Eugene Griffin EGRX
This BLOG focuses on the development of an unused HO scale module created in 2018. (story here: https://forum.mrhmag.com/post/yesterdays-timesaver-todays-timesaver-module-tomorrows…-12209420?trail=75 ).
 
The HO module was a modern era adaptation of the timesaver. The module was completed and used as a timesaver but was never developed into a scene.
 
The end result of the BLOG will be a module with a developed winter industrial scene that will be used as an office switching layout. NOTE: the module could be incorporated into a future HO scale layout.
 
IMG_0228 Compare copy.jpg
 
This story was started in the Office switching layout using two salvaged Proto48 Modules BLOG ( https://forum.mrhmag.com/post/office-switching-layout-using-two-salvaged-proto48-modules-12775340?trail=75 ).

Working on:   https://forum.mrhmag.com/post/office-switching-layout-using-a-2018-ho-module-13636599

Holding Pattern: https://forum.mrhmag.com/post/office-switching-layout-using-two-salvaged-proto48-modules-12775340

Reply 3
Eugene Griffin EGRX
 
The train room Proto48 cleanup took a sidetrack when a MRH BLOG inspired the utilization of an old 2018 HO module that is currently being used as a On30 / O equipment storage area. (photos below)
 
IMG_0228 Compare.jpgIMG_3717.jpeg
 
The plan is to use the HO module in an area of 9’ X 20” above the computer desk in the office. The module will not have an off stage area but will utilize a shelf to store the HO equipment.
 
HO scale Layout 2025_2.jpg
 
Of the above two possible building placements, I like the one at the top of the photo. Not sure if the track near the silos and old wooden warehouse will be abandoned or utilized. The old wooden warehouse (not completed) is a 3D printed frame with that will utilize HO scale sheets of wood siding. In addition a 6” X 6” diorama will also be utilized. (photo below)
 
IMG_3723.jpeg
 
The final plan includes HO equipment storage drawers instead of a shelf and occupies the same area.
 
HO scale Layout 2025_7.jpg
 
 
Reply 5
Eugene Griffin EGRX
Finished all the outdoor projects today and decided to start this project.
 
Unbelievably, the orange store did not have any cheap lumber (1X3, 1X4, 1X6) , had to go to the dark blue store (no not the light blue store) and they had the cheap lumber. I was able to start the the project!!!
 
This will be a short BLOG and I hope to complete this by September.
 
The white board is removed and the computer desk out of the way the project begins. The shelving unit is staying and the HO module will occupy the upper shelf.
 
IMG_3726.jpeg
Reply 4
Eugene Griffin EGRX
A.I. background generation
 
There are two locations for backgrounds, on the left of the "Final plan" (see previous post)  between the green wooden elevator building and the corrugated metal silos, and on the right between the corrugated metal silo and the old wooden warehouse.
 
The concept for the scene is a Prairie railroad town during the winter. Using an A.I. image generator the following background(s) have been generated for the right side of the "Final Plan".
 
kSF3Z8L8xed2Qp1V7oef--1--wg4cb_resized_3.9063x-real-esrgan-x4-plus.jpeg
 
XcaR3xMK08GNa1p2ssBj--1--5978e_resized_4.0323x-real-esrgan-x4-plus.jpeg
 
For the left side of the "Final Plan" the following have been generated:
 
 
DFx0SeD3i12Y7T6hux8o--1--ti3n1.jpg
 
dJP7OUtxnRkNZjAimCoU--1--aydnf.jpg
 
F0uzs31YPICNVvzBtUCt--1--em7iq_resized_3.9063x-real-esrgan-x4-plus (1).jpeg
 
UbuOAvRjQRk0FSkNsLnE--1--k24wp_resized_3.9063x-real-esrgan-x4-plus.jpeg
 
For the right, the first image is in first place, for the left side's background image, 2 and 3 are in first place.
 
 
Reply 4
Eugene Griffin EGRX
Measured everything twice, designed it in Sketchup, and measured again.IMG_3730.jpeg
 
I have never built drawers before and they worked. I finished one drawer face to test the clearance above the computer monitor, at the moment the desk and monitor are 18” in front of the shelf,   the clearance worked as planned! Tested the storage drawers with the On30 equipment, everything except the On30 Crane Derrick Car fit (height limitation) in one drawer. Then I wanted to test the HO module and the height of a scrap piece of hardboard that will be used as the backdrop. It’s doable! Not bad and as expected there is enough width for the planned track including the additional 5.5 inches on either side of the module.
 
IMG_3732.jpeg
 
I don’t remember when I bought this Walthers kit. The 2010 to 2015 era of HO scale modelling was in a small bedroom and this kit is an area eater. No model railroading occurred from 1982 to 2010 except for a brief period experimenting with N scale. This means I purchased it when I was a child (paper route money!!) between 1978 to 1982, maybe??? It needs a refresh and only the front half is going to be used in the plan.
 
The plan calls for a view block at this end, instead the mainline(foreground track) will curve into the extra shelf width and disappear behind a hill. There is a rail car door below the street light on the rear half of the building, with a little luck those parts of the building will serve as a convincing backdrop.
Reply 5
Eugene Griffin EGRX
It’s raining and I have time to work on the project.
 
IMG_1024.jpgIMG_1021.jpg
 
The above two photos were taken using an iPad 2 in 2013 of a module on a HO scale layout. Below is the module today.
 
IMG_3759.jpegIMG_3758.jpeg
 
In the above and following photos, the module in 2025 has a little damage and dust. However, it could still be used on a HO layout. The train room cleanup project requires salvage or reuse. From the above I will salvage the turnout and some track to be used at the back of the new HO office switching layout and a portion of the curve and scenery will be reused to accomplish an illusion of a main line disappearing around a hill.
 
IMG_3760.jpeg
 
I completely forgot these modules were created using hand laid track on foam insulation “roadbed” anchored by drywall screws that were coved with painter's tape (photo above). Scenery was then applied further securing the track to the scene. Below is further examples of the track salvaged from that 2013 HO layout.
 
IMG_3761.jpeg
 
IMG_3762.jpeg
 
The salvaged curve section (25” X 13”) (photo above) will be used for the mainline on the shelf end of the plan (photo below). The turnout pictured in the middle end of the module will be removed.
 
IMG_3764.jpeg
 
Hopefully today!!
Reply 6
laming
A.I. background generation
 
<snip: Some pretty impressive stuff>
 
Okay... at the risk of offending the "anti-AI" mindsets... I'm going to say it:
 
Those AI generated scenes look GREAT to my eyes.
 
If I was doing snow on my layout, I would copy/paste those into one of of my "PhotoDrops" in a New York second and be happier than a pig layin' in the mud on a sunny day.
 
I would love to figure out a way to avail myself of AI to help me create some of the "PhotoDrop" scenes I see in my mind that I want to create at some locations on my layout.
 
Andre
Reply 5
Eugene Griffin EGRX
 
<snip: Some pretty impressive stuff>
 
Okay... at the risk of offending the "anti-AI" mindsets... I'm going to say it:
 
Those AI generated scenes look GREAT to my eyes.
 
If I was doing snow on my layout, I would copy/paste those into one of of my "PhotoDrops" in a New York second and be happier than a pig layin' in the mud on a sunny day.
 
I would love to figure out a way to avail myself of AI to help me create some of the "PhotoDrop" scenes I see in my mind that I want to create at some locations on my layout.
 
Andre
Thank you for the comment.
 
There are some free sites, as mentioned in the https://forum.mrhmag.com/post/ai-confusion-13635888?trail=100 thread, I like the https://creator.nightcafe.studio/ image generation web site. It is free with restrictions.
Reply 2
Eugene Griffin EGRX
Productive day
 
Instead of forging ahead with the plan, I decided to test the plan both physically and mentally.
 
HO scale Layout 2025_7 copy.jpg
 
The first concern was the switch back using the industry lead at the back center of the above image. The switch location and the switch back seemed incorrect  and awkward.
 
The second issue was the closeness of the foreground track to the edge of the shelf. This could result in possible loss of equipment.
 
The third, was the additional 5.5 inches added to the original module at right of the above image. The new plan is below.
 
HO scale Layout 2025_ver2.jpg
 
The new plan (above image) removes the rear switch back from the layout, increases the distance in the front of the layout, and removes the additional 5.5 inches from the right of the original module.
 
In addition, the feed elevator building no longer accepts boxcars and requires only one track, a new industry is served on the left of the above using an independent track, the older fertilizer building is no longer rail served (maybe), and a team track with dedicated switchback is seen front left in the image.
 
 
IMG_3771.jpeg
 
The original plan for the module was a modern adaptation of the timesaver, and required space for a locomotive and freight car between the points of the turnout and the end of the track. (above photo)
 
IMG_3772.jpeg
 
Of course, the game required strict control of the length of the equipment 😏. (above photo)
 
 
 
 
Reply 3
Eugene Griffin EGRX
Step by step
 
IMG_3778.jpeg
 
IMG_3779.jpeg
 
IMG_3781.jpeg
 
Tested the placement of some structures and track length for the Walthers 67’ Trinity 6351 4-bay covered hoppers. There is enough room on the rear track for an empty hopper, space for a grade level crossing (above), a hopper being loaded/unloaded, and space to move the loaded hopper without fouling the turnout.
 
 
Work continues tomorrow.
 
 
Reply 4
Eugene Griffin EGRX
I had to run an engine
 
IMG_3789.jpeg
 
Managed to get some tasks done on the Office switching layout this week. Completed factory/warehouse track and modified the structure to ensure clearances (above). A photo from an iPhone or other camera taken between the boxcar and the structure really simplifies the process. The plastic bricks will be replaced by concrete (plaster of Paris).
 
IMG_3791.jpeg
 
The above photo shows the extended warehouse track and mainline, and recycled scenery.
 
The Athearn Ready-to-Roll (DCC ready) formally Mid South now EGRX CF7 started without any issues. I m not sure when this engine was lasted used, when the cheaper DCC decoder was installed, or when it was painted for the EGRX. It will now be the official engine of the layout and a new DCC sound decoder will be installed.
 
The track needs cleaning, the turnout frogs are not powered, and the turnouts used nails to set the points. However, I had to run the engine.  
 
 
Reply 4
Eugene Griffin EGRX
Test of a SDXN147PS SoundFX v3 Decoder and a DPDT turnout control
 
A SPDT switch is enough to energize the turnout frog based on the the turnout point setting. In this case I had 7 DPDT switches in the parts container and decided to use them. The required parts were the DPDT or SPDT switch, plastic straws, a stiff metal wire. A offset bend in the wire acts like a spring to absorb excessive tension or compression. (photos below)
 
IMG_3814.jpeg
 
IMG_3813.jpeg
 
The above shows the hidden mounting are for the turnout control. It will be hidden behind fascia and a visible pull/push bar will be added. For now there is enough space for a finger to throw the turnout. (Six more to install)
 
IMG_3816.jpeg
 
The rear track is installed and wired (above image). The elevator structure will fill in the blank space between the silos and will cover the 67’ hopper. The other hopper represents the ready to move location for the industry. An additional track will be added in the foreground for a small freight yard (black line in above photo) after the turnout controls are completed. A planned switchback for a team track (red line) will not be added. The team track occupies a location of excessive reach across for uncoupling. Any freight cars on the team track will more than likely be knocked over. The location will instead be used for static models of lumber, vehicles, or what might be stored in a trackside location.
 
A SDXN147PS SoundFX v3 Decoder was installed into the EGRX CF7. This N scale decoder has sufficient current ratings based on stall current of the CF7 and was immediately available locally. Other applications may result in decoder overheating and damage.
 
The Decoder’s start, mid., and max. voltage CV values were modified to a setting for a switcher listed in the general Digitrax decoder manual. In addition, the acceleration and deceleration rate CV values were modified to prevent sudden starts and stops.
 
There appears to be no connection with brake squeal function in this sound decoder unlike another sound decoder that allows for the modification of the deceleration rate during the brake squeal function.
 
The below video shows smooth acceleration and deceleration. The only issue is the timing of the deceleration to prevent excessive speed when coupling to equipment. Changing the deceleration rate should allow for better control without the braking function offered in another sound decoder.
 
https://youtube.com/shorts/SzxNtl6moFk
Reply 3
Eugene Griffin EGRX
SD40-2 Road Switchers and now is the time
 
[259338%2F9427404%2Fmceclip0]
 
I am not modelling the UP so the two Athearn SD40-2 units (1616,1618) must be leased (Photo above). Both units are equipped with Soundtraxx DCC decoders. These decoders have the link between the brake squeal and deceleration of the locomotive. (video below)
 
 
Seeing the SD40-2s working in  a consist and continuing with the train room cleanup project resulted in a thought of seeing the road switchers hauling a mixed freight to the modelled location. This is not possible with a 8’ 11” switching layout. However maybe the O gauge (Not Proto48 that’s locked in) idea could be moved. The O gauge modules are easily disassembled and can be stored . I moved a 7’ previously built HO scale module to the location for visual guidance. (photos below)
 
IMG_3818.jpeg
 
IMG_3823.jpeg
 
From the edge of the above module (foreground in image) to the wall is 19’ 6”, definitely an impressive scene if developed. On the opposite wall a 12’ length is available for a staging yard under a Proto48 expansion area. At a minimum, the road switchers could enter the scene with mixed freight for the area, switch the industries, and leave the scene with the pulled freight cars. A further extension of the mainline to the right of the plan below would allow the modelling of through freights.
 
The office switching layout only models the switching of the industries in a compressed area, simulating the movement of freight cars using  the removal by hand method.
 
HO scale Layout 2025_ver3_out_of_office.jpg
 
Adding to the thought of change is a stack of HO freight yard modules (photos below), the required supplies are in house, and this will help with the train room cleanup project.
 
IMG_3821.jpeg
 
IMG_3831.jpeg
 
The time to make the change is now before scenery starts on the office switching layout.
Reply 4
Eugene Griffin EGRX
Watching the paint dry
 
Yes the HO scale office switching layout is moving out of the office.
 
The theme will stay the same a Prairie town in the winter. The single scene will occupy a straight section over 19 feet in length plus an additional 7 foot Ikea shelf (photo below) attached at an angle to further define the town’s industries. The tracks leading into the scene will be hidden both connecting to a staging yard on the opposite wall.
 
IMG_3837.jpeg
 
IMG_3835.jpeg
 
IMG_3833.jpeg
 
Instead of watching the backdrop paint dry, I decided to look at possible buildings for the scene. The above structures have been packed and out of sight for years. A few interesting possibilities in addition to a few kits and accessories may help build a scene that should include old low-rise buildings next to modern industrial areas. Interestingly, the current price in the local hobby shop for the Walthers Heavy Duty Overhead Crane is 50% more than the price tag in the photo.
 
IMG_2668.jpeg
 
 
Reply 6
Eugene Griffin EGRX
Rebuilding at the new “Out of Office” location
 
IMG_3850.jpeg
 
The above industry will represent a feed supplier located next to the tracks, It will consist of an old wooden warehouse, silos, and another building. The recently sided old warehouse sits on a newly poured field stone foundation. A little adjustment will be necessary before the side foundations are poured. This is a first attempt at this style of foundation in HO scale. The following two photos show the newly extended plastic manufacturer and the feed supplier. This end of former office switching layout was extended allowing for the larger structure and two truck bays next to the road. Further modifications are required including painting, weathering, and details for all shown structures.
 
IMG_3852.jpeg
 
IMG_3851.jpeg
 
A new industrial area will be modelled on a 11’ 8” extension that connects to an additional 8’ 10” section of mainline (photo below). The track plan has not been developed and the industries for the industrial area are still being considered. The tracks in town  will consist of two double ended sidings on either side of the mainline , and a storage track, in addition to the required sidings for the town industries. Industries in the town will include a grain elevator, fuel supplier (maybe), feed supplier, and plastic manufacturer. The manufacturers located on the industrial spur will depend on available railcars and  may include metal and lumber product fabricators (trusses, prebuilt structures) .  
 
The location of the Walthers ADM structure (center background of the below photo) will be a large wooden grain elevator. The actual ADM kits may not be incorporated.
 
IMG_3848 (1).jpeg
 
 
The train room cleanup project continues on the right of the above photo in preparation for the staging yard and a winter scene will be developed using the feed supplier and plastic manufacturer.
 
Reply 6
Eugene Griffin EGRX
Twelve feet ten inches for staging
 
IMG_3859.jpeg
 
 
The train room cleanup project continues with the removal of a old Proto48 curve that included a snow scene, addition of supports for a future Proto48 scene, addition of 53 inches of Ikea shelves, and most importantly the setup of the yard modules for the staging yard. The staging yard setup allowed myself to take a trip down memory lane and extract all possible modern era rolling stock. I now know I have enough grain service covered hoppers, covered hoppers with pneumatic unloading for plastic pellets, flatcars, tank cars, and 60’ High Cube boxcars to service the town industries. My memory suggests I have more than two 50’ boxcars, but maybe the missing 50’ boxcars are Athearn blue box models.
 
The available length for the staging yard was 12’ 10”. Out of the available length 11 inches were unused to ensure separation of the HO town scene from the Proto48 scene, 38 inches were required for the luxurious curve into the staging yard and the remaining length was consumed by #8 turnouts and the yard tracks. (photo above and below)
 
IMG_3856.jpeg
 
IMG_3860.jpeg
 
Obviously if the model represents a 67’ covered hopper then the length of the model can be calculated. The issue is accepting the reality that 12' 10" for a staging yard will not accommodate 20 HO freight cars on a single track nor will it hold eight 67’ covered hoppers on the longest track in this staging yard.
 
Three yard modules out of five were used of the two yard modules not used one module was placed in the staging yard approach area to hold the locomotive fleet. The other will be stored. (Photo below)
 
IMG_3861.jpeg
 
The main driver for the move of the HO scale switching layout out of the office is long freights pulling into town. Possible locomotive consists include the two SD40-2 with the GP40-2 and the two MP15AC with the two SW1500 . The BN SW1000 will be in private service at the Grain elevator, the GP35 had it’s drive shafts removed (Not sure why I did that) and the CF7 will be used in town for switching. (above photo)
 
Reply 6
tp
Cool 🙂
Reply 3
Eugene Griffin EGRX
Objectives
 
IMG_0115.jpeg
 
IMG_2080.jpeg
 
  • Model a Prairie town during the winter (Long trains, large grain elevators, sparse trees)
  • Model long freight trains rolling past the town
  • Model train meets in the town
  • Must have multiple industries for multiple switching tasks
HO scale Layout 2025_out_of_office_ver4.jpg
 
The above plan includes the following tracks:
 
Town:
    • Double ended siding (7+ ft)
    • Single ended siding (7 ft)
    • Plastic industry
    • Feed supplier siding
    • Grain elevator with two sidings and a engine storage track
    • Industrial spur (not completed)
Staging and Mainline:
  • Staging yard with approximately 12’ of run through track in the yard and an additional 12’ lead to the main
  • Over 24 feet of mainline track from the staging yard turnout (left side of plan) to the passing siding turnout (right side of plan)
 
HO scale Layout 2025_ver3_out_of_office copy.jpg
 
The original plan had two double ended sidings, one on either side of the main (above), and a single grain elevator track. The change in the plan should create an appearance of a large grain operation as seen in the first photo of this post. The plastic industry siding contains enough additional track to allow for switching of the grain elevator without fouling the main, and the feed supplier receives at most two carloads at any given time and therefore requires minimum switching distance.
 
Overall the plan allows for in town train meets with a restriction of 7ft on one train assuming train splitting is not allowed.
 
IMG_3852 copy.jpg
 
Work continues on the town tracks (new plan), taping and filling the open corner in the background, and fixing the taped joint in the background (above photo).
 
Reply 6
Eugene Griffin EGRX
Working on the Grain Elevator Scene
 
IMG_3901.jpeg
 
The above area circled in red will contain the grain elevator scene. The scene will include two tracks, one for storage of filled covered hoppers and the other for empties to be loaded. The two tracks will extend past the bottom of the above photo with one track cutting through the raised terrain and appearing to be a former connection with the mainline while the other track is hidden behind the raised terrain (foreground above photo) . The individual tracks will have a capacity to hold seven 67’ Trinity covered hoppers.
 
IMG_3936.jpeg
 
The above grain elevator scene was started on the 23rd of August and does not utilize any existing modules. Remaining work while the scene is in the office occupying the former switching layout location includes a remaining track section leading into the turnout, painting track work, ground cover, and painting of the silos. After this work is completed the scene will be placed on the layout.
 
IMG_3935.jpeg
 
The office has a darker shade of blue for the backdrop (above photo) compared with the layout’s backdrop (first photo of this post). I prefer the darker blue and now is the time to change it.
Reply 7
Eugene Griffin EGRX
Waiting for the glue to set  
 
IMG_3956.jpeg
 
IMG_3840.jpeg
 
The above photos show the change in background color, the first photo is the newer darker blue and the second photo was the original lighter blue, I definitely like the darker blue especially the lack of washout of the color under work lights. Lighting has to be considered in the development of this layout, not only to reduce shadows on the backdrop but to allow for blemishes in the paint as seen above the orange container.
 
The new double stacked container cars passed through the opening in the backdrop without any issues. I don’t have a modern Autorack car and trust it will also clear. After considering trees and embankments on either side of the track to hide the opening, like so many others, a combination of a highway bridge, trees, and the required embankments  will conceal the opening in the backdrop.
 
IMG_3951.jpeg
 
IMG_3953.jpeg
 
The snow test on the grain elevator scene is completed and after the glue sets the scene will be moved out of the office onto the layout.  In the above photo, at least to my eyes, the snow between the two silos appears to have a yellow tinge. It is the same color as the foreground snow. The office uses multiple lights with different temperature ratings, another reason to consider lighting when developing a layout.
 
IMG_3958.jpeg
 
 
The grain elevator scene is further back on the layout providing a good place for testing of various products and adhesives to create a winter scene. Hopefully the use of an older Atlas #4 turnout will not be regretted, similarly the placement of the turnout behind a hill will obscure it from view and assist with the train room cleanup project.
 
Completion of track work and electrical connections for the town spur will be completed after the grain elevator scene is moved from the office to the layout. Supplies to start the highway overpass should arrive this week and the scene to disguise the backdrop transition will start.
Reply 6
Eugene Griffin EGRX
The Grain Elevator scene
 
IMG_3966.jpeg
 
The grain elevator scene was built using a single layer of 1/2” thick rigid foam insulation board. Modules for this layout and past layouts used three 1/2” thick foam boards laminated together with PVA (white glue) and mechanical fasteners (drywall screws). The mechanical fasteners prevent the slippage of the foam boards and allow the usage of the module while the glue sets. The bond between layers requires a putty knife for separation after the white glue dries (setting time is unknown). In this location, it was easier to hand lay the track, add the grain elevator foundation, add silos, and add scenery while in a easy to reach location. A 1/2” thick layer of foam board allowed for easier integration with the existing module and easier placement at the location next to the backdrop. The risk was breakage during moving and placement.
 
The scene survived the move and placement without any damage.
 
IMG_3964.jpeg
 
The alignment of the track cutting through the embankment (above photo) allows for a future connection or a modelled past connection with the mainline and room to add an additional trackage for a 67’ covered hopper without fouling the mainline. Currently both tracks will hold six 67’ covered hoppers with rear track having room for expansion to hold more than one additional covered hopper. The planned double ended sidings in the town will have the capacity to hold a train with seven 67’ covered hoppers and assigned locomotives.
Reply 5
Eugene Griffin EGRX
It’s an Oval
 
IMG_3972.jpeg
 
Layout work stopped while I weathered and modified the Walther’s Lakeville modern-style warehouse being used as a manufacture of a product requiring plastic pellets. The above scene is located near the transition from the staging yard that is now concealed using a newly purchased Walthers’ kit. The initial intention for the project was to use what is available in the train room to help with the cleanup. The well cars (container cars) are also new, so much for intentions.
 
Keeping with the train room cleanup, all code 83 rail was consumed leaving older code 83 atlas track and code 70 rail, both will be used for the industrial spur. The problem, the remaining portion of the uncompleted oval that leads back to the staging area requires an additional 30 pieces of 3’ code 83 rail, this estimate includes the rail to make turnouts. The oval will accomplish the modelling of through freights.
 
Additionally, completion of the oval would allow for automation of the through freight traffic including active signals. A July 4th video posted on the ATSF Southern Transcon blog makes the thought of automation very tempting even for this simple oval track plan.
 
Reply 6
Eugene Griffin EGRX
Automation
 
HO scale Layout 2025_out_of_office_ver4 copy.jpg
 
I have never attempted to automate a layout and this is a first draft of a possible automation plan.
 
Does the above layout need an automated traffic control system. No!
 
The job of the operator of the layout includes a transfer job to the town from the staging yard, switching the town spur and the industrial spur (not completed), and returning the train to the staging yard. The same operator could set the turnouts, and activate a through train or trains stored on the 14’ double ended sidings at the bottom right of the above plan.
 
Alternatively an automated traffic control system could generate scheduled traffic from the 14’ double ended sidings reducing the job of the operator to the transfers and switching tasks in the town during periods when no traffic is scheduled.
 
Hypothetically!!
 
HO scale Layout 2025_out_of_office_ver4_1 copy.jpg
 
The town includes the mainline, a passing siding, and a local usage double ended siding. In addition, a turnout connects to the mainline for the town spur (upper part of the above plans) and a turnout continues past the local usage siding for the industrial spur (not drawn). A crossover, that will not be removed, also connects the mainline to the passing siding and is a remnant of the “Timesaver Game”.
 
IMG_3989.jpeg
 
The first requirement of an automation system is information on the current state of the points on all turnouts that will be part of any route taken by a train under it’s control. The system will need an electrical connection to an open/close switch connected to the throw of the turnout. In this case the above DPDT switch can take on dual duty where one side correctly energizes the frog and the other acts as the independent open/close switch for the automation system.
 
If all turnouts are manual and some turnouts are incorrectly thrown for the oncoming train the system could stop the train until the operator manually throws the switches for the correct routing. Alternately switch machines can be used allowing the automation system to correctly set the points of the turnouts for the routing. The automated turnouts in above plans are mark using a red on black “A”.
 
The above track plans identify the turnouts that require automation for through trains and opposing through trains that will meet in the town. The manually thrown turnouts with a connection to the automation system are identified by the yellow on black “M”. Incorrectly thrown manual turnouts could cause derailments or unexpected routing. In the event of incorrect alignment of the manual turnouts the automation system will stop the train and the local operator will correct the alignments. None of the the town’s spur track turnouts require connection to the automation system and are controlled locally. The exception is the turnout leading into the industrial spur and the local usage siding, this turnout is automated for convenience the same automation for convenience could be applied to all turnouts (for a price).
 
Train detection
 
Obstacle_edetection.jpeg
 
One method for train detection uses electrically isolated sections of track and electronics to monitor current flow in each of the isolated sections. Full train detection using this method will require the addition of resistors on the insulted side of a wheel of each freight car causing a small current  and allowing detection. Another possible method (above photo) uses obstacle detection by detecting reflected infrared light. The above example includes all electronics for voltage control and detection sensitivity for triggering a detection signal.
 
IMG_3980.jpeg
 
The obstacle detection modules using reflected infrared light will be mounted under the track and between the rails. In the above photo the red painted nails marks the spot on the mainline and passing siding where freight cars will not foul the other track. The ideal location for the detection modules is to the right of the identified location. Detection modules will be placed at similar location at the other end of the mainline and passing track. The automation system could track number of detection pulses entering a track and the number of detection pulses leaving a track using this arrangement.
 
IMG_3978.jpeg
 
The hypothetical automation system will start the train after verifying all turnout points are aligned for the trains route and all track is clear for the next track section the train will occupy on that route. In the event of a meet with an opposing train the system must stop the train before the fouling point of the opposing train’s track. The trains stopping distance is not exact and is a function of the decoder’s deceleration rate. The detection circuit will not detect the fouling of the opposing trains track if the train stops with the detector at a gap between the cars (above photo). This possibility assumes the couplers will not be detected. If the system accurately counts freight cars passing then the fouling will be caught.
 
IMG_3985.jpegIMG_3986.jpeg
 
In addition to counting, adding a second detector at a distance greater than the gap width between coupled freight cars will provide a method for the system to ensure all freight cars are past the fouling point. The left photo shows a possible clearance of the fouling point, whereas the right photo shows that neither detector is active and the fouling point is clear. If the locomotive does not activate the last detector before fouling then the opposing track is clear and no action is required.
 
Other considerations for the automation system include:
  • Multiple detector sets on each track of the 14’ double ended siding located at the bottom of the above plans will allow multiple trains on each track.
  • control of a signal system
  • communication with the DCC system
  • user interface
 
Hypothetically!!
Reply 6
Ray Hamilton
I’d be cautious of the reflected infrared detectors. I tried them and was unhappy with the results. Dark undersides when used between the tracks looking up failed to detect. When placed looking across the track, dark color car sides failed to detect.
 
I switched to active transmitter/receiver infrared detectors and have had no problems.
Ray
 
Modeling Southern Pacific’s Ventura Subdivision in the San Fernando Valley (GEMCO to Northridge) circa Summer 1958.
Reply 4
Eugene Griffin EGRX
I’d be cautious of the reflected infrared detectors. I tried them and was unhappy with the results. Dark undersides when used between the tracks looking up failed to detect. When placed looking across the track, dark color car sides failed to detect.
 
I switched to active transmitter/receiver infrared detectors and have had no problems.
Thank you for that information!  
Reply 2
Reply