trainzluvr

Please give me some feedback on these three options for my staging level (31" above the floor); or if there is another option I did not consider.

#1

 

#2


 

 

#3

One square is 1 ft. Train lengths are ~7-8 ft. although I could probably run longer through trains.

The staging track will be connecting to the double track helix (one end to the inner and the other end to the outer loop in #1 and #2). Potentially I will double track the connections between the ends of the staging and the helix so they connect to both loops, and also put cross-overs in between.

For added functionality, the peninsula will serve as a turn-around loop so the trains can be re-staged easily. I'm also thinking to add more track to the peninsula for additional staging (either stub- or double-ended) as seen below, with different track densities. This is based on the idea that there's never enough staging track... 

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
trainzluvr

The two options I'm thinking

The two options I'm thinking about are:
- to have the main staging at the top, and then double tracking and scenicing the peninsula run all the way to the helix (in blue at the bottom left);
- to utilize the peninsula as a turn-around curve and additional stub-ended staging as in the layout drawing below

The considerations for both options are really that when trains reach the helix, they need to climb 3 loops (12") up to the middle level and then go to the left side and enter the main yard (above the main staging).

After seeing so many videos with trains going through a helix, I realize I don't like that dead-time. Any way of minimizing this is worth while, imho. Originally I wanted to build an elevator on the left wall, but I dropped the idea because I did not have enough straight length for my train size.

So, my plan with the helix is to make it open on the outside and scenic the entire 7 loops so that the trains can be visible all the time and appear as if they are going through scenery (whatever is ~4" of height worth) and not just be hidden in some dark tunnel for 3-4 minutes.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
David Husman dave1905

Dead time

You do realize that the ENTIRE lower level is effectively "dead time"?

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
dark2star

staging in stages

Hi,

I like the concept of "sceniced staging". Just looking at your latest plan, why not do staging in stages, so to say?

You could do the "ready tracks" and just a turnback loop around the peninsula. Once you get a better feel for your staging you could add some staging tracks inside the loop and even later put the staging at the top in.

As a side mark, I did see some ingenious concept where the layout was operated bidirectionally, but on their way into staging trains were sorted to go only in a single direction through staging (like a one-way street). There was some stub-staging (and some reversing), there was even a way to turn trains and they would continue in the direction of the one-way-street. This allowed him to fit more trains through his staging in a shorter time and the control plant for selecting a train was simpler (there is only one way through). Might be worth a thought.

Have fun!

Reply 0
Neil Thomas Cadmaster

Sorry about the image size,

staging.jpg Sorry about the image size, but I have the same amount of tracks in my main staging and use them for east and west trains. The way I am looking at your staging diagrams I just see no reason for the complicated cross-overs through the wall. Am I understanding your intentions are that the "ready Tracks" connect to the helix on the left? If so you really have no reason to have a cross-over. 

Neil

Reply 0
trainzluvr

Compound ladders; sceniced staging, ready tracks

@Cadmaster, it's hard to tell what size your staging is, but by the looks of it, you seem to have more space than me? Is that a helix on the left or a reversing loop? Where does the other end connect to (on the right)?

@darkstar, do you remember where did you see that concept, was there a drawing included perhaps?

@dave1905, please read below if my idea with sceniced peninsula would fix the dead time, otherwise what else  could I do about it?

 

Below is a new version with compound ladders, where maroon is the main, orange is Eastbound (up the helix to middle deck) and Green Westbound (helix down from upper deck).

The orange tracks are longer based on the ladder orientation so I chose those to be incoming (to my railroad) trains. Although both orange and green can be both directions if the bridge across the entrance is used.

Shortcomings are that there's no reversing loop anywhere yet (where should it go?). Also, the "Ready tracks" are not long enough to accommodate the longest train coming from staging.

What I'm thinking is that while the trains are travelling through the sceniced (double track) portion, which could symbolize a Class 1 railroad, they would gradually climb up 4" before reaching the "Ready tracks."

This means I would start the helix 4" above the staging deck surface, reducing the helix climb to 2 loops instead of 3.

It also means that I could potentially have a reversing loop below the helix connecting to the bridge on the left and also to the two helix tracks for continuous running.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
dark2star

Comments & answer

Hi,

no, I don't remember where I read about the concept of the staging being uni-directional. However you could easily do so - just connect the downward leg of your helix to the bridge and the ready tracks only to the upward leg. You could even do a track along the back of the staging yard (at +1 turn?) to connect to the receiving end of staging with the bridge disconnected

You mentioned a place to turn trains, I think your peninsula would be a nice place to connect to a wye track. Especially if you don't go both directions through all of your yard you'll be fine with a simple wye

Looking at your latest diagram (which I quite like), I see something completely different: Trains coming down from your helix could travel along the wall all the way past a connection at the right end of the (now) green yard. The green yard would just be one or two tracks (stub-ended). You would reverse all trains into (fully stub-ended) staging on the peninsula. To get a train back into the layout you just pull it out of peninsula staging and go to the helix via the ready tracks. Which would give you a lot of space for extra scenery along the top. And would eliminate the bridge. (sorry for the mess!)

Finally, I like your idea of accessing the helix one turn up, however that would limit your access to the ready tracks severely. With the size of your ready yard I'd consider that carefully. However I do see an opportunity to have one access to the helix at +1 turn up, if it bypasses the ready yard. For example your trains to staging leave the helix early (crossing over the up tracks) and go around the ready yard to reach "ground level" where they enter the green yard. That would work. The track would be long enough to park three trains that need to go into staging quickly, so having a choke point at the connection to the green yard would be less of an issue.

Have fun!

Reply 0
Neil Thomas Cadmaster

  In answer to your

la_opt_7.jpg 

In answer to your questions. My layout space is approx 32'x28' The circle on the top left is a 1 3/4 turn helix up to the main level. The other end of staging comes out directly into my main yard. You can see below. I have made some minor changes to the as built, but for the most part what you see is what you get. page-001.JPG 

Where I say loose the turnouts. What I mean is the purple track that feeds the left hand staging keep it separate. Have a cross-over on the end of the blob and do basic scenery on the entire lower level. If crews can see their trains they are going to be a whole lot happier. Use the ready tracks as a temporary hold location. Not sure you need that many tracks, but It can't hurt if you do. 

Neil

Reply 0
trainzluvr

I incorporated some of the changes

I incorporated some of the changes proposed here, then thought to re-evaluate the stub-ended yard with double-slips. Reason for this is after looking at the last version it appeared to me that there was this huge network of compound turnouts which could be replaced with double-slips, achieving the same result.

Also, I felt that the cost of so many turnouts would be offset by using the double-slips in their place, along with reducing the complexity.

I am not sure whether both cross-overs are now necessary in the peninsula, because I added a cross-over at the throat of the staging yard. The inner track in the peninsula doubles as a wye, and the only way to achieve accessibility to both sets of tracks in the staging was to put a cross-over just before the throat. If there is a better solution to this, please tell me!

I also reduced the "ready tracks" by one, so that the return from the helix continues through without touching that yard. I believe this might be a better solution than the bridge over the entrance, as it reduces the number of "gates" at the entrance from 3 to 2 (middle and upper deck now).
The alternative with 3 gates would require me to loop around the bottom part of the helix and come around through the bottom wall where the "ready tracks" enter the helix, as it was supposed to spiral counter-clockwise.

I'm not happy with the length of "ready tracks" as they would not fit a train from the longest key track above which is 200" long. Perhaps I should shorten the stub-end tracks instead?

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
dark2star

Like it ever more

Hi,

it is looking less complex compared to some of the earlier proposals.

How will trains travel through the staging area?

  1. Train leaves helix and goes on the "rear inbound" track into the yard. (Access to all staging tracks).
  2. Train will be reversed and re-staged between runs using the "rear inbound" track.
  3. Train leaves the staging yard and goes to the ready yard. (Access to some staging tracks only via the "rear inbound" and the crossover in the middle of the peninsula)
  4. Train leaves the ready yard towards the helix via the "front outbound" track.

Naturally there is a choke point at the entrance of the main staging yard. Which is not a problem as there is enough capacity on the inbound and outbound tracks for trains to wait. However the "front outbound" track is only available to half of the trains leaving the staging yard (the ones accessed via the very front track of the staging yard). If you could move the crossover closer to the yard you'll improve the use of the "front outbound" track.

You mention the length of the ready yard. I don't see an issue there, you can use the "front outbound" track on the peninsula to "ready" a very long train and still get trains in and out of the main staging yard via the "rear inbound" track. However that would be improved by moving one or both crossovers on the peninsula.

Finally, while I understand (and somewhat like) the chain of double slips in the middle of the yard, I would expect it to be sufficient to have these only on the front three or four tracks and just park the trains one behind the other in the long rear tracks?

Have fun!

Reply 0
jimfitch

Dave point out that the

Is the entire orange track plan above staging?  Dave point out that the ENTIRE lower level is effectively "dead time"

What Dave said didn't bother me too much at first because staging is by nature dead time and a needed element in many layouts. 

However, with the last design with entire orange plan with stub-end yard with a long row of expensive double slip switches, and a stretch of "ready track" all before the helix, that is a LOT of dead track area dedicated to storing and staging trains (staging on steroids).  For sure you would want a lot of access clearance and perhaps scenic it and perhaps see if you can work any of it into to real world part of the layout.

Or am I misreading the last iteration track plan?  It seems like entirely half the layout is staging?

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 0
David Husman dave1905

Plan

This is one of the least flexible plans so far.  100% of the trains entering staging will have to be manually turned.  There is no "run through" or double ended staging at all.

I still don't understand the purpose of the "ready tracks", especially if the bottom level is sceniced.  If the trains can't go up the helix, why are you taking them out of staging?  If a mole is operating the bottom level why not put the "ready tracks at the top of the helix so the operators just pick the trains up at the top and the helix and staging is entirely "invisible".

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
joef

Who will operate staging?

Who will operate your staging? If it’s your train crews, then those double slips will be a disaster. I have a hard time getting my train crews to figure out a regular six turnout ladder, much less a compound ladder or heaven forbid, one with double slip switches that overlap two yard ladders. There is also a principle in staging: don’t forget maintenance. Assume one or more turnouts in staging will fail and need replaced. Have you allowed for that?

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
HVT Dave

@ Joe

Quote:

those double slips will be a disaster. 

Joe, he's been told the same thing by several other excellent modelers.  But, he keeps insisting on adding them.  Guess he'll have to learn from his own experience.  

Dave

Member of the Four Amigos

 

Reply 0
trainzluvr

My (grand?) vision...

I made another revision removing the "ready tracks", as it was noted that they were redundant.

Please allow me to to explain my vision of what I'm hoping to achieve...

In the bi-directional flow of traffic, blue staging tracks are Westbound trains that climb the helix (via red helix track) to the middle deck, while pink are going Eastbound climbing to the upper deck (via the green helix track).

In the unidirectional flow, both blue and pink staging tracks are climbing the helix (via red track) to the middle deck, while incoming trains descend from the upper deck (via green track) back into staging.

Entire lower deck you are seeing is representing a Class-1 railroad. By scenicing and double and triple-tracking I hope it would add enough suggestion for that, allowing for some very long sidings where trains can meet, pass or wait. Potentially also alleviating the dead time through that sceniced run.

This is entirely the domain of CTC - no grubby fat human fingers will be touching turnouts on these tracks, including those double-slips that everyone is worried about. If/when I make it to the operations on this railroad, I envision 4 (potentially 5) operators plus a dispatcher who will also exclusively manage trains on the blue and pink tracks.

When a dispatcher orders the engineer to take a train on Blue 1 track, (s)he would be assisted by the automated system that would line all the turnouts up for the desired traffic, taking guesswork out of the equation.

In the absence of a human dispatcher, this railroad will be fully computerized so that 1 or 2 people can run it. I'm talking about unprecedented automation using computer vision, neural networks and potentially voice comms. I am fairly confident I can do a lot of this even right now.

It is one of the reasons I switched back to H0 from N scale, because the larger scale allows me more room for things like in-cab cameras, automated de/coupling, engine and rolling stock feedback, and generally more room for all kinds of electronic sensors.

I also believe that AR (Augmented Reality) will play a large role in our lives in the near future, and I see no reason why couldn't we extend it into model railroading. Even today, I can have a cab view from my locomotive using a built-in camera. Why not add a bunch of other fully physically simulated things such as fuel and air pressure gauges, speed, grade, etc? They are all there in the prototype, and if I can have it in my model railroad, it will bring me closer to experiencing a real thing every time, escaping the bird's eye view we are all confined to.

I hinted about this on the other forum last year regarding fully scenicing tunnel insides, but it fell on deaf ears...

Anyway, I apologize for going too far off topic - please comment on the above staging plan if you don't care about automation.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
David Husman dave1905

Plan

The track plan you have will be horrible for the operation you have in mind.

You are looking only at the start of a session, not looking at the end of a session.

Good luck!  Keep us posted on how it works out.

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
HVT Dave

Augmented Reality

@ TrainzLuvr, I totally get your Augmented Reality, a kind of melding of virtual reality with physical model railroading.  That explains your choice of the Z21 system with its cab view integrated into the digital throttle.  And I think I am starting to understand where you are headed with the CTC and automated running concepts as they apply to your layout.  I look forward to following along as you build your layout and implement this technology.  You can check out my blog and track plan to see how I incorporate double-ended staging and continous/automated running via the link below.

Dave

Member of the Four Amigos

 

Reply 0
trainzluvr

Why is the latest plan horrible for operation?

I would like to understand what am I missing at the end of a session that makes it as such. Is it that trains cannot be turned around (yet), or something else? A lot of plans I've seen have stub-ended staging yards and their owners seem quite content with them...

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
trainzluvr

I went ahead and answered my own question

I really did not want to build a gate on all 3 decks at the entrance. But after looking at the last plan, I realized that trains coming from the helix (and the upper deck) would not be able to reach their origin (Blue) tracks, and also that congestion would be created on the single outbound main (the one below Pink tracks).

This is still not fool proof - I need to relieve the congestion on the inbound main going to Pink tracks with outbound trains from Pink going to the upper deck (travelling the opposite direction of my railroad - Eastbound). Perhaps another cross-over somewhere along the main line?

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
David Husman dave1905

Reverse

The entire lower level is a "reversing section", not just the loop you added across the aisle.  Everything from the base of the helix to the balloon loop.  I would suggest making the balloon loop a reversing section and the smaller of the helixes, since its unlikely that you would have two trains in the short helix at the same time.

It will also become complicated because trains at the extreme eastern end of the layout will have to share sidings with trains at the extreme western end of the layout, leading to the possibility of an EWD train having to meet another EWD train (or vice versa) or a EWD and WWD train both physically going the same direction on the same track.

You don't have "double track" on the lower level, you have two single tracks, which are operationally hundreds of miles apart, but physically next to each other.

There are also considerations because you won't be able to arrive a train in New York and depart a train at Los Angeles at the same time because they could both occupy the double slip lead at the same time.

Probably the thing that will determine how fast you feed trains onto the layout is the time it takes to transit the interior helix.  Whatever the time is to climb the helix, twice that time is the feed rate for launching trains.  If it takes 5 real minutes to climb the helix then you won't be able to run trains more then about 10 real minutes apart.  If you are running unidirectional (all trains on the visible portion of the layout operating in the same direction) the restricting piece will be the time it takes to get from the start of the double slip lead, around the balloon loop back to the double slip lead.

Previously I had thought you had a "double track" helix, when what you have are two nested single track helices.  In that case you would need the "ready tracks", not as staging , but as meeting points, because the helixes now become the longest single track stretches on the layout and will need sidings at both the top and the bottom.  The "turn time" in the single track determines how frequently you can run trains bidirectionally.  The turn time is how long it would take a train to leave the last siding before the longest single track, run to the next siding, then let a train at that siding run back the other direction across the longest single track to the first siding.  What ever that time is, to run from A to B and back to A, on average you can't feed trains onto the layout closer than that spacing or you will jam up the layout with trains stacked up waiting their turn on the longest single track (the helix).

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
joef

The combined double slip ladder

The combined double slip ladder is a bad idea. It’s complex, expensive, confusing, and very limiting operationally. You’re saving a maybe a foot of staging track length but operationally creating a major bottleneck with the shared yard ladder. And one train on the ladder can block the combined two staging yards and make them unusable for any other trains in staging while it’s traversing staging. Plus making sure the four points on each double slip are properly aligned will be extremely tricky without some form of complex computer controlled track selection route control. Even then derailments and trains accidentally colliding with trains in other staging tracks are going to happen. Replace this with two parallel yard ladders using ordinary turnouts with double track routes in and out of each staging yard and you will immediately increase staging throughput by 2-3x. As it is, your combined single yard ladder with the slip switches and your single track feed in/out of staging greatly constrains staging train throughput.

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 0
Craig Thomasson BNML2

A couple of observations

I think Dave has brought up a few excellent points.  Looking at the latest plan, I also feel that it's got a few serious flaws.

When Dave mentions "the end of a session", he could mean a couple of things.  You've discussed how the staging yard will feed into the layout, but what about once those trains get up there?  Do they stay up there or do they come back down to staging?  And once they come back down, how do they interact with the other trains still coming up? Or do all the trains go up before they all come back down again?  He can also be referring to how do you plan on re-staging the trains (turning them) between sessions?

There are 4 areas on the current plan that I think need to be addressed.

a_opt_10.jpg 

First, a question: Do you intend this lower level to be 2 different lines at opposite ends of the layout (let's say Chicago and Los Angeles)? Previously, you have mentioned that the Blue yard will feed the Red helix approach (let's call this the BR line) and the Pink yard will feed the Green helix approach (let's call this the PG line).

If it's meant to be 2 separate lines, then you really should replace the central passing tracks in the triple-track areas with separate passing sidings on each main track.  Alternatively, you could keep the triple-track passing sidings and have them be "shared" with each main track.  Logically, they represent a siding on each main at each end of the railroad, but physically, they're shared.

Alternatively, you could fudge the lower line and have it represent 2 single-track lines that come off the helix to feed a double-track main.  An example of this would be UP at Sierra Blanca, TX.  To the East, the single-track ex-T&P line goes to Dallas, and to the Southeast the single-track ex-SP Sunset Line goes to San Antonio.  To the West is double-track to El Paso. A set of crossovers gets trains from/to the appropriate track since UP tends to operate the double-track as directional running (typically right-hand running).

Now, on to the pain points:

At 2, the crossover is redundant and makes no sense at that location.  You should remove it.

At 3, this track arrangement should be replaced with the same arrangement as at 1.  As it currently stands, you need to occupy all 3 tracks just for 2 trains meeting on the BR line. The train in the center track needs to occupy the PG line before it can get back to the BR line. If you look at prototype track arrangements, each end of the center track almost always follows the arrangement as at 1.

At 4, again this should be reworked so the center track terminates as in 1.  Currently, you essentially have long single-track arrangement leading into the Pink yard tracks.  If you have a train leaving one of the middle tracks, and another one has to come in on another middle track from on the layout, the incoming train needs to hold all the way back at the 1-3 siding.  Additionally, the lowest Pink track comes off the BR line.  You can't even get to it unless you go from the PG line to the BR line way back at 3, and that train must use the 1-3 siding to get to that track. If needed you can shorten the siding at 1-3 and then move the siding at 4 further down the main away from the yard to make room for the turnouts.  These sidings really only need to be as long as your longest staging track anyway.

Now, if you want to go the route of single-track to double-track idea, then you could get rid of the passing sidings altogether. You would just need a set of crossovers at the base of the helix and another set just before the yard.  You would then handle the double-track as directional running, crossing trains over at each end as needed.

At 5, you have a turning loop to make restaging trains easier (good!), but what's your goal for restaging?  Do trains from the Blue yard get turned and put back in the Blue yard, or do they get put in the Pink yard? (i.e. is a Chicago train turned around to head back to LA? Or does it magically appear in LA ready to go to Chicago? I see you've used one of the Blue tracks as a through track so you can run a Pink train through the loop and back to the Pink yard.  But you have no way of doing the same thing for the Blue yard unless you run a Blue train all the way around, and then back it in to its yard track.  I'd put a double-crossover on the bridge at 5.  Then you could return the one Blue track back to staging, and could turn any train returning it back to its same track.  The question then becomes is the length of the turning track around the helix long enough to hold your longest train and still clear the crossovers?

Keep up with the tinkering and new ideas.  It's better to identify problem areas now in the planning stages rather than once you have all the track down and another level built on top.

Craig

See what's happening on the Office Park Zone at my blog: http://model-railroad-hobbyist.com/blog/49643

Reply 0
David Husman dave1905

Options

The staging the way he has it drawn can be operated two different ways conceptually.  Which way he chooses will determine which way it should be connected and wired.  They aren't necessarily mutually exclusive, but choices need to be made, loop is the simplest, out and back is the more complicated.  The combination is mechanically and electrically the same as out and back, just operationally more complicated.

goptions.jpg 

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
trainzluvr

Another revision coalescing suggestions

As a bit of a background, I have been trying to keep my railroad "sincere" direction wise, making it a "true" South railroad (East to the left, West to the right). This works for Blue tracks all the way, and for Pink tracks starting from the upper deck on.

Operationally, Blue tracks go up to the middle deck (Westbound) while Pink go to the upper deck (Eastbound). I would optionally like to use Pink tracks as Westbound only as well, in case I choose to have trains only go in one direction (Westbound to the middle deck, via red outer track) and then come back down to staging (off the green inner track).

That Yellow middle track after the staging is where I'd like to hear some comments about. It appears to help Blue trains come back around, but it does not help the Pink trains reverse. I guess I need something similar on the other end.

I think that a lot could be resolved if the Green track from the helix looped around the bottom of the helix and crossed the entrance gate to the other side. But, before I put anything on paper, I need to obtain the "building permit" from my Supreme Overlord to take another 3" of hallway towards the bottom of the plan.
Another option that could work is to climb-up ~4" starting from the middle cross-over all the way to the helix and connect to the 2nd loop outer track. Then the inner track can go around the bottom on the 1st loop and to the gate without needing to bulge into the hallway.

Also, in order to fit tracks on the upper right (staging entrance), I ended up using Fast Track curved templates as that was the only geometry that would fit the available space. Not sure how I feel about that - never made any turnouts before. I know Joe makes it look easy, but I guess I have to try it myself and see how it goes. The concern there is the distance from the aisle to the electrical panel that I'm trying to keep as close as possible.

Thank you everyone for your suggestions.

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 0
David Husman dave1905

Center sidings

Can't give you a definitive answer since I don't know if you are operating like its a loop or an out and back layout.

I personally would lose the center sidings.  They are complicated when its one line, they will be very complicated when its actually two different places at the same time, with four trains trying to meet at one siding.

I would think that a pair of sidings one on each lead to the helix would be sufficient.  I would put a pair of crossovers on the lift out bridge to the balloon loop and no other crossovers between the leads to the helices.

The yellow track goes away.

Electrically and operationally cleaner.

 

Dave Husman

Visit my website :  https://wnbranch.com/

Blog index:  Dave Husman Blog Index

Reply 0
dark2star

Not sure

Hi,

there have been some interesting discussions over the weekend. However I'm still not sure. In fact I liked the plan from Friday morning ( https://forum.mrhmag.com/post/question-about-staging-track-arrangement-12210347) best, so far.

Anyway, I was thinking your helix would be a double-track helix with trains going up on the outer track and trains coming down on the inner track. Which will also allow you to have more than one train going up while more than one train is going down.

With the pink and the blue yards, as soon as you have (one or both of) them double ended you need a running track passing each of them. If you make it one long single-ended yard, you don't even need any running track.

Your latest plan from Sunday evening has a lot more running tracks and less storage tracks, while limiting access. Look at a train coming down the helix on the green "down" track and needing to go through the turning loop into the pink yard. It has to choose tracks right out of the helix, blocking all movements out of the blue yard. It will even block trains out of the pink yard to the red "up" track. You'll end up running all trains from the helix directly into the pink yard and re-staging them to go to the layout via the blue yard. Which essentially reduces your storage capacity to ~1/3rd of Friday morning's plan.

When you mention automating the layout, I would give up on assigning yard tracks to certain destinations - your software will do the assigning nicely. In that case it would even be sufficient to have a bunch of long single-ended staging tracks and a turning facility - your software can optimize storage so that trains are available in the order of being called. But you need to have good access.

With the Friday plan linked, there would only be a few changes to allow trains entering and leaving staging with minimal interference. In that plan the ready yard is fine, because it allows trains to be pre-staged, so that there will be trains going to the helix can leave basically one after the other, even while trains are arriving down from the helix. The size of your ready yard can be changed depending on your operating scheme.

I would go back to the Friday morning plan. If your helix is both tracks up and down add a set of crossovers between the helix and the ready yard. Move the peninsula crossover to the yard throat. Put the double slips only on the front two or three tracks. That will give you a rather simple design with lots of storage. The long access tracks on the peninsula and the ready yard will provide the buffer to allow trains entering and leaving at the same time. There is no need for staging trains crossing the aisle on a bridge.

OK, enough said. I'll keep quiet now

Have fun!

Reply 0
Reply