Yaron Bandell ybandell
This blog will serve as a place to show the progress of my build of the Philadelphia & Reading bridge over the Susquehanna river in Harrisburg, PA.

Build Highlights:
  • Bridge over the Susquehanna river, Harrisburg, Pennsylvania, USA
  • Bridge consists of 51 concrete arches
  • One plate girder bridge
  • Dual track
  • Dual track crossing underneath on west side
  • 0.7% grade
  • No compression
  • Building both dual tracks to Free-mo module standards
  • Main bridge arches, pilasters and piers to be scratch build from 20-thou and 40-thou styrene sheet
  • Main bridge pier cutwaters to be 3D printed
  • Handlay code 83 track on Central Valley Model Works tie strips
  • Fast tracks #10 switches for cross overs
  • Include Free-mo Modular Signal System plus signal heads.
Bridge Background:

A Philadelphia and Reading bridge, now part of Norfolk Southern crossing the Susquehanna river in Harrisburg, PA.

In this Google Earth image you can see the bridge is the one closest to the Interstate 83 bridge:
[Google_Earth_01_1080px]

The complete bridge by an unknown photographer:
[P%26R%20Bridge%2043]

An aerial close up photo by an unknown photographer:
[P%26R%20Bridge%2040]

Originally this bridge was built with only 46 concrete spans in 1924. Each span plus corresponding pier structures measures 76'-3" in length. Each concrete arch measures 66', while the piers are 11’-6” and 9’ wide. There is a reason the piers alternate between these two widths. This bridge was build by replacing an existing bridge in place. The old bridge had spans of 152’-6” wide. The wider piers of the new bridge encased the original bridge’s piers, while the narrower piers were purpose build. At a later date five spans were added on the east side, giving the bridge a total of 51 concrete spans.

An elevation drawing from the west side of the bridge as found in Railway Age 69 volume 21:
[PRSusquehannaBridge-RailwayAGe69-21-002]

In this same Railway Age issue, a detail view of the west side part of the bridge was found:
[PRSusquehannaBridge-RailwayAGe69-21-004]

The pier encasing process is shown in this photo published in Railway Age 73 volume 23:
[PRSusquehannaBridge-RailwayAge73-23-004]

On the west side the mighty PRR crossed with two tracks under the first concrete arch, while the Northern Central crossed with three tracks under the deck girder bridge.

To date, only the PRR tracks (now also Norfolk Southern) still cross under the  bridge as can be seen in this photo by an unknown photographer:
[P%26R%20Bridge%2034]

On the East side there is a pair of cross overs that are protected by signals.

The bridge measures nearly 3,960' in total length, which includes these 51 spans and a 69' plate girder bridge on the west side. Without compression in HO scale this equates to 45'-6". Now convert this all to 14 similar sized module sections for ease of build and transport and you’ll end up with a nearly 50’ long Free-mo module.

The aim is to build the bridge as it looks in the current time frame: the 51 arches, the Northern Central tracks are gone, but the PRR tracks are still there. The PRR track will be modeled such that the module can also be used as a 26” long double track Free-mo module if a setup can’t accommodate the full 50’ bridge.

I'll update this thread with pictures of the various build activities when they occur with the intend to create a more detailed article for publication at a later date. Enjoy!

-Yaron.
Susquehanna Bridge Build | My Personal Website | Capitol Free-mo

Reply 25
Yaron Bandell ybandell
cdguenther wrote:
I was talking to Elizabeth (RRMofPA volunteer coordinator) Sunday, pointed to this picture and told her we have a guy building a full scale model of it, and that it would be available2024. She got very excited by that. 🙂
Clarence from Capital Free-mo
Clarence, I guess that means we'll be invited back and will get a good spot next year?
Reply 2
cdguenther
I haven't spoken to them yet, but that is my expectation.
Reply 3
Yaron Bandell ybandell
A mid long-weekend update but before I do that, let's refresh ourselves on the various bridge component names that I'm using so the next paragraphs hopefully are easier to follow:
 
[DSC_9538]
 
 
Okay, on towards to the update.
 
Yesterday I've been working on trying to complete the two west approach spans. It's the first time where I got to assemble the soffit, the pilasters, pieces of parapet, a pair of cutwaters, string course components, and a base all  together and check the fit.
 
Cutting to the chase, this is what it looks like as of this morning:
 
[0099_20230903_111021]
 
I'm happy with the tightness of the fit between the top line of the barrel and where it meets the side of the pilaster. The string course fits nicely as well. The parapet components need a little pre-install work because of 3D printing blobs and some minor elephants foot at the base of the components. Where the soffit meets the side of the pilaster I knew I had to add some backing some backing to make gluing those pieces together more easily and to ensure strength. Without a backing strip of styrene it would have only been a 20-thou butt joint in a place where hands are very likely to grab while installing and removing the span from the module for transportation.
 
All the above joints can be seen in these two pictures:
 
[0100_20230903_111536]  [0101_20230903_111103]
 
This set of spans sits at the end of the west end section of modules and as such has to accommodate the set of spans from the adjoining module to connect. I already had created and detailed out the hook mechanism on the end of span #2 but I felt that with the base I needed to make it easy to align the bottom of the pier internals to the base. I took some 40-thou styrene and cut those into 20 x 15 mm strips and bend them halfway and glued them to the base so they will catch and guide those pier internals to their proper position:
 
[0102_20230903_111331]
 
A closer look at the top of the bridge spans, looking at the parapet:
 
[0103_20230903_111050]
 
The inside of a span looks like this with the soffit installed. The fit of the soffit against the inner spandrel wall arch is really tight and neat:
 
[0104_20230903_111252]
 
Because the long 3D printed parapet components are slightly bend in the middle I need just a little bit of force to attach it to the string course. So bring out the clamps! Bring out the clamps! Bring out more clamps! That's three clamps shy of using all of my little red clamps I own.
 
[0105_20230903_114244]
 
Meanwhile the 3D printer has been running for two weeks non-stop producing parts. Not shown is the several dozen of long parapet components printed as well. Longest print to date was: 1 day, 5 hours, 1 minute and 25 seconds for five pairs of cutwaters. Other prints are either 6 hours, 9 hours or 19 hours long. I'm thinking I'm close to having printed 2/3 of all the 3D printed components I need.
 
[0106_20230903_114915]
 
I've also fitted the soffits for spans 3 through 15 with their respective travel rib indent components. This enables me to start the same assembly process as shown for the west approach spans for the two eight span sections build so far. Here is the floppy lot of them:
 
[0107_20230903_115017]
 
I also measured the two eight spans sections I  build so far. I'm happy to say: one measures in at 7'-1/4" long, while the other measures in at 7'-1/8". Not bad for trying to align eight spans into a single larger piece, where minor glue and fit errors compound into a larger error. A total error of 1/8" is within specs I'd say.
Reply 8
John P
Fun fact, 7 feet and one quarter of an inch was the gauge used on the Great Western Railway in England, from 1838 until 1892.
Reply 4
MikeHughes
I think this needs an entry in the Guinness Book of World Records.
Happy NMRA Member since 2024
Reply 2
Yaron Bandell ybandell
John P wrote:
Fun fact, 7 feet and one quarter of an inch was the gauge used on the Great Western Railway in England, from 1838 until 1892.
I might have to include that on a FAQ sheet for the bridge when on display at shows 🙂
MikeHughes wrote:
I think this needs an entry in the Guinness Book of World Records.
Funny thing you say that because I've been looking at that. Category could be something like: "Longest small scale railroad bridge in modular standard".
 
Any show organizer wants to pay the $1500 or so fee to have an official from GBoWR come over and do the official measurement and handing out of a plaque in front of the local media? 😜The alternative is self attestation / certification for a $100 or so fee with the plaque being mailed 😁
Reply 4
MikeHughes
Is there a way to nominate you for an MMR?  If this project doesn’t confirm that, I don’t know what would.
Happy NMRA Member since 2024
Reply 4
Yaron Bandell ybandell
@MikeHughes, I appreciate the vote of confidence, but being able to build a bridge in itself isn't worth an MMR badge IMO. The rolling stock build one is pretty important too to make an allround model rail roader. Same with track work and the electrics.
 
I do hope i can get enough credit to count towards the scratch build structure certificate. But i believe the bridge can't be part of a "diorama". So i might have to build the west approach twice and have the original 46 span bridge judged. Because span 3 through 46 are all removable already. Anyone know those NMRA MMR rules on the top of their head?
 
I hope they have a celebration room big enough for it to be displayed. Maybe at the 2025 NMRA convention *ha ha ha* I do have the 2025 NTS on my shortlist for participating in the Free-mo layout. Anyone involved in that committee so the Free-mo group can get a massive space allocation? This year's allocation was on the small side.
Reply 3
Yaron Bandell ybandell
Took me about two days of work to get the soffits in a section of eight spans and start with the attaching of the pilasters, cutwaters, and the bottom plates. I've done nearly all of the south side of this section. I do need to re-cut a pilaster for pier #3 as it was glued crooked to the cutwater.
 
Getting the seams to align of the soffit to the bottom of the barrel and the seams of the soffit and the pilaster is a tediously slow job. But the result is getting there:
 
[0108_20230904_222244]
 
The angle of the picture does exaggerate the 0.7% incline of the bridge 😁
 
In order to speed up the parapet installation I bought a bunch of smaller clamps, including a bag of 100 red spring clamps. I'll be eagerly awaiting the arrival of the Amazon delivery person tomorrow.
Reply 6
Lancaster Central RR
Looking good. I don't have the patience for major scratch building projects.

Lancaster Central Railroad &

Philadelphia & Baltimore Central RR &

Lancaster, Oxford & Southern Transportation Co. 

Shawn H. , modeling 1980 in Lancaster county, PA - alternative history of local  railroads. 

Reply 3
Yaron Bandell ybandell
The weekend was pretty much a bust building the bridge as I helped my father-in-law with a drywall project. I did manage to die cut a bunch more styrene sheets though.
 
Today I made some headway by finishing installing the cutwaters and pilasters on the south side of this first section of 8 spans. I also installed the parapets on the top of the bridge and promptly ran out of 2-inch clamps. I wonder why? 😁
 
[0110_20230911_221641]
 
[0111_20230911_221655]
 
Anyone feeling inclined to count how many 2-inch clamps I used?
Reply 11
Ray Hamilton
128?
 
Ray
Ray
 
Modeling Southern Pacific’s Ventura Subdivision in the San Fernando Valley (GEMCO to Northridge) circa Summer 1958.
Reply 4
Yaron Bandell ybandell
128?
 
Ray
Correct!
Reply 3
MikeHughes
Hey, is that an 8 bit bridge?
Happy NMRA Member since 2024
Reply 4
Yaron Bandell ybandell
MikeHughes wrote:
Hey, is that an 8 bit bridge?
It does look kinda "block-y" like an 8 bit game, doesn't it? 🙂
[20230912_155048]
Reply 6
Kevin S.
What a neat project!  I'm impressed.  😊👍
Reply 4
jeffshultz
I don't know about that Guiness Book of World Records entry - there was this Freemo module(s) in Kansas City:
 
[IMG_2690]

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 5
Yaron Bandell ybandell
jeffshultz wrote:
I don't know about that Guiness Book of World Records entry - there was this Freemo module(s) in Kansas City:
 
[IMG_2690]
Jeff, that is the Tunkhannock Viaduct also know as the Nicholson viaduct in Nicholson, PA. Andy Moniuszko built this Free-mo model without compression on a 24' module . When i first was looking for building a bridge that was the bridge i was researching only to find that Andy just started building it a month earlier. Andy sadly passed away afew years after completing that bridge. Family members reportedly saved that bridge, but i haven't seen it appear on any shows after his passing unfortunately.
 
I do know that a Sipping & Switching Society of NC  member has a compressed version of the Rockville bridge over the Susquehanna at Marysville, PA which is just a few miles north of my bridge. That module is 32' long but would have to be over 43' if the bridge were to be built uncompressed. This is the longest bridge module I know of, until I finish mine. My bridge will be 44-1/2' and with the approaches it totals 56'. So imagine two of Andy's bridges and that's about what mine will look like. Be sure to drop by the New England Free-mo layout at Amherst in January!
Reply 6
jeffshultz
56... Feet. <blink>
Carry on, sir! 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 4
Tim Bowser NCR-Boomer

Yaron wrote:

Jeff, that is the Tunkhannock Viaduct also know as the Nicholson viaduct in Nicholson, PA. Andy Moniuszko built this Free-mo model without compression on a 24' module . When i first was looking for building a bridge that was the bridge i was researching only to find that Andy just started building it a month earlier. Andy sadly passed away afew years after completing that bridge. Family members reportedly saved that bridge, but i haven't seen it appear on any shows after his passing unfortunately.
 
I do know that a Sipping & Switching Society of NC  member has a compressed version of the Rockville bridge over the Susquehanna at Marysville, PA which is just a few miles north of my bridge. That module is 32' long but would have to be over 43' if the bridge were to be built uncompressed. This is the longest bridge module I know of, until I finish mine. My bridge will be 44-1/2' and with the approaches it totals 56'. So imagine two of Andy's bridges and that's about what mine will look like. Be sure to drop by the New England Free-mo layout at Amherst in January!

I'll assume this is the S&SSNC bridge you're describing:

Rockville-SSSNC.jpg

Taken at the 2019 Neuse River Train Show, or "Raleigh" to the regulars...

Tim B.
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 6
Yaron Bandell ybandell
NCR-Boomer wrote:

Yaron wrote:

 
NCR-Boomer wrote:

I'll assume this is the S&SSNC bridge you're describing:

Rockville-SSSNC.jpg

Taken at the 2019 Neuse River Train Show, or "Raleigh" to the regulars...

Tim B.
Tim, that's indeed the 32 feet long model of the Rockville bridge I was talking about.
Reply 3
pldvdk
Yaron,
 
All I can say is I'm in total awe!!!!!!  

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 4
Yaron Bandell ybandell
pldvdk wrote:
Yaron,
 
All I can say is I'm in total awe!!!!!!  
Thank you Paul. Where have you been hiding lately? I've been missing updates on your awesome Pokey 3.0!
Reply 2
pldvdk
It's summer in MN, and I want to be outdoors on my bike, not in the basement working on the layout.  When winter comes, I hope to be back at it and moving the layout forward more.

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 3
Yaron Bandell ybandell
pldvdk wrote:
It's summer in MN, and I want to be outdoors on my bike, not in the basement working on the layout.  When winter comes, I hope to be back at it and moving the layout forward more.
It was too hot in Virginia to be outside a lot of the summer days, so I had a nice time in my 80F garage building spans. Better than when it's 50F during winter 🙂
Reply 5
Reply