railandsail

I'm building a double deck layout in its own handi-house shed  It has a large wide door at the entrance that needs a couple of 'entrance bridges' that can be moved aside relatively quickly. Because of the large width of the opening I am thinking it should be a 'split bridge' type like the bascule type where both of the two sides would swing up.

https://en.wikipedia.org/wiki/Bascule_bridge

Since there are two decks these bridges need to raise up vertically in such a way as to end up vertical and stacked.

Does anyone have some good photos of 'entrance bridges' that might have been utilized on modular railroad displays at train shows?...or club layouts??...etc

Total span approximated at 42 inches,..double tracked on both levels.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 1
raifenton

Bridging a door in a room corner

21%20(2).jpg 

Reply 0
edfhinton

Profile between levels?

@raifenton - I like that profile between the two levels of your photo.  I can't tell from the photo what you used to create that.  It looks think, flexible, and provides a nice curve to the embankment.  What did you  use to do that?

Thanks,

-Ed

 

----------------------------------------------------------------------

Proprietor - Northern New England Scenic (V4). N scale NH B&M from Exeter to Bartlett in the mid-1950s.

https://nnescenicmodelrr.com

Reply 0
railandsail

More Photos

@raifenton

Need more photos to understand your presentation

Reply 0
herronp

I wanted a locking mechanism..........

.........that I could activate easily from either side of the entry bridge. Here in pictures and a video is what I came up with. 

CD3B199.jpeg 

DEF2F1F.jpeg 

https://m.youtube.com/watch?v=29QnIijhtv4

 

I have yet to finish laying the track but the ties are down over the joint and have remained properly positioned during a winter/summer/winter heat-humidity cycle.  We got a new puppy so my basement work sessions were cut back considerably!!

Peter

 

 

Reply 0
raifenton

Bridging a door in a room corner

My problem was with bridging a doorway in a room corner with four curved tracks at three different levels.  The track ends were soldered to brass plates to allow adjustment but as the timber seasoned and relatively little temperature changes in the layout room occurred, such adjustments became unnecessary.  The bridge board is maintained in the up position by two door locks with their handles linked to a timber shaft extended out to a releasing knob.

Rai Fenton, London UK

20345%29.jpg 

0%282%29.jpg 0%282%29.jpg 

Reply 0
raifenton

Bridging a door in a room corner

Apologies for the truncation of my first attempt in entering my item - I'm on a learning curve here!

Rai

Reply 0
railandsail

Thank you for your

Thank you for your contribution. I'll have to inspect the postings a bit later today, after I finish some more work on my new decks.

Reply 0
railandsail

'Parallellogramming',...squareness

I've returned to working on my entrance-way bridging project. I figured since I had my 3 layers of plywood deck temporarily in place, now was the time to try and finalize this design.

I was pleasantly surprised at how 'square' all of my original metal framework was ! I did end up have to lower one side by 1/32" to get the staging deck crossing to line up.

Then I decided to address the parallel rigidity. I had been thinking about this addition of a 'rectangular plywood plate'  at the upper regions as posted in this photo and the following 2 submissions,....

 

Quote:

The swinging bridge is a very good idea, I never thought of it.

That aluminum is about 1" wide, and naturally I would thing of T-hinges, just like you did.  Then I thought, full size door hinges would be more reliable. But how to attach them?  OK, without starting over,  I would apply 3/4" ply or 1" lumber to both the swinging frame and the shed.

DougL
2%281%29.jpg 

 

 

Quote:

As well as beefed-up hinges, maybe you'd need to add some diagonal bracing to the frame to stop it from "parallellogramming" on the way down and letting the bridge tracks bump into the fixed tracks?

Pete M

 

Quote:

Being a structural engineer, I can tell you that the corner braces you're using will most likely allow the swing gate to rack much too far left and right. In short, they probably don't make the structure stiff enough in the lateral direction.
You can easily improve the lateral stiffness by at least an order of magnitude by simply adding small triangular (say three inches or a bit more on the sides bordering the 90 degree angle) gussets at each corner of the frame. Welding them in place would be best, but self-tapping screws would probably work well enough. I would avoid bolts for that, since the clearance holes would still allow some lateral movement.

Mark P.

 

 
So I added my plywood plate
DSCF4327.JPG 
And I added a piano hinge to the affair.... to be continued

Reply 0
railandsail

Piano Hinge ?

I have, and still am, debating with myself on the use of that piano hinge on the upper beam. I have no doubts that it is a more 'exact' hinge than many others, and for that reason is the one to be considered in most cases.

But here is my delimma. Should I be depending on that rotation/attachment point way up there to correctly align my crossing tracks down below. Or should I be building the rectangular frame structure as an entity unto itself to align those 3 crossing tracks/bridges, then simply hinge it at the top to move it out of the way, but without the concerns about the hinging point bringing everything else into alignment??

I went ahead and included the piano hinge just in case this was the route I choose in the final decision. It seems as though I am thinking about alternative ideas to accomplished my goals as I go along with the construction of this fixture.

Reply 0
vggrek

I hope you can pass under

I hope you can pass under this thing in case it will not work after a few times of use. Looking forward to see it work well.

Reply 0
railandsail

SNAFU

Not everything goes as planned,...
 
1) I got kidnapped on 3 occasions this past holiday weekend to go out for afternoon lunches and cocktails with some neighbors,...so my bridge fixture building project got a little 'interrupted'.

2) Even while I was originally very excited about the manner my mock up was fitting my space, wouldn't you know some gremlins would show up.

I figured that with my initial good fit I could just proceed forward with cutting out the very bottom crossover piece (for the staging tracks), mount it to the alum crossbeam I already had there, and fit and trim the wedges for either end. With that one done, then I could proceed forward with doing the 2 deck crossover pieces above that, and somehow make those 'very slightly adjustable' to account for dimensional changes that might occur.

(finish this story in the morning)

Reply 0
dark2star

Hybrid construction?

Hi,

the lift-up seems to be a very nice idea, I think.

Looking at the alignment, you mentioned it is a long distance from the hinge to the lowest deck.

Would it be possible to use the lift-up for the task of lifting the bridges, but provide enough flexibility that a set of alignment wedges can take up the task of aligning the bridges within their intended locations?

Something like a set of shelves the actual bridges rest on when lifted and some springs to pull them into the alignment wedges when lowered?

Just thinking out loud...

Have fun!

Reply 0
railandsail

Dark2star,Something like

Dark2star,
Something like this that I posted earlier in this subject thread ?....

Quote:

My plan to address both of these  

a) any 'racking / parallellogramming' of the rectangular frame,

b) the cut ends of the rails on the bridges having to pass sideways across the cut ends ends of the rails of the fixed tracks,

 

...by employing a wedge shape phenomena.

Both ends of that plywood piece that bridges the staging level will be cut at a slight angle across their width, and in such a manner that the edge facing the shed's door will be shorter than their opposite edge that faces the interior of the shed. Those angled ends will mate up exactly with wedge pieces added to the plywood deck/shelves on either side of the entrance opening.

When the framed structure is lowered into position the matting wedges will force exact horizontal alignment regardless of any racking, and the angled faces will prevent any of the rails passing directly perpendicular to one another.
 

At both ends of the plywood bridge, a bolt action fastener placed on the bottom surface of the plywood, and matting up with its reciprocal on the deck plywood,... will ensure firm fore-aft placement, and height alignment.

 

Updating this idea, I have been thinking that the 3 deck pieces that actually span the opening need NOT be continuous pieces across the span. Rather they might be short segments at each of the 6 joining points (3 decks X 2 ends each) , so 6 short segments acting as shoes/abutments for the bridges themselves. Thus there would be NO continuous plywood deck under the bridge itself, across the entrance opening. This would lend itself to a more flexible situation in making track alignments,...the 'floating' bridge itself between 2 feet/shoes providing flexibility

And it would look more realistic to not having that plywood deck piece under the bridge itself.

Reply 0
dark2star

Lift bridges

Hi,

just a wildly alternative thought, why not build "real" lift bridges? A single lever could operate several of these via rope and pulley and it might be less effort than the three-deck-fold-up-with-many-flexible-parts system?

Have fun!

Reply 0
railandsail

Lift Bridges

I considered that in the beginning, but I did not have enough ceiling height in my shed.

Reply 0
railandsail

Update

As I posted previously I was pleasantly surprised with the 'dimensional fit' of my original mock-up fixture.
DSCF4332.JPG 

DSCF4333.JPG 

DSCF4335.JPG 

 

BUT, when I went to add the 8” wide plywood deck to the lower staging level crossing, it did not extend out level across the 3 wide tracks,...rather it drooped at the outer edge away from the frame.

At first I was not understanding why, as all my metal framing were exactly square, and the brackets I had used were all double checked for squareness. Turns out it had to do with drilling those holes to mount those 90 degree brackets at the bottom of my swinging fixture.
DSCF4328.JPG 

 

DSCF4329.JPG 

 

0closeup.jpg 



I decided I was going to have to redrill those holes in replaced alum frames using a drill press to get really accurate placement,...and substitute 90 degree 'corner brackets'
0walmart.jpg 

CBF50.jpg 
I got two of those corner brackets out that I had previously purchased for another project. When I got to inspecting them more closely, and with a metal square tool, I found they were NOT exactly square either,...in several directions !!

I was just about to walk out the door yesterday morning to go visit a few stores and see what sort of corner brackets they had. My contractor friend happen to stop by and made the suggestion that I simply use a rectangular piece of my ¾ plywood to assure exact squareness of the bottom portion of the swing up fixture. Why didn't I think of that? I had done that exact thing up top?

No need to go searching for premium brackets, and exact drilling of mounting holes. Here it is pictured in its glued up stage. I'll get better/more-understandable photos tomorrow after the glue sets up.
DSCF4339.JPG 

Meantime I went about experimenting with cutting some of my proposed 'angled wood blocks' that would be utilized to 'locate' the swing structure when lowered into place. I cut these on a 10 degree angle,...then went ahead and glued those bottom ones into place.
DSCF4336.JPG 

 

DSCF4337.JPG 

Ready for fitting the bottom deck tomorrow.

Reply 0
ctxmf74

Alignment

   Hi Brian, I'd try to use some kind of latch that pulls the joints in alignment when the bridge is in service. I'm using tool box hasps on my two lift bridges( I originally had three bridges but I found the curved one was hard to keep in alignment so I fixed it solidly in place and if I don't feel like ducking under it I just walk around to the other door to get into that part of the  layout space) The two remaining lift bridges sit on abutments with alignment pins and the tool box hasps pull them down securely. Having three bridges on one lift up structure is going to make alignment even more critical so make the closure devices as secure as possible...DaveB

Reply 0
jTrackin

Keep it simple and light and

 

Keep it simple and light and cheap runs well.

 
 

ps://model-railroad-hobbyist.com/node/36136

 

otorised.png 

James B

Reply 0
railandsail

Tool Box Hasp

Quote:

 Hi Brian, I'd try to use some kind of latch that pulls the joints in alignment when the bridge is in service. I'm using tool box hasps....

DaveB

I have plans on using two hefty sliding bolt action latches on either side of the staging level. If for some reason the tolerances in these latches is too much, perhaps I need to consider those tool box hasps.

Reply 0
railandsail

Motorized lift

 

I recall seeing your excellent work on the subject thread on this forum. In fact I made several comments on it. i didn't have the ceiling height to allow all 3 of my levels to be raised like that.

BTW, didn't you originally consider several levels of bridges? What have you done about that??

Reply 0
railandsail

2 steps forward, 1 step back

2 steps forward, 1 step back

There are times when my progress appears to follow this pace. Case in point, a few days ago I glued up my new plywood reinforcing panels into my metal frame, and left them sit overnight for the bond to fully develop.
F4339(1).JPG 

Turns out I used the wrong glue. I used my trusty old TiteBond ll. It may be great on wood, but not on smooth alum metal. It cracked right off. I had to clean all those pieces up, and resort to polyurethane glue. I also decided to speed things up by adding mechanical fastenings concurrently. So I had to do a whole detail measuring project AGAIN.

Here is that frame structure with the lower 'squareness plate' glued and screwed in place. I also purchased a couple of 4” brackets that will support the lower staging deck 'bridge'.
DSCF4344.JPG 

 

DSCF4343.JPG 

Then here is the staging deck placed onto those brackets
DSCF4345.JPG 

 

DSCF4346.JPG 

 

DSCF4350.JPG 

Notice my particular good close fit with the angled butt blocks. The tracks shown in those last photos are just representative as to approx location of the 3 staging crossing tracks. In reality I will eventually lay flex track across that deck and joints, and use a razor saw to cut the angles in place.
Here is that swing-up structure raised up to the ceiling
DSCF4356.JPG 

...and that structure partially the way up,...clearing the tip of the peninsula....
DSCF4357.JPG 
 

 


You might have noticed those two 'blobs' on the wall that the frame structure is bolted to …
DSCF4342.JPG 
Turns out I had to some extra sanding of the masonite seams/tape in those 2 areas to get a really flush surface for the structure to sit against while remaining in a straight down/vertical attitude.

Its my intention to utilize 2 sliding rod hasp like this one to 'lock' the lower deck in place. I intend to mount those on the underside of that deck piece at either side. And I am thinking I want to mount them at an angle as I have laid them out there.
DSCF4351.JPG 
I have found that MANY of these type sliding hasp are NOT built to very close tolerances, so I have gone looking for better ones, and/or a way to modify this large one to fit my desires.

Reply 0
jTrackin

I found it easy after l

I found it easy after l realised you don't have to worry about hinges, brackets and motors being loose as long as you design so it auto disconnect from the lifting mechanism and it sits on the brass ailment pins which are also the electric contacts. This works for me so far if i want i leave it up or i can leave it down.

James B

Reply 0
railandsail

Next 2 Upper Decks

Once I get this bottom deck very exactly in place, and continuously repeatable, I will begin to work on the two levels above it. I have some curtain rod brackets that appear to be just what I need here.

DSCF4348.JPG 

DSCF4349.JPG 

They will be screwed to the alum uprights. As you might see they have slots for those screws. That will allow for them to be adjusted up-down as needed for any small dimensional changes of the frame structure itself.

As I have hinted at previously each side of these decks will be 'individuals',...that is the decks will not be continuous across the span, but rather blank at their centers. The bridge structures themselves will span this center span.....just like real bridges.
DSCF4352.JPG 

 

DSCF4353.JPG 

 

DSCF4354.JPG 

 

There are two reasons for this choice:
1) having the individual ends independent allows for more 'adjustments' in case of misalignments in the future.
2) more realistic appearance.

Reply 0
railandsail

No Hasp

Quote:

my intention to utilize 2 sliding rod hasp like this one to 'lock' the lower deck in place. I intend to mount those on the underside of that deck piece at either side. And I am thinking I want to mount them at an angle as I have laid them out there.
DSCF4351.JPG 
I have found that MANY of these type sliding hasp are NOT built to very close tolerances, so I have gone looking for better ones, and/or a way to modify this large one to fit my desires.

 

I've decided NOT to utilize those sliding bolt hasp. Number one they just have too much 'slop' in their fit.

And number2, why do I need them? I was clamping some pieces of wood just below my wedge shapes in order to hold the whole structure up in place while I rebolted it to the wall. My thought was why do I need those hasp? The bottom deck fit so nice and fine, and with just enough resistance to hold itself in place. So I just glued two bottom pieces onto my wedge shapes and left it like that. If I ever find a need for more hasp, etc, I can add them later 
DSCF4360.jpg 

 

DSCF4361.jpg 

 

DSCF4362.jpg 

Reply 0
railandsail

Actual Gaps in the Tracks

I'm getting ready to lay some of my staging area track down near my entrance way door swing bridge,...bridge described here... https://forum.mrhmag.com/post/layout-room-entrance-swingdown-bridges-3-of-them-in-combo-12210684

I'm taking a closer look at exactly what I might do for the most immediate gaps in the tracks. I've seen several new products introduced and I know at least one of those would not be applicable as they would not work with my 'sliding connection'.

A couple of days ago I considered placing 'rerailers' on either side of the track gaps.

This morning I thought how about placing the rerailer across the gap, then cut it in such a manner as to provide a stable gap??

 

 

Reply 0
Reply