A mid long-weekend update but before I do that, let's refresh ourselves on the various bridge component names that I'm using so the next paragraphs hopefully are easier to follow:
Okay, on towards to the update.
Yesterday I've been working on trying to complete the two west approach spans. It's the first time where I got to assemble the soffit, the pilasters, pieces of parapet, a pair of cutwaters, string course components, and a base all together and check the fit.
Cutting to the chase, this is what it looks like as of this morning:
I'm happy with the tightness of the fit between the top line of the barrel and where it meets the side of the pilaster. The string course fits nicely as well. The parapet components need a little pre-install work because of 3D printing blobs and some minor elephants foot at the base of the components. Where the soffit meets the side of the pilaster I knew I had to add some backing some backing to make gluing those pieces together more easily and to ensure strength. Without a backing strip of styrene it would have only been a 20-thou butt joint in a place where hands are very likely to grab while installing and removing the span from the module for transportation.
All the above joints can be seen in these two pictures:
This set of spans sits at the end of the west end section of modules and as such has to accommodate the set of spans from the adjoining module to connect. I already had created and detailed out the hook mechanism on the end of span #2 but I felt that with the base I needed to make it easy to align the bottom of the pier internals to the base. I took some 40-thou styrene and cut those into 20 x 15 mm strips and bend them halfway and glued them to the base so they will catch and guide those pier internals to their proper position:
A closer look at the top of the bridge spans, looking at the parapet:
The inside of a span looks like this with the soffit installed. The fit of the soffit against the inner spandrel wall arch is really tight and neat:
Because the long 3D printed parapet components are slightly bend in the middle I need just a little bit of force to attach it to the string course. So bring out the clamps! Bring out the clamps! Bring out more clamps! That's three clamps shy of using all of my little red clamps I own.
Meanwhile the 3D printer has been running for two weeks non-stop producing parts. Not shown is the several dozen of long parapet components printed as well. Longest print to date was: 1 day, 5 hours, 1 minute and 25 seconds for five pairs of cutwaters. Other prints are either 6 hours, 9 hours or 19 hours long. I'm thinking I'm close to having printed 2/3 of all the 3D printed components I need.
I've also fitted the soffits for spans 3 through 15 with their respective travel rib indent components. This enables me to start the same assembly process as shown for the west approach spans for the two eight span sections build so far. Here is the floppy lot of them:
I also measured the two eight spans sections I build so far. I'm happy to say: one measures in at 7'-1/4" long, while the other measures in at 7'-1/8". Not bad for trying to align eight spans into a single larger piece, where minor glue and fit errors compound into a larger error. A total error of 1/8" is within specs I'd say.