railandsail

I'm designing a new double-deck layout to fit inside my 12x16 'train shed'.  It will have an 'outdoor' helix structure,... outside the main shed, but in its own enclosure.
%2C%20ps.jpg 

It will have shelf's on either side, and a peninsula. For the longest time I had been planning for a 6-8 track staging area to be located approx 8" under ONE of the side shelfs,...perhaps like this

Edited: removed an old track plan as it is way out of date, and replaced it with this newer version,..
s%281%29.jpg 
 

 

I decided to re-look at the possibility of utilizing the helix structure to gain access to the the staging tracks. What if I decided to try to add two loops to the bottom of my planned outdoor helix to take the trains down to the staging level?
 

And now I could have staging tracks on both sides of the layout  I could even have staging down the center of the peninsula. Lets see 6 tracks each on both sides, and 2-4 down the center,...wow, 14-16 tracks of staging (each with a different type train ready to run)

Brian

1) First Ideas: Help Designing Dbl-Deck Plan in Dedicated Shed

2) Next Idea: Another Interesting Trackplan to Consider

3) Final Plan: Trans-Continental Connector

Reply 0
railandsail

Train Directions in a Helix

I just ran across this posting this morning and thought I need to make a reference to it so I might give it more considerations as I try to drawn new track plans for my double deck layout. As my memory slows down I need to put it in writing,....

 

Quote:

https://forum.mrhmag.com/post/question-about-staging-track-arrangement-12210347

dark2star

you can certainly go bidirectional on both tracks of the helix. However, common sense seems to be to run trains up on the outer track and down on the inner track. The reason is that curves increase the friction of a train, as does climbing. Going up on the outer track (larger radius) will ease the friction on the curve somewhat making it easier for the loco to pull the train. Going down the added friction of the smaller radius is less of an issue.

Also, trains will take a few minutes to go up and down the helix, by running trains up always on the outer track you'll get more trains through the helix as they can follow each other rather than having to wait for opposing traffic to clear.

As for the storage yard, it depends a lot on how you operate your layout. For Michael Rose, the deep (4+ trains) serial storage is fine, in your case a more shallow serial storage (2 or 3 trains) might work. Especially with a re-staging loop in there, so you can get the second train out without running the first across your layout. If you need more trains into and out of storage, a double-ended yard is better, but for capacity you'll be better off with stub-ended storage. Same with how you operate your helix, I've seen designs where the outer track connects exclusively to the middle deck and the inner track exclusively to the upper deck, but the majority runs the outer track up and the inner track down.


LARGE EXCERPT


If you really want the helix to be bi-directional on both tracks, this "stacked" layout might or might not work and you'll need extra crossovers. Just try to follow any route your trains will take - and see how that gets you where you need.

Your original design isn't really "bad", it just puts too much track and turnout in places that don't add operational value. And how you operate really decides on your storage yards - directions in the helix, serial storage of trains, turning trains between sessions ...

Reply 0
railandsail

Compound Ladder or Pinwheel Ladder for Staging

I'm back to drawing up my staging tracks for final design before cutting the plywood decks that will support them on either side of the shed. Previously I had given very little recognition to pinwheel or compound ladder arrangements, but now i want to take a final look at these possibilities.

1) Pinwheel Arrangements 
Quite awhile back a gentleman in this discussion suggested a pinwheel ladder design, and even provided some alternative arrangements.
%20PS750.jpg 

 

 

 

2) Compound Arrangement
Just recently I ran across this on another forum,...

Quote:

Espeefan wrote:
Just looking for some input on a design I drew up for a compound yard ladder.  I am working on designing a double deck layout, with one level dedicated completely to a staging yard.  My original plan used a standard ladder track arrangement, but after I decided to increase the center to center track distance to 2.5", I thought I'd give the compound ladder a try, to better maximize the length of all the tracks, and keep them more consistant.  My concern is the 's' curve that is naturally created where the right hand turnout is joined to the left hand turnout, after a short tangent of track.  All turnouts in my plan are #6s.  The 3.63" long straight between the right and left hand turnouts should ease the effect of the 's' curve, but will it be enough?  I hope to run all the usual modern day equipment, but is that possible?  I thought of using #8 turnouts in place of the two #6s, which cause the 's' curve, but when I layed them over the plan, I noticed I did not gain anything.  Probably due to me keeping the same center to center track distance, which requires a 3.63" long straight between the #6 turnouts.  With #8s, I need no extra track to maintain the spacing.

%20ps750.jpg 

http://s4.photobucket.com/user/Espeefan/media/Compound%20ladder_zpstvbsccvq.jpg.html

 

My geometry capabilities have greatly diminished with age, so I ask this quick question. Would that compound ladder example sited as #2 above still hold up with its track spacing down the side, if the horizontal feed line was slanted down at something like 20 degrees??

 

 

Reply 0
Ken Rice

Compound pinwheel

Option #8 in your pinwheel diagrams is a compound pinwheel.  It doesn't have to be an either or choice.

Reply 0
railandsail

Pinwheel Preference?

There is actually a reason I believe I prefer the pinwheel arrangement. Tell me if my reasoning is incorrect.

If I power all of the turnouts with switch motors they could all be located on the front curving edge of the staging deck plywood,...within relatively easy reach for servicing/replacement. Or they might even be manually controlled from the front edge of that staging deck??

 

 

Reply 0
railandsail

original idea

This was my original track plan for the ladder. I was going to have all the switch machines (Peco's) lined up along the rear edge of that supporting plywood deck (not shown so close to the edge in this dwg), and be able to access them from that 'hollow triangular space' between the staging deck and the shed's corner.

If I now place the ladder turnouts out on the front edge, I will have even easier access.


20ladder.jpg 
 

 

Reply 0
railandsail

Rotated 25 degrees

Quote:

My geometry capabilities have greatly diminished with age, so I ask this quick question. Would that compound ladder example sited as #2 above still hold up with its track spacing down the side, if the horizontal feed line was slanted down at something like 20 degrees??

Brian

I think this answers that one question I had  ( I question my sanity sometimes these days)

0degrees.jpg 

 

I'm not as enamored with this 'compound' arrangement as much as the 'pinwheel' one. The switches are not all lined up along the edge, and it takes a little more thought as to what number track you are entering.

 

 

Reply 0
Ken Rice

Access is important

If this staging is going to be under the main layout, then I'd agree that keeping the turnouts at the edge of the benchwork is an important consideration.

Reply 0
railandsail

Pinwheel Preference

Quote:

If I power all of the turnouts with switch motors they could all be located on the front curving edge of the staging deck plywood,...within relatively easy reach for servicing/replacement. Or they might even be manually controlled from the front edge of that staging deck??
Brian

Here is my first mock-up using Peco mediums. Got interrupted with having to do eye surgery today (just cataract), so it will be a day or so before I get back to it.
DSCF3286.JPG 

 

DSCF3288.JPG 

 

DSCF3289.JPG 

 

BTW I am doing this mock-up on a piece of plywood at the main deck level rather than my staging level that will be 8" lower.

And that piece of white paper taped to the rear wall is actually a depiction of the 3-way turnout that feeds the staging tracks, and is located just on the other side of that back wall.
DSCF3290.JPG 

Reply 0
railandsail

Refining the Mock-up of Staging Track Entrances

First I had to assembly all of the Peco mediums together in a firm manner so they could be moved around as a group in that pinwheel ladder configuration. Then I went searching for how I could make them line up correctly with the shelf I was planning down each side. I found I could now get 6 tracks down the side in a14" depth shelf, with a 2 1/8" center between tracks.
DSCF3291.JPG 

 

DSCF3292.JPG 

 

DSCF3293.JPG 

None of the connecting tracks are less than 24" radi.

Then I went to mocking up the center peninsula staging that includes 6 more tracks on a 13 inch wide shelf located under the 24" peninsula main deck above it.

All thet urnouts in these photos are Peco mediums
 

DSCF3294.JPG 

 

DSCF3296.JPG 

Then I drew in a proposed curve line that would represent the outer edge of the staging track shelf in the area of the pinwheel ladder.
DSCF3298.JPG 

 

I'm hoping to rig up some 'fixtures' mounted on that strip of shelf just outside of the turnouts that will allow a cable type manual operation of the individual turnouts, ie, wire within a plastic tube that would come up to a small panel mounted of the front face of the main deck's edge at the front of the aisle.

Anyone with ideas (links) to that subject matter??

 

 

Reply 0
ACR_Forever

Umm.

These switches are all within inches of the front of the layout now, using the pinwheel arrangement, right?  That's one of the reasons I suggested a pinwheel.  Pecos are all positive-action switches - the embedded spring means you need no actuating mechanism beyond your fingertip.  I've automated peco ladders with toggle switches and tortoises before, but was always tempted to go back to finger-flicking.  Visitors could never figure out the toggles, even though they were arranged to mimic the ladder construction for simplicity.

It's up to you, Brian, but I'd be totally satisfied with the Pecos as they are, since you're standing right there.  It's quite different when you're looking at hidden staging.

Blair

 

Reply 0
railandsail

Unreachable Staging Level Turnouts

Blair, please be aware that the mock up of the staging tracks I did above was done on a board up at the main deck level. Those staging tracks and turnouts will be on a shelves 8" under that main deck, so not so reachable for conventional hand control (hand flicking).

But I think a cable type system might well be utilized. Thats way I just posted this subject thread.

Quote:

Manual Turnout Control by Cable

Basically I like the KISS principle. I like the idea of manual control for my turnouts where possible, particularly with Peco sprung turnouts.

I'm looking for as many ideas as possible for flexible 'cable control' of turnouts.

Reply 0
jimfitch

Under or not, is it going to

Under or not, is it going to be easier to finger flick them vs. bending over and looking at the turnouts after throwing a lever or switch to verify everything is lined up?  Then might as well flick the switches by finger.  The distance to each of the switches is anywhere from a few inches to a max of maybe 18 inches from the looks of the photo's

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
anteaum2666

Switch Machines?

Hi Brian,

I realize your question is about manual switch control, but are you against switch machines in staging altogether?  Perhaps because of cost or complexity or some other reason?  Or are you open to using switch machines?

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
railandsail

Manual Operation verses switch machines

I definitely did NOT want something  hanging below the plywood deck,...of either my staging deck nor the main decks above. I've already got a ton of Tortoise & Peco machines, but still like the idea, simplicity, of manual operation (and I don't intend to go thru the aggregation and expense of energizing the frogs of my insulafrog Pecos).

I prefer some sort of small diameter 'tube within a tube' or 'cable within a tube' that can lay flat on the plywood deck, snake (curvable) under the stock Atlas track (non-roadbed), and be rigid enough at its exit point to PUSH against the spring action of a Peco turnout. I know most will pull, but that single cable needs to PUSH.

 

 

 

 

Reply 0
railandsail

Ground Level Control Cable vs Underdeck Control Apparatus

GregC:
I'm hoping to just line up the wire/tube-within-a-tube with one end of the throwbar of the turnout, anchor that end of the cable in place, and have the inner wire/tube slide in and out,....all at 'ground level' rather than under the deck. Then use ground cover to camouflage the cable.

The reason I am thinking of 'ground level' control is to avoid all that under deck apparatus that many of the different control shemes want to utilize,...but all that apparatus interferes with underdeck storage, and is suseptible to damage.

If I am going to utilize such a cable system in my freight yard, then it likely needs to be flexible enough to snake thru a number of different tracks to reach those turnouts on-the-far-side.

Those turnouts in the peninsula area of staging will likely need some sort of 90 degree device such as a 'bellcrank' to operate those turnout throwbars via a cable running back to head of the aisle-way on the right hand side of the layout.

DSCF3293.JPG 

 

DSCF3296.JPG 

Reply 0
anteaum2666

Just a Suggestion

Since you already own a ton of Tortoise machines, what if you TOP mounted them for staging.  Then you could wire them up to 2 or 3 Digitrax DS64 switch controllers, and program in routes.  You can control those DS64 with push buttons on a schematic control panel.  So, if you want track 7, you just push the button for track 7.  It would be a little more work to set up, but it would make using your staging under an 8" deck WAY easier.

I have my 5 track staging yard, with about 8" clearance, set up this way.  It works great!  The black buttons select the track.  The LEDs show the selected route (green).  The red buttons are for the reversing loop.  The routes are shown labeled on the DS64, and the label Route Inputs shows where the push button wires are connected.

ingPanel.jpg DS64.png 

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
railandsail

Top Mounted Tortoise

Do you have any top mounted Tortoise machines? ...photos??

I just find them to be awfully bulky units for the work they do.

That's a fine & neat looking set up you have their.

Reply 0
ctxmf74

"I just find them to be

Quote:

"I just find them to be awfully bulky units for the work they do."

   How about using some snap track or uni track turnouts with switch motors built in to the side of them? Since it's staging they don't have to look realistic. If you can't decide by now it's probably time to consider a different yard design or just kick the can down the road and move on to construction.Nothing gets done during such extended planning and the best solutions to design problems always become apparent when the wood is being cut....DaveB  

Reply 0
greg ciurpita gregc

angles

Quote:

Those turnouts in the peninsula area of staging will likely need some sort of 90 degree device such as a 'bellcrank' to operate those turnout throwbars via a cable running back to head of the aisle-way on the right hand side of the layout.

the lower arm in underbench linkage shown below allows that arm to be perpendicular to the facia while the throw bar can be at any angle.

the way i've seen this linkage constructed is with the upper arm having a 2nd bend that is soldered into the inner vertical tube.  They also use an aluminum bar with multiple vertical holes for a bent control wire and a hole with a set screw to attach to the inner vertical tube.   Being able to disassemble for maintenance is desirable.

 

greg - LaVale, MD -- my layout   --  threads of interest

Reply 0
railandsail

Swinging Linkage Arm

Yes Greg, I thought about that same thing for those central located peninsula turnouts where the cable control would likely be arriving at the turnout throw bar at something close to 90 degrees. Plus I thought they might be shortened in height where they would not be coming up from underneath, but rather acting close to ground level.

Reply 0
railandsail

Staging Ladder Turnout Controls

Quote:

Then I drew in a proposed curve line that would represent the outer edge of the staging track shelf in the area of the pinwheel ladder.
DSCF3298.JPG 

I'm hoping to rig up some 'fixtures' mounted on that strip of shelf just outside of the turnouts that will allow a cable type manual operation of the individual turnouts, ie, wire within a plastic tube that would come up to a small panel mounted of the front face of the main deck's edge at the front of the aisle.

 

How about locating the combo micro-switch 'fixtures' at ground level on the edge of the staging deck, and then control those switchs with a cable up to the top deck. Fixtures like these,...

evel%201.jpg 

evel%202.jpg 

Reply 0
railandsail

Helix Roadbed

Sure wish I had discovered this foam-core product before constructing that masonite roadbed of mine

Quote:

https://forum.mrhmag.com/post/foamcore-layout-baseboard-12197926

I'm reading thru this discussion, and a few others suggested by Prof Klyzir . It certainly appears as he has had considerable experience with these foamcore products.

Wish I had discovered this info earlier as I might have utilized this product in a few locations on my current build. I am considering utilizing some as a roadbed for my track rather then balsa.

And I think I definitely would have used it to build the roadbed for my external helix
Helix Roadbed
https://forum.mrhmag.com/post/multiple-staging-areas-access-to-them-perhaps-subloop-in-the-helix-12209513

In fact if I should ever have to replace my current roadbed in there it will likely be foamcore material

Quote:

Foamcore Availability and Sourcing

Dear ??? (YoHo),

IIRC sourcing of foamcore was covered in another Foamcore thread, but as a quick wrap-up:

- I've used any/everything sold as "foamcore" I could lay my hands on hereabouts,
with a test-duration of the earliest efforts now reaching the 15-year mark.
("Layout in a Box" contest from the 2001 Aust NG Convention).

- These examples uses include both (clay) coated and no-coated paper surfaced options

- and both "art store", "picture framing", and "pro-signage" options

- The best for both performance and price thus far has been my most-recent purchase,
genuine 3A Composites "Foam-Cor".

http://graphicdisplayusa.com/products/fome-cor/ 

Admitedly I buy it by the carton rather than by the individual sheet,
(I use it everywhere, so it files under "must-have-on-hand basic materials" for me),

and the resulting per-sheet cost is AUD$10. (Approx US$7.50 as of 13th Jan 2017)

- That said, the most I've paid "per sheet" has been AUD$15,
(I've seen it offered in high-grade art stores for significantly more, but I do have my limits... ),

and even at $15 that still allows a 5x2x2 Procenium module to be built for under AUD$50 all-told...
(Inc a seperate 2mm Matteboard curved backdrop section,
3x 12V Halogen lighting-rig installed,
and subroadbed in-place, ready for track laying and scenery).

Happy Modelling,
Aim to Improve,
Prof Klyzlr

Look what I went thru,....one of those things you wished you had done differently !!

https://forum.mrhmag.com/post/multiple-staging-areas-access-to-them-perhaps-subloop-in-the-helix-12209513


 

Reply 0
railandsail

Just a Suggestion Fri,

Quote:

Just a Suggestion

Since you already own a ton of Tortoise machines, what if you TOP mounted them for staging.  Then you could wire them up to 2 or 3 Digitrax DS64 switch controllers, and program in routes.  You can control those DS64 with push buttons on a schematic control panel.  So, if you want track 7, you just push the button for track 7.  It would be a little more work to set up, but it would make using your staging under an 8" deck WAY easier.

I have my 5 track staging yard, with about 8" clearance, set up this way.  It works great!  The black buttons select the track.  The LEDs show the selected route (green).  The red buttons are for the reversing loop.  The routes are shown labeled on the DS64, and the label Route Inputs shows where the push button wires are connected.

ingPanel.jpg 

I'm going to have to re-consider this suggestion. My initial thought was that I just never liked the idea of these stall machine electronics,...current on all the time. But I guess the current in only on as long as you are running trains. When you shut it down for the evening, everything is off,...correct?

And I must remove the springs from my Peco turnouts?

Reply 0
anteaum2666

Current On/Off

Hi Brian,

Yes, when you turn the power supply off, all power will be off to the Tortoise machines.  I use the 12v rail of an old computer power supply to run all my Tortoise machines.  This is plugged into a power strip, so turning off the power strip will kill the power to the switch machines.

I've never top mounted a Tortoise, but Circutron's site actually has an explanation of a couple of methods.

Quote:

Can I mount my TORTOISE™ on top of the layout?

This is perfectly acceptable in situations where the TORTOISE™ cannot be mounted conventionally due to obstructions.

Do you have room for the Remote Mounts' Actuator Mounting plate under the layout?  If so, mount the TORTOISE to the RTM following the instructions and then route the drive cable through a hole in the layout down to the Actuator.

If not, you might be able to just use the stainless steel wire and teflon tube by themselves to directly drive the throwbar.  Select the drive arm hole that gives you just a little more throw than the points' motion.  Likely the first or second hole.  Then just run the tube and wire across the layout surface to mate with the end of the throwbar.  We recommend putting a V bend in the wire near the throwbar so the wire can flex to take up any excess motion. 

One other method that has worked well for us is to mount the TORTOISE directly to the layout surface on the top with the circuit board pointing UP.  Before mounting, bend the spring wire following the instructions, then cut the spring wire to be 1/8" longer than the top (mounting) surface of the TORTOISE.  Using a 1/4" or 5/16" spade bit, drill into the layout surface to a depth of 3/16" or so centered at the location that the wire will be when mounted.  This location should be straight out from the throwbar.  The distance does not matter but the closer, the better.  Now measure from the center of this hole to the opening in the throwbar you will connect to and cut a piece of 1/16" brass tubing to a length 1/2" less than the measurement.  Take a piece of .025" spring wire/music wire/piano wire and cut it to 1/2" MORE than your measurement.  Now form a tiny loop in one end of the wire.  Make this as small as you can by bending it around the TORTOISE wire with needle nose pliers.  Coat the wire with Teflon or Graphite powder and thread the straight end of the wire through the brass tube and lay it on the layout surface with the little loop centered over the hole you drilled.  The straight end should be extending over or alongside your throwbar.  Make a mark on the wire where it will have to be bent to engage the hole in the throwbar.  Then cut off all except 1/8"-1/4" beyond the mark and make the bend at the correct angle to properly engage the throwbar hole.  Now check that you can move the points by moving the horizontal wire and that when the points are at the center of their motion, that the loop is perfectly centered over the hole.  Set the height of the brass tube so that there are no binds and fix in place with epoxy adhesive.  Paint it black to simulate steel conduit or hide it under foliage/ground cover.  Now set the TORTOISE fulcrum about 1/4" down from the top surface and place the TORTOISE while you make sure the TORTOISE wire enters the tiny loop.  Test operation and make sure that the points are held tight at both sides.  Adjust the fulcrum if necessary.  Fasten the TORTOISE down with screws when you are sure of the operation.  Hide the TORTOISE under a structure.

That bottom explanation is a bit long, but it sounds to me like you just drill a hole to accept the throw wire, run a horizontal wire from the throwbar to the hole, with a loop over the hole, then mount the Tortoise upside down, with the throw wire through that hole.  They run the horizontal wire through a brass tube to keep it in place. 

I don't think you'd have to modify your Pecos, although I don't use Pecos.  But I think they would just snap in place with the movement of the actuator wire. 

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
anteaum2666

Current On/Off

Hi Brian,

Disregard this post.  It accidentally posted my last one twice and I couldn't remove the copy.  Joe can remove this one if he sees it and is so inclined. 

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
Reply