I'm continuing to dismantle my old Siskiyou Line 1 and exploring how to build the new Siskiyou Line 2 TOMA modules. There were some questions around all this on another thread, so rather than pull that thread off-topic, I've moved those discussions here.

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
BOK

Thanks, for sharing your TOMA

Thanks, for sharing your TOMA thoughts, Joe.

A good friend of mine, Jim Hediger, now retired from Model Railroader once told me that most model railroads are over built for their life expectancy. He also said that some should have been dismantled years before they were. 

This was a result of a discussion we had several years ago about building simple, lite, construction, but sturdy railroads. Recently, he moved from his home to a smaller residence and dismantled his large HO railroad, the Ohio Southern (sp?). Now living in smaller space he is building a switching layout using some of the original equipment and structures from his former railroad.  

Barry 

Reply 0
dapenguin

more about the c frames

Are the "C" frames causing your attachment angle problems?  Would a separate back and top into pockets be a way to solve this?

As I said previously, and will repost,  I am using a steel stud beam on small book shelves to get 'It dont move'.  Im also eventually wedging it in by going along 3 (2 1/2) walls.

Edit:  I just decided I'm gona repost that on my own blog.  I will add a link once I do.

Edit:   https://forum.mrhmag.com/post/my-new-layout-in-my-new-house-12213048

TC Carr
Malheur, Kopperton & Tejas * Sn3½ in 1923
(the I don't know yet) * Sn2 "Gilpin in Idaho"
​Anaconda, Oregon & Pacific * S Scale Heavy Electric
My Blog Index

Reply 0
Michael Tondee

A couple of things

Any reason you went with the cinder block vs. a solid "cap" block? I'm experimenting with using the cap block to hold an antenna mount on my roof. The mounts are a common sight on convenience store roofs around the rural area I live, they hold DirectTV type dishes for various commerce communications.

The other thing is is when it comes to tear out, I keep thinking of the term "chainsaw layout" and "Madea" using one on a couch in some Tyler Perry movie I saw. Seems to me a chainsaw literally could be used to cut larger sections into more manageable pieces once out of the house. They're headed to the dumpster anyway. I'm not sure I wouldn't consider carefully using my electric chainsaw inside rather than a sawzall.

Michael, A.R.S. W4HIJ

Model Rail and "mad scientist" for over 50 years.

Member of "The Amigos", Co-Inventor of the A.O.S.T.

I call what I do "An artistic impression of reality" and the Island is "lost" somewhere in the Pacific Northwest, see it here...

The Blackwater Island Logging & Mining Co.

Reply 0
Will_Annand

Thanks Joe

Thanks for sharing your methods Joe.

Reply 0
joef

Cinder block vs cap block

Quote:

Any reason you went with the cinder block vs. a solid "cap" block?

Cinder block is 5 lbs lighter and easier to grab hold of with one hand. 25lbs seem plenty stout, vs 30lbs for the cap block. The cap block takes two hands to pick up. I can carry two 25lb cinder blocks, one in each hand, quite easily -- and I can grab them one-handed, too.

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
joef

Angle problems at ends

Quote:

Are the "C" frames causing your attachment angle problems? Would a separate back and top into pockets be a way to solve this?

That's part of it, but the complex 1/4" plywood framework makes it difficult to get the ends perpendicular and there's just too much flex still in the 1/4" plywood. I also went with flush Fremo-style track joints, and with the light box style benchwork, that's a problem.

Fremo modules are dominoes, so all you need to worry about is getting the rails to line up. With the shadowbox, I also need to get the backdrop and valance to line up too. If the backdrop is off by 1/16" inch that creates an ugly ridge, and if the valance alignment is off 1/16", that creates an ugly out-of-step joint too.

Bottom line, something needs to be adjustable, and it's obvious the track could be adjustable if I used bridge track sections to allow the track joints to be adjustable just a little. Also, I'm moving to 1/2" plywood with metal bracing to align things up better. We will see how it goes.

 

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
jeffshultz

There are days I'm glad I'm lazy...

Joe built the SL1 to last - and it did, a quarter century, and would have gone longer if he'd wanted it to. 

Me... I don't know how long my layout will last. Probably as long as I want it to, providing the shelf brackets don't pull out of the walls. Nearly all of my construction, thanks to my both doing it by myself and being only middlin' talented at it, is simple open box style, with plywood and foam top. Put it on shelf brackets and screw it to the wall. The freestanding sections are more of the same with legs, sometimes multiple sections bolted together. Definitely the lazy person's method of building benchwork - the only level changes are either from cutting away foam or making a mistake and mounting one section 2 inches higher than the adjoining one - it was easier to keep going and carve a slope in foam (or maybe I used the Woodland Scenics foam slopes....). 

Most of my boxes are 8 feet long, simply because I didn't want to cut any wood I didn't need to. 

The happy accident is that all you have to do is unscrew the backpiece from the wall, lift it off the brackets, and haul it out the back door. Some of it you'll need to pull legs off after unbolting the pieces apart - but that's all freestanding. 

If you really want to get rid of it, do it when backyard burning is allowed...  

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 0
joef

Actually ...

Quote:

If you really want to get rid of it, do it when backyard burning is allowed...

Actually, now that we've dismantled Oakland and Rice Hill, the fireplace in the downstairs is freely available.

My son suggested I just start piling up the lumber from the rest of the layout as I dismantle it, and then burn it in the fireplace. You don't need any burning season to do that!

That's what I'm likely to do, since taking loads to the dump is $25 a pop, or getting a dumpster is $500 a pop (estimated 20 dump loads, so it's a wash). With 60% of the layout still to be dismantled, free disposal of the debris is looking mighty good at this point -- and lowering the heating bill a little is just a bonus.

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
eastwind

2x2 legs vs L-shaped

I think if you shop and price it out the L-shaped legs end up being more expensive. Even if the cost is the same for the lumber, you have to pay for glue and screws and spend the time making them. Not worth the trouble IMHO, 2x2 FTW.

Also a slightly-warped 2x2 can still be used as a leg, but if one or both of the 1x2s are slightly warped they aren't going to fit together to make a very good L-shape very easily.

Attachment of legs is most convenient when the legs are made of the same material as the module frame. It's not as easy to attach PVC pipe to wood, or PVC pipe to aluminum C-framing as it is to attach these things to themselves.

WRT posts about module lightness and portability, there is an obvious tradeoff with stability. Where you set the slider on that spectrum is going to depend on whether the module is mainly portable (moving from one exhibition set up location to another) or mainly stay-at-home (and only moving when you sell the house). 

Designing a layout to be moved once every couple of years should IMHO result in a different set of decisions than designing one to be moved every couple weeks.

 

 

You can call me EW. Here's my blog index

Reply 0
Mark Pruitt Pruitt

joef...the complex 1/4"

Quote:

joef

...the complex 1/4" plywood framework makes it difficult to get the ends perpendicular and there's just too much flex still in the 1/4" plywood.

What kind of plywood were you using? You might be able to find a significantly stiffer one than what you used (but the price would likewise also be stiffer, I'll bet!). 

Quote:

...taking loads to the dump is $25 a pop, or getting a dumpster is $500 a pop (estimated 20 dump loads, so it's a wash).

 Does the dump cost vary by load size? If you have a friend with a dump truck, maybe you reduce the number of loads.

Reply 0
Bill Brillinger

Fireplace

You want to be careful what you burn in a fireplace. Woods with glue in them may be asking for a chimney fire. And a chimney that hasn't been used in 25 years should at least be checked for blockages first.

Bill Brillinger

Modeling the BNML in HO Scale, Admin for the RailPro User Group, and owner of Precision Design Co.

Reply 0
joef

Absolutely

Quote:

You want to be careful what you burn in a fireplace. Woods with glue in them may be asking for a chimney fire. And a chimney that hasn't been used in 25 years should at least be checked for blockages first.

Absolutely ... the chimney sweep will check it out thoroughly before any fire gets burned in a fireplace not used for 28 years!

And you can’t burn plaster or nickel silver, so there will still be trash, but not too much for the regular trash can, let's hope. 

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
joef

Dump loads

Quote:

Does the dump cost vary by load size? If you have a friend with a dump truck, maybe you reduce the number of loads.

It’s $25 for up to 250lbs, then so much a pound after that. My well built layout is heavy ... most loads of my van were right at the limit.

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
MEC Fan

@ Dave = Perfection

I wish I was as perfect as this guy. 

 

I think you should start an advice column...............

Reply 0
ACR_Forever

amusing.

I ripped out my 700 sq ft. old layout in four days, including track salvage.  Albeit, no significant plaster.  Guess I had planned ahead, my buddy groused for years when we were building about my anal No-hidden-fasteners fetish.

But seriously, wall refinishing is a given.  Took me most of a week to fix, crackfill, plaster, and prep the walls.  Then three days for painting.  New owner's only complaint is there's no airflow down there, because I refused to have the added dust load from ducted heating.  He can fix.  He waived the inspection requirement, so he has zero comeback.

 

Really, Joe, you had so many guys helping build and run it, where are they now?  For shame.  A weekend, a case of beer or two, a few pounds of burger and buns, and that layout should be GONE.

Blair

P.S.  Seriously, though, I understand how this goes.  Life's a series of mistakes, interspersed with, one hopes, a day or two of fun now and then.  When my wife finishes her radiation treatments, I hope we'll have a few days of fun.  I sense I've been a pain on the forum recently, and everyone's forbearance has been appreciated.

 

Reply 0
TimGarland

3/4 inch plywood

Just listened to the latest AML podcast featuring Lance Mindheim who has been professionally constructing layouts now for 20 years and he states he no longer uses dimensional lumber for legs but 3/4” plywood cut into 3” strips and glued into L-shaped braces with brad nails. 

Years ago Kalmbach did a special video for the World’s Greatest Hobby featuring Michael Gross as a narrator using this same technique. A small 2x2 was attached to the bottom of the legs to allow for leveling screws to be added for uneven floors. The H-shaped leg braces were connected to the underside of the layout with carriage bolts and wing nuts.

Tim

Reply 0
Neil Erickson NeilEr

August Layout Un-Build

Joe:

I'll be in Portland at the end of August if you need help with screwdrivers, sawzall, or manual labor. The sooner the beast is beaten, the sooner we all see more of SL2!

Neil Erickson, Hawai’i 

My Blogs

Reply 0
Ken Rice

Legs, layout/backdrop/lighting as a unit vs separate

Since my layout is going to be around the walls anyway, I view legs as a significant downside.  They get in the way rolling stuff under the layout, cleaning, etc.  I’m leaning toward adjustable shelf brackets (the kind with the vertical track that the brackets clip into) which would be trivially repurposed to support bookshelves if the house needs to be sold.

Still, seems like whatever holds the thing up (legs or shelf brackets), from there on up construction could be the same.

There is a definite appeal to having the backdrop, lighting, and layout section all a single unit.  For one thing as you pointed out they all stay in alignment with each other that way.  But there’s also a definite appeal to not having them be a single unit.  A layout section without a backdrop or lighting valence attached means you can easily work on it from all sides including top and bottom.  And it’s not quite as much of a big box to cart out to the back yard to spray paint the track.

Some sort of assembly jig might help keep all the pieces aligned as you assemble things.

Reply 0
ctxmf74

Random thoughts

   I can't see living with cinder blocks under a layout for years at a time,they be a pain to keep clean and interfere with under the layout access. I'd rather screw it to the wall in a few spots for stability and then patch the holes if I ever had to move. Also seems a bit at odds with building lightweight bench work then having to carry heavy cement blocks around. Wooden 2 by 2 legs( really 1.5 by 1.5) are strong enough but pretty flexible so need some cross bracing. Slightly wider T or L section legs look a bit more in proportion with most benchwork and will need less cross bracing due to being stiffer. Pine ripped to 2 1/2 " and nailed into a T section gives a 2 1/2 by 3 1/4 leg section that looks heftier than a 2 by 2  and is a lot stiffer. A nail gun makes quick work of assembling the 2 parts. I''d look into ways to make the backdrop and lighting assembly separate from the benchwork for the reasons noted by Ken. Perhaps the backdrop sections could attach with stakes ( like flat bed tracks) with an aluminum H section sliding down between them for alignment. The lighting could possibly be cantilevered from the backdrop with LED flood lights and a fabric top/valence( Let there be lightness!...) .......DaveB

Reply 0
joef

The advantage of a shadowbox

The one big advantage to me of the shadowbox construction is that I don't need a module rotisserie. All I need is an ordinary table. If I need to rotate the module to work on it, I can just flip it around 90 degrees at a time to get at any side I want from the bottom to the top. I also like that it protects everything for moving. I just attach some plastic temporarily on the front and then stack the module sections in the moving van. So I really like it -- and it's very attractive for viewing too, coming with its own lighting built in.

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
jimfitch

Rotisserie - makes me hungry

Rotisserie - makes me hungry for some rotisserie chicken!

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
Ken Rice

Stacking

Stacking the shadowbox construction modules puts a much bigger strength requirement on the backdrop frame.  Doesn’t seem like it would be too hard to make a skinny backdrop frame that would support itself and a few lights, but if it has to also support the weight of another whole module stacked on top of it, in a van, going over bumps on the road... I think I’d be inclined to screw a piece of plywood over the front to transfer the load from the valence to the base that way rather than with the twisting moment on the backdrop.

Reply 0
Prof_Klyzlr

Stacking modules

Dear Ken,

Quote:

Stacking the shadowbox construction modules puts a much bigger strength requirement on the backdrop frame. 

Agreed, but it's not that onerous to build a proscenium module properly to handle such...

ofile_01.jpg 

oorong13.jpg 
Setup_01.jpg rab_Safe.png 

IMG_0686.jpg IMG_0687.jpg 

Happy Modelling,
Aim to Improve,
Prof Klyzlr

Reply 0
Michael Tondee

Backdrop seams

I can't abide any sort of seams, doors or windows in a backdrop. Even the tightest least noticeable seam spoils the illusion we try so hard to create. Even if I build my next pike in a sectional/TOMA fashion the backdrop will be a separate entity with properly mudded and sanded seams. Not that big a deal to attach furring strips to the walls and the backdrop to those and easy to repair the wall when and if it has to come down. You can still do shadowbox too without making it part of the modules. My current pike is, I don't build them any other way. I can see going to all the trouble for an exhibition type display but for a home pike that may or may not have to be moved, I'm not a fan.

Michael, A.R.S. W4HIJ

Model Rail and "mad scientist" for over 50 years.

Member of "The Amigos", Co-Inventor of the A.O.S.T.

I call what I do "An artistic impression of reality" and the Island is "lost" somewhere in the Pacific Northwest, see it here...

The Blackwater Island Logging & Mining Co.

Reply 0
Prof_Klyzlr

Late to the party (apologies in advance)

Dear Joe, MRHers,

Apologies for being late to the party, looks like I have a lot to catch up on.
When Joe first posted the "Proscenium Module Experiment List", I have to admit I sat for a day or so,
mulling-over, re-checking my personal layout archives and wider reference library for "prior art examples",
and drafting multiple itemised responses...

but to then hear Joe say,
"...I think I got most of the list sorted, just gotta solve the module<> module interface accuracy",
it kinda cooled me out. If the stated "Experiment List" is already well-covered then far be it from me or anyone else to second-guess what's workin'... (It's all about "finding the solution to the problem" ).

So, with that said, there's a number of points-arising which bear comment, prior-art references to link back-to, and some examples and alternatives to share...

Quote:

My one other big fail -- and I think this is related -- is using 1/4" plywood is a pain. It flexes too much even with my i-beam torsion-box approach. Lots of fiddily laminating and alignment of pieces.

PROFK: I know you've said "No Foamcore", but there's a reason my last 4 layout-builds levered the basic design of Keiran Ryan's "$100 Module", adapted to use 5mm Foamcore. No "Fiddly" in it, it literally tab-and-slots together. Works whether you elect to use 9mm CD Plywood (a la Keiran R), Sintra, or Foamcore.

nimation.gif 

Quote:

I did try using PVC pipe for legs and that also failed miserably. The stuff just flexes too much over its length with legs that are 48" or more long, and attaching braces to it became a big pain. 

PROFK: Have to ask, did you try inserting dowel inside the PVC tube? "Nine Mile" and "Brooklyn : 3AM" used fold-up trestle-legs with PVC conduit extensions. Tassie Oak dowelling was inserted + Liquid-Nailed + Screwed inside the PVC conduit, greatly improving rigidity and allowing reliable screw-fixings (if required, found to be not-needed in practical application)

tensions.jpg 

Quote:

I also built a 3/4" plywood plate that the legs attach to at the bottom using thumb screws and wing nuts (the plywood uprights for the legs have slots in them, allowing height adjustment) -- and then I put a cinder block on it. Makes the legs extremely stable and kick proof. It also makes the layout impossible to tip over if you accidentally trip and reach out against it to brace yourself. This approach for stability yet portability was a major win.

-600x450.JPG 

PROFK: Certainly, adding ballast-weight to the legs will help counteract "tip forces", although it should be noted any layout can be tipped if the-person-doing-the-tipping is actively "pushing til it goes over"...
(as opposed to just an accidental "nudge").

I should also note that the earliest documented reference I could verify in my personal library to adding weights to leg systems for stability was on Page 22 of Iain Rice's "An approach to Model Railway Design : Finescale in small spaces" circa 1990

Speaking of layout legs, I was not a fan of "A-frames" for a very long time, largely due to seeing many poorly-designed and constructed wooden examples. Not square, heavy, and too-thick even when "folded flat" for exhibition transport. My last few layouts have levered pre-cut aluminium tube to form A-frames that fold-down to 1-inch thick, and weigh 2.45Kilos (5.4 pounds) each. The lower member is even perfect for laying a weight/sandbag (or cinder block) on for additional stability...

NB the apparently "leaning module end" is due to perspective distortion, I guarantee the modules shown are 90-degree square in real life....

_on_Legs.jpg 

Quote:

Are the "C" frames causing your attachment angle problems? 

PROFK: I would suspect that, based on the pics and Joe's comments that there are "too many parts, and too fiddly to assemble", the "C"s are actually not single-sheet profiles. (See above GIF animation). Using a single sheet of material to form one-piece profile "C"s provides significant resistance to deflection and "leading-edge overhang roof droop". Oh, and having a coved backdrop<> roof sheet is not just a cool way to hide the vertical-backdrop<> horizontal-sky joint, it also form an integral torsion spring which stiffens and strengthens the roof.
(The large wide sheet, curved thru almost 90-degrees also acts as a structural gussett in L-R and Fore-Aft racking axis)

Quote:

That's part of it, but the complex 1/4" plywood framework makes it difficult to get the ends perpendicular and there's just too much flex still in the 1/4" plywood. I also went with flush Fremo-style track joints, and with the light box style benchwork, that's a problem.

Fremo modules are dominoes, so all you need to worry about is getting the rails to line up. With the shadowbox, I also need to get the backdrop and valance to line up too. If the backdrop is off by 1/16" inch that creates an ugly ridge, and if the valance alignment is off 1/16", that creates an ugly out-of-step joint too.

Bottom line, something needs to be adjustable, and it's obvious the track could be adjustable if I used bridge track sections to allow the track joints to be adjustable just a little. Also, I'm moving to 1/2" plywood with metal bracing to align things up better. We will see how it goes.

PROFK: There's a lot to unpack here.

"Complex framework = difficult to achieve perpendicular ends

PROFK: Two parts. 1: With an aluminium exoskeleton and one-piece continuous endplates, structural forces and dimensional integrity is assured, assuming it's constructed with appropriate diligence and care. Assuming one goes this route, whatever "module core" is used to support the track between the end-plates of the exoskeleton is largely structurally irrelevant.

2: The module design as shown in the GIF animation above cannot help but assemble "square and perpendicular", assuming the londitudinal "strip" members are cut square and to consistent length to begin with.
(I learned the hard way, the "natural" edge of a sheet of Foamcore should not be assumed to be perfectly 90-degrees out of the carton, but then again neither should any sheet material! ). GIven that all of the "strips" required come from one sheet of material, it is dead-easy to cut the sheet to the desired "module length" dimension _first_, then rip the resultant "module length sheet" into the required-width strips.

"Flush rail ends VS lightbox benchwork"

PROFK: Unsure if Proscenium module designs specifically are inherrently "incompatible" with flush-rail ends. Rather, and it's been thoroughly discussed here onlist previously, flush-rail-ends demand _high-accuracy_ alignment systems. Any attempt to use a "tolerant" or "sloppy" alignment systems
(which feels like a contradiction in terms, but we'll allow it in this context)

with "flush-rail-end" technique is doomed to failure, the two techniques are inherrently opposite in mechanical nature. (Kinda like choosing to use a power-system which relies on transferring power from rail to wheel,
and then deliberately placing isolated lengths of rail all over the layout and expecting the power-system to work).

"1/16" required for visually nice roof and base fascia alignment"

PROFK: Um, lemme back up here:
- 1/16" certainly is a good benchmark for visually smooth Roof and Base fascia joints,
but a Flush-rail-end system demands repeatable alignment accuracy more along the lines of < +/- 0.010" in both X and Y axis.
(Z axis is down to how the rail joints are cut/timmed, and the perpendicularity of the module endplates, see above)
- Assuming we are using a suitably-accurate alignment system
(say, like the interleaved-tongues shown on the end of the module below)

_lh_side.jpg 

then said alignment accuracy is entirely possible and reproducible.
- Assuming the alignment system (interleaved tongue in this case) is rigidly anchored to the End-Plate, there is no mechanical possibility for the module-end (and associated roof and base fascia endges),
to move-independently of the alignment system.

- Assuming we are using flush-rail-ends which are rigidly-anchored to the End-plate
(using brass screws, PCB ties, whatever your chosen technique is),
there is no mechanical possibility for the rail-ends to move-independently of the end-plate,
and by extension, the alignment system.

Upshot, if the alignment system "moves", then _everything_ 
(Alignment system, end-plate, base fascia, roof fascia, and rail-ends)
cannot-help but move, and maintain relative positional relationship/alignment in consequence.

"Bottom line, something needs to be adjustable...and the track could be "

PROFK: Certainly, spanning track pieces, spanning rails, and even "free-floating flexing rails" have been used to compensate for _tolerant_ "alignment" systems
(it makes my skin crawl every time I mix those terms,
a properly-engineered alignment system does not allow tolerance "slop", because "slop" =/= Alignment)

but I'm confident that with even basic layout-building tools, we can do a lot better than a derailment-guaranteed 1/16" alignment accuracy. (FWIW, the interleaved-tongue systems shown were constructed with a hacksaw, file, basic metal square, and a 18V battery drill/driver).

"...moving up to 1/2" plywood..."

PROFK: Just as a BTW, I did the calcs. A 6' x 2' x 2' aluminium exoskeleton with 3mm MDF endplates weighs in at 5kilos / 11 pounds. Using Foamcore and lightweight scenery techniques to complete the module should wind up between 10-12kilos/22-27 pounds. In contrast, Keiran R used 9mm CD plywood and reported a "module only" weight of 30 kilos/66 pounds  http://krmodels.com.au/100dollarmod/100dolarmod.html 
(and that is _before_ any track, wiring, lighting, or scenery was applied... ouch!). Moving to 1/2" ply, I strongly suspect the nominated 40-pound module weight limit for a 6x2x2 module will be under threat...

Happy Modelling,
Aim to Improve,
Prof Klyzlr

PS I saw a reference in the "Experiments List" to "freeform module shape". It should be noted that even if the underlying exoskeleton frame is geometrically squared-off, the module body can easily bulge and curve to accomodate more "organic" forms...