!
If it's a good idea, go ahead and do it. It is much easier to apologize than it is to get permission.
- Admiral Grace Hopper
Reply 1
DJH4d
Building the layout has been divided into several phases in order to allow us to take on this project in smaller bits at a time. Everything you seen so far is phase 1. This covers from Willow Springs, IL to NR Junction as well as the staging yard. The staging yard has been the focus of our efforts since the last update. The idea is so we can work on it and get everything done before building the benchwork for Emporia, KS. Since there is only a 10" opening between the two, that would make laying track much more difficult. The staging yard is actually two yards. One part is a double slip yard with ten storage tracks, one main, and one set-up track. This yard is for the computer controlled trains and can hold running sessions length trains of 25' with 1' of extra space on each end. The second yard is a 13 track stub end that can also hold a 25' train with extra space. This is for the manually controlled trains. Everything is controlled with RR&Co and has Tortoise switch machines on all the switches.

With all that said, time to look at some photos.

The cork for the double slip yard has been laid and painted to match the rest of the benchwork. Once the yard ladder has been laid out, 9 pieces of flex track was installed for each track to get the desired length.
sdgsdfgf.jpg

More progress.
dfjdfjdfg.jpg

Once the track reached its full length, the yard ladder was laid out for the other end.
dfjdfgjgf.jpg

The benchwork for the stub end yard has been completed with it ending under NR Junction.
gsdgsdfgf.jpg

Cork installed and painted.
shsdhsdf.jpg

Since we now knew where the double slip yard ended, we could build the benchwork for the return loop.
sdhsdfsdfg.jpg

Thanks for looking,
-Dave
Reply 7
CandOfan
Why do you call it a "double slip yard?"

Modeling the C&O in Virginia in 1943, 1927 and 1918

Reply 1
ctxmf74
Who's gonna get under there and do all the wiring? ....DaveB
Reply 1
DJH4d
CandOfan wrote:
Why do you call it a "double slip yard?"


Just a term I picked up when referring to a yard track with a ladder on each end.

-Dave
Reply 0
DJH4d
ctxmf74 wrote:
Who's gonna get under there and do all the wiring? ....DaveB


I did. Stay tuned for that update.

-Dave
Reply 0
DJH4d
Time for more updates. Work continues on the staging yards.

The return loop painted and track installed.
asgasdfdf.jpg

With the switch installed for the stub end yard, the yard ladder could be laid out.
sagasdgsad.jpg

More progress. My personal record is 216' of track laid in one day.
asgasdgdsfd.jpg

Overall view of the staging yard with the return track. Once the benckwork for Emporia, KS is built, you will not see any of this.
hsdfdgdf.jpg

Track from the wye at NR Junction to the staging yard has been laid. You will notice that 1 1/2" sides has been added to both sides of the benchwork. Derailments are a part of life and we would rather not have stuff take a trip to the floor. At this point, the track for the staging yard is 95% complete.
djdfgjfgh.jpg

 With all that going on, the track for the main was ran all the way to Willow Springs, IL. This completes the main for phase one.
djdfjdfghgh.jpg

For now, we're installing a temporary loop so that way we can run trains.

Return loop benchwork.
dfghdfghg.jpg

Road bed and cork installed.
sfhshsdfh.jpg

We do stop and check our work from time to time. Everybody uses something to check for clearance. So we use a Schnabel car.
jsjsdfgfg.jpg

That about wraps up this update. As always, questions, comments, and complaints are welcome.

Enjoy,
-Dave