Eugene Griffin EGRX
This BLOG focuses on the development of an unused HO scale module created in 2018. (story here: https://forum.mrhmag.com/post/yesterdays-timesaver-todays-timesaver-module-tomorrows…-12209420?trail=75 ).
 
The HO module was a modern era adaptation of the timesaver. The module was completed and used as a timesaver but was never developed into a scene.
 
The end result of the BLOG will be a module with a developed winter industrial scene that will be used as an office switching layout. NOTE: the module could be incorporated into a future HO scale layout.
 
IMG_0228 Compare copy.jpg
 
This story was started in the Office switching layout using two salvaged Proto48 Modules BLOG ( https://forum.mrhmag.com/post/office-switching-layout-using-two-salvaged-proto48-modules-12775340?trail=75 ).

Working on:   https://forum.mrhmag.com/post/office-switching-layout-using-a-2018-ho-module-13636599

Holding Pattern: https://forum.mrhmag.com/post/office-switching-layout-using-two-salvaged-proto48-modules-12775340

Reply 3
Eugene Griffin EGRX
Opto-isolator Wheel Gap Sensor
 
HO scale Layout 2025_out_of_office_ver4_1 copy2.jpg
 
The reflected infrared detectors will be tested prior to usage and if issues are found the sensors are changeable to active detectors with transmitter and detector placed on either side of the track. The issue with active detectors  is appearance. This will not be an issue in the staging yard, however, hiding the active detectors is a problem in the scene.
 
Block detection using a resistor on a wheel of the freight cars is not appealing. Without resistors on freight cars the locomotive is the only trigger method for current based block detection. After the locomotive transitions to a new block the previous block shows unoccupied. This is an issue for trains that occupy more than one block and positioning of trains on a passing siding for opposing train meets.
 
This possible implementation of an automation system’s block control uses the automation system for control and does not rely solely on block occupancy circuits.
 
If a train crew knows the length of the train and the length of the track between the passing siding’s turnouts then the automation system needs to know the same information. This may provide a solution. In addition, the location of the locomotive within a detection block could be solved by dividing the block into appropriate sized sub-blocks.
 
The remaining issues using current detection for block occupancy detection is :
  • car counting (might not be required)
  • last car detection for terminating a grade level crossing signal
 
Why current detection? Why not voltage detection?
 
The new possibility is an electrically isolated track attached to an opto-isolator and connected to the opposite track using a resistor. The track length for the isolated track is less than the distance between the axles in a freight car’s truck, ensuring one wheel of a truck is in contact with a powered rail.
 
These sensors could be used for block detection, grade crossing activation/ deactivation, and wheel counting (last car detection).
 
In the diagram, sensor numbers are identified with a number in a black box.
 
A train enters (above diagram) from the left and triggers the Wheel Gap Sensor number “1” and stops prior to sensor “2” while a train blocking the planned route departs.
  • Grade level crossing signal activates
  • Grade level crossing countdown timer activates
  • Grade level crossing countdown timer expires
  • Grade level crossing deactivates
 
Train stopped before sensor “2” starts after route clears.
 
  • Grade level crossing signal activates using sensor “2” and/or “1”
  • Grade level crossing countdown timer resets as wheels cross sensors "2" and "4"
  • Last car crosses sensor “4” triggering short countdown
  • Grade level crossing count down timer expires
  • Grade level crossing deactivates
  • Wheel counts reset in all sensors for grade crossing
 
Note sensors “3” and ”5” are used to trigger the grade level crossing from the industrial track.
 
All sensors for a location will connect to a single microcontroller (ESP32) and each sensor has a possible wheel count (expected count is a multiple of two times all wheels in train).
 
The train triggers sensor “6” as the train enters the block protecting the main between the passing siding turnouts (or “7” for the passing siding). The wheel count from the triggered sensor allows the automation system to determine the number of cars and locomotives in the block.
 
If required, braking will start at the system calculated remaining distance based on the wheel count, train length, and block track length.
 
Trains exiting the block using sensor “8” or “9” will result in a comparative count with the sensor at the beginning of the block. If the both block entry sensor and block exit sensor equal then the block is clear and all associated wheel count sensors are cleared.
 
 
Reply 4
Eugene Griffin EGRX
Electronics Project -Automation System
 
IMG_4012 (1).jpeg
 
The electronics arrived for the beginnings of the automation system (excluding optocouplers). Based on information provided a quick test is required to determine accuracy and best placement for the near infrared emitter/detector pairs (A). Included in the test is an in track reflective sensor (B), beside the track reflective sensor (C), and a modified sensor that receives near infrared from the opposite side of the track (D). The active yellow LED indicates the cross track sensor (D) near infrared source is not block and is activating the sensor (above photo).
 
IMG_4028.jpeg
 
The first test, as expected the reflective in track sensor (B) detects the freight car (active green LED (B)), beside the track reflective sensor (C) detects the freight car (active yellow LED (C)), and across the track sensor (D) detects the freight car (inactive LED (D)).
 
IMG_4030.jpegIMG_4037.jpeg
 
All initially tested freight cars excluding the two tested tanks cars triggered sensor (C ). The tank car in the above left photo has a higher clearance between the track and the car body that might explain the sensor issue, however the tank car in the above right photo is closer to the track. Neither tank car triggered sensor (C ). The cross track sensor (D) operated as expected for all cars in the test.
 
IMG_4039.jpegIMG_4038.jpeg
 
The in track reflective sensor (B) operated correctly for the initial test group of freight cars, including the two tank cars. The sensor did not detect gaps between the freight cars. A possible explanation is the couplers reflected enough near infrared to trigger the sensor.
 
Selecting another set of freight cars produced a non-detection (LED (B) inactive) for sensor (B) in the above left photo. None of the four similar freight cars (sample above right photo) produced a detection starting after the leading truck and ending before the trailing truck.
 
The cross track sensor (D) proved to be the most accurate when placed at an angle. This allowed for the detection of flatcars. The reflective in track sensor (B) produced enough data to be useful. The beside the track reflective sensor (C) also produced useful data. Of the sensor placements (C ) and (D) are similarly visually unappealing.
 
IMG_4041.jpeg
 
In the above photo, the blue LED on the ESP32-WROOM development board flashes for entertainment and to show the system is alive, the slide switch and rotary switch are used to test the code for turnout positions, and the two near infrared emitter/detector pairs can be seen with green power LEDs active (another inactive green LED indicates detection).
 
IMG_4046.jpeg
 
The output from the ESP32-WROOM test is shown above. There was enough GPIO for eight turnout position sensors, two LED outputs for a grade crossing, and nine track sensors (near infrared emitter/detector pairs or wheel gap sensors). The time sensitive track sensors are assign to hardware interrupts on the faster ESP32-WROOM core. The less time sensitive turnout position were assigned to a task (I like call it a thread) that loops every 250ms and the grade level crossing LED flashers were assign to another task with a 1s delay between the LED on/off cycle, both tasks have been placed on the slower ESP32-WROOM core.
 
Hopefully the automation data can be changed into useful information on train position. The optocouplers were the last to arrive and a test section of track for the wheel gap sensor needs to be completed followed by the integration of the ESP32-WROOM with the track sensors. Additional software will be added to the ESP32-WROOM to allow for a WI-FI based web page with current system information.
 
Work continues on the scenery and the code 83 rail arrived!!
Reply 5
Ray Hamilton
Your testing supports my observations that reflective IR is unreliable. Other than painting the underside of all your cars white or aluminum, I don’t think you’ll get the results you want.
Ray
 
Modeling Southern Pacific’s Ventura Subdivision in the San Fernando Valley (GEMCO to Northridge) circa Summer 1958.
Reply 2
Eugene Griffin EGRX
Some Scenery and more Testing
 
IMG_4075.jpeg
 
The plastic product factory is missing a couple hose racks and some ballast next to the track at the end of the building. After the ballast dries finishing scenery will be add including more ground cover followed by a layer of snow, trees, and shrubs (above photo). The new railroad bridge over the stream is built using turnout ties and a vehicle bridge is required further downstream.
 
As the scenery continues on the right of the photo a road crosses the tracks and ascends to meet the main highway on the left. A grade crossing is required and the control of the grade crossing requires sensors for triggering.
 
The in track IR sensors will be tested for the control of the grade crossing as the final test. Changing to an alternate sensor requires electrical isolation of the track and depending on the selection addition of another wire.
 
IMG_4076.jpeg
 
The previous test results showed inconsistent behaviour of the in track IR sensor. The in track sensor is the most appealing for it’s low profile. Adjustment of the sensor’s sensitivity produced noise (signals) for each car except for one (above photo).  
 
The noise (signals) from the sensor is useful and can be used for car detection. The nose showed up in the ESP32-WROOM test of the IR sensor as multiple activations of the hardware interrupt for a single trigger event (reflection detection of the IR). This behaviour could be considered a switch bounce and eliminated by a capacitor and resistor. Instead of masking the bounce, it becomes a useful indicator of a train passing. This includes minimal activation of the IR sensor from the unpainted axles of the tank car fleet (excluding the one above) and increasing activation of the IR sensor for the remaining cars.
 
IMG_4058.jpeg
 
Testing of the locomotive fleet showed consistent activation at the leading edge of the model and fuel tanks.
 
The next test will use the IR sensors in the scene to activate the grade level grossing. The software will use the noise (signals) generated either by the leading locomotive or the axles of the leading freight car to trigger the grade crossing and any other remaining noise to indicate the presence of a train.
 
During initial testing of the sensors using the ESP32-WROOM activation of the hardware interrupt occurred during a trigger event only, without the detection of a reflection the sensor was inactive.
 
If the testing produces inconsistent results alternate sensors will be used.
Reply 5
Eugene Griffin EGRX
Waiting for parts and pieces
 
IMG_4133.jpeg
 
Most of the required parts for the automation system are in the train room. The only remaining pieces are hookup wire and a USB interface for the new NCE Power cab starter system. The automation system definitely requires some assembly. Other activities delayed progress on the train room cleanup project, the last addition was the beams for the road bridge.
 
IMG_4127.jpeg
IMG_4126.jpeg
 
Work progressed on the automation system. The two photos above show the flashing of the Walthers crossing signal and the movement of a servo. The servo will be used for automation of the turnouts. Currently the test system uses two ESP32-WROOMs.
 
IMG_4158.jpeg
IMG_4159.jpeg
IMG_4162.jpeg
 
The automation system will generate a webpage with current sensor states. The above test output (shown on an iPad and still under development) shows the track plan, sensors, and turnouts in the south end of town. The first two photos captures the update of the web page’s crossing signal and the corresponding change in the LEDs. The push button represents a sensor, in the photo the ML-S1 sensor changes to inactive and the grade grossing deactivates.
 
IMG_4144.jpeg
 
This section of the layout will have 9 sensors, 4 automated turnouts, 2 manual turnouts, grade grossing signals (2 GPIO pins), and at least one three color searchlight signal (3 GPIO pins) . The automated turnouts require 1 output pin for controlling the servo, 1 input pin for turnout position, and 1 input pin for local activation of the turnout. The south end of townwill use 28 GPIO pins on the ESP32. Similarly the north end of town requires the same number of sensors, at least one three color searchlight signal, and 3 automated turnouts.
 
Multiple ESP32s will be required possibly 2 per block based on the GPIO pin requirements for block control and hardwired communications between ESP32s. The planned control areas are the staging area, south end of town, and north end of town. Possibly a single ESP32 will be used for train management, webpage server, and central communications.
 
IMG_4138.jpegIMG_4140.jpeg
 
The above photos demonstrate that light will activate these IR sensors. Light sources such as sunlight, IR remote controls, iPhone camera IR, and concentrated LED light from a work light are some of the triggers for the IR sensors. A battery powered work light held at a height of 2 inches above the sensor (first photo) would not trigger the sensor with reflected IR. Turning the work light on at that height triggered the sensor. With the light on, the sensor deactivated when the work light was held at a height of of approximately 7 inches. The current location of this layout does not have natural lighting and the planned lights will be LED strips at a height of at least 24 inches.
 
The IR sensors cost less than $1.50 each (cost may vary) and if they do not perform as hoped the IR sensors can be repurposed and replaced with a different sensors. The ESP32-WROOM-32 had a unit price of less than $9, and the 3.3 volt USB power convertor cost less than $2.25 per unit (cost may vary). The largest single cost items for the project was the NCE starter system and the NCE USB interface.  
 
 
Reply 5
Eugene Griffin EGRX
You know you are in the weeds when
 
Screenshot 2025-10-25 at 2.21.22 PM.png
Screenshot 2025-10-25 at 2.21.51 PM.png
 
The above images are from Google Street View of CPR searchlight signals. The searchlight signal with three heads controls the approach to the passing track and the double head signal controls the exit from the passing track. The single mainline track next to the the three head signal is not controlled until the next major city.
 
The following signal rules will be in use on my layout for the modelled town’s passing track. These are based on the CPR US East/West operating rules (Route Signalling Rules).  
 
Screenshot 2025-10-25 at 3.58.41 PM.png
Screenshot 2025-10-25 at 3.58.41 PM copy.png
Screenshot 2025-10-25 at 4.01.12 PM.png
 
A double head searchlight signal is planed and will function the same as the double head signal shown in the above Google street View image. Instead of a three head signal for the approach to the passing track a single head signal will be used.
 
The single head searchlight  signal and the top head of the double head searchlight signal  will have the following rules (based on the above extracted signal rules):
 
GREEN - clear to proceed at mainline speed on through track.
YELLOW - proceed at reduced speed possible diverging route (single head only) and/or stop at next signal.
RED - stop.
 
The bottom head of the double head searchlight signal will have the following rules:
 
GREEN - diverging clear
YELLOW - proceed at reduced speed through turnout possible stop at next signal.
RED - stop.
 
How did I get here?
That’s easy, I took a diverging route and decided to proceed with an automation system build.
 
IMG_4174.jpeg
 
In the above photo the ESP32 (A) is the access point web-server, controls four servos using PWM, monitors 6 turnout positions (2 manual, 4 automated), monitors 3 pushbutton switches (hardware interrupts) for local activation of  automated turnouts,  and is the communication unit for the south block including communication to the ESP32 (B). The ESP32 (B) monitors 11 track sensors (IR - hardware interrupts) (D), and controls the LEDs on the single head signal , double head signal, and grade crossing. I ordered the wrong Micro MX JST connectors the Atlas searchlight signal has 1.25mm spacing and not 1.0 mm (E).
 
IMG_4171.jpeg
 
The pinout plan for the two ESP32s with the right side in the above screenshot being the web server (A) and the left side the sensors and LEDs controller (B) the area in red is either not available on the 30 pin ESP32 or not recommended for use on both. I almost made a mistake and proceeded without using the yellow light in the searchlight signals (not enough GPIO pins), I wasn’t aware of the operational significance. After researching the use of the signals for routing on the CPR I decided to force some GPIOs into service (possible oversized round peg into a undersized square hole scenario).
 
The same scenario had already occurred with a single sensor (IR)  that requires specialized logic in the software to match it’s always on signal until blocked. This ESP32s (B) will be duplicated for the north block excluding the unique sensor. I decided to order a variety pack of 74HCXXXs chips at connivance store prices and the correct 1.25 mm Micro MX JST connectors from the same variety store that has rapid free delivery for members. They arrived today ((E) and (C ) in the photo). Lucky me the variety pack has 74HC595 (shift registers) in addition to the 74HC04 (Hex Inverters). Problem solved, the 74HC595 uses  3 pins to control 8. Removing two searchlight signal heads from direct control of the ESP32 frees up 4 GPIO pins (only using red and green), three of those pins will drive the 74HC595 the remaining pin will be used for the yellow output of the signal that remains connected to the ESP32.  The 74HC04 will allow the removal of the specialized logic for the unique IR sensor.
 
Maybe another day of testing. ( I really want this off my desk!!)
Although this wasn't a planned project it has been very interesting.
Reply 5
Eugene Griffin EGRX
Time flies
 
IMG_4314.jpeg
 
I looked at the BLOG posts and it’s been 24 days since I last posted (above laptop screen) and October 17th was the last day I worked on the layout.
 
IMG_4141.jpeg
IMG_4142.jpeg
IMG_4167.jpeg
 
I did manage to stop by the local hobby shop and purchase the above freight cars and new double headed search light signals. I mentioned to the shop owner that the store had a great selection. This triggered a story about a famous musician that visited the store and purchased a large assortment of HO scale detailing parts. This musician would take modelling projects on the road to pass the time. I decided this was a great idea and brought the components of the train automation project so I could complete some last minute changes and finish the access point web page (first photo).
 
The automation project requires 3 pairs of ESP32s at locations where turnout control and point position sensing , signal control, and track sensor monitoring are concentrated. These ESP32s could create a reasonable local automation system, but not train automation system.
 
The initial design uses two or three ESP32s to generate a visual output, control the routing of trains, scheduling of trains, generate switch lists for train creation and car routing, send messages to the local controllers for signal color setting and turnout positions control, and monitor current location of all trains and freight cars. It might of worked and would have cost less than $30.
 
RDK-1560.jpg
 
Then I found the above $90 computer with the following specifications:
 
CPU 8 x A55 1.5GHz
RAM: 8GB LPDDR4
NPU: 10 TOPS
GPU: 32Gflops
Ethernet, Wifi, Bluetooth, 4 USB 3.0 ports, HDMI, and Ubuntu
 
It’s waiting to be picked up at the courier’s drop off location and if it does what it says it does it will be the brains of Train Automation system.
 
TEMP HO scale Layout 2025_out_of_office_ver5.jpg
 
The staging yard design was revisited during this trip. The new design has the potential to add at least one foot to the yard length (possibly more if the curve track module is used). The transparent green area is the future home of the last extension of the Proto48 layout. The redesign of the staging area will reduce the number of tracks exiting the left bottom of the above image from two to one reducing the risk of an issue in a area that is difficult to access.
 
IMG_3519.jpeg
 
On November 11th, before leaving on this trip, the Northern lights put on a nice light show  above my home (above photo).
 
I will have 20 days after I return to get the projects finished (except for the new computer that is a trip project) and I am looking forward to working on the layout during that time.
Reply 6
Eugene Griffin EGRX
Penny wise but time foolish
 
IMG_4697.jpeg
 
IMG_4698.jpeg
 
Finally had some time to start the snow scene near the south end of the layout and attach some of the electronics (above). The board is attached with lift off hinges (photo below) that I already had. (Still working on the train room cleanup project).
 
IMG_4701.jpeg
 
A RDK X5 Computer will interface with the ESP32 (shown above) and control the automation of the layout, this is a change of plan from the original ESP32s only.
 
 
IMG_4700.jpeg
 
The above rat’s nest of wires is what happens when you try to save a few pennies. Under the wires are three cascaded 74HC595 ICs that could control up to eight search light signals. I lost patience after soldering the terminals and before doing the wires. A dedicated ESP32 could have easily handled controlling eight search light signals, currently three ESP32s are priced at $17.99 USD on Amazon. Definitely a time foolish and penny wise experience.
 
IMG_4708.jpeg
 
IMG_4706.jpeg
 
IMG_4707.jpeg
 
Tested the spacing of the 3mm IR emitter/detector (above photos), one tie separating the emitter from the detector eliminated the need for angled holes.
 
The first single head search light signal was added to the scene. (photos below)
 
IMG_4719.jpeg
 
IMG_4720.jpeg
 
Finally managed to add some pavement (charcoal sanded grout) to the approaches for the highway overpass (photos below).
 
IMG_4702.jpeg
 
IMG_4703.jpeg
 
 
Reply 8
Eugene Griffin EGRX
The less you know, the less it costs
Prototypical Signals (attempt)
 
A question on signal requirements for a siding that isn't used for routing provided information on prototype signals!!
 
 
Based on the discussion, the track plan will be changed, signals will be added to match the prototype, and another ESP32 will be added to control an additional four signals.
 
Screenshot from 2026-03-15 00-06-55.png
 
The above is the new HTML code for the access point generated by the ESP32 Signal controller. The changes include a 3 target signal, a two light dwarf signal, and movement of the turnout for the non routing siding further down the signaled siding.
 
The ESP32's access points will only be used for testing and playing. The primary functions of the ESP32 controllers are setting signal states, controlling turnouts, monitoring sensors, communicating with secondary ESP32 controllers (UART2) , communicating with I2C device, and communicating with the main computer (USB).
 
The initial idea for signal placement was based on a Google Map's image that was misleading and the discussion pointed out my error. (photo in the discussion and previously on this blog)
 
Screenshot from 2026-03-14 23-10-52.png
 
Screenshot from 2026-03-14 23-31-50.pngScreenshot from 2026-03-14 23-32-12.png
 
The prototype arrages signals as shown above. The first Google Map's image shows a three target signal close to the points of the turnout, and a two target signal on the main track across from a two light dwarf signal on the diverging track.
 
The next two Google Map's images show a different placement of the three target signal on the opposite side of a grade crossing that is near the turnouts shown in the last Google Map's image.
 
The discussion provided some guidance on possible information for the prototype. (2006 Time Table was found for the prototype)
 
The Time table provides rules and other information for different subdivisions of the prototype. For the above Google Map's images a Centralized Traffic Control (CTC) is in place and all sidings are signaled (with two exceptions). The Google Map image below shows a different signal arrangement near a larger industrial spur, the Time Table provides speed and load limits for all industrial spurs in the subdivision.
 
 Screenshot from 2026-03-14 23-57-06.png
Reply 4
tp
Glad to see a new post here 🙂
Reply 1
Eugene Griffin EGRX
Back at it!!
 
IMG_4830.jpeg
 
Updating the signals to match the prototype's resulted in some modifications to the electronics and the purchase of signals with three targets (above).
 
IMG_4831.jpegIMG_4832.jpeg
 
The new design will use 4 ESP32s to control turnouts, monitor sensors, and control signals/sounds. The previous design for the IR sensors was messy and would not accommodate 21 IR sensors in a small space, the new design allows for easy replacement of a sensor and has
a smaller footprint (bottom left in the above left photo).The addition of a real time clock module (RTC HW-084) with a rechargeable button battery (top middle in the above left photo ) to a ESP32 is a work around. The RTC module connected to the RDK X5 without any problems or code the only issue was the Ubuntu startup script would set the RTC module to 17:00 on December 31, 1999 the default time for the RDK X5 without network time server. Several attempts to correct the startup script have failed and therefore the workaround. The RDK X5 will not be connected to the internet.
 
The design is repeatable for the North end of town and the GPIO assignment sheets have been laminated (no changes, photo above).
 
IMG_4824.jpegIMG_4823.jpeg
 
The beginnings of the train automation system is shown above. The left photo allows a operator to monitor turnouts, signals, and sensors including manual control for the turnouts and signals. The right photo tracks equipment movement past a camera. The last test was captured in the database resulting in a few known locations of freight cars. Freight cars with unknown locations were manually entered into the database from my "I have this road number list". The unknown equipment is a O scale car I rolled past the camera during a test of the system's ability to guess the reporting mark and number for a car that wasn't "known" to the system. The system is coded using python except for C code used to communicate with the ESP32s.
 
IMG_4825.jpeg
 
Today I did the last test of the initial system. I bought a NCE Power Cab for the HO layout and the NCE USB connection. (First photo below shows the NCE USB interface bottom of photo connected to the Power Cab) The NCE USB interface is an independent cab that is controlled by sending bytes from a computer. The NCE USB interface and control method appeared to be easier to control and appeared not to require a driver. The test this afternoon proved both to be true.
 
The byte stream required to set locomotive 3 reverse speed (28) to 1 is 0xA2, 0x00, 0x03, 0x01, 0x01 and 0xA2, 0x00, 0x03, 0x02, 0x01 for forward. This requires a python serial connection to the the linux USB device. To guarantee the software will connect to the correct device a script can be added in the system to assign unique names for the USB devices. (see second photo below)
 
Sample of the Python code used:
 
import serial
usb_ser = serial.Serial("/dev/ttyUSB-NCEUSB",19200,timeout=0.001)
 
CTC_values_forward = bytearray([int("0xA2",16),int("0x00",16),int("0x03",16),int("0x02",16),train_speed28])
usb_ser.write(CTC_values_forward)
 
# OR
 
CTC_values_reverse = bytearray([int("0xA2",16),int("0x00",16),int("0x03",16),int("0x01",16),train_speed28])
usb_ser.write(CTC_values_reverse)
 
 
IMG_4829.jpeg IMG_4822.jpeg
 
A short test video of a Athearn SD70M-2 being controlled by python code on the RDK X5.
 
The FURX 100 (SD70M-2) is the newest locomotive that was received shortly after Christmas. Before Christmas I decided I shouldn't be on the naughty list and placed myself on the nice list. Sure enough a jolly old guy delivered the FURX 100 to my mailbox!!
 
 
Reply 3
Eugene Griffin EGRX

Planning the trains

IMG_4862.jpeg

The NCE USB interface was the last technical hurdle for the train automation project. The remaining major hurdle/project is doing the work.

IMG_4865.jpeg
 

The removable panel (photo above) swings down to eliminate overhead wire connections saving some time and back pain. Seventeen sensors out of twenty one are connected to the terminal strips. After completing the remaining sensors a interface/power board for the signals and turnouts will be added to the front shelf of the panel.

The automation system will (once written) activate random trains stored in the staging area. The trains will pass through and have random opposing train meets in the town.

During the modification and wiring of the sensors I started to daydream about what trains will randomly be passing by the area I am switching. Since the era is early 2000s and I plan to use mostly lease units from EGRX and others leasers, the question I had for myself was “What trains could I run given the limitation of my existing locomotive roster?”.

The thought of scrapping my favorite locomotives, the SW1500s (1298, 1299) and the MP15ACs (1415, 1428) , to match the era wasn’t appealing. After searching the internet I found both still active and surprisingly freshly painted during that period.

The SW1500s were rebuilt and repainted in 2001 (below links).

CP1415 (MP15AC) is shown still looking new in 2010 and CP1428 shines in 2014 (below links).

According to Wikipedia, SD70M-2 was built from 2004 to 2011, SD40-2 was built from 1972 to 1997, and GP 40-2 was built from 1972 to 1986.

The date ranges allow the use of the diesels in the early 2000s, although not at a single prototype location. I will proceed with my modest locomotive roster knowing it is not prototypical. The BN 394 (SW1000) is assigned to the grain elevator as a private locomotive. The CP GP-35 and the Ontario Northland will be in the engine area as decorations. (first photo upper left)

The next question I thought of was “What trains could be scheduled during a session?”.

  • North bound Container train (currently 11 cars expecting 15 cars) total length greater than 99 inches plus locomotive lengths. Assigned engines a SD70M-2 (FURX 100, DCC, sound) and a SD70M (DCC, no sound, to be purchased).

  • South bound Grain train ( maximum 20 cars) total maximum length 172 inches plus locomotive lengths. Assigned engines a SD40-2 (UP 1616 or 1618 , DCC, sound) and a SD45-2 or SD38-2 (DCC, no sound, to be purchased).

  • Random direction mix freight (length dependent on town passing track). Assigned engines a SD40-2 (UP 1616 or 1618 , DCC, sound) and/or GP40-2 (EMD 769, DCC, no sound).

  • Local Switchers and road switchers (SW1500s and MP15ACs).

The estimated amperage for multiple active trains with multiple engines on the mainline and in the staging area exceeds the 1.8A NCE Power Cab. A booster will be required and the estimates indicate a 5A booster should suffice. The town tracks can be isolated and connected to the 1.8A original power supply of the NCE Power Cab powering the SW1000 at the grain elevator and any engines that are switching the town tracks.

HO scale Layout 2025_out_of_office_ver6 copy.jpg
 

The above is version 4 (not the last version) of the staging yard (The area from center of the photo to the right of the photo contains a hot water storage tank and a furnace). The last goal for the staging area is a reversing loop. The only requirements for the reversing loop are minimal reduction of staging yard real estate and a radius that will not derail the longer flat cars and the 89’ auto carrier (planning is ongoing).

 
 

Reply 3