Ken Rice
After waffling on what to model next for the last 6 years (yikes!) I've finally settled on an interesting prototype with a (deceptively?) simple track arrangement for a switching layout and nice scenery possibilities which I believe is within my skill and time limitations to get to a state the casual observer might mistake for "finished" before the sun burns out.  My plan is to build it more or less on the TOMA approach.
 
The prototype is the East Penn Railroad's Bristol Industrial Track in Bristol, PA.  The East Penn RR operates a number of unconnected shorelines in Pennsylvania and Delaware.  The Bristol Industrial TrackAll told from the far end of the interchange track to the far end of the customer siding it's about 1.2 miles long.  There's a single customer with a double track warehouse with a runaround at one end, and a single interchange track with CSAO (Conrail Shared Assets Organization) with no runaround at the other end.  They do their shuffling at the customer end to get ready, run light to the interchange and come back with the inbound cars, then shove the outbounds out to the interchange and come back light.  Somewhere in there they do the spotting.  Trips to/from the interchange I've seen on railfan videos range from 2 cars to 16 cars, recent typical seems to be around a dozen.
 
The long time power for the Bristol job is PRL 81, an NW2 (PRL is Penn Eastern Rail Lines, a predecessor of East Penn RR).  When the NW2 has problems ESPN (East Penn RR's reporting marks) 52, an SW900, or ESPN 1800, a GP18 takes over while it's being repaired.
 
Google Maps pin to the customer end of the line: https://maps.app.goo.gl/Z4jqZwHUsMSZugaq9
 
I'll end this first post with a video that shows the character which attracts me to the line in the first place.  Trackplan, construction photos, etc. coming soon in a following post.
 

My Bristol Industrial Track blog: https://forum.mrhmag.com/post/east-penn-rr-bristol-industrial-track-construction-begins-13769392
My blogspot blog (older layouts): http://rices-rails.blogspot.com/

Reply 14
Nsmapaul
YouTube railfanning I came across videos of it, and was intrigued.  So I found it on google maps an was more intrigued.  It seemed like a good fit for a switching layout with a nice scenic setting.
 
 
Zero.  The in and outbound interchange cars are always spotted at the CSAO end, if not hanging over onto the CSAO lead (if there’s more than 10-12 cars).  The CSAO power never gets more than a few feet into the interchange track.
You’ve got to draw the line vigorously somewhere, otherwise these things tend to mushroom 🙂
If you should happen to extend any to show Shared A**holes, they use either one or two CSXT GP40-2’s. Train comes from Morrisville yard.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

 “If it moves and it shouldn’t, use duct tape. If it doesn’t move and it should, use WD40.”

Reply 3
Ken Rice
Found a track chart for that area that may help you. 537FDF69-14D5-4F05-B13E-0A814230606B.jpeg

“0” track on the bottom now goes off to a rock salt distribution facility(at least that’s what I think it is). They definitely offload 2 bay covered hoppers there.
Wow, that’s great, many thanks!
Reply 3
Ken Rice
If you should happen to extend any to show Shared A**holes, they use either one or two CSXT GP40-2’s. Train comes from Morrisville yard.
I probably won’t (have to draw the line somewhere), but that’s good to know anyway.  Thanks!
Reply 3
Ken Rice
Time for some roadbed!  The prototype Bristol Industrial Track doesn’t have much in the way of a ballast profile, but there is a little.  So I wanted some cork, but not as thick as standard cork roadbed.  I found a roll of 1/8” thick cork 16” wide by 8’ long from Amazon, which I’ve had spread out flat on a piece of plywood for a week or so to relax to flat.  Today I sliced about 11 feet of 3.5” wide strips off it.  That seems like a good width for double track on 2” centers.  The easement for the curve in the corner starts about where I stopped the cork - I’m going to wait for the corner module to be built so I can draw out the curves and easements properly and get the right shape cut out of the cork.
 
I glued it down  with regular tight bond.  I weighted it down at the end which still had a little residual curl with a lifetime plus supply box of finish nails (I got a little carried away after I bought the brad gun, got a finish nailer and supplies, and ended up not using it much).  I worked left to right gluing a foot or so at a time.  I’d previously drawn a line where the edge of the cork should be.
 
[259338%2F9653233%2Fmceclip0]
 
[259338%2F9653235%2Fmceclip0]
 
[259338%2F9653237%2Fmceclip0]
 
I managed to slip a folded piece of wax paper into the joint between the modules before gluing the cork over it.  I wanted glue right up to the edges, although I did take care not to get too sloppy at the joint.  I’ll slice through the cork once the glue is thoroughly dried.
 
One painfully slow trip through Home Depot later (paint department fully manned until I settled on a color, then no-one in sight), the glue was dry enough to take the weights off and do a little sanding to flatten out a few little waves and bumps.  There’s one slight dip I’ll spackle if I have any good spackle left (I am not going back to HD!) otherwise I’ll just get generous with the caulk in that spot when gluing down the track.
 
The thing the same color as the cork slightly off the front edge of the layout is my sanding block - a piece of Baltic birch ply (very flat and rigid) with sandpaper carpet taped to it.  Works great.
 
[259338%2F9653242%2Fmceclip0]
Reply 11
Ken Rice
Spiffing it up a bit with some extremely crude “scenery”.  I got the idea from James McNab’s blog - he painted everything with Behr “Wild Rice”, a sort of dark slightly brownish green.  I used that for everyplace grass, weeds, brush, and trees will go.  I got some Behr “Smoky Wings” gray to paint where ballast and pavement will go.  I masked off the outline of the two warehouses - not sure how I’m going to handle making them removable but also look blended in yet, I may want to glue a foundation down, so bare wood for now.
 
I wasn’t planning on doing the fascia yet, but now that I see how it looks with a bit of paint the lack of a black fascia really stands out.  And at least a band of sky backdrop.  And mockups for the warehouses.  The backdrop will have to wait until I decide what I’m going to use for a backdrop - maybe aluminum flashing, or styrene, or linoleum, or something else thin but self supporting enough to not need too much framing for the curve around the corner.  All of those projects will need to wait for supplies.  For the warehouse mockups I still need to do some better photo measurements to work out how tall they are.
 
I seem to be building this layout TTMA - The Two Module Approach.
 
Tomorrows project will be to make a template for drilling the holes in the ends of the modules to bolt them together, and to improve the hold down system - I’m not completely happy with the cabinet screws, and as long as I’m using T nuts and 1/4-20 screws with fender washers anyway, might as well use some more.
 
[259338%2F9653532%2Fmceclip0]
Reply 9
Ken Rice
This afternoon I made a jig to quickly and consistently mark the hole centers for the screws that will clamp the module ends together.  Since the holes in one module will be oversize precision is not critical, precision doesn’t matter, but repeatability does.  In keeping with the goal of getting good results despite sloppiness or changes I decided to use three pegs to position the template on the module ends - two sit on the top, on registers the front edge.  The pegs stick out both sides so it works for both ends.  I had some 1/2” dowel on hand so that’s what I used.  A cutoff from a module top, 1/2” forstner bit in the drill press, a bit of glue, and Bob’s your uncle.  A couple 1/8” holes are for marking where the holes should go - just big enough to easily push the prick punch through and leave a nice mark.  Simple and easy to make.  I think it’s going to work out well.
 
[259338%2F9654377%2Fmceclip0]
 
[259338%2F9654387%2Fmceclip0]
 
[259338%2F9654383%2Fmceclip0]
Reply 11
laming
 
Wow! Looks like cabinet-level carpentry!
 
Impressive!
 
Andre
Reply 5
Ken Rice
 
Wow! Looks like cabinet-level carpentry!
 
Impressive!
 
Andre
Thanks!  But trust me, it’s not cabinet level 😁
Reply 3
ArborRails
Love the prototypical trackplan! The warehouse looks like the perfect industry to have the switching be as casual or complex as you want it to be. Bench work looks top notch as well, I'm going to enjoy following this one.
Reply 5
Ken Rice
Love the prototypical trackplan! The warehouse looks like the perfect industry to have the switching be as casual or complex as you want it to be. Bench work looks top notch as well, I'm going to enjoy following this one.
Thanks!  Yup I think there’s going to be a nice range of operation.
Reply 2
Ken Rice
A somewhat unexpected and not entirely welcome way of finding out new information about my prototype.  The one customer East Penn RR has on the Bristol Industrial Track is Judge Organization Logistics Services.  I’ve been digging for a few bits of information:
  • Recent satellite photos show cars clearly spotted at doors on the smaller warehouse at the end of the track, in addition to the large one I know is the Judge Org warehouse.  Is that a second customer, or did Judge acquire that warehouse for more space?
  • Better estimates of the dimensions of the warehouses, especially the height - horizontal dimensions are easily measured off satellite photos, but not vertical dimensions.
A few weeks ago I came across this little tidbit:
“More than 100 years old, trucking/logistics firm P. Judge files for bankruptcy”
The article mentioned that “A spokesman for the law firm representing P. Judge in the bankruptcy said the company continues to operate.”
A bit of a bummer, but I figured “continues to operate” meant that there was some hope that things would work out.
 
This evening while searching around in different ways to get better pics of the warehouses to better estimate dimensions the Greek Real Estate Partners site popped up in search results https://www.greekrep.com/properties/ because it lists 30 and 32 Runway Rd Levittown PA as being available for lease.  Those are the addresses of the two warehouses I’m modelling.  There are nice color PDF brochures with details:
 
Those two are only recently on the market.  The 30B one is Judge.  The fact that the 32B one appears to have gone on the market at the same time as 30B can’t be coincidence, they must both be Judge.  Or I guess former Judge.
 
So, first question answered - the second warehouse (32B) is also Judge Logistics.
 
For bonus points, the floor plan outline in the PDF for 30B makes it clear that Judge has half the building front to back.  Based on where cars where in older satellite photos I think at one point they had the back half of 30A as well, I guess PolyCube which occupies 30A must have needed more space and somehow they worked out a way to get 32B instead of the back half of 30A.  The brochure also says 30B has 3 rail car spots, when there are clearly 4, and the floor plan shows they didn’t count the one in the corner which clearly has cars spotted at it in the satellite photo they superimposed the floor plan over.
 
And second question partly answered - the PDFs say 30B has a “28' CLEAR HEIGHT”, and 32B has “32' CLEAR HEIGHT”.  So if I assume the warehouse floor is 4’ above the railhead (standard dock height), all I have to do is figure out how to get an estimate of typical roof truss height for this sort of warehouse to get a pretty solid height estimate for both buildings.  Does anyone happen to know offhand?
 
The floorplan for 32B - this is the end warehouse with 3 doors generously spaced for 60’ cars:
[259338%2F9659563%2Fmceclip0]
 
The floorplan for 30B - has 3 doors marked which are spaced for 50’ cars, plus one door tucked into the corner which is spaced far enough away from the first marked door that you can have 60’ cars spotted at both as long as there’s no cars spotted at the middle marked door, as shown in the satellite photo the floorplan has been superimposed on.
 
[259338%2F9659564%2Fmceclip0]
 
A closer view of that floorplan to show the little numbers in the markers on the various doors:
[259338%2F9659566%2Fmceclip0]
 
The rail doors are marked with a 7, some of the truck doors with 4, the truck doors with the gray hashed area are marked 5, the people door on the side is marked with a 1, the exits on the rail side are marked with a 2.  I’d guess those are just keys off to some side note that wasn’t included in this brochure that has more information.  Ah well, taunted by more info just out of reach.
 
So, what does this all mean fo my HO scale East Penn RR Bristol Industrial Track?  At the worst it means my time period is no longer “roughly the present”, it is now nailed down to somewhere in the range of 2020 (when the additional track I’m including was added near the warehouses) through  2025.  I don’t have a problem with that.  At best some other rail customer(s) lease those warehouses and bring in just as much or more traffic as Judge did, and open up the end date again.
Reply 7
laming
At the worst it means my time period is no longer “roughly the present”, it is now nailed down to somewhere in the range of 2020
 
Welcome to the world of desiring to reasonably reflect accuracy. Pursuing such an approach typically brings you to a decision point in which you either:
 
*Accept the findings and model within.
 
*Adjust your era to accommodate.
 
*Reject reality and go forward via modeling fantasy.
 
There's no "wrong" answer among the above, just different choices resulting in different directions.
 
Andre
Reply 6
Ken Rice
Welcome to the world of desiring to reasonably reflect accuracy. Pursuing such an approach typically brings you to a decision point in which you either:
 
*Accept the findings and model within.
 
*Adjust your era to accommodate.
 
*Reject reality and go forward via modeling fantasy.
 
There's no "wrong" answer among the above, just different choices resulting in different directions.
Very true!
Reply 3
Ken Rice
The plan for this weekend is to wrap up the construction part of the first two modules:
  • Holes/T-nuts/etc necessary for fastening the modules together once they’re installed.
  • Update my approach for keeping the modules from sliding around when bumped from cabinet screws to the same T-nuts and 1/4-20 screws that will fasten the modules together.
  • Fascia
The second module already has horizontal cross pieces where the feet are, but the first one doesn’t.  So this evenings project was to add them.  I used 1x2’s, with pocket screws to clamp them in place while the gorilla glue dries.  Was that necessary?  Probably not, probably a few toenailed brads would have been fine, but I haven’t pocket screwed anything for a long time and the urge struck.
 
To get ready for the fascia project I had already traced out the curve of the top on the corner of the first module and cut a matching curve on plywood scrap to add to the bottom, to help form the curve in the fascia.  Tonight I glued it in.  I started trying to screw it in place to clamp while the glue dries, but the screws shifted it just a little so the curves didn’t line up quit right anymore.  So I backed them out, re-aligned it, and used the brad gun to pin it in place.
 
Here’s that first module with the newly added cross pieces and the bottom curve for the fascia.  The foot and cross piece area is looking increasingly Frankensteinish as I keep adapting it to better ideas, but it’s still fine for the bottom side of the layout.
 
[259338%2F9660774%2Fmceclip0]
Reply 8
Ken Rice
I got the holes drilled and T-nuts installed for holding the modules together and down to the brackets.  That went pretty well, except I got a little sloppy measuring for where the hole in the shelf bracket needed to be to line up with the hole in the module cross piece on the first module.  Lesson learned on the second module - I set it in place and used a stubby pencil poked down through the whole to mark the bracket directly.  But for the first one I had the problem of moving a 5/8” hole a bit.  Fortunately I had a 5/8” dowel in my dowel collection so I was able to cut a short piece off to stuff in the hole and get a forstner bit started offset a bit, then knock the dowel out of the hole again.  I went with 3/4” holes after that to give myself a little more room for sloppiness - 1 1/4” fender washers allow for quite a bit of hole.
 
One of the hold down screws before I snug it up to show the size of the hole vs the washer.  There’s a T-nut in the top of the cross piece the screw is threaded into.
 
[259338%2F9662732%2Fmceclip0]
 
The screws that hold the modules together are basically the same idea, except I stuck with the 5/8” oversize hole for them - those holes are all pretty accurately marked with my hole in end of module marking jig, which I’ve marked the size hole to drill on both sides to increase the odds of not getting them wrong.  A 5/16” hole for the T-nut on the right looking at the end, a 5/8” oversize hole for the screw on the left.
 
[259338%2F9662735%2Fmceclip0]
 
A nice big C clamp works great to press the T-nut into place.
 
[259338%2F9662733%2Fmceclip0]
 
And the two modules held together.  Apologies for the slightly blurry photo, the basement currently stinks of 409 cleaner so I’m not going down there to retake it.
 
[259338%2F9662738%2Fmceclip0]
 
That takes care of everything except for the fascia.
Reply 5
Ken Rice
I decided to use 1/4” MDF for the fascia.  On past layouts I’ve used 1/8” Masonite, except for on the Palmer Industrial Park layout where I used 1/4” MDF and I liked the beefier look and feel of it.  I bent it around two fairly tight radius curves at the end with a lot of patience and soaking with water over a few days, and a couple broken attempts (https://rices-rails.blogspot.com/2011/11/palmer-industrial-fascia.html).  I read about using 409 cleaner to bend MDF here on the MRH forum, so I decided to try that.  I cut a few 6” wide strips from a salvaged chunk of 1/4” MDF from a previous project to experiment with before I try it on a full 8’ long piece.  I soaked by spraying the section to be bent while it rested on a cheap roller brush tray for about 15-20 minutes, then got impatient since it was getting close to lunch time and bent it into place.
 
[259338%2F9662759%2Fmceclip0]
 
I have the module sitting upside down on the workbench, on 1/8” Masonite spacers so the fascia will stick up above the surface by that amount.  Another advantage of modular construction - I remember quite a bit of tweaking to get everything lined up right around the corner of the old layout where I had to work in place.

as you can see from the photo below I was pressing my luck by not soaking it more - there’s the beginnings of separation there.  I think once it dries I could probably sand it, maybe smooth with a little putty and it would be fine after painting.  But that’s why this is a test piece.  I’ll try that once it’s completely dried just to see.  Depending on how that turns out I may or may not do another test piece before going for the real one.  The other thing I almost screwed up was the clamping - as you can see from the photos those clamps have barely enough reach.  I’ve pulled out the Jorgensen clamps for next time, they don’t get much use these days but they do have excellent reach for something like this.
 
[259338%2F9662761%2Fmceclip0]
 
And now I have to just wait for that curve to thoroughly dry out, which will probably take long enough that I won’t get a second try today.  Patience is hard!
Reply 8
Ken Rice
The results of my fascia bending experiment are in.  Short version - I’m going to try a different approach.  Long version…
 
The first big problem is that 409 stinks.  I did realize how much it stank while I was actually doing the spraying and clamping, but going down to check on it later - wow.  I do not want to use 409 again.
 
When I unclamped the test fascia, it held it’s shape quite well without much of any springback.  You can see it swelled a bit around the bend where I soaked it with 409.
 
[259338%2F9669994%2Fmceclip0]
 
Some detail shots for posterity.  The outside shows signs of a bit of stress, and a little cracking.
 
[259338%2F9670002%2Fmceclip0]
 
The edge view shows how far in that cracking went.  That’s not good.  But surprisingly the piece still feels plenty strong.
 
[259338%2F9670003%2Fmceclip0]
 
The inside of the bend shows a good deal of, ah, squishing?  Not a cosmetic problem for this corner, but the next four bends after this will have the inside of the curve to the aisle so I’ll need them to end up smoother than this.
 
[259338%2F9670006%2Fmceclip0]
 
Looking at that biggest smush from the edge on it becomes clear that it’s a crack.
 
[259338%2F9670007%2Fmceclip0]
 
And holding a straightedge up to the fascia along the straight and curve shows that it bulges out between where I had it clamped at the curve, in addition to the swelling on the bend.
 
[259338%2F9670010%2Fmceclip0]
 
My conclusions:
  • I could probably make this test bend work if I had to.  It’s strong enough.  Some careful sanding and maybe a little wood filler to smooth things out and it would probably be good enough.
  • I should have used pieces of plywood as tall as the fascia and long enough to cover 6+ inches of straight plus the transition into the curve, so there would be no bulge out.
  • I should have prepared blocks to put inside the benchwork so I could clamp closer t the bend without that angled corner piece being in the way.  And I should have used clamps with a longer reach (throat?).
  • I should have soaked more thoroughly and bent more gradually, with time for more soaking in between gradually increasing the bend to help minimize the cracking and squishing.  I was trying to rush things, I think there is no substitute for allowing time for the material to gradually adjust.
So what next?  I know the gradual soaking in cold water approach I used on the old layout worked.  I’m hoping to get the process a little faster and more predictable than that if I can.  I bought a $10 hot plate and a cheap stew pot on Amazon, I’m going to try steaming the bend next.  I bought those because I’m not sure what if anything from the MDF will end up stuck to the pot as residue, and I think it will be much easier and safer to do this in the workshop than try to make it work on a gas stove top in the kitchen.
Reply 5
Al Carter tabooma county rwy
Ken, here's another option: "bendable plywood" - I found it at a real lumber store (not a big box store) in Seattle. It is 2mm thick and comes with the outside "grain" either lengthwise or the shorter (4') way. Very easy to bend - I had some inside fascia curves on a layout a few years back that were about 6" radius. Not cheap, though, about $30 per sheet. But with careful planning, you can get a lot of fascia or valance material out of a sheet. Check your local lumber store - mine up here in Mount Vernon, WA didn't stock it, but ordered me a sheet. It is smooth and takes paint very well.
 
Al Carter, Mount Vernon, WA
Reply 3
Ken Rice
Ken, here's another option: "bendable plywood" - I found it at a real lumber store (not a big box store) in Seattle. It is 2mm thick and comes with the outside "grain" either lengthwise or the shorter (4') way. Very easy to bend - I had some inside fascia curves on a layout a few years back that were about 6" radius. Not cheap, though, about $30 per sheet. But with careful planning, you can get a lot of fascia or valance material out of a sheet. Check your local lumber store - mine up here in Mount Vernon, WA didn't stock it, but ordered me a sheet. It is smooth and takes paint very well.
 
Al Carter, Mount Vernon, WA
Interesting, I didn’t know about the all plies grain in the same orientation kind, only the kerfed kind.  I just checked a relatively local supplier and they sell half sheets of 1/4” (cut either way 4x4 or 2x8) for $40.00.  More expensive than the 1/4” MDF but not too bad.  If I can’t make the MDF work I’ll try that, thanks for telling me about it!
Reply 2
Al Carter tabooma county rwy
Ken, that is not the same thing. The "bendable plywood" (what it was labeled at Compton Lumber in Seattle, back about 20 years ago) is 2mm thick - about 1/8". Regular 1/4" plywood will not bend as tight or easily.  
 
Al Carter, Mount Vernon, WA
Reply 3
Ken Rice
Ken, that is not the same thing. The "bendable plywood" (what it was labeled at Compton Lumber in Seattle, back about 20 years ago) is 2mm thick - about 1/8". Regular 1/4" plywood will not bend as tight or easily.  
 
Al Carter, Mount Vernon, WA
The stuff I’m looking at is called “Whacky Wood” billed as “Rotary Cut, 3 Ply lauan, Very flexible, Construction grade”.  Boulter Plywood in Medford, MA, for anyone else who happens to be in the greater Boston area and needs some fancy plywood or hardwood - https://www.boulterplywood.com/.  One of those places you can’t get to from anywhere without a major traffic hassle of some sort, but once you finally make it they’ve got a lot of good stuff.  They’ve got a picture of what I think is 1/4” going by the tape measure, bent to about a 6” radius.  Nice to know about in case the MDF doesn’t work out.
 
[259338%2F9670245%2Fmceclip0]
Reply 3
Ken Rice
One final note to the 409 experiment.  I unclamped it all early last week, and just left the bent MDF sitting next to the module.  Here's what it looks like now.
 
[259338%2F9671530%2Fmceclip0]
 
Instead of relaxing and opening up the corner, it tightened up more!  Weird.
Reply 4
Ken Rice
On to the steam bending experiment!  I was going to take a picture of the process in action but I ran out of hands.  This is the amazon basics 8 quart stew pot I got for the experiment, sitting on the cheap 1000 watt hot plate.  I put an inch or so of water in it and cranked the temp control to the max.
 
[259338%2F9671550%2Fmceclip0]
 
My first attempt was to place the board on the pot, set the cover on top of it, seal in the steam around the edges a bit with masking tape, and let it soak up the steam.  The problem with that quickly became apparent - steam collects in the lid, and eventually condensation runs down the inside of the lid and pools on the MDF, and that's bad.  Frst bend attempt has a few giant cancerous bulges, although it did bend very nicely in the places it didn't get wet.
 
The second attempt I started by trying to get the condensation to run off the lid only in the back by tipping it a little.  That failed but I caught it quickly so there's only a small water bulge.  After that I just held the MDF over the pot without the lid.  Lots more steam escaped, but enough apparently penetrated the MDF and warmed it up that I was able to start bending it while it was still over the steam.  I flipped it over periodically so both side of the board got steam and kept pushing the bend in.  Once it looked close enough I scooted into the shop and clamped it up.  The whole second bend attempt took probably 10 minutes - pretty quick compared to the 409.  The failed first bend is sticking out to the side.
 
[259338%2F9671551%2Fmceclip0]
 
[259338%2F9671571%2Fmceclip0]
 
This time I was prepared with chunks of plywood big enough to apply a more event pressure to avoid the bulge problem (I hope), and I used the Jorgensen clamps to get more reach and more even pressure.  I also used a piece of sheet metal on the outside to in theory help keep the MDF from cracking around the curve, but I'm not sure it did anything useful.  I also taped a piece of wax paper around the corner of the benchwork so moisture wouldn't soak into the plywood.
 
The steamed MDF bent much more nicely - no swelling or no cracking visible from the end.  And steamed MDF has much less moisture so I think this might be unclampable fairly soon.  I'm going to give it a full day anyway though just to be sure since it's my first try at this approach.
 
[259338%2F9671562%2Fmceclip0]
 
This is what happens when you get hot water (condensed steam) on MDF, and those are not the worst spots - the worst spots are to close to the module to see until I unclamp it:
 
[259338%2F9671575%2Fmceclip0]
 
My conclusion so far:  Don't get hot water on MDF, but steam bending seems like it will work pretty well.  I can see why people make steam boxes for serious bending, but I think the uncovered pot is probably good enough for this project.  At least in the middle of winter when the extra humidity vanishes fast.
Reply 6
Ken Rice
Caboose ground throws -  in my opinion they're the best way to control turnouts for head-in-the-game industrial switching.  The action is at least reminiscent of the prototype action unlike finger flick, and you don't need to devote any mental energy to which switch/lever controls which turnout.
But they're huge.
 
My solution on my O scale layout was to mount them under instead of on the head block ties.  So, can I do that in HO scale?  I'm using Peco code 70 track and switches, on 1/8" cork roadbed.  N scale caboose ground throws have enough travel for HO turnouts, so I'm experimenting with 206S and 222S ground throws left over from my N scale layout.
 
The idea: Trim the cork roadbed so the ground throw mounts on the layout surface under the head block ties.  File the ground throw so the top  fits up between the ties.  The Peco head block ties are perhaps just a wee bit wider than they should be, so that helps.
 
The experiment to see if it's going to be feasible...
 
Stock 222S on the left, on the right is one somewhat crudely thinned down with an exacto knife on one end and a file on the other.  The file is the way to go, much easier to get a clean trim.
 
[259338%2F9671909%2Fmceclip0]
 
A mockup of how it fits together.  The thickness of the 1/8" cork works out perfectly.  The ground throw sticks above the ties just enough to allow the handle to lie flat.
 
[259338%2F9671910%2Fmceclip0]
 
[259338%2F9671912%2Fmceclip0]
 
There are two remaining details I need to work out before layout track.  First, how to connect the ground throw throw bar with the turnouts throw bar.  And second, how to protect the moving parts from ballast.
 
The 222S comes with a variety of clip on things for connecting to the throw bar, but they only fit on one way up, and they all presume top mounting.  I could drill and tap the ground throw end for 00-90, and run a screw down through the hole in the end of the turnout's throw bar.  I did that with my O scale Atlas turnout under tie ground throw mounting and it worked pretty well.  But that was with bigger screws and meatier bits of plastic.  I could also try gluing a pin into the end of the ground throw.  I have a feeling the ground throw plastic is going to be challenging to glue to though.  Time for some experimentation I guess.
 
The ballast problem is easier.  I think I just need to pre-paint under the throw bar area and keep ballast out of there, and then cover the sides of the ground throw and the protruding end of the throw bar so ballast around the sides and end of the head blocks doesn't cause trouble.
 
All this is much easier to do before turnouts are glued in place.  A bit of patience figuring it out before I start laying track should pay off.  Or at least that's what I keep telling myself as my eagerness to get some track on the layout rises.
Reply 10
Steves VR
Hey Ken,
Enjoying this build.
You seem to have found a solution to bending the MDF, I was going to suggest using two layers of 1/8.
 
Cheers,
Steve.
Reply 3
Reply