Last week I fix/upgraded the power connections within the 3D printer by installing cutting off the soldered wire ends and crimped on ferrules instead. It's a known issue with the Ender 3D printers that various power connections are a fire hazard if used stock from the factory if this fix/upgrade isn't performed. Facing day long prints, I had to ensure my printer was safe to use unattended. I also put up one of the wireless cameras, so I can monitor the prints remotely.
After the fix/upgrade Last week I did some test printing of railing components to fine tune my 3D printer. I also got some more white filament and some spare printer parts (bed, hot end, bowden tube: just in case something breaks, I won't be down for long.
The print below was 13 hours and 42 minutes in of what ended up being a 15 hour and 35 minute print.
As you can see, I can barely fit twelve of the bridge railing components on my 3D printer bed. But it works! When I printed the 36 pier railings next, I ended up with several of them warping at the corners. Two even let go of the print bed because of that, resulting in some spaghetti.
In order to counter act the warping, there are two things you can do:
- level the bed
- increase the bed temperature
I bit the bullet and read up on how to enable my bed leveling mesh in the printer. After an hour mucking around with a feeler gauge and a 5 x 5 leveling grid and some simple test prints I could see that my first layer now laid down more consistently than before.
I also increased the bed temperature to 70 from the default 60 degrees, to help the first layer flow better while being extruded.
While the 3D printer is churning out new parts, I continued assembling spans. I ended up finishing the second eight span section of the bridge. This is what I have assembled so far:
And a top view of them side by side:
You can clearly see the "waffle box"-like construction in the above.
And just because every now and then I need a break from assembling spans: finding the paint colors to use!
The bottom line is straight kraft paint on the white styrene under 6500K TL lights. The upper line is paint on brush applied Vallejo grey primer (too lazy to grab the compressor and air brush). So far I think the "Toasted Marshmellow" and "Antique White" colors comes close. Compare with the color of the main structure (not the railing part) of the bridge in this picture:
Then again, I've got a red-green deficiency in my eyes, so it'll be fun trying to get this to match.
I also have a lead on another color that others have used for similar colored bridges in the area. It's "Gloss Almond" by Rustoleum. That will be one of the next tests.
Tomorrow I must not forget to put in my carriage bolt and other nuts and bolts order in at Bolt Depot because I need the carriage bolts to be embedded in the base of the pier and the other bolts are needed to assemble the module legs.
On Sunday I had my 100 foot roll of flat 10/3 stranded wire come in for the Free-mo DCC track bus. I did a quick Anderson Power Pole connector crimp test and I'm happy with the results.
Making great progress this week, if I may say so. It helps that I finally got some days off as well.
More to come soon!