Yaron Bandell ybandell
This blog will serve as a place to show the progress of my build of the Philadelphia & Reading bridge over the Susquehanna river in Harrisburg, PA.

Build Highlights:
  • Bridge over the Susquehanna river, Harrisburg, Pennsylvania, USA
  • Bridge consists of 51 concrete arches
  • One plate girder bridge
  • Dual track
  • Dual track crossing underneath on west side
  • 0.7% grade
  • No compression
  • Building both dual tracks to Free-mo module standards
  • Main bridge arches, pilasters and piers to be scratch build from 20-thou and 40-thou styrene sheet
  • Main bridge pier cutwaters to be 3D printed
  • Handlay code 83 track on Central Valley Model Works tie strips
  • Fast tracks #10 switches for cross overs
  • Include Free-mo Modular Signal System plus signal heads.
Bridge Background:

A Philadelphia and Reading bridge, now part of Norfolk Southern crossing the Susquehanna river in Harrisburg, PA.

In this Google Earth image you can see the bridge is the one closest to the Interstate 83 bridge:
[Google_Earth_01_1080px]

The complete bridge by an unknown photographer:
[P%26R%20Bridge%2043]

An aerial close up photo by an unknown photographer:
[P%26R%20Bridge%2040]

Originally this bridge was built with only 46 concrete spans in 1924. Each span plus corresponding pier structures measures 76'-3" in length. Each concrete arch measures 66', while the piers are 11’-6” and 9’ wide. There is a reason the piers alternate between these two widths. This bridge was build by replacing an existing bridge in place. The old bridge had spans of 152’-6” wide. The wider piers of the new bridge encased the original bridge’s piers, while the narrower piers were purpose build. At a later date five spans were added on the east side, giving the bridge a total of 51 concrete spans.

An elevation drawing from the west side of the bridge as found in Railway Age 69 volume 21:
[PRSusquehannaBridge-RailwayAGe69-21-002]

In this same Railway Age issue, a detail view of the west side part of the bridge was found:
[PRSusquehannaBridge-RailwayAGe69-21-004]

The pier encasing process is shown in this photo published in Railway Age 73 volume 23:
[PRSusquehannaBridge-RailwayAge73-23-004]

On the west side the mighty PRR crossed with two tracks under the first concrete arch, while the Northern Central crossed with three tracks under the deck girder bridge.

To date, only the PRR tracks (now also Norfolk Southern) still cross under the  bridge as can be seen in this photo by an unknown photographer:
[P%26R%20Bridge%2034]

On the East side there is a pair of cross overs that are protected by signals.

The bridge measures nearly 3,960' in total length, which includes these 51 spans and a 69' plate girder bridge on the west side. Without compression in HO scale this equates to 45'-6". Now convert this all to 14 similar sized module sections for ease of build and transport and you’ll end up with a nearly 50’ long Free-mo module.

The aim is to build the bridge as it looks in the current time frame: the 51 arches, the Northern Central tracks are gone, but the PRR tracks are still there. The PRR track will be modeled such that the module can also be used as a 26” long double track Free-mo module if a setup can’t accommodate the full 50’ bridge.

I'll update this thread with pictures of the various build activities when they occur with the intend to create a more detailed article for publication at a later date. Enjoy!

-Yaron.
Susquehanna Bridge Build | My Personal Website | Capitol Free-mo

Reply 25
Yaron Bandell ybandell
thewizard1 wrote:
There one more expense you may have when it comes time to paint. I would not suggest using an air brush if you want to get it painted this year.
A gun like this will make life much easier. Also a 20 foot hose😁
Screenshot_45.jpg
Exactly! I need to buy one of those anyways to refinish some kitchen cabinets and doors in the house, so adding that to the toolbox isn't a problem. When I calculated the amount of primer needed I ended up with something like six large rattle cans worth of primer.... It's amazing how everything needs to scale up for a project like this 🙂 It's not like: "Oh, I still have a used can of primer on a shelf. Heat. Shake. Shake. Spray. Spray. Done."
 
I'm currently trying to figure out the best colors of paint to get to mimic the concrete colors of the bridge. I have one handicap of having a mild red-green color deficiency which makes matching colors slightly more difficult. As far as I can tell the main part of the bridge has a yellowish/light almond hue to it with the top railing part being more greyish in tone.
Reply 3
thewizard1
You can get a computer generated color match in automotive paints from a reasonable size color photo. Automotive base coat is a lacquer based product there is also waterborne paints that are Alkyd paints I believe that is what the Tru-Color model paints are. May be worth some research and your primer will be key as it will need to be plastic compatible.
The only thing I have mastered in life is how to spend money
Reply 2
dark2star
My local paint shop can do color matching if you have a large enough "chip" of paint. The machine squeezes well-measured amounts of color into the "base medium."
 
They have quite a few different "base media" to choose from - various laquers, acrylic paints, wall paint, ... - I think they can even color-match primer paint... They were nice enough to send us to another local paint shop when we wanted something  they don't specialize in.
 
My kid wants to repaint a Matchbox car for a different fire service color. In Germany there are "standardized" colors (RAL-1234 with the numbers pointing to an entry in their table) and the local supermarket had the exact color in their very limited range of model colors :-)  It even comes in very tiny paint tins :-)
Reply 3
Yaron Bandell ybandell
thewizard1 wrote:
You can get a computer generated color match in automotive paints from a reasonable size color photo. Automotive base coat is a lacquer based product there is also waterborne paints that are Alkyd paints I believe that is what the Tru-Color model paints are. May be worth some research and your primer will be key as it will need to be plastic compatible.
Problem with photo colors is that they can wildly vary based on how the photo is printed.
 
 
dark2star wrote:
My local paint shop can do color matching if you have a large enough "chip" of paint. The machine squeezes well-measured amounts of color into the "base medium."
 
They have quite a few different "base media" to choose from - various laquers, acrylic paints, wall paint, ... - I think they can even color-match primer paint... They were nice enough to send us to another local paint shop when we wanted something  they don't specialize in.
 
My kid wants to repaint a Matchbox car for a different fire service color. In Germany there are "standardized" colors (RAL-1234 with the numbers pointing to an entry in their table) and the local supermarket had the exact color in their very limited range of model colors :-)  It even comes in very tiny paint tins :-)
I think NS would have a slight problem if I were to take a small pick axe to the bridge to get a sample of the concrete 🙂
 
I'll have to make some educated guesses and use washes to weather the bridge such that the exactness of the concrete color doesn't matter as much. Plus I'll get my wife and kids to be my color matching eyes.
Reply 4
dark2star
Hi,
 
while you could take a photo, edit it to create a group of similar color renditions and hold it up to the bridge for color matching, I don't think that would be useful.
 
Many structures will look different in different lights. There's a church on a hill across town. Some days it appears a very dark grey, almost black. Yesterday evening it was lit up by the setting sun and appeared a dazzling white-yellow in front of a very dark cloudy sky.
 
Getting close enough is good enough. You may want to get the scenic details and the water color right, so that the overall look is consistent. If the bridge looks like a sunny day, so should the river and the street/bushes at the banks of the river. I think that getting the feel right matters more than "exact" matching of color. Mostly.
 
Have fun.
Reply 4
Yaron Bandell ybandell
I had the die cutters running most of the weekend while working on 3D CAD updates of the pier bottoms. I had to create 6 versions of "cut waters". The piers alternate in width due to the encasing of the old bridge piers. Then there are two piers that are extra wide for some unknown reason.  Then the angle on the cut water on the north side is the same for each pier, while on the south side the angle varies between the narrow, wide and extra wide piers. This then makes for the six cut water versions. This is where using parameterized 3D CAD drawings are handy. Draw once, alter a few variables and you have your six versions.
 
The base is designed to align with the pier internals and can hold a carriage bolt so I can bolt down the bridge to the module using a wing nut. The base also needs to have an opening to accommodate passing through four Anderson Power Pole connectors for track power.
 
This is what I came up with:
 
[20230806_212902]
 
And this is how the pier internals and a pilaster would connect with these 3 components:
 
[20230806_212753]
 
I did notice that I need to lower the cut waters as they are too tall. I also need to either 1) change the side components of the pilasters and the front components to accommodate the mounting method on the back of the cut waters, or 2) make a slot in the back of the cut water so the pilaster can slide in "as-is". Either way: back to the drawing board.
 
Oh, and it's confirmed that the bridge will be at the Timonium, MD train show in this October, no matter the state it's in.
Reply 7
Yaron Bandell ybandell
dark2star wrote:
Hi,
 
while you could take a photo, edit it to create a group of similar color renditions and hold it up to the bridge for color matching, I don't think that would be useful.
 
Many structures will look different in different lights. There's a church on a hill across town. Some days it appears a very dark grey, almost black. Yesterday evening it was lit up by the setting sun and appeared a dazzling white-yellow in front of a very dark cloudy sky.
 
Getting close enough is good enough. You may want to get the scenic details and the water color right, so that the overall look is consistent. If the bridge looks like a sunny day, so should the river and the street/bushes at the banks of the river. I think that getting the feel right matters more than "exact" matching of color. Mostly.
 
Have fun.
Darkstar, I'm with you on this. I think if I have a color that is close, then with the rest of the colors and some washes for weathering the overall scene will end up looking correct.
Reply 4
Bshoop
I'm plannin' on going to the Timonium show in October. It would be cool to see you/ it there!
Reply 4
Yaron Bandell ybandell
Bshoop wrote:
I'm plannin' on going to the Timonium show in October. It would be cool to see you/ it there!
It should be on display in the North hall of the Cow palace with the Capitol Free-mo layout. It'll be fun to meet  MRH forum members like you.
Reply 4
Crivvee Crivvee
Wow, very impressive! I will be following you. It definitely will be a help in doing Rockville. 
Jeff
Reply 4
DaleMierzwik
Such a cool build. I look forward to seeing it complete. One day I would like to make a show where it is in use. I don’t make it out east often, maybe once every couple of years so it may be a while until I am able to see it live.

Dale


Reply 3
Yaron Bandell ybandell
Such a cool build. I look forward to seeing it complete. One day I would like to make a show where it is in use. I don’t make it out east often, maybe once every couple of years so it may be a while until I am able to see it live.
Dale,
 
Thank you for your kind words. Not sure where in the USA you are located, but once the bridge is in a working and properly sceniced state it will go to several shows. The obvious shows are the ones in Timonium, MD, the Amherst show in West-Springfield, MA, and Sipping & Switching Society of NC shows near Raleigh, NC. Then on my radar are a few "mid-west" shows in Indiana and Michigan. The 2025 National Train Show in Novi, MI (Detroit) might be on the list as well. I'll make a point of announcing those shows in this Journal when I can confirm it'll be there.
Reply 3
Yaron Bandell ybandell
I managed to run a few test 3D prints this week for the cut waters / piers. In the last update I showed a version "1" of detached cut water/pier and pier base. I wasn't happy with how it forced me to cut some of the styrene off the pilaster in order for it to fit behind the cone.
 
So I printed a "V2" where there is now a slit between what I call the glue strip and the back of the cut water and cone. This allows me to simply insert the pilaster assembly and have the pilaster sides wrap over the glue strips. I still found some errors/issues in this version, so I sketched up a "V3".
 
Pilaster assembly:
[20230811_180203]
 
[20230811_174626ann]
 
After printing "V3", there were still some minor issues. This side shot of "V3" showing some of the problem areas. In "V2", even though the cone failed to properly print, I noticed that there was a potential for a noticeable gap between the pilaster front and the back of the cone due to the 3D printer nozzle having to turn around. Arrow "A" shows  that in "V3" I explicitly had the back of the cone jot out a bit further so I can file this and ensure it perfectly lays flat against the pilaster front.
 
For "V3" I had decided that I could increase the glue strip (arrow "B") height to the base of the cone so it would support more of the pilaster side. In hind sight this was a bad move because now the gluestrip makes the filing of the back of the cone more difficult. So "V4" will have the glue strip height reduced again.
 
I also noticed that I failed to extrude upwards two rectangular sections (arrow "C") of the sketch that sit in between the back of the rounded cut water shape and the glue strip. This is fixed in "V4".
 
[20230811_180149ann]
 
Arrow "D" in the below image indicates that the glue strip needed to be made thicker so the top of it wouldn't flex as much.
 
"V3" also includes a marking indicating which version it is, since I have 6 different versions: three for the south side of the bridge and three for the north side. The marking indicates: N (North) or S (South), followed by either: N (Narrow), W (Wide), or XW (ExtraWide). You can see that the below pier is a "South Narrow" pier.
 
The differences are small, especially between the "North Narrow" and "South Narrow" versions, but would ruin the repeating looks of the bridge piers. So having markings while printing 22 pairs of the wide, 22 pairs of the narrow and 2 pairs of the extra wide ones, will help ensure I don't make any errors in their placement.
 
[20230811_180112ann]
 
This is a screenshot of the "V4" in Fusion360 with all the above described improvements included. It'll take about 1 hour and 45 minutes to print one of these or about 3 hours to do a pair of them.
[20230811_Pier_South_Narrow]
 
 
The pier base was updated as well to offset the carriage bolt placement and make inserting the pier internal wall parts easier by removing some of the alignment slots in the middle and relying on alignment on the ends and the center of the pier base.
 
This is the new version for the narrow pier base. A wide and extra wide pier base were easily created as well using parameters in the drawing dimensions:
[20230811_Pier_Base_Narrow]
 
 
The pilaster assembly dry fitted in the "V3" version of the printed cut water / pier. Rear view:
 
[20230811_174730]
 
 
Front view:
 
[20230811_174948]
 
side view:
 
[20230811_174849]
 
Not a bad fit so far if I may say so.
Reply 7
Yaron Bandell ybandell
In the last picture you might notice there is a 20-thou gap between the pilaster side and the back of the cut water below the base of the cone all the way to the bottom of the pier.
 
This will be filled with a thick white styrene glue (a home made mix of styrene off cuts dissolved in MEK) that is also used to glue the pilaster front to the back of the cut water, and the pilaster sides to the glue strips. When it has dried, a few passes with sand paper or a file makes this smooth.
Reply 6
Yaron Bandell ybandell
More 3D printing going on this weekend. I printed one version of each of the six cut waters / piers. I also printed a redrawn version of the bridge's railing. For the railing I need to look into why some of the corners are lifting. Adhesion on the bed is typically good, but for the 2 test prints they end up lifting while previous test prints didn't have that issue... I might have to print them with a brim instead.
 
Here the six versions of the cut waters lined up:
 
[20230813_203003]
 
Front view with from left to right the Extra Wide, Narrow, and Wide versions.
 
[20230813_203327]
 
And an overhead shot:
 
[20230813_203335]
 
And here the railing with the nasty lifting in the corners. The white is the new newly printed one, the grey version was printed a while back and didn't have nearly as much lifting in the corners:
 
[20230813_210846]
 
Apart from the 3D printing, I did move my 3D printer into the garage and pointed a camera at it. This way the cats won't have to be supervised from jumping on top of the 3D printer enclosure, or worse, inside the enclosure. And while I'm working I won't have the noise either. The printer is fairly silent, but with the amount of printing that needs to happen I think it'll get old quick. The camera allows me to see remotely how my on average three hour prints are progressing. A heated filament box was added to keep the moisture out and allow for drying of filament when needed.
 
While waiting for 3D prints to complete, I managed to weed (remove) about three spans worth of styrene components from six sheets of styrene. I Can now assemble the next four spans to complete the second section of eight spans.
Reply 4
Yaron Bandell ybandell
Last week I fix/upgraded the power connections within the 3D printer by installing cutting off the soldered wire ends and crimped on ferrules instead. It's a known issue with the Ender 3D printers that various power connections are a fire hazard if used stock from the factory if this fix/upgrade isn't performed. Facing day long prints, I had to ensure my printer was safe to use unattended. I also put up one of the wireless cameras, so I can monitor the prints remotely.
 
After the fix/upgrade Last week I did some test printing of railing components to fine tune my 3D printer. I also got some more white filament and some spare printer parts (bed, hot end, bowden tube: just in case something breaks, I won't be down for long.
 
The print below was 13 hours and 42 minutes in of what ended up being a 15 hour and 35 minute print.
 
[20230816_112258]
 
As you can see, I can barely fit twelve of the bridge railing components on my 3D printer bed. But it works! When I printed the 36 pier railings next, I ended up with several of them warping at the corners. Two even let go of the print bed because of that, resulting in some spaghetti.
 
In order to counter act the warping, there are two things you can do:
  1. level the bed
  2. increase the bed temperature
I bit the bullet and read up on how to enable my bed leveling mesh in the printer. After an hour mucking around with a feeler gauge and a 5 x 5 leveling grid and some simple test prints I could see that my first layer now laid down more consistently than before.
 
I also increased the bed temperature to 70 from the default 60 degrees, to help the first layer flow better while being extruded.
 
While the 3D printer is churning out new parts, I continued assembling spans. I ended up finishing the second eight span section of the bridge. This is what I have assembled so far:
 
[20230823_193033]
 
And a top view of them side by side:
 
[20230823_221159]
 
You can clearly see the "waffle box"-like construction in the above.
 
And just because every now and then I need a break from assembling spans: finding the paint colors to use!
 
[20230823_221256]
 
The bottom line is straight kraft paint on the white styrene under 6500K TL lights. The upper line is paint on brush applied Vallejo grey primer (too lazy to grab the compressor and air brush). So far I think the "Toasted Marshmellow" and "Antique White" colors comes close. Compare with the color of the main structure (not the railing part) of the bridge in this picture:
 
[P%26R%20Bridge%2033]
 
Then again, I've got a red-green deficiency in my eyes, so it'll be fun trying to get this to match.
 
I also have a lead on another color that others have used for similar colored bridges in the area. It's "Gloss Almond" by Rustoleum. That will be one of the next tests.
 
Tomorrow I must not forget to put in my carriage bolt and other nuts and bolts order in at Bolt Depot because I need the carriage bolts to be embedded in the base of the pier and the other bolts are needed to assemble the module legs.
 
On Sunday I had my 100 foot roll of flat 10/3 stranded wire come in for the Free-mo DCC track bus. I did a quick Anderson Power Pole connector crimp test and I'm happy with the results.
 
Making great progress this week, if I may say so. It helps that I finally got some days off as well.
 
More to come soon!
Reply 9
thewizard1
 
The antique white looks like the best starting point
Try a bit of black (blue black like a  mars black) and a touch of yellow and possibly some white use it as a wash over the color.
The photo of the bridge has a grey green tint to it. the black and yellow will give you that tone.
 
 
Screenshot_112.jpg
The only thing I have mastered in life is how to spend money
Reply 4
Bshoop
FWIW, I just use this to paint concrete stuff. Cheap, easy, and to my eye (especially after weathering it) pretty convincing.
That's admittedly subjective, though. It's not as dark as the cap looks, and there IS that rather large variable- yours vs.my layout lighting.
 
20230824_000650.jpg
 
Here's Schrute Bros. Coal Co. that I used it on...
20230824_000742.jpg
Reply 7
KingCoal
Your build technique is so interesting, it feels like you should leave one section unfinished to display the brilliance and complexity of its construction. Or bring an extra section for display by the finished product. Being a Reading structure is icing on the cake.
Reply 4
Yaron Bandell ybandell
Quote:
The antique white looks like the best starting point
Try a bit of black (blue black like a  mars black) and a touch of yellow and possibly some white use it as a wash over the color.
The photo of the bridge has a grey green tint to it. the black and yellow will give you that tone.
 
Charles ( @thewizard1@thewizard1),  thanks for the suggestion I'll have to give that a whirl.
 
@Bshoop, dang, that is also looking pretty good. *ponders*
 
KingCoal wrote:
Your build technique is so interesting, it feels like you should leave one section unfinished to display the brilliance and complexity of its construction. Or bring an extra section for display by the finished product. Being a Reading structure is icing on the cake.
@KingCoal, thank you for your kind words. I'd like to think that anyone else who'd want to build something similar out of styrene would use a similar style of tab and slot and "waffle box"-style construction. Maybe not? I probably will have a spare section that I might bring as there are often people asking how we build our modules. With the bridge structure being so out-there as it is, I can only assume people will want to know how it was constructed. An unfinished piece would be the perfect example.
Reply 3
Yaron Bandell ybandell
Yesterday I started a print that supposedly was going to take 1 day and 6 minutes. Well, after some time printing:
[20230824_210755]
 
I ended up with this:
 
[20230824_210806]
enough cutwaters to create an eight span section.
 
In anticipation of these being printed I started to assemble the pilasters. After attaching the pilasters to the cut waters it looks like this:
 
[20230824_221621]
 
Now in the above image you can't readily tell, but there is something quite wrong with the first front pilaster assembly:
 
[20230824_221600ann]
 
Arrow A points to an assembly error, while arrow B points out that you can see that each pilaster has a different height. Since the front and back cutwaters are different you are seeing 18 unique components of the bridge. Yes, every single of the 51 pilaster assemblies is unque across the entire bridge...
 
So what's caused that first pilaster to lean to the left? Here is the answer:
 
[20230824_221815ann]
 
The above image is a detail shot of the back of the cutwater print with the pilaster inserted into a slot. Look at the line indicated by arrow A. THe ncompare that line to the one indicated by arrow B. The pilaster assembly was not fully seated which causes the pilaster to lean. No way to remove this without destroying everything, so I'll have re-cut the pilaster for this pier out of styrene and print another cutwater (a 1-1/2 hour print).
 
Even though I didn't do any paint today, I was artistic in a different way: Fun with camera angles...
 
[20230824_221649]
Reply 9
filip timmerman
Impressive build Yaron !
Success &

Filip

Reply 3
bno4333
Dale,
 
Thank you for your kind words. Not sure where in the USA you are located, but once the bridge is in a working and properly sceniced state it will go to several shows. The obvious shows are the ones in Timonium, MD, the Amherst show in West-Springfield, MA, and Sipping & Switching Society of NC shows near Raleigh, NC. Then on my radar are a few "mid-west" shows in Indiana and Michigan. The 2025 National Train Show in Novi, MI (Detroit) might be on the list as well. I'll make a point of announcing those shows in this Journal when I can confirm it'll be there.
Saw this picture in the lobby of the Railroad Museum of Pennsylvania when we set up last weekend
IMG_4928.jpg
 
I'm sure they would be happy to see it next year.
 
Roger Hammond
Reply 6
Yaron Bandell ybandell
bno4333 wrote:
Saw this picture in the lobby of the Railroad Museum of Pennsylvania when we set up last weekend
IMG_4928.jpg
 
I'm sure they would be happy to see it next year.
 
Roger Hammond
Roger, I think there is a good chance that the bridge will end up in Strasburg, PA if Capitol Free-mo is returning to the PA Railroad Museum in 2024. If I'm not mistaken, next year will be the bridge's 100 year anniversary.
Reply 5
cdguenther
I was talking to Elizabeth (RRMofPA volunteer coordinator) Sunday, pointed to this picture and told her we have a guy building a full scale model of it, and that it would be available2024. She got very excited by that. 🙂
Clarence from Capital Free-mo
Reply 5
Reply