Eugene Griffin EGRX

A newly purchased 2 rail O scale MTH 0-6-0 and a change to the steam era (actual years will be decided later) ended the proto48 layout. Buying and changing the wheels to proto48 on the steam era freight cars and the 0-6-0 was the deciding factor.

IMG_0867 2.jpg This blog will cover the repurposing of two 7’ partially completed proto48 modules into a completed (this is a first for me) 11’ 2” office switching layout. 

Working on:   https://forum.mrhmag.com/post/office-switching-layout-using-a-2018-ho-module-13636599

Holding Pattern: https://forum.mrhmag.com/post/office-switching-layout-using-two-salvaged-proto48-modules-12775340

Reply 15
Eugene Griffin EGRX
Story time.
 
The reporting mark EGRX belongs to a fictional equipment leasing company Eugene Griffin Rail-Equipment Inc. (“Marks ending with the letter "X" are assigned to companies or individuals who own railcars, but are not operating railroads” reference Wikipedia). The EGRX company specializes in older freight cars and engines that are used to service smaller short line railroads and industries. The EGRX company provides flexible lease terms that minimize cost for industries and rail operators.
 
Map.jpg
The above map shows industries being serviced by a short line railroad using EGRX leased equipment on a former Class II mainline.
 
Map_2.jpg
 
The former Class II mainline crossed a Class I railroad at a level junction, crossed over a creek and the Valley Road, and then continued past multiple industries before turning southeast and crossing Highway 1 (above map). The industries included a produce canning plant, a corrugated pipe manufacturer, a utility pole manufacturer, and a transload track utilized by a fuel distributor, feed and seed distributor, and a lumber mill (the transload track serviced the lumber mill and corrugated pipe manufacturer prior to the mill’s expansion).
 
The former Class II railroad had crossing rights with the Class I for the level junction (left center). After the Class II abandoned the line, the Class I changed the crossing rights requiring the operating railroad to call for permission to cross the Class I mainline. A cost avoidance decision resulted in the former Class II track being abandoned starting on the west side of Highway 1.
 
Map_3.jpg
 
A snack food manufacture (pictured above) is located on the former Class II mainline several miles west of the Class 1 railroad’s level crossing. The track curves to the north after passing the west side of the manufacturer and a maintenance area for the railroad. The Class II railroad leased the right-of-way above the tracks to the manufacturer allowing the construction of the connection between the buildings. This connection allowed the snack food manufacturer to acquire the warehouse on the north side of the track.  
 
Map_4.jpg
 
Map_5.jpg
 
The former Class II mainline continues north passing a fertilizer distributor then curves to the east and joins with the Class I interchange tracks. The track continues east passing an industrial area then turns to the southeast crossing over the Class I mainline and stops before crossing Highway 1 (map above).
 
OfficeBuild2025_ver2_office.jpeg
 
The model of this fictional railroad started in the Office switching layout using two salvaged Proto48 Modules (shown above). This location closely approximated a Inglenook sidings switching layout (http://www.wymann.info/ShuntingPuzzles/sw-inglenook.html) and models the eastern portion of the southeast branch.
 
OfficeBuild2025_ver2_snackfood.jpeg
 
The snack food manufacture mentioned above is modelled as a addition to the Office switching layout (see above, red boxcars are on the main). Miles of track, the level junction of the Class I railroad, and most of the snack food manufacturing plant would be contained in the 2X4 studded wall (if it was modelled).
 
The following illustrations shows the planned model of the short line’s southeast branch as it passes the fertilizer distributor and connects with the Class I interchange tracks before heading east on the northeast branch to the industrial area (not shown right of hot water tank).
The interchange tracks are approximately 20 linear feet in length (including the curve). The removable red sections allow for access to the electrical panel, furnace, and hot water tank. Crossover turnouts will be placed on the red section in front of the electrical panel allowing for a required runaround track for the Northeastern branch (future build, not pictured below). The proximity to possible storage under the stairs for freight cars makes the electrical panel red section a good location for a fiddle-yard.
 
OfficeBuild2025_ver2.jpg
 
The model stops at the hot water tank (illustrated below). The clearance between the black 4” pipe and the hot water tank is 5 inches, more than enough for a O scale track. Unfortunately, the pipe leading from the hot water tank’s pressure relief valve blocks almost 2 inches of the 5 inches of clearance (future work). The track from the most eastern turnout on the northeastern brach of the model to the hot water tank is enough to hold a SW7 and two 50’ boxcars and defines a good stopping point for the planned build of the extension.
 
OfficeBuild2025_ver2_2.jpg
 
 
 
Reply 5
Eugene Griffin EGRX
Time to build
 
The above plan had the southeast branch join the northeast branch near the interchange track turnout. This allowed for a 0.8% grade and a one inch increase in elevation. The elevation wasn’t needed resulting in the following plan change.
OfficeBuild2025_plot2.jpg
 
The build of the next section has begun.
 
IMG_3024.jpeg
 
IMG_3025.jpeg
 
IMG_3027.jpeg
 
The clearance is required for a steam era O guage line that will be operating in the valley  (see below) .
 
IMG_3028.jpeg
 
Lift off hinges (amazon purchase) are being used for the removable sections (lower photo).
 
If all goes as planned,  only scenery for the diesel era proto48 (upper part of photo) and steam era O gauge (lower part of photo) will be seen unless the trains are running.
Reply 5
Eugene Griffin EGRX
Finally starting the work on the interchange area.
 
IMG_3105.jpeg
 
IMG_3108.jpeg
 
The planned fertilizer distributor will be located in front of the level and will be built later.
Reply 5
Eugene Griffin EGRX
The plan worked.
It's a very tight clearance and I am happy that the 67' (IL 62') bulkhead flatcars did not touch the backdrop.
 
 
IMG_3118.jpeg
 
IMG_3116.jpeg
 
The couplers are mostly within the rail and no rail can be seen at the middle of the cars.
A little scenery and the lift out section will be completed.
 
IMG_3120.jpeg
 
 
Reply 8
Eugene Griffin EGRX
Better call MOW 😉
 
Depending on the location within a train, a couple of the bulkhead flats were derailing shortly after the new lift out section as they entered the old salvaged (circa 2016) module. I used a metal ruler and discovered some unevenness in both rails at different locations.
 
The solutions are either ensure the trucks on the bulkhead flats could navigate uneven poorly maintained track or fix the track. MOW was called.
 
IMG_3133.jpeg
 
IMG_3137.jpeg
 
Hand spiking track is sometimes tedious and other times relaxing.
 
On the other hand, scenery can be random and happens without planning. I decided the road in front of the track on the lift out needed a wooden culvert and ditches. This will be followed by wooden guardrails and eventual a single lane road bridge over the steam era class I main.
 
IMG_3129.jpeg
 
Work continues on the lift out.
 
Reply 8
Eugene Griffin EGRX
The first pass at the scenery on the lift out is almost completed.
 
IMG_3147.jpeg
Reply 7
Eugene Griffin EGRX
Did some electrical and a quick test with this out of the box Atlas O GP-7 after converting the wheels to Proto48.
The video is rough and low resolution.
 
Reply 5
ctxmf74
 Looks like that GP7 runs pretty well. Does Atlas still use the twin motor "China" drive? What decoder or decoders did you use?.....DaveB
Reply 3
Eugene Griffin EGRX
 Looks like that GP7 runs pretty well. Does Atlas still use the twin motor "China" drive? What decoder or decoders did you use?.....DaveB
Hi DaveB,
 
Short answer it has China Drive and most likely  QSI Quantum TitanTM Sound-Decoder, however, I am not 100% on the decorder  as I haven't opened the hood.
 
Why does run better:
  • newer?
  • newer decorder?
  • newer DCC power system?
Background, This GP-7 was purchased from Western Depot in 2022 and wasn't used until recently, the Atlas O web site shows a date of March 2014 as the latest production run for the GP-7  UP 115 model.
 
 
The other change was a purchase of a DigiTrax DCS52 in 2022 as oppose to the 2005 Prodigy Express DCC.
Decorders (?) never used more than one even on the old SD35.(max 0.8 Amp in stall)
IMG_3164.jpegIMG_3172.jpeg
 
One Note: There has been a change in the method of pickup from the insulated wheels. As seen below the older method used metal contact, the newer GP7 uses what maybe ballbearings???? This has caused problems with the proto48 wheelset on curves, and as a result I more than likely will assign this unit to O Gauge instead of Proto48.
 
IMG_3171.jpeg
Reply 4
Eugene Griffin EGRX
IMG_3196.jpeg
 
309 moving some freight cars.
Reply 7
Eugene Griffin EGRX
Finally back at the addition to the office layout.
 
IMG_3250.jpeg
 
Cleaned out from under these old staging sections. Both sections will be lowered with the top section matching the new addition to the office layout.
 
IMG_3251.jpeg
 
 
Time permitting the lift out section and the two tracks in those areas should be completed by next weekend. Scenery will be minimal if any as this is a staging and storage area representing an interchange with a class I railroad. The extra space in the first picture will store extra freight cars.
 
OfficeBuild2025_ver4.jpg
 
 
I’m extending my plan for this year’s build to include a modern warehouse currently housing a plastic pipe manufacturer. The sigle track in front of the building continues into the industrial area and is approximately 40' from the warehouse track.
 
Screenshot 2025-02-23 at 3.29.05 PM.jpg
 
Car Tracker.jpg
 
I wanted to know what operating years were possible for the fictional shortline. Based on the "used on model" column the operating years could be from 1998 to 2025. However if I use TTPX 804005 (third from bottom) the start year moves to 2007 based on the cars build date. The end date is based on a 50 year useful life of the car. Additionally, some railroads are no longer in business, these cars have beed purchased by and assigned the EGRX reporting mark. (first three)
Reply 6
Eugene Griffin EGRX
What is needed?
 
IMG_3261.jpeg
 
Work continues on the staging/storage area for the addition. The section in front of the electrical panel is removable similar to the section on the left of the above photo.
 
The section on the left used lift off hinges that I have had for sometime (train room cleanup project). When I built the new section, I questioned the reason for using the lift off hinges and instead used bolts and a piece of wood to hold and align the removable section. (below)
 
IMG_3262.jpeg
 
From what I have seen, railroads also avoid unnecessary and overly complicated solutions. The below screen captures from Google Street View, show the removal of a turnout that is no longer required as well as simplifying turnouts by using a self guarded frog.
 
 
Screenshot 2025-03-04 at 8.54.52 AM.jpg
Screenshot 2025-03-04 at 8.59.28 AM.jpg
 
The modelled interchange area serves as the entry point for rail cars from a Class I railroad. At some location on the Class I mainline there is a turnout that will be either a trailing point or facing point depending on the Class I’s train direction. A facing point turnout would require the locomotive to travel to the runaround tracks on the interchange drop off the rail cars on one track and connect to the rail cars for pick up on the other track, returning to the main by shoving the cars down the interchange track.
 
This operational style may have been required in the past. However,  two turnouts on the interchange track can be eliminated if the interchange track is only serviced by trailing point turnout Class I trains. These trains would back up the interchange track pull the cars from the interchange and then shove cars for drop off onto the interchange track.
 
Following the above operational style, the outer track becomes the interchange track (see first photo in this post) and the second parallel track is abandoned. This scenario allows for storage and staging, as all interchange cars will arrive and depart from a single track and the abandoned track can be used to store unused cars.
 
Operationally, the area now has one turnout connecting the southeast branch,  northeast branch, and interchange track. In addition, given the Class I would not sort delivered freight cars for the southeast and northeast branches , the area is the first switching job required in a session.
 
Is the fertilizer distributor needed?
 
Changes2.jpg
 
OfficeBuild2025_ver4_changes.jpg
Reply 5
Eugene Griffin EGRX
Finally found the time to finish the staging area.
 
IMG_3273.jpeg
 
In the above photo the foreground track represents the abandoned track and the rear track is the interchange track in the plan.
 
The photo below shows the completed section and the lift out section to the southeast branch in the lower right corner of the photo. with the lift out section removed working in the are was less restricted.
 
IMG_3272.jpeg
 
The staging area will hold Approximately 21 freight cars. Hopefully work on the scenery for the interchange area will start as well a the curve tracks heading to the northeast branch.
Reply 6
Eugene Griffin EGRX
Layout Progress
 
IMG_3289.jpeg
IMG_3298.jpeg
 
The first track to be completed for the northeast branch was the section behind the furnace (above two photos). The tight clearances required testing before continuing with the plan.
 
No problems were found.
 
IMG_3293.jpeg
 
The section of track that curves from the interchange tracks to the track leading to the northeast branch (above photo) is nearing completion. After the ballast glue dries the rails and scenery will be completed for this scene.
 
The blue background board is secured using drywall screws. Although this section may never receive a photo background other locations will eventually have a background photo. Using a screw and the blue background board will allow the background to be easily removed and replaced after the application of a background photo. Photos will be left unsecured near the screws and glued after placement of the background board.
 
IMG_3296.jpeg
 
The plan placed the turnout frog at the end of the rails in the above photo (right). The turnout points would be in a tight clearance area to the right of the above photo, this would result in difficulties maintaining the turnout. The above photo shows the new location for nonstandard curved turnout that will be built at a later date. This change isolates the rear track (for now abandoned) of the interchange and uses the foreground track (previously abandoned) as the primary interchange track. The turnout will be added at the originally planned location for the southeast branch. (previous photo)
 
While the glue dries on the ballast I completed the northeast industrial area track plan (below) and will spike the new southeast branch turnout in the interchange area.
 
 
OfficeBuild2025_ver42.jpg
Reply 6
Eugene Griffin EGRX
Work continues on the interchange area
 
IMG_3305.jpeg
 
IMG_3310.jpeg
 
IMG_3318.jpeg
 
IMG_3323.jpeg
 
Looks like the roof contractor only completed 25% of the new shingles on the salvaged house moved to this location. Both the house and fence were salvaged from a snow scene that will no longer be used.
 
The lack of use of the rear track will be enforced by adding tall grass between the ties (the grass will also hide the reduced number of spikes).
 
Work continues on the interchange scenery, I plan to add an additional abandoned track representing  the location of a former fertilizer distributor. The track will be used as a storage area for the operator of the branch line.
 
 
 
Reply 6
Eugene Griffin EGRX
Sunset on the new interchange scene
 
IMG_3328.jpeg
 
Great progress on the scenery today. Definitely needs some cleanup.
 
Work continues tomorrow.
Reply 5
Eugene Griffin EGRX
The abandoned fertilizer distributor
 
IMG_3346.jpeg
 
The foreground track was cut from an old module and will serve as the branch line operator’s wheel storage track. The building (work in progress) represents the fertilizer distributor’s  abandoned storage shed.
 
IMG_3347.jpeg
 
The overall scene is shoulder height and should provide a nice location to sort cars for the northeast and southeast branches.
Reply 3
Eugene Griffin EGRX
Work continues on the interchange area.
 
IMG_3354.jpeg
 
Test fitting the new stone foundation for the abandoned freight shed. The foundation was created using plaster of paris, concrete dye, and stones.
 
IMG_3357.jpeg
 
The operator of the short line (EGRX) is using the abandoned freight shed property for a workshop and wheel storage. The above shed was printed, a few years ago, on a 3D filament printer using wood infused filament and will serve as the workshop.
 
IMG_3360.jpeg
 
IMG_3361.jpeg
 
IMG_3364.jpeg
 
Next: complete the stone foundation and more scenery.
Reply 5
Eugene Griffin EGRX
The intercherchange area.
 
IMG_3393.jpeg
 
IMG_3388.jpeg
 
IMG_3399.jpeg
 
IMG_3401.jpeg
 
IMG_3395.jpeg
Reply 8
tp
Looking good 🙂
Reply 1
Eugene Griffin EGRX
Looking good 🙂
Thank you!
Reply 1
Eugene Griffin EGRX
Switching the interchange track
 
 
I certainly don’t work on the model railroad when the weekend weather is warm/hot with a cool breeze (That’s outdoor time).
 
Decided to energize the new interchange area. First test for electrical shorts (NONE!). Next track voltage, looks OK! (pictured below).
 
IMG_3411.jpeg
 
Time to drop off and pickup cars from the interchange track.
 
 
The plan for the Northeast branch has been revised.
 
Screenshot 2025-05-08 at 12.07.20 PM.png
 
Based on a 2009 aerial photo from Google Maps there is definitely a old industry track to the right of the photo and what appears to be new ballast on the left where a possible turnout for a storage track existed (red lines in the above photo). Unfortunately, Google Maps does not have any views of the area prior to 2009.
 
The storage track is needed ( the interchange tracks are full and the fiddle yard will not be ready for some time). Extra cars in the area will allow for local switching based on industry needs without returning to the interchange. Although the Google maps photo does not have a fertilizer distributor, the need for a runaround track provided a good location for the industry. (Photo below). The white surface area represents a future steam to diesel transition era Class I railroad. The two eras will be view blocked and operate independently.
 
OfficeBuild2025_ver6.jpg
 
Once the track is completed there is plenty of work on the layout. The next task is powering up the other SW unit with new electronics and setting the acceleration and momentum for both of the locomotives. EGRX 309 definitely has a instant acceleration in the video.
 
Progress maybe slowed by warm sunny weather, let’s hope for rain!!!
Reply 4
Eugene Griffin EGRX
Interchange testing
 
 
When the interchange area was designed the limited space and a requirement for a turnout to the southeast branch limited the curves to approximately three feet eight inches in radius. This is sharp for the modern freight car lengths, especially with Proto:48 flanges. During the testing none of the freights cars exhibited any issues navigating the curves. However some, especially the lighter and longer bulkhead flats and a couple boxcars, would climb the points of the thrown turnout.
 
Initially the proximity of the sharp curve to the points was considered as a potential problem. The corrective step was the installation of a guardrail to force the wheels toward to the inner rail of the curve (photo below).
 
IMG_3483.jpeg
 
As testing proceeded, the problem did not appear again until the number of freights cars being shoved was increased. The problem of the leading wheel of the trailing truck climbing the point once again appeared for the bulkhead flats and a couple of boxcars. This happens when these cars are being shoved and are closer to the locomotive or are directly coupled to the locomotive in longer trains. What was noticed at the locomotive coupler, similar to the photo below, was the off centering of the couplers. It appears that a moment may be setup that results in the trailing wheel of the trailing truck being forced to the inner rail and the leading wheel being forced to the outer rail and the thrown point. (It should be noted that 15 O scale freight cars have a noticeable drawbar pull when pulled by hand)
 
IMG_3482.jpeg
 
There are two freight cars with Protocraft couplers installed (photo below). Initial test indicate that the coupler maintain center and the Protocraft couplers navigated the sharp curves. However, further testing will require a greater variety of freight cars with the Protocraft couplers installed especially the longer freight cars.
 
IMG_3480.jpeg
 
 
IMG_3484.jpeg
 
Another known issue is the lack of staging and a plan to use of a fiddle yard. The photo above shows the portion of the staging yard after the lift out section, the capacity in this area is 5 freight cars per track. There is a possibility to use a nine foot section that could be accessed by replacing the straight track in the above photo with four foot radius curves (photo below). This 9’ X 19” area was the “could be” area. Plans for this area included a G scale switching layout, On30 switching layout, or HO scale switching layout. Currently it is a storage area.
 
IMG_3490.jpeg
 
 
 
 
Reply 4
Ken Rice
What was noticed at the locomotive coupler, similar to the photo below, was the off centering of the couplers.
That’s why using appropriately sized easements is a good idea.  Lacking that, your options are basically don’t couple long and short cars together, eliminate the longer cars, or put couplers that swing on the longer cars.
 
I had the same problem on my old O scale layout with easements sized for 50’ cars when I briefly experimented with a couple 89’ flats - on a new curve with an easement sized for the longer cars they were fine, but on the same radius old curve with the shorter easements they’d derail a shorter car coupled to them.  I “fixed” the problem by getting rid of the long cars.
Reply 3
Eugene Griffin EGRX
That’s why using appropriately sized easements is a good idea.  Lacking that, your options are basically don’t couple long and short cars together, eliminate the longer cars, or put couplers that swing on the longer cars.
 
I had the same problem on my old O scale layout with easements sized for 50’ cars when I briefly experimented with a couple 89’ flats - on a new curve with an easement sized for the longer cars they were fine, but on the same radius old curve with the shorter easements they’d derail a shorter car coupled to them.  I “fixed” the problem by getting rid of the long cars.
Definitely storing the longer cars.

It should have worked, I am still looking for something wrong at that location.  Maybe I can create an easement up to the points of the turnout. More than likely, I  will go back to plan A with the turnout removed and expand the staging as mentioned.
Reply 2
Reply