Eugene Griffin EGRX

A newly purchased 2 rail O scale MTH 0-6-0 and a change to the steam era (actual years will be decided later) ended the proto48 layout. Buying and changing the wheels to proto48 on the steam era freight cars and the 0-6-0 was the deciding factor.

IMG_0867 2.jpg This blog will cover the repurposing of two 7’ partially completed proto48 modules into a completed (this is a first for me) 11’ 2” office switching layout. 

Working on:   https://forum.mrhmag.com/post/office-switching-layout-using-a-2018-ho-module-13636599

Holding Pattern: https://forum.mrhmag.com/post/office-switching-layout-using-two-salvaged-proto48-modules-12775340

Reply 15
Eugene Griffin EGRX
The above-pictured trestle was started years ago. The second module was part of the staging yard. (shown below)
 
IMG_0899.jpg
Reply 8
Eugene Griffin EGRX
 
OfficeBuild.jpg
 
The trestle module will be shortened from 7' to almost 54", and the 7' staging module will be shortened to 6' 8".
Two industries will be created, one using a new curved track.
 
Based on the 50' 6" Atlas 2 rail O scale boxcar, the switching layout is close to an Inglenook switching puzzle that I will enjoy running occasionally to break up the computer work.
 
IMG_0901.jpg
Reply 9
Alex Wood AlexW
Looks nice! That would be a good application for a ProtoThrottle!

Modeling the modern era freelanced G&W Connecticut Northern

Reply 4
Eugene Griffin EGRX
Hello AlexW,
 
It might indeed.
 

However, a MRC Prodigy Express and a Prodigy Advance handheld will be used until they fail. (need to get every cent out of them)

I have run the GP7 (latest release) using the Prodigy. All functions that I will ever use are available with the pair.

In addition, the goal is to finish the modules without buying more “stuff” unless needed.  To accomplish this goal, I will focus on the modules, and I will not experiment with batteries, ESP 32, ESP8266, and 3D printing of throttles cases or any other side hobby. 🙃

Eugene

Reply 8
Midland Valley
Hello Eugene,
 
  Great looking project!  Should be a lot of enjoyment....always fun to follow any Proto48 threads....
 
  Thanks for sharing.
 
Gary H.
Reply 4
Eugene Griffin EGRX
Had some time over the last few days to write a Java program to control the Switching layout.
 
It follows the Inglenook pick-up rules and will replace missing cars from staging (shelf above the layout) on the second iteration (then the sequence is repeated). It uses a CSV file to store current car locations.
 
Pickup Iteration after generating a CSV file from the spreadsheet.
- The car selection for pickup is random
- Cars in siding 0 are in staging
- Cars in siding -1 are not available for use
 
java InglenookSwitch.java
Loading cars from Railcars.csv
Siding: 0 Position: 0 Car Id: RBOX33651 Info: ,7-79
Siding: 1 Position: 2 Car Id: BN249224 Info: ,12-75
Siding: 1 Position: 3 Car Id: GRN8034 Info: ,11-76
Siding: 2 Position: 1 Car Id: MP357102 Info: ,5-75
Siding: 1 Position: 1 Car Id: AN5160 Info: ,6-77
Siding: 2 Position: 2 Car Id: GRN8045 Info: ,11-76
Siding: 2 Position: 4 Car Id: MNS49897 Info: ,5-79
Siding: -1 Position: -1 Car Id: CSXT136039 Info: ,11-77,O gauge wheelset
Siding: -1 Position: -1 Car Id: RBOX33616 Info: ,7-79,Couplers are not atlas compatible (protocraft)
Siding: 2 Position: 5 Car Id: SM4202 Info: ,4-80
Siding: 2 Position: 3 Car Id: ACFX77411 Info: ,5-88,Chlorine Tank Car
Total Cars on Siding: 8 [AN5160, BN249224, GRN8034, MP357102, GRN8045, ACFX77411, MNS49897, SM4202]
Siding value 0 (Staging), -1 (Not in Service)
Generating Pickup List
Train Order: Engine - GRN8034- MP357102- AN5160- ACFX77411- BN249224
Switching Completed (Yes or No)?
Yes
Writing the following to Railcars.csv
0,0,RBOX33651,7-79
0,0,BN249224,12-75
0,0,GRN8034,11-76
0,0,MP357102,5-75
0,0,AN5160,6-77
2,2,GRN8045,11-76
2,4,MNS49897,5-79
-1,-1,CSXT136039,11-77,O gauge wheelset
-1,-1,RBOX33616,7-79,Couplers are not atlas compatible (protocraft)
2,5,SM4202,4-80
0,0,ACFX77411,5-88,Chlorine Tank Car
File overwritten successfully.
 
Set Out  Iteration after is triggered by open siding positions (always 5 out and 5 in)
-  The set-out list and engine placement are randomly selected from all cars in the staging yard.
 
java InglenookSwitch.java
Loading cars from Railcars.csv 
 
Siding: 0 Position: 0 Car Id: RBOX33651 Info: ,7-79
Siding: 0 Position: 0 Car Id: BN249224 Info: ,12-75
Siding: 0 Position: 0 Car Id: GRN8034 Info: ,11-76
Siding: 0 Position: 0 Car Id: MP357102 Info: ,5-75
Siding: 0 Position: 0 Car Id: AN5160 Info: ,6-77
Siding: 2 Position: 2 Car Id: GRN8045 Info: ,11-76
Siding: 2 Position: 4 Car Id: MNS49897 Info: ,5-79
Siding: -1 Position: -1 Car Id: CSXT136039 Info: ,11-77,O gauge wheelset
Siding: -1 Position: -1 Car Id: RBOX33616 Info: ,7-79,Couplers are not atlas compatible (protocraft)
Siding: 2 Position: 5 Car Id: SM4202 Info: ,4-80
Siding: 0 Position: 0 Car Id: ACFX77411 Info: ,5-88,Chlorine Tank Car
Total Cars on Siding: 3 [GRN8045, MNS49897, SM4202]
Siding value 0 (Staging), -1 (Not in Service)
 
Generating Set Out List
Generate Train drop switch list
 
Available Cars
RBOX33651
BN249224
GRN8034
MP357102
AN5160
ACFX77411
 
Train Order: Engine - ACFX77411- MP357102- RBOX33651- AN5160- BN249224
 
Placement List
Siding: 1 Position: 1 ACFX77411
Siding: 2 Position: 3 MP357102
Siding: 1 Position: 2 RBOX33651
Siding: 2 Position: 1 AN5160
Siding: 1 Position: 3 BN249224
 
 
Switching Completed (Yes or No)?
Yes
Writing the following to Railcars.csv 
 
1,2,RBOX33651,7-79
1,3,BN249224,12-75
0,0,GRN8034,11-76
2,3,MP357102,5-75
2,1,AN5160,6-77
2,2,GRN8045,11-76
2,4,MNS49897,5-79
-1,-1,CSXT136039,11-77,O gauge wheelset
-1,-1,RBOX33616,7-79,Couplers are not atlas compatible (protocraft)
2,5,SM4202,4-80
1,1,ACFX77411,5-88,Chlorine Tank Car
File overwritten successfully.
 
 
 
 
 
 

 

Reply 4
Eugene Griffin EGRX
Some progress in the Office.
 
IMG_0912.jpeg
Reply 13
Eugene Griffin EGRX
Some Progress on the bridge module. 
 
IMG_0927.jpeg
 
A few more rivets and the bridge will be ready for painting.
 
Let it Snow.
 
This is one of my favourite snow scenes https://forum.mrhmag.com/post/snow-on-the-grass-12199821.
 
I am going to try to emulate the above scene, I should receive supplies from Scenic Express next week.  
Reply 8
Eugene Griffin EGRX
The experiment continues
 
 
IMG_0997.jpeg
Reply 10
Eugene Griffin EGRX
Time to clean the train room
 
That's the title, the plan is to salvage some older modules and add an extension to the Office switching layout.
 
My inspiration this article:
 
 
and my 2018 post:
 
 
The idea, extend the above through the wall and into the train room. The extension will be approximately 10 feet by 14 inches and be built from anything on the floor of the train room. The extension will contain an industry (maybe two) a run around track and the lead into the office.
 
I started yesterday, here are a few pictures.
 
Before
 
IMG_0866.jpg
 
 Yesterdays and todays and todays progress
 
IMG_2774.jpeg
 
IMG_2776.jpeg
 
IMG_2779.jpeg
 
The plan is to have an operational extension ready to connected to the office layout by end of day Sunday.
Reply 10
Eugene Griffin EGRX
Plan
 
OfficeBuild.jpg
Reply 7
Eugene Griffin EGRX
Today the track crew removed some old rails and laid new ties.
 
IMG_2799.jpeg
 
IMG_2802.jpeg
 
Operational by sunday night?? 🙄 !!!
Reply 6
Eugene Griffin EGRX
Instead of the #6 turnouts used in the plan, code 125 #8 turnouts will be used.
The planned capacity of eight 50 foot freight cars will more than likely be reduced.
 
IMG_2806.jpeg
 
IMG_2807.jpeg
 
First #8 turnout completed, two more required.
The code 125 rail was previously weathered and used on an older layout.
Before the remaining turnouts are completed the new ties need to be stained.
Reply 6
Eugene Griffin EGRX
I was hoping for an operational module (power to the rails) by Sunday night, however I still need to  solder feeder wires, spike the rails, and adjust the turnout points. Maybe a couple nights work to complete the tasks. The real goal was to work on the model railroad!!!
 
IMG_2818.jpeg
Reply 10
Eugene Griffin EGRX
Work on the addition progressed.
 
OfficeBuild2.jpg
Plan Changes
  • Removed an industry from the future project area, an electrical panel posed considerable challenges.
  • The hole into the office was moved from the outside track to the next inner track.
  • The outside track was curved and now holds at least three 50' freight cars
The main is represented using the red boxcars in the above. Capacity for the addition again is eight 50' freight cars with one fouling an industry turnout.
 
IMG_2822.jpeg
 
Testing plaster brick wall that was created using brick sheets. The color is a little off but these will serve as the industry facade.
 
IMG_2824.jpeg
 
Plaster and stones were tested many years ago to model a preformed concrete wall with embedded rocks. The appearance wasn't what I wanted, however the reverse side looks like a preformed concrete wall section. This will be used as part of the industry in the addition.  (Some sanding and assembly required)
 
IMG_2825.jpeg
 
Most of the tracks have been spiked except for the outer track.
 
IMG_2827.jpeg
 
 Work on the addition continues!!
Not bad for one holiday weekend and a Saturday.
 
Reply 5
Eugene Griffin EGRX
 
Added an interchange area to the plan .
OfficeBuild3.jpg
 
 
  • Completed the modification to the industry area to allow for three 50 foot freight cars.
  • Increased the height of the hole to allow for a Berwick Hy-cube boxcar.
  • Finished the industry foundations and added  the brick walls.
IMG_2845.jpeg
 
IMG_2841.jpeg
 
More scenery and industry work this weekend.
Reply 8
Eugene Griffin EGRX
Scenery is progressing
 
IMG_2858.jpeg
 
IMG_2861.jpeg
 
IMG_2859.jpeg
 
IMG_2857.jpeg
 
  • more base scenery
  • align the office modules (plan change) to these modules
  • switch the industries
Reply 10
cboyan43
I love those photos taken down the line. Nice work as the close up photos show.  

Chris

Reply 4
Eugene Griffin EGRX
I love those photos taken down the line. Nice work as the close up photos show.  
Thank you.

The work continues!
Reply 3
Eugene Griffin EGRX
Functional and Uncompleted
 
The office build started in November of 2023 and was functional and not completed on the last post  (Jan. 15, 2024) of this blog. During the build in 2023, I added the following scenery to the original bridge module.
 
IMG_0959.jpegIMG_0997.jpeg
 
The additional scenery added approximately 4" to the module and therefore the original plan for the Nov. 2024 addition. The change meant the added scenery needed to be removed.
 
As of today the status of the module is almost completed. The added scenery was removed,  the steel bridge has been painted and rusted, and additional supports for the bridge and trestle  were completed over the past few evening.
 
A few scenery elements and some snow are remaining to change this office module from "Functional and Uncompleted" to "Completed" a rare event for the owner of the rails that the EGRX operates on.
 
IMG_2879.jpeg
IMG_2880.jpeg
 
IMG_2884.jpeg
Reply 9
Eugene Griffin EGRX
No trains this week !
 
Best wishes to everyone, Merry Christmas, and a Happy New Year!
 
FyADD6l6awpvHkTpunOJ-fbgP8-adjusted_7.8125x-real-esrgan-x4-plus.jpg
Reply 4
Eugene Griffin EGRX
Happy New Year!!!
 
I am enjoying how the layout is progressing and decided to do a little planning for car capacity.
 
IMG_2962.jpeg
 
The above screen capture from Google Maps shows a transload track of a short line. Visible left center, are tank cars for a fuel distributor that specializes in fuel and seasonal heating oil deliveries to the farms in the local area. The right side of the above picture shows an auger for a feed and seed supplier. The transload track allows for storage of equipment (trailer and auger) in addition to providing a location for a connection to the electrical grid without requiring the two business extra overhead of owning a property with access to the tracks. A single transload track with these two customers will generate tank car and covered hopper traffic for the railroad.
 
IMG_2961.jpeg
 
IMG_2963.jpeg
 
 Transload tracks can also serve customers with adjacent property. Two examples shown In the above Google maps screen captures are a corrugated pipe manufacture that has built a earthen ramp up to a transload track for unloading coiled steel rolls and loading manufactured corrugated pipes, and a company that specializes in the production of wooden utility poles. Both industries require flatcars to ship finished products. The corrugated pipe manufacture will also receive loads of coiled steel rolls either on specialized freight cars or flatcars.
 
The EGRX services a transload track in the office switching layout. This single track is approximately 260 scale feet in length and has a capacity of roughly five 50’ boxcars. Enough to handle the above four industries and a sawmill’s occasional shipments of dimensional lumber by rail instead of truck.
 
The number of cars required to service the transload track industries and the vegetable canning industry dedicated track in the office switching layout are as follows:
 
  • 2 tank cars for the fuel distributor one for diesel and the other for home heating oil (allow 27” of storage)
  • 2 covered hoppers for the feed and seed distributor (allow 30” of storage)
  • 2 bulkhead flatcars specialized for utility poles (32” of storage)
  • 1 flatcar specialized for coiled steel loads (16” of storage)
  • 2 bulkhead flatcars for corrugated pipes loads (32” of storage)
  • 2 50’ boxcars for shipping printed cardboard boxes for the canning plant (27” of storage)
  • 1 50’ boxcar for shipping canned vegetables (13.5” of storage)
 
The office switching layout requires approximately 180 inches of storage in the interchange tracks for the above rail cars. The first industry of the new extension will add another 120 inches of storage for a grand total of 300 inches (25’) of interchange tracks storage.
 
The planned interchange tracks (2 tracks X 10’ in length) are not enough for the current industries let alone a possible industry on the northeast branch serviced by the EGRX. The last plan included an industry north of the interchange tracks, this industry needs to be removed and the interchange tracks need to be expanded.  
Reply 6
Ken Rice
For any given op session, you only need the interchange track to actually contain the cars that are going to be involved in that session.  For the trans load/team track you describe (excellent choice for an industry by the way) that’s probably 1-3 cars for the average session, maybe more sometimes.  You can fiddle the rest off layout.  When I was in O scale I had a couple shelves under the interchange track end of my layout to fiddle cars on and off from.  It works quite well.  I wrote about it here: https://rices-rails.blogspot.com/2012/01/no-name-gets-car-storage.html
Reply 3
Eugene Griffin EGRX
Thanks Ken!
 
I like the shelf storage idea pictured in your blog.
 
The idea of focusing on maximum cars per session instead of the required storage capacity of the interchange/visible staging  definitely saves on space and the idea of the cars being removed from the scene is of interest.
Reply 4
Reply