Rodney Edington Rods UP 9000
    N Scale
    Minimum radius=    Mainline  24"         Highline side of Keddie Wye  15"      Industrial    12"
    Minimum turnout= Mainline #10's     Yard #7's          Industrial #5's 
    Micro Engineering code 55 on layout       Atlas code 80 in helix and staging yards
    Code 55 turnouts, Mostly Atlas  with a few ME and scratch built thrown in.
    Code 80 turnouts, Peco large
    Inside dimensions of layout room   27' 6" X  51' 6"
    Mushroom design
    Layout height   52" to  60"       (Main Staging Yard is 90" off the floor)
    Maximum grade 1% except between Merlin and Keddie Wye 2%    Quincy Railroad and Helix 2%
    Easy DCC  command station,  16 wireless and 10 tethered throttles
    CVP Boosters   4, 10 amp and 2, 5 amp (50 amps total (overkill))
    Era  1953
   Cabinet grade 1/2" plywood for roadbed and 1/2" Micore 300 for subroadbed.
   Micore is a lot like Homasote, but it's fiberglass based and will not expand and contract with either
moisture or temperature.
 
 
    This is a very basic track plan.
 
 
[bpl7Us]
 
 
[ycFNdy]
 
 
[jJtS0d]
 Later
 
Rodney
 
Reply 17
Rodney Edington Rods UP 9000
 Here is the helix and it's the heart of the layout.
 With the way I designed the helix, trains can run continuous, loop to loop and to and from staging.
 For Ops sessions, I have a helix operator that will bring trains out of staging and stage them for eastbound or
  westbound, and bring trains off the layout and run them back to staging.
 
 
[djdK48]
 
 
[oa1ZbS]
 
 
Top of helix.  Track on the left goes down to layout and the one on the right in the one trains come up the helix on.
 The track that is running across back over to the staging yard is the connection for continuous running in the
 staging are. Handy for breaking in locomotives.
 
[lp77ZA]
 
 
 
[kBNOzl]
 
Reply 15
Rodney Edington Rods UP 9000
 Staging yard
 
It's pretty empty right now as I reworking the trains to get ready for Ops sessions February 24th and 25th.
I will have 10, 50 to 60 car freight trains and 2 California Zephyr's (one eastbound and one westbound)
along with 7 freight trains staged on the helix.
 
 
[ZB64Jc]
 
 
[esLqTG]
 
 
[pVIyUe]
 
 
[r4t32n]
Reply 15
Paul Mac espeelark
Looks like that’s going to be a great layout for operations Rodney!

Paul Mac

Modeling the SP in Ohio                                                                                  "Bad is never good until worse happens"
https://model-railroad-hobbyist.com/node/38537
Read my Blog Index here
 
Reply 5
tp
wow
Reply 5
joef
I always run hot and cold on a large helix into and out of staging.
 
This helix is so significant that you are wise to make a special position just to manage the trains in and out of it. From top to bottom, a train will be in there running at freight train speeds for 8-9 minutes. Halfway down will take 4+ minutes. All told, you have an estimated 250 feet of track in that helix, or 1.5 times around the room.
 
Put another way, 45% of your total length of run is in that helix. Helix running, especially if it's eventually  hidden running, is some of the most boring running on the layout. A helix is a necessary evil with a multideck layout, and I must admit, I greatly disliked the 2 turn helix running on my Siskiyou Line 1. That's why the plan for Siskiyou Line 2 will have NO helix.
 
A helix is an impressive looking benchwork structure, but if you can make some of it pop out partway down as visible track, you will avoid some of the boredom. I found when a helix is hidden running, the operator keeps edging the throttle up every minute or two as a precaution, so when the train finally emerges, it's approaching mach 1 ... hah!

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 5
laming
 
Based on living with a tri-level layout utilizing two stacked heli for about 11 years, my experiential conclusions concerning a helix are similar to yours.
 
At times I can see how they can be an evil necessity, but they bring nothing to the table insofar as operational positives. The only thing they offer is a means to increase one's main line run. In that respect they accomplish that goal with the caveat of all the track, time, and expense, invested into same.
 
Based on my previous experience with them, early on in the developing of my current layout track schematic I ruled out a helix. This meant I surrendered the potential for a longer main line run, but the gain was that my ruling grade was now out in the open where it could be seen. Deciding against a helix made the entire required grade visible all the way to the upper level. Thus, the necessary climb is now a visual treat as well as being an operational highlight instead of it being track buried inside a helix cabinet. (Something I ended up having to endure on the old tri-level layout.)
 
SO, I too, decided no helix... thus the use of the "nolix" on my current layout.
 
Andre
Reply 5
Rodney Edington Rods UP 9000
 
Looks like that’s going to be a great layout for operations Rodney!
 
 Thanks, Paul
 
 
tp wrote:
wow
 
That's what about everybody says when the see it.
 
 
joef wrote:
All told, you have an estimated 250 feet of track in that helix, or 1.5 times around the room.
 
Not far off Joe. It's 170 feet just for the outer track. My mainline from helix to helix is almost 400 feet.
 
 
joef wrote:
Helix running, especially if it's eventually  hidden running, is some of the most boring running on the layout.
 
 That is why I have a helix operator and no part of my mainline of the railroad uses the helix. My road crews don't have to deal with the boring
trains in the helix. They get to enjoy running trains on the layout.
  I think of my helix as staging only.
 
 
joef wrote:
I found when a helix is hidden running, the operator keeps edging the throttle up every minute or two, so when the train finally emerges, it's approaching mach 1 ... hah!
 
 I do run the trains at full throttle while in the helix. That is the only way we can keep trains staged for the next road crew when I have a full crew of 16 or 17.
Reply 8
jimfitch
I have a 2 2/3rd turn helix with my layout,  but I could have had virtually the same track plan as a nolix and reverse loops at either end of the run. 

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 4
Rodney Edington Rods UP 9000
  The far track is exiting the helix, coming into Adelaide (west Oroville)
 There is 3 industries to switch here
 
 
[QuEx9J]
 
 
Far left track is the interchange with Sacramento Northern.  It's also the connection to the far right track for the bottom reverse loop
 
 
[apHrnm]
 
 
 There will be a small sawmill and creosote treatment plant here.
 
 
[vAifRl]
 
 
[lZI2xo]
Reply 8
Rodney Edington Rods UP 9000
 West Oroville
 
 
[WrKc9E]
 
 
[j0adQT]
 
 
[7pPg27]
 
 
[uL0Ycv]
 
Reply 9
Rodney Edington Rods UP 9000
 Oroville Yard
 
 
[xuz1Rp]
 
 
[xnOvrW]
 
 
[i29v94]
 
 
[nsSkgh]
Reply 9
ctxmf74
A very ambitious layout plan. How many folks will be building it? Looks like it will require lots of man hours. I like the WP setting, should allow for some great scenery up the canyon to Keddie .....DaveB
Reply 3
Rodney Edington Rods UP 9000
ctxmf74 wrote:
A very ambitious layout plan. How many folks will be building it?
 Thanks
 
 So far, I've done almost everything myself.  I'm very picky about trackwork and won't let anybody do that. 
Once I get the last of the industrial tracks in, we'll start having work sessions (hopefully by spring) and get some scenery started.
Reply 3
laming
 
What an intriguing layout!
 
You should NEVER tire of operations on that empire!
 
Andre
Reply 2
Paul Mac espeelark
Very nice Rodney!
Am curious what you are using for your turnouts. Tortoise?
Also, how are the turnouts controlled/selected on your panels? Are those just toggle switches with lights to indicate the selected route?

Paul Mac

Modeling the SP in Ohio                                                                                  "Bad is never good until worse happens"
https://model-railroad-hobbyist.com/node/38537
Read my Blog Index here
 
Reply 3
Rodney Edington Rods UP 9000
Very nice Rodney!
Am curious what you are using for your turnouts. Tortoise?
Also, how are the turnouts controlled/selected on your panels? Are those just toggle switches with lights to indicate the selected route?
 
 Thanks again Paul,
 
Most of the turnouts are Atlas code 55 with a few ME's and scratchbuilt code 55 thrown in.
 
 I have Tortoises on all the mainline turnouts that can be switched at the control panel or the dispatcher  (haven't got them set up for dispatcher yet).
Everything else has/will have servos controlled by Arduino's. So far, I have about 150 turnouts on servos and another 40 or so with Tortoises.
All the yards ladders have rotary switch matrix to dial up the track. The staging yard will also have relays to turn the power off and on through the matrix. 
Reply 2
Rodney Edington Rods UP 9000
laming wrote:
You should NEVER tire of operations on that empire!
 
 Let's hope not.
Reply 2
trainzluvr
Holy crap !!
 
That's not a basement empire...it's half the world in the basement!

 


YouTube channel: Trainz Luvr
Website: Trains Luvr

Reply 3
jimfitch
With the length of the run, I wonder if that layout could be built as a nolix.

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 2
Rodney Edington Rods UP 9000
jimfitch wrote:
I wonder if that layout could be built as a nolix
 
 It is a nolix, but I have a helix connecting the two ends of the layout. I could of had stacked return loops at both ends of the layout where the
helix is, but I wanted a continuous run and that what the helix does.
 
From the Oroville to Portola, the layout gains 26" in elevation. The track is 80" off the concrete floor at Portola.
Portola is stacked over Oroville.
 
 
 This is how the mushroom works for stacked benchwork.
 This was taken early in construction and you can see Oroville below and on the upper is leading to Portola is now
 
 
 [xndMg0]
 
 
 
 Hope this help understand how it all works together.
Reply 7
Rodney Edington Rods UP 9000
 East Oroville
 
 
[F888KH]
 
 
[f2Ku7u]
 
 
 The third track from the left in the forground is the SP interchange track. The building on the left is Ida Packing and gets served 
with boxcars by WP and with refers by SP. SP track goes inside.
 
 
[7FnRvW]
 
 
  The SP main is on the far right and will get blended into backdrop where it ends.
The next track on the right is the WP main and then a siding.
The next is the lead to the A&D tracks and then the yard lead.
 
 Stockley's Van Camp building will be between that string of refers and the fiddle yard. Refers on one side
for frozen foods and boxcars on the other for canned foods.
 
 
[FBX2Ep]
Reply 7
laming
jimfitch wrote:
With the length of the run, I wonder if that layout could be built as a nolix.
 
From what I understand of Rod's concept...
 
The stage and helix are intrinsic to operations and not just a mileage maker/elevation gain device.  It is vital to his operational scheme. He has a chap assigned to being the stage/helix operator and that job is responsible for incoming/outbound trains/etc. (The helix/stage job sounds like a busy and fun job.)
 
In other words, the helix/stage is absolutely essential to support the operations he has planned.
 
Andre
Reply 4
jimfitch
I wanted a contentious run too, hence my helix.  Er, continuous!

D&RGW focus late 70's thru early 80's west of Grande Junction CO.

Jim Fitch
northern VA

Reply 4
Rodney Edington Rods UP 9000
laming wrote:
From what I understand of Rod's concept...
 
The stage and helix are intrinsic to operations and not just a mileage maker/elevation gain device.It is vital to his operational scheme. He has a chap assigned to being the stage/helix operator and that job is responsible for incoming/outbound trains/etc. (The helix/stage job sounds like a busy and fun job.)
 
In other words, the helix/stage is absolutely essential to support the operations he has planned.
 
Andre
 
 
  Thanks,  Andre.
Very well said
Reply 4
Reply