DJH4d
Hi all, we've been working on this for over a year and now I think we finally have enough to show what we've gotten done. This started back in 2017 as an inside joke, but it took on a life of its own. I bought a lot in Middle Tennessee and built a 100' x 53' pole barn home with a 100' x 40' shop area. These are know as "Barndominiums". The shop area was finished out with climate control and will be used as a train room. We're modeling the ATSF/BNSF Southern Transcon from Willows Springs, IL to Vaughn, NM. We may continue west, but that's not for sure yet. The years modeled are 1990 - 2006.

Anyway, l will be posting a series of updates over the next few weeks to show our progress. We also have a Facebook group for those who use it. Starting with the building, these are from Oct/Nov of 2020.

Thanks for looking,
-Dave
Capture.jpgfsadfasd.jpgggsdff.jpg
Reply 19
johndrgw
   I am curious about some of the products used. What brand of flex track, including codes (83,70, 100 etc.), are you using? Turnouts --brand and size (6,8, 10 hand laid)? You said you were using Tortoise switch machines. I recall you  mentioning something about RR&Co control but I am not familiar with that. I assume DCC and if so, what brand? What are you using as glue for the cork and track? I use an adhesive, flexible acrylic caulk (DAP flex or some name like that).
   Regarding the carpentry, I was concerned that the torque created by the roadbed and track on the edge of the benchwork would eventually twist the support structure downward, especially along the interior "walls." I use diagonal supports from the outer edge of the benchwork to the wall about every 6 to 8 feet, and I use "L" girders at the back and front for longitudinal support. How are your outer edges supported?
  A layout this size takes a lot of money. You must have won the lottery!  I am (as are probably the readers here) very envious. Good luck with all of this project.

John
Reply 1
CandOfan
DJH4d wrote:
Just a term I picked up when referring to a yard track with a ladder on each end.

-Dave
I wondered as I did not see any double-slip switches in there... which is what I thought of with that term.

Wow, a Schnabel car as a clearance "template"!

Modeling the C&O in Virginia in 1943, 1927 and 1918

Reply 1
DJH4d
Hi John, great questions!

"What brand of flex track, including codes (83,70, 100 etc.), are you using?"

Atlas code 83 flex track with brown ties.

"Turnouts --brand and size (6,8, 10 hand laid)?"
Walthers code 83 DCC friendly. 6 in the industrial areas, 8s in the yards, and 10s on the main.

"You said you were using Tortoise switch machines."
Correct.

"I recall you  mentioning something about RR&Co control but I am not familiar with that."
https://www.freiwald.com/pages/traincontroller.htm  - We use the TrainController Gold V9.0

"I assume DCC and if so, what brand?"
Yes and we uses ESU ECoS 50210 command station.

"What are you using as glue for the cork and track?"
Elmers white glue, but what you use works too.

"How are your outer edges supported?"
If you look in some of the pictures, you can see 1x4 supports coming from the wall at a 45 degree angle. We have those every 8 feet. For the second and third level, we plan on using something like what you used. That way it keeps the area under those levels clear. You will see them in an upcoming update.

" Good luck with all of this project."
Thank you!

Let me know if you have any more question,
-Dave
Reply 1
DJH4d
As of 4/18/22 work has been continuing on the layout, but it's the "behind the scenes" kind. However, we finally reached the point where we can run trains.

The fascia for the staging yard has been roughed in. We still need to glue all the joints together, fill nail holes, sand, and final paint. But, this gives the overall look how it should look in the end.
sdfsdhsdf.jpg

More fascia.
sjsdfsdfg.jpg

The temporary loop has the track and wiring installed. This will be removed when we get to the point where we can build Willow Springs, IL.
jsdjsdfgf.jpg

Wood ties were installed under all the rail joints. We chose this over the Atlas ties due to the rail joint causing a slight hump. The wooden ties has a slightly lower profile and compensates for the rail jointer. Once the track is painted and weathered, you won't be able to tell the difference.
shsdfhsdf.jpg

Here's the behind the scenes work. Wiring is done with switches and signals being finished up this week.
jssdjsdfg.jpg

The throttle charging station is done. All the throttles have a small port that plugs into them and magnetically attaches to the charging cable when dropped into the slot. Cables are ran through the wall and plugs into an outlet on the other side.
sdjsdfsdfg.jpg

We'll get to see some train run in the next update.

Thanks for looking,
-Dave
Reply 5
Dtheobald
This is incredible. Thank you for sharing the progress. Looking forward to your next update. 
Reply 1
DJH4d
Now to the fun part...

We're running a few trains to find any flaws in the track so that way we can fix them before we build the next level of bench work. Here we see BNSF 977 passes on the main while BN 7146 sits in the west runner siding.
gsdfgsdfg.jpg

BNSF 5146 and SF 5126 wait in the staging yard for their turn around the layout.
sdhsdfhfs.jpg

SP 8315 has been set up and is ready to depart. Hard to believe that's a 25' train.
sdhsdfhsdfgf.jpg

As always, questions, comments, and complaints are welcome.

Enjoy,
-Dave
Reply 8
DJH4d
Here we were as of 06/23/22.

Bench work for the coal yard was started and is currently completed past the power station. We're doing enough of this line so a coal train can pull past the coal plant and shove back in the yard. However, this move shouldn't be required.
hgdfghgh.jpg

Track and cork has been glued down. Hopefully, we'll have this 100% done and be able to use it in the next running session.
dfjdfgjfg.jpg

You may have noticed that the mainline track looks different in the last photo. Everything short of NR Junction was weathered using Rustoleum Camo Brown and the rails were painted rusty brown. We're very pleased with the results and can't wait to see how it looks with ballast.
jfgdfjfg.jpg

The bench work for the next level continues to grow. This is where the 2nd level climbs to become the 3rd level and this is the duck under where it cuts back across the aisle. Before anybody asks, yes it tall enough to walk under without ducking and yes, there will be risers to stand on to follow your train.
gssdfgsdf.jpg

On the back wall, this is Curtis Hill and the only level spot is the crossovers. It's about 1.5% and this is how the 2nd level becomes the 3rd.
shsdhsdfg.jpg

At this time, we stopped short of NR Junction.
hsdhsdfhf.jpg

Thanks for looking,
-Dave
Reply 3
DJH4d
I have a moment, so time for another update...

With the 2nd level in place, we were able to install the backdrop. It's laminated board painted Autumn sky blue.
dfsgsdfgfg.jpg

More backdrop that follows the track curve.
dfjdfjdfgj.jpg

Overall look.
dfjdfgjdgg.jpg

More bench work. Merrick is on the right, Matfield Green is on the left. We're stopping here till after the next running session.
gsdhsdfg.jpg

Bench work continues at NR Junction. You can see how close it is to the staging yard track, but it will clear a double stack with a little room to spare.
ssdfgsdfg.jpg

The bench work for the rest of NR junction. Past this, it opens up to Emporia yard.
jdjdfghgh.jpg

Time for some trains from the June running session!
sdfgsdfgf.jpg

BN doing some switching.
sdsdfgfdg.jpg

Uggg... Santa Fe! *shivers in BNSF*
jsdhsdff.jpg

Thanks for looking. Comments, questions, and complaints are welcome.

Enjoy,
-Dave
Reply 5
CandOfan
I'm curious as to why some of the benchwork is painted sky blue. Obviously the backdrop has a reason to be that color, but some of the benchwork?

Modeling the C&O in Virginia in 1943, 1927 and 1918

Reply 2
DJH4d
CandOfan wrote:
I'm curious as to why some of the benchwork is painted sky blue. Obviously the backdrop has a reason to be that color, but some of the benchwork?


We started painting the wood for the 2nd and 3rd levels blue so it blends in with the backdrop.  Even though there's nothing below it, we're using the blue wood here since it's already painted and available.

-Dave
Reply 1
DJH4d
It's been a hectic few weeks, but I finally have a moment to get everyone updated with the progress we've made.

Work continues on the coal branch. We went ahead and installed the rotary dump. It's a Walthers kit and will have a building enclosing it like the real thing. Our will not be operable at this time. However, we'll see what the future brings.
1.jpg

Further down, the run around siding is taking shape. One the real railroad, the tracks rise here and there's a road that runs under these and over the mainline. We're doing the same thing.
2.jpg

The end of the coal branch on our layout. There's enough room for a 4 unit consist to cut off, clear the switch, and run around their train.
3.jpg

On the other side of the aisle, the wye at NR junction is staring to take shape.
4.jpg

Overall view.
5.jpg

Cork and  rails continue to grow westward
6.jpg

The next update includes the bench work for Emporia yard.

Thanks for looking,
-Dave
Reply 6
DJH4d
In July, we did sneak in a running session before the bench work for Emporia yard covers the staging yard. Here's some of the trains that ran.
7.jpg

One more.
8.jpg

With the running session done, it was full steam ahead with the bench work for Emporia. It's 4' wide here and is attached to the wall while being braced to the staging yard bench work. With the addition of plywood, it makes a nice stiff base for the yard.

9.jpg

Plywood attached to the bench work for Emporia.
10.jpg

We built a loop that connects the new bench work with Merrick on the other side of the wall. This is also attached to the wall and braced with the staging yard bench work. This is the last of the permanent bench work for the main level at this time. All that's left is to build a temporary loop at the end of Matfield Green so we can run trains. More on that later.
11.jpg

With the bench work completed, it was time to start cutting out and gluing together roadbed. At this location, there's 3 main lines and a yard lead.
12.jpg

Thanks for looking,
-Dave
Reply 7
Mark Nolan LVRR1972
Where in middle TN are you located?
  I am in Brentwood, so it can't be too far away.
Reply 1
DJH4d
Where in middle TN are you located?
  I am in Brentwood, so it can't be too far away.


Pretty close, Columbia, TN

-Dave
Reply 0
Mark Nolan LVRR1972
About 40 minutes depending on which side of town.  Let me know how to get in touch with you so we can compare some notes on what we are working on.  We probably can help each other on these projects
dmnolan1967@gmail.com
Reply 0
DJH4d
We didn't forget about the end of the tracks at NR Junction. Once the cork was laid at Emporia, rails continued to grow west. However, it's slow going laying 3 main lines at the same time.
13.jpg

At the other end, the roadbed is attached to the bench work, sanded smooth, and had track cork glued. On the other side, roadbed for Matfield Green starts to take shape.
14.jpg

This completes the permanent bench work for the main level. From here the tracks enters a helix and climbs to the second level. For now, we're going to build a temporary return loop.
15.jpg

With the bench work for the main level done, all that was left was to build the temporary loop. Here, you can see how we attached it to the end of the permanent bench work.
16.jpg

Coming together...
17.jpg

... and done. All that's left is to add sides and lay track. Someday, there will be a helix here.
18.jpg

Enjoy,
-Dave
Reply 4
DJH4d
About 40 minutes depending on which side of town.  Let me know how to get in touch with you so we can compare some notes on what we are working on.  We probably can help each other on these projects
dmnolan1967@gmail.com


Hi Mark, I can be reached at southerntranscon@gmail.com. Feel free to reach out if you have any questions.

-Dave
Reply 1
DJH4d
With the roadbed complete, the tracks continued to head west. These are the crossovers at Merrick. What you can't see is the switch machines are already installed, wired up, and programmed into RR&Co. Also, I've been doing pretty good about getting blocks powered up as the track is completed.
19.jpg

Crossovers at Ellinor are 100% completed. Off to the right is the La Junta subdivision that goes to Strong City and Newton. On the layout, it's about 25' long and will end at the backdrop.
20.jpg

The new addition has been added to the dispatch screen. Here's what the railroad looks like to the dispatcher.
21.jpg

Thanks for looking,
-Dave
Reply 6
DJH4d
With bench work winding down, it was full steam ahead with track and wiring. At CP 127.1, the double track ends and starts a stretch of single track with sidings that extends through the helix and continues to the second level. This should make running sessions more interesting.
sdfasdfsd.jpg

Looking the other way. The switch at the bottom is for the first siding at Mattfield Green.
sdfgsdfgf.jpg

We went ahead and super elevated the curves here. This was achieved by inserting a strip of styrene under the outer rail and we're happy with how it turned out. It's a very subtle look, but it can be seen with autoracks or double stacks.
dfhdfghg.jpg

At the end of Mattfield Green, the return loop got its rails and was wired up.
gsdfgsdfg.jpg

Later we'll take a look at getting this signaled and get the auto run set up so the computer can run trains.

Thanks for looking,
-Dave
Reply 8
Patrick 1
Wow this ridiculous ✊🚂🔥🔥🔥🔥🔥🔥🔥🔥
Reply 0
DJH4d
The tracks at Matfield Green, KS are in place. You can see a couple of switches that are for the house track that's located in town. At this point, this wraps up the mainline for the first level.
gdsfgsdfgf.jpg

Weathering track continues when I have time. So far, the main is painted all the way to NR Junction.
6.jpg

Thanks for looking,
-Dave
Reply 6
DJH4d
With the track and wiring complete, the signals were installed where needed. For now, we're using the stock Digitrax signals. These will be replaced by the correct signals as we get them built. All that's left is to chase a few bugs in the computer program for the new section, but, the mainline is now in service all the way to Matfield, KS
7.jpg


We now turned our attention to installing the brackets that will support the bench work for the second and third levels.
8.jpg

Now that the brackets are installed, we started to cut and install the board to form the backdrop.
9.jpg

Thanks for looking,
-Dave
Reply 5
Dtheobald
This is awesome. Thanks for sharing. 
Reply 0
jeffshultz
i'm going to be interested to see why the brackets are upside down. Or was that explained previously?

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 4
laming

Every time I visit this thread, I'm blown away all over again.

Amazing.

Andre

Reply 1
Reply