railandsail

I'm building a double deck layout in its own handi-house shed  It has a large wide door at the entrance that needs a couple of 'entrance bridges' that can be moved aside relatively quickly. Because of the large width of the opening I am thinking it should be a 'split bridge' type like the bascule type where both of the two sides would swing up.

https://en.wikipedia.org/wiki/Bascule_bridge

Since there are two decks these bridges need to raise up vertically in such a way as to end up vertical and stacked.

Does anyone have some good photos of 'entrance bridges' that might have been utilized on modular railroad displays at train shows?...or club layouts??...etc

Total span approximated at 42 inches,..double tracked on both levels.

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 1
railandsail

Work on that Bridge Idea

Its been quite cool in FL the last few days, so I spent some time inside my heated shed to work on my entrance-way bridge idea. I'm going to utilize this very stiff, thick sidewall, 3/4 alum beams to make my 'rectangular frame' I spoke of above. Basically all I need to use to make the this frame 'in-square' and strong enough are a number of stiff corner brackets. Here are a few pics of the materials,...

DSCF3681.JPG 


DSCF3682.JPG 

 

Here are 3 decks, staging at bottom (3 tracks wide), main deck (2 tracks wide), top level (2 tracks wide). This is just an initial mock-up with foamboard pieces inserted to show how decks might be laid.

DSCF3680.JPG 

 

DSCF3678.JPG 

 

Likely the bottom staging deck crossing will be a piece of the 3/4" plywood I am using for the decks all around the room. The crossings at two upper levels may be just the bridge structure themselves?

 

 

Reply 0
railandsail

Guides and Electrical Connections

I needed to make a reference to this other entryway bridge discussions for ideas concerning guide plates and electrical connections,...


 Lift Out Bridges, KISS
https://forum.mrhmag.com/post/lift-out-bridges-kiss-12197777

 

 

Reply 0
railandsail

Kit Bash Dbl-track Bascule Bridge

Quote:

Brian.....Kitbash?

%20ps750.jpg 

When I see the truss bridge parts of this lift bridge, I feel is a reflect Mirror of the double track truss bridge offer by Walthers.

As I mentionned before, a kitbash of both bridges, lift one and the truss one, could be quiet easy to do.

The approach and the parts from the lift bridge could be enlarged to fit togheter.

The end of the truss bridge cut ,following picture to be glued on the lift part of the lift bridge.

Parts of the lift bridge could be easily used to enlarge the bascule and weight system.. and if not enough or not suitable, parts of Central Valley bridge ( offered separetly) could be easily subsitued.

Using pictures for help, this is not an impossible task; really if this lift bridge  was offered in N scale, I would do the kitbash directly.

This will give you a very unique bridge, none could own one !!!

I think with not great difficulty you could obtain a bridge very similar to the one pictured above.

Thanks again Marc, I was going back over this posting and looked more closely at the Jacksonville bridge. You are correct that might not be so difficult to kit-bash. Interesting how that 'tower frame' narrows down. I had not noticed that before.

Reply 0
railandsail

Initial Metal Frame

Here is my initial stage development of the metal frame that will support the 3 bridging tracks across the entrance to my train shed....

basic frame hinged down
DSCF3714.JPG 

 

basic frame hinged up to ceiling
DSCF3711.JPG 

 

mock-up with one bridge for upper level track, and 3 staging level tracks at bottom
DSCF3719.JPG 

 

ceiling hanging
DSCF3716.JPG 

 

'see-thru' feature of this concept
DSCF3718.JPG 

Sorry for photo contrast due to very bright outdoor lighting verses structure itself. But basic idea that the trains can run across these bridges while the shed door is open to outdoor breeze and light, and the layout can also be viewed from outside the shed while trains are running.

With the shed door closed, a backdrop painted/attached to its inside surface will provide a watery scene the bridges are traversing.

 

 

 

Reply 0
railandsail

Lift bridge with door closed

Forgot to photo this image yesterday
DSCF3725.JPG 

 

Turns out those hinges at the top are plenty strong to hold the frame structure, but they are too slender to resist the bending that will result with long term usage and heavier weights that will be added to the structure. So I will likely add another crosspiece up top just under the one mounted to the wall, and that will also allow for 3-4 hinges to be utilized across that upper bar.

 

Reply 0
railandsail

Potential Hinge Modification

Quote:

Turns out those hinges at the top are plenty strong to hold the frame structure, but they are too slender to resist the bending that will result with long term usage and heavier weights that will be added to the structure. So I will likely add another crosspiece up top just under the one mounted to the wall, and that will also allow for 3-4 hinges to be utilized across that upper bar

Just to follow up on that observation about the hinges, here are a couple of photos that depict that weakness i spoke of correcting. Actually it not presently as bad as it looks,...more of an optical illusion due to the overlapping feature of the tapered arm of those hinges.
DSCF3726.JPG 

 

DSCF3727.JPG 

 

So I will likely add another cross piece to the rectangular frame at the upper location, and it will be tied in via those corner braces as I did down at the bottom (just a short representative piece taped in place here). That will give me another whole cross piece to mount several more rectangular hinges to,...so then at least 4 hinges up there.
DSCF3729.JPG 

 

DSCF3728.JPG 

Reply 0
PeteM

Alignment of tracks

Brian,

That's a neat concept no doubt. But I'm worrying about how the cut ends of the rails on the bridges will have to pass sideways across the cut ends ends of the rails of the fixed tracks as the bridges arcs down. It'll be almost horizontal movement close to the end of the arc.

Depending on the radius of the bridge frame arc, would the rear bridge track ends have to pass across the ends of two or three sets of the fixed track ends? Maybe there's more room for error than with a vertical movement of each single bridge rail against its fixed mate one gets with a lift-up, drop-down or lift out section?

As well as beefed-up hinges, maybe you'd need to add some diagonal bracing to the frame to stop it from "parallellogramming" on the way down and letting the bridge tracks bump into the fixed tracks?

Pete the worrier. 

Pete M

Frying O scale decoders since 1994
https://www.youtube.com/user/GP9um/videos

Reply 0
Mark Pruitt Pruitt

Brian, Being a structural

Brian, Being a structural engineer, I can tell you that the corner braces you're using will most likely allow the swing gate to rack much too far left and right. In short, they probably don't make the structure stiff enough in the lateral direction. You can easily improve the lateral stiffness by at least an order of magnitude by simply adding small triangular (say three inches or a bit more on the sides bordering the 90 degree angle) gussets at each corner of the frame. Welding them in place would be best, but self-tapping screws would probably work well enough. I would avoid bolts for that, since the clearance holes would still allow some lateral movement.
Reply 0
vggrek

Sorry, but you are talking

Sorry, but you are talking about a lift-up door and this is already solved.
First i would looking for lift-up cabinet doors and their mechanisms. They offer a range of adjustment and weights. The horizontal beam, from what the door is hunged, must be enough stiff and at least fixed on the posts of the shed door.
With the thing what you build, the rails will be misalligned before the first lift-up.

Reply 0
railandsail

Alignments

Lets see if I can tackle both problems that have been brought up here recently.

 

My plan to address both,  

a) any 'racking / parallellogramming' of the rectangular frame,

b) the cut ends of the rails on the bridges having to pass sideways across the cut ends ends of the rails of the fixed tracks,

...is to employ a wedge shape phenomena.

Both ends of that plywood piece that bridges the staging level will be cut at a slight angle across their width, and in such a manner that the edge facing the shed's door will be shorter than their opposite edge that faces the interior of the shed. Those angled ends will mate up exactly with wedge pieces added to the plywood deck/shelves on either side of the entrance opening.

When the framed structure is lowered into position the matting wedges will force exact horizontal alignment regardless of any racking, and the angled faces will prevent any of the rails passing directly perpendicular to one another.

 

At both ends of the plywood bridge, a bolt action fastener placed on the bottom surface of the plywood, and matting up with its reciprocal on the deck plywood,... will ensure firm fore-aft placement, and height alignment.

Need a little sketch?

 

 

Reply 0
PeteM

Clever!

So the whole moving assembly is basically a wedge with the narrow side towards the back (door side). Fixed tapered guides align it horizontally before the bridges engage with the fixed shelves and keep it so. The back (door-side) bridge rail is the shortest and front (aisle) side rail is the longest, eliminating near-misses as the rails swing into place.

10/10 for ingenuity! 

Pete M

Frying O scale decoders since 1994
https://www.youtube.com/user/GP9um/videos

Reply 0
DougL

perhaps you could use full-size door hinges

The swinging bridge is a very good idea, I never thought of it.

That aluminum is about 1" wide, and naturally I would thing of T-hinges, just like you did.  Then I thought, full size door hinges would be more reliable. But how to attach them?  OK, without starting over,  I would apply 3/4" ply or 1" lumber to both the swinging frame and the shed.  That also resolves the racking.  I used your photo and overlaid a sheet of ply in yellow and door hinges in black.  I drew the door hinges off the vertical aluminum only to reinforce the idea you could put the door hinges anywhere along the top, if you have a large enough plywood sheet

idge2(1).jpg 

 

 If you don't mind a do-over, then yep, there are ready made swing-up door alternatives. 

You could also look at T-slot aluminum framing. Search for 80/20 building system. 

That system is much easier to construct, and has fittings like hinges and braces to make it absolutely square. It is more expensive than simple Al square stock. I estimate $200 (in 2018) to make your design.  Of course the fittings are more costly than the long stock,  $13 for 1x1x48 inches on Amazon.

Here it is used to make a swing bridge. Turn it sideways to make your bridge .  It demonstrates many of the things you want - square, anti-racking, and hinges.

 

--  Doug -- Modeling the Norwottuck Railroad, returning trails to rails.

Reply 0
railandsail

That's an interesting

That's an interesting contribution there Doug. I will have to sit down and review it soon, as I had some 'mods' in mind myself,...but other projects got put in ahead of it.

 

 

Reply 0
railandsail

Larger Hinges & Plywood Insert

BTW Doug, I'm going to utilize your suggestions for the larger hinges and the extra piece of plywood between the frame at the upper portions....good idea.

Still trying to work out details on whether I can get a double track bascule bridge(s) in there?....need to firm up that track spacing of the double mainlines as it effects the track plans in those two adjoining corners to either side of the entrance door.

 

 

Reply 0
Marc

Profiles wich slide inside each other

 

I see many aluminium profiles in this post.

If you have a catalog of Aluminium profile ( I get one from Alu Suisse as an ironworker)  You find numerous profile which are designed to have a sister which slide inside his grooves.

You could easily use them and combinate them to make a lift structures which remain lightweight and easy to build with available usual Tools.

Kind of these profiles can be found on the net if you search parts for home build CNC machine.

This can be also done with iron profiles, but these always come in 18'long (in Europe).

This kind of profile can give you moving parts with no play, no lateral play and no up and down play.

Sure you can find easily such kind of profiles and the prices is not excessive.

On the run whith my Maclau River RR in Nscale

Reply 0
Tim Bowser NCR-Boomer

Tossing in an idea

Since a couple folks have raised the issue of side-to-side racking, and you're set on the vertically hinged apparatus, might I suggest acquiring a used aluminum storm door and use that as the framework?  Racking would be put to rest, and warping from being held in the 'up' position should be minimal.

Just 2 cents worth...

Tim B.

Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 0
vggrek

Brian, all of the connection

Brian, all of the connection and parts of this ..."structure" are "movable". The thing is hanged from wood screws and the members are connected with angles and screws (self-drilled or not it's the same).  The predictable failure modes are the material (al) bearing failure and the prying of the screws. It doesn't matter that the "structure" is lightweight, the time and the use will do their job as usually and on anything.

You want to enforce the alignment by wedges (horizontally) and bolts (vertically). Beside the fact that you have to achieve the alignment for 6 pair of edges simultaneously by using a design and montage procedures that they can’t guarantee any accuracy, any force applied to the "structure" will be a nail to its coffin.
You posted a kiss lift-out bridge. Think how to apply this to the 3 bridges. The successfully aligned bridges have 2 bearing points and they are matching them always, they lay on them. No forces induced to the structure by moving the bearings. Of course one of them has to allow the contraction or dilatation. The swing bridges, like a door, are a good option, but they have to be “semi-independent”. You have to be careful with connection types, mounting methods and their stiffness and finally with the things that support your structures. 
Do I need a sketch? No, the photos are worth a million of words and sketches. :> ) The TIME and the USE wear out everything.

Archimedes ran naked through the streets of Syracuse and he was yelling “eureka”, but only once. Also he said “Give me the place to stand, and I shall move the earth”.

Confucius: “Study without reflection is a waste of time; reflection without study is dangerous.”

Reply 0
railandsail

Challenge & Imagining

Its going to be a challenge, but that will make it all worthwhile to make it work.

What I'm having a problem with right now is imagining how to fit the bridges, that are shorter than my 36" wide opening, and their approaching tracks/piers/grounds onto the lifting portion. Its just something about 'viualization'.

I think I need some images/photos to give me some help with ideas.  So if anyone has some please post them.

 

 

Reply 0
Ken Rice

Cardboard + afternoon = mockup

You’ve got the measurements.  You already have the basic assembly to bridge the door mocked up (you’ve posted pictures of it).  Spend an afternoon with some cardboard and make a crud facsimile of the bridges and stick them in place.  Bit more cardboard for the approaches.  Doesn’t have to be very accurate, just close enough to give you a feel for what it’s actually going to look like in place.

Reply 0
railandsail

Mock Up

Yes Ken, I sort of had that in mind

Reply 0
railandsail

Double Bascule Bridges

This fellow Rich just reposted some nice photos of his side-by-side bascule bridges

 

more here: http://cs.trains.com/mrr/f/11/t/216776.aspx?page=2#3153524

 

 

Reply 0
railandsail

Jacksonville Fl bridge

Perhaps I could have some sort of approaching connection-bridge like this one in Jacksonville,..

ps750(1).jpg 

Reply 0
railandsail

New Idea

After looking at that Jacksonville double track bridge I had a new idea. Instead of utilizing the Walther's bascule kits. Perhaps I could make my arrangement out of 3 regular double track truss bridge kits from Walthers, etc

I would use 2 of those kits end-to-end to provide a nice wide river crossing to my entranceway,...and they would already be a relatively narrow double track arrangement. I could go ahead and use this idea in my planning and building of my RR without waiting to modify the bascule bridges.

Then at some later date I could add the superstructure and counterweight of bascule configuration to one of those regular dbl-track bridges. I would use some of the beam arrangements from that 3rd kit I purchased. And I would have to find an appropriated machinery shed to place in the overhead. Counterweight,..no problem, my bascule bridges are NOT going to be operational,..just for show.
 

I like this idea,...full width river for the shed's entrance, dbl-track spacing in line with what I have already drawn, and no waiting to resolve details/problems with modifying bascule bridge kits.

 

 

Reply 0
eastwind

It's all about the boats

What sort of a river are you modeling? Is it a river with cargo ships running up and down it or a shallow thing barely worth the dam that's been built 100 yards upstream? The railroad isn't going to spend money to build any kind of a lifting bridge if they don't have to in order to accommodate ship traffic. Your double bascule bridges would look pretty stupid lifted in the air over a little creek for a guy in his kayak. If you aren't modeling a prototype river, then you don't need a river at all, or bridges of any kind, just model some more flat land crossing the gap. 

In fact, that would be a good first version to get some trains running, you can always fancy it up later.

You can call me EW. Here's my blog index

Reply 0
railandsail

Boats

I'm imagining my aisles are mostly harbor/waterways. My old time waterfront village just inside the bridge from the larger bay outside the entrance has a number of vessels including a tug, a coal barge, and a derrick barge,..

2C800(2).jpg 

 

2(2).jpg 

 

Then my central peninsula will have a container unloading area, and possible an abbreviated railroad-car-barge and/or ramp for same.

Reply 0
Reply