A couple of observations
I think Dave has brought up a few excellent points. Looking at the latest plan, I also feel that it's got a few serious flaws.
When Dave mentions "the end of a session", he could mean a couple of things. You've discussed how the staging yard will feed into the layout, but what about once those trains get up there? Do they stay up there or do they come back down to staging? And once they come back down, how do they interact with the other trains still coming up? Or do all the trains go up before they all come back down again? He can also be referring to how do you plan on re-staging the trains (turning them) between sessions?
There are 4 areas on the current plan that I think need to be addressed.
First, a question: Do you intend this lower level to be 2 different lines at opposite ends of the layout (let's say Chicago and Los Angeles)? Previously, you have mentioned that the Blue yard will feed the Red helix approach (let's call this the BR line) and the Pink yard will feed the Green helix approach (let's call this the PG line).
If it's meant to be 2 separate lines, then you really should replace the central passing tracks in the triple-track areas with separate passing sidings on each main track. Alternatively, you could keep the triple-track passing sidings and have them be "shared" with each main track. Logically, they represent a siding on each main at each end of the railroad, but physically, they're shared.
Alternatively, you could fudge the lower line and have it represent 2 single-track lines that come off the helix to feed a double-track main. An example of this would be UP at Sierra Blanca, TX. To the East, the single-track ex-T&P line goes to Dallas, and to the Southeast the single-track ex-SP Sunset Line goes to San Antonio. To the West is double-track to El Paso. A set of crossovers gets trains from/to the appropriate track since UP tends to operate the double-track as directional running (typically right-hand running).
Now, on to the pain points:
At 2, the crossover is redundant and makes no sense at that location. You should remove it.
At 3, this track arrangement should be replaced with the same arrangement as at 1. As it currently stands, you need to occupy all 3 tracks just for 2 trains meeting on the BR line. The train in the center track needs to occupy the PG line before it can get back to the BR line. If you look at prototype track arrangements, each end of the center track almost always follows the arrangement as at 1.
At 4, again this should be reworked so the center track terminates as in 1. Currently, you essentially have long single-track arrangement leading into the Pink yard tracks. If you have a train leaving one of the middle tracks, and another one has to come in on another middle track from on the layout, the incoming train needs to hold all the way back at the 1-3 siding. Additionally, the lowest Pink track comes off the BR line. You can't even get to it unless you go from the PG line to the BR line way back at 3, and that train must use the 1-3 siding to get to that track. If needed you can shorten the siding at 1-3 and then move the siding at 4 further down the main away from the yard to make room for the turnouts. These sidings really only need to be as long as your longest staging track anyway.
Now, if you want to go the route of single-track to double-track idea, then you could get rid of the passing sidings altogether. You would just need a set of crossovers at the base of the helix and another set just before the yard. You would then handle the double-track as directional running, crossing trains over at each end as needed.
At 5, you have a turning loop to make restaging trains easier (good!), but what's your goal for restaging? Do trains from the Blue yard get turned and put back in the Blue yard, or do they get put in the Pink yard? (i.e. is a Chicago train turned around to head back to LA? Or does it magically appear in LA ready to go to Chicago? I see you've used one of the Blue tracks as a through track so you can run a Pink train through the loop and back to the Pink yard. But you have no way of doing the same thing for the Blue yard unless you run a Blue train all the way around, and then back it in to its yard track. I'd put a double-crossover on the bridge at 5. Then you could return the one Blue track back to staging, and could turn any train returning it back to its same track. The question then becomes is the length of the turning track around the helix long enough to hold your longest train and still clear the crossovers?
Keep up with the tinkering and new ideas. It's better to identify problem areas now in the planning stages rather than once you have all the track down and another level built on top.
Craig