railandsail

I'm building a double deck layout in its own handi-house shed  It has a large wide door at the entrance that needs a couple of 'entrance bridges' that can be moved aside relatively quickly. Because of the large width of the opening I am thinking it should be a 'split bridge' type like the bascule type where both of the two sides would swing up.

https://en.wikipedia.org/wiki/Bascule_bridge

Since there are two decks these bridges need to raise up vertically in such a way as to end up vertical and stacked.

Does anyone have some good photos of 'entrance bridges' that might have been utilized on modular railroad displays at train shows?...or club layouts??...etc

Total span approximated at 42 inches,..double tracked on both levels.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 1
Rick Sutton

Brian

I used a rerailer across a problematic gap on my entrance swing up bridge and it really helped out. Used a jeweler's saw to cut it.

Reply 0
ctxmf74

lift up gaps

If you run the track straight across the entrance and have decent end of rails alignment when the section is closed there should be no problems with the gaps. I haven't had even one derailment on my lift up section despite running all kinds of un-tuned marginally compliant rolling stock. Toy train wheels can hop across quite wide gaps with no complaints. :> )   ...DaveB

Reply 0
Rick Sutton

If you run the track straight across the entrance

True. My first swing gate (straight and simple) worked like a charm. In my current, much smaller layout I had to continue a curve across the entrance or the track would not work out. Decided to make it macho strong out of quality plywood layers. I think that was a mistake. Every time I swing that sucker up I have to lean against it to force it into position where it can be locked down. If there's a next time I'm gonna figure out a way to get back to a simple, light weight straight gate again.

Reply 0
eastwind

straight vs perpendicular

If your track doesn't go straight across an edge of your gate, you can adjust the edge's angle so it's perpendicular to the track. 

The swing gate I'm planning for my layout has a hinge on the corner with the red dot. The gate swings out to the left. 

The top edge needs to be adjusted slightly because the track isn't quite crossing the gap at a perpendicular angle (because I plotted the track after drawing the gate and haven't tweaked the gate to match the track yet). 

edit: forgot to attach the image:

20detail.jpg 

You can call me EW. Here's my blog index

Reply 0
railandsail

Atlas Rerailers for the Gaps

I gave this subject its own subject thread,... https://forum.mrhmag.com/post/gaps-in-trackwork-12217019

Reply 0
railandsail

Swing Bridge

I have the Walthers double track swing bridge, but I'm not to excited with the way it looks.

I like this look much better,....but need to figure out how I can incorporate it into my entranceway structure?

02748-1.jpeg 

Reply 0
railandsail

Laying First Track on Entranceway Bridge

I've been working my way around the lower main level and staging track levels of my around-the-walls layout. I finally reached the entranceway swing-down bridge structure. I figured it best to go forward with laying the staging level tracks across it before I placed the big steel mill section back in there.

As I mentioned before I decided to use rerailer tracks at each of 'couplings' of those staging tracks that were going to bridge across the entrance,....there are 3 of those staging tracks that will go all way around the room.

I decided I did NOT want to glue these tracks and the rerailers down to the plywood,...but rather would screw and tack nail them into place so minor adjustments could be made in the future.

So here is the bridge structure swung down getting those 3 staging tracks ready,..

age(200).png 

 

95301-1.jpeg 
......screws are employed at either end of the rerailers.


.....tack nails are employed at the ends closest to cut joint...
95631-2.jpeg 
(at first I tried these brass tack nails, but they turned out to be too soft to fully drive into the good plywood, so these others were used)
95851-3.jpeg 

 

I put a metal straight edge across the tracks as a guide when making the razor saw cut.
age(201).png 

 

and hear is the bridge partially lifted after the cuts to the tracks.
age(202).png 

 

Have to finish up the connecting tracks today. So far it looks pretty promising.

 

 

Reply 0
ACR_Forever

rerailer function -

I always thought a rerailer used across a gap the way you have is a waste.  Surely a rerailer is supposed to rerail a car that has derailed crossing the gap, correct?  But the rerailer does its job with the slopes and angles at it's ends.  sorry, Brian, but I think you've misunderstood how they function, and therefore misapplied them.

Blair

Reply 0
railandsail

@Blair, I think your are

@Blair,

I think your are correct about the manner in which the rerailers work. I may have to change them out if they give me any trouble.

I was thinking more in the 'firmness' and shape holding capabilities of the joint when i placed them like this.

Maybe I should reconsider how I mount them on my upper 2 main decks??

 

 

Reply 0
Rick Sutton

rerailers

After catching shirt sleeves on the exposed rails when my drop down was in the down position and ripping them out of alignment or worse i rebuilt the interface several times to mitigate this problem. Atlas rerailers were the final and best solution. I don't care about the rerailing function but those things are so handy when laid across a gap and cut with a jeweler's saw. Clean solid interface with the rail ends protected from snags.

Reply 0
ACR_Forever

Good alternative point, Rick,

Though I haven't encountered that problem.  But I have suffered from minor alignment drifts that caused derailments, and a rerailer might have helped, if it were shaped to corrrect a derailed car.

Blair

Reply 0
railandsail

Clean solid interface with

Quote:

Clean solid interface with the rail ends protected from snags.
Rick

Perhaps that was one of the thoughts that entered my mind when I placed them like that. 
 

But gentlemen you have brought this to my attention and I believe I need to do some re-considerations before I continue on with my crossings at the next 2 levels up. I like not having snags, but I also like the idea of the rerailer.

I believe I will leave this staging track level as it is for now, but I did some measurements to determine if I could modify it in the future without encountering significant problems. At the moment I am thinking of mounting two rerailers head-to-head on each track as it crosses the joint between main deck plywood and bridge deck. Now the question is where exactly the join line would be? Lets see if I can get an image up and suggest where it might be??

age(203).png 

This is how I thought I might make my diagonal cut across one end of one rerailer to match up with a second one,.....either at the end of the tracks, or at the end of the plastic stock. I believe I would prefer the end of the plastic stock to try and avoid snags by exposed tracks?

The diagonal cut is an effort to avoid any snags of the tracks with each other as the tracks are moved 'across'  one another in their rotation back and upward.

 

 

Reply 0
railandsail

No Alternative Suggestions?

No alternative suggestions here??

(took a break with lawn work today,...neighbors and mine,...worn out !)

Reply 0
dark2star

Try it

Hi,

as you have it already installed, try it. See what works for you and what doesn't. You'll be able to modify it if it doesn't work well - or try something different on other levels... Or - if it works - you'll be fine.

Have fun and stay healthy

Reply 0
ctxmf74

Alternatives?

You could cut them in half and install them with the re-railing ends facing each other at the gap. That might re-rail any wheel that doesn't successfully cross the gap on the rails. I'd be more inclined to skip the re-railers and just install PC board ties ( or use gapmasters) at the gaps though.....DaveB

Reply 0
railandsail

You could cut them in half

Quote:

You could cut them in half and install them with the re-railing ends facing each other at the gap. That might re-rail any wheel that doesn't successfully cross the gap on the rails.

I was thinking about this, but I wondered how I would go about connecting the 'flush rails' of the cut half to the rails leading up to them? I believe I can't use rail joiners there,... that's why I thought I would need to use the entire rerailer rather than just half??

Reply 0
jimfitch

Seems like a good idea to use

Seems like a good idea to use re-railers cut at the lift out gap to minimize rails being snagged.  The only other thing that might be good is to place a re-railer on either side of the game to catch any wheels that might go a-stray due to any misalignments. 

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
railandsail

That's what I'm think, just o

That's what I'm thinking, ....just go ahead and use an entire rerailer on either side of the gap (thus 2 for each track),...but cut off the short bit of regular rail sticking out of the 'gap-end'..

I think I will do this for the upper 2 deck layers, and just let that bottom staging-tracks one be as it is, unless it gives me trouble.

 

 

 

 

Reply 0
eastwind

design solution to problem

If the point is to rigidly maintain the track gauge, you can use pcboard ties or gapmasters. 

If the point is to avoid snags, you can make your own protection similar to a rerailer just by gluing down a strip of styrene in between the tracks, plus strips on top of the ties to the outside. Make them just slightly taller than the rails, allow appropriate flangeways and you get the same effect as you are getting from a cut-in-half rerailer. Basically like making a road grade crossing.

If you want both things, use both approaches, with strips on top of the pcboard ties or gap masters.

And if you want rerailing, put one full regular rerailer in the middle of the liftout that will work in either direction to put wheels derailed by the first joint back on the tracks before a derailed wheel reaches the joint on the far end.

And if you want total belt and suspenders, put a rerailer in the line on the mainland side of the lift-out too.

By then the whole thing should look like heck, but run pretty well.

You can call me EW. Here's my blog index

Reply 0
ctxmf74

  "I wondered how I would go

Quote:

"I wondered how I would go about connecting the 'flush rails' of the cut half to the rails leading up to them? I believe I can't use rail joiners there,"

I don't have a rerailer  here to look at but I'd guess you could remove some of the plastic with a zona saw or nippers so the rail joiners could slide on. Putting the re-railer end right at the gap might help the wheels stay on the rails but I'd be more inclined to glue down pc board ties and run the rails across the joint, solder them in place then cut the gaps with a dremel .....DaveB

Reply 0
railandsail

Exposed Rail Experiment

Quote:

"I wondered how I would go about connecting the 'flush rails' of the cut half to the rails leading up to them? I believe I can't use rail joiners there,"


Ran a little experiment yesterday on a junk Atlas rerailer I had with steel track rather than NS. I cut the rerailer almost in half, then took a small punch and pushed one of the rails back thru the rerailer plastic such that about a 1/4" of rail projected out the rear. That's enough to get a normal rail joiner on to , and thus attach to the ordinary track of the layout.   So I now have this option to use on those upper levels.

But since I am not really worried about exact appearances, but rather reliable running, I think I will use the whole rerailer pieces rather than chopped off ones.

Edited:
Here are a couple of photos of that experiment,...
84321-1.jpeg 

84348-2.jpeg 

 

 

Reply 0
bear creek

A swing bridge w/ main track across layout room entrance

Check MRH issue 2 (April 2009) for an article on how I built a bullet proof swing bridge across my layout room entrance.

theCreek.jpg 

This bridge which was built around 16 years ago is still working flawlessly - except that sometimes when temperature and humidity are just right the locking pins slides easily enough that the spring pressure of the bridge-in-place micro switch pops the pin up which turns off track power on both sides of the bridge.  When the cry of "Hey my trains doesn't have power": is heard near the room entrance, knowledgable check and re-seat the pin then all is well.

I drove small wood screws at the edges of the bridge and surrounding terrain then soldered the rails to those screws to hold the rail ends in correct alignment.

If the track comes out of either horizontal or vertical alignment I can resolder them back into proper position. In 16 years I've had to resolder one rail one time.

Charlie

Superintendent of nearly everything  ayco_hdr.jpg 

Reply 0
railandsail

Bridge Track Wiring

I'm not able to view any of the details that were in your article, and I don't know that I have that issue anywhere easily found?   Did your bridge swing down like mine, or swing over to one side??

As pertains to the electrical supply to the bridge tracks, at the moment I am thinking my feeder wires will run down one of those swinging arms, so they will be continuous wires. Since they will be a little longer feeder wires, I'll likely use some heavier wiring

Reply 0
Benny

...

If rerailing after the cut rerailers is really that big of a deal, you can put another set of them on the bridge itself between the two ends.


I think you got some really nice clean cuts doing it the way you did.

--------------------------------------------------------

Benny's Index or Somewhere Chasing Rabbits

Reply 0
bear creek

Swing bridge article is downloadable in MRH issue #2

It swings side to side, not up and down.

You should be able to download issue 2 at: https://model-railroad-hobbyist.com/magazine/mrh-2009-Q2/legacy_download

The article (Up the Creek: Plate Tectonics)  starts on page 99 or 100 (depending on whether you go by magazine page #s or Adobe pdf page #s).

Unforetunately the video clips that were part of the article no longer seem to be playable. However, there are lots of photos showing construction details. Note that this article details construction of a lift hatch as well as the swing bridge).

Cheers,

Charlie

 

 

Superintendent of nearly everything  ayco_hdr.jpg 

Reply 0
Reply