This blog will serve as a place to show the progress of my build of the Philadelphia & Reading bridge over the Susquehanna river in Harrisburg, PA.

Build Highlights:
  • Bridge over the Susquehanna river, Harrisburg, Pennsylvania, USA
  • Bridge consists of 51 concrete arches
  • One plate girder bridge
  • Dual track
  • Dual track crossing underneath on west side
  • 0.7% grade
  • No compression
  • Building both dual tracks to Free-mo module standards
  • Main bridge arches, pilasters and piers to be scratch build from 20-thou and 40-thou styrene sheet
  • Main bridge pier cutwaters to be 3D printed
  • Handlay code 83 track on Central Valley Model Works tie strips
  • Fast tracks #10 switches for cross overs
  • Include Free-mo Modular Signal System plus signal heads.
Bridge Background:

A Philadelphia and Reading bridge, now part of Norfolk Southern crossing the Susquehanna river in Harrisburg, PA.

In this Google Earth image you can see the bridge is the one closest to the Interstate 83 bridge:
[Google_Earth_01_1080px]

The complete bridge by an unknown photographer:
[P%26R%20Bridge%2043]

An aerial close up photo by an unknown photographer:
[P%26R%20Bridge%2040]

Originally this bridge was built with only 46 concrete spans in 1924. Each span plus corresponding pier structures measures 76'-3" in length. Each concrete arch measures 66', while the piers are 11’-6” and 9’ wide. There is a reason the piers alternate between these two widths. This bridge was build by replacing an existing bridge in place. The old bridge had spans of 152’-6” wide. The wider piers of the new bridge encased the original bridge’s piers, while the narrower piers were purpose build. At a later date five spans were added on the east side, giving the bridge a total of 51 concrete spans.

An elevation drawing from the west side of the bridge as found in Railway Age 69 volume 21:
[PRSusquehannaBridge-RailwayAGe69-21-002]

In this same Railway Age issue, a detail view of the west side part of the bridge was found:
[PRSusquehannaBridge-RailwayAGe69-21-004]

The pier encasing process is shown in this photo published in Railway Age 73 volume 23:
[PRSusquehannaBridge-RailwayAge73-23-004]

On the west side the mighty PRR crossed with two tracks under the first concrete arch, while the Northern Central crossed with three tracks under the deck girder bridge.

To date, only the PRR tracks (now also Norfolk Southern) still cross under the  bridge as can be seen in this photo by an unknown photographer:
[P%26R%20Bridge%2034]

On the East side there is a pair of cross overs that are protected by signals.

The bridge measures nearly 3,960' in total length, which includes these 51 spans and a 69' plate girder bridge on the west side. Without compression in HO scale this equates to 45'-6". Now convert this all to 14 similar sized module sections for ease of build and transport and you’ll end up with a nearly 50’ long Free-mo module.

The aim is to build the bridge as it looks in the current time frame: the 51 arches, the Northern Central tracks are gone, but the PRR tracks are still there. The PRR track will be modeled such that the module can also be used as a 26” long double track Free-mo module if a setup can’t accommodate the full 50’ bridge.

I'll update this thread with pictures of the various build activities when they occur with the intend to create a more detailed article for publication at a later date. Enjoy!

-Yaron.
Susquehanna Bridge Build | My Personal Website | Capitol Free-mo

Reply 25
jeffshultz
We have an "atmospheric river" dumping rain on us right now in Oregon, so in-house activities are now the primary ones. 

orange70.jpg
Jeff Shultz - MRH Technical Assistant
DCC Features Matrix        My blog index
Superintendent, 2nd Division PNR, NMRA
Northwest Oregon/Southwest Washington

Reply 3
Yaron Bandell ybandell
Got a bit of plywood since the last update. one sheet of 3/4-inch Birch and several sheets of 5mm ply:
 
[0114_20230923_202056]
 
Started cutting spines and side panels for the waffle boxes that will be the module sections. This is one of the West end side panels being cut:
 
[0115_20230923_202010]
 
Here a stack of the spines and side panels for the modules that are pure water (4 inches tall sides). They were ripped with a track saw. I did manage to get an average accuracy of 20-thou with that over 8 feet long cuts. Not bad...
 
[0116_20230923_202244]
 
For the ribs I grabbed a few lengths of spine and cut them on the chop saw into smaller pieces:
 
[0117_20230923_202202]
 
I used LibreCAD and my Cameo die cutter to cut a template out of a 20-thou styrene sheet for the bottom waffle box cut outs:
 
[0118_20230926_145550]
 
Tracing the cut outs this way is waaaay faster than with a compass and ruler: took me like 2 minutes to do this entire sheet worth of cut outs:
 
[0119_20230926_134402]
 
However, making the cut outs is not that fast. Took about 2 hours to cut all the 84 holes with the 2-inch hole saw. At least I had three sheets stacked while doing this.
[0120_20231001_115257]
 
Then after I cut those nearly 100 holes, I used a jig saw for an hour to "connect the dots" and ended up with my desired cut outs to act as the waffle box bottom:
 
[0121_20231001_135416]
 
Starting the assembly process of the West approach module by placing the two spines and holding them to the 3/4-inch birch end plate:
 
[0122_20231001_151153]
 
Side view of the spines being held in place by 90-degree clamps:
[0123_20231001_151256]
 
The ribs were cut from 5mm ply and had 1/2-inch square dowels glued and stapled to them:
 
[0124_20231001_151224]
 
Putting the ribs in place with glue and staples to avoid having to clamp for 24 hours:
 
[0125_20231001_153311]
 
This all went together in about an hour:
 
[0126_20231001_154705]
 
More cubby hole views!
 
[0127_20231001_154712]
 
Looking towards what will be the West approach on the Lemoyne side of the Susquehanna river:
 
[0128_20231001_154850]
 
And here a test fit of the first two spans on the West approach module. After this picture was taken I noticed I had to cut away some of the roadbed and spine to allow for scenery to slope down properly.
 
[0129_20231001_231017]
 
That's it for now. More updates after Thursday.
Reply 9
Yaron Bandell ybandell
Some photos of the first partial module appearance at the Great Scale Model Train Show in Timonium, MD:
 
Inaugural south bound train under the bridge during layout setup & testing:
 
[20231014_090623]
 
[20231014_090630]
 
The way the bridge module is used in this setup is non-standard by using the North-South tracks at 50" nominal height instead of their "normal" 48" nominal height.
 
Overview shots of the 16 feet of bridge (or 21ft of the 56ft module) setup at the show:
[20231014_154159]
 
First lesson learned: make the side to side slop on the holes for the carriage bolts larger so the bridge can be straightened out.
 
[20231014_154247]
 
[20231014_154255]
 
[20231014_154133]
 
Second lesson learned: make the cross braces an integral part of the module to ensure leg stability in lieu of getting thicker threaded rods holding up the modules.
 
Third lesson learned: go back to the slot design in the legs for easier and better adjustment ability.
 
If you are in the mid Atlantic area, come see it in person on Sunday October 15, 2023!
Reply 11
John B acsxfan1
Some photos of the first partial module appearance at the Great Scale Model Train Show in Timonium, MD:
 
Inaugural south bound train under the bridge during layout setup & testing:
 
[20231014_090623]
 
[20231014_090630]
 
The way the bridge module is used in this setup is non-standard by using the North-South tracks at 50" nominal height instead of their "normal" 48" nominal height.
 
Overview shots of the 16 feet of bridge (or 21ft of the 56ft module) setup at the show:
[20231014_154159]
 
First lesson learned: make the side to side slop on the holes for the carriage bolts larger so the bridge can be straightened out.
 
[20231014_154247]
 
[20231014_154255]
 
[20231014_154133]
 
Second lesson learned: make the cross braces an integral part of the module to ensure leg stability in lieu of getting thicker threaded rods holding up the modules.
 
Third lesson learned: go back to the slot design in the legs for easier and better adjustment ability.
 
If you are in the mid Atlantic area, come see it in person on Sunday October 15, 2023!
John B, Modeling the Maryland and Ohio Railroad (Protolance) ex Western Maryland East Sub in N Scale from Baltimore to Hagerstown.
Reply 3
John B acsxfan1
I saw your work there today - it was impressive
John B, Modeling the Maryland and Ohio Railroad (Protolance) ex Western Maryland East Sub in N Scale from Baltimore to Hagerstown.
Reply 4
Yaron Bandell ybandell
I saw your work there today - it was impressive
Thank you John.
Reply 3
cdguenther
When you look at it from the side, you can see the grade as it climbs from the yet to be constructed east side to the west (high) side. Three inch rise in fifty six feet of length. It's a privilege to feature this as part of our Free-mo layout.
Reply 4
Tim Bowser NCR-Boomer
Second lesson learned: make the cross braces an integral part of the module to ensure leg stability in lieu of getting thicker threaded rods holding up the modules.
 
Third lesson learned: go back to the slot design in the legs for easier and better adjustment ability.
 
I'll have a detailed description later on an idea for the support leg 'infrastructure'; after seeing what you're doing with the module itself, those legs are going to be a project in and of themselves. 

As for the legs, Drew has come up with Ver. 7 of the NECHS support leg.  It only requires half the router table time, and with one tweak (I jokingly call it 'Ver. 7A'), the rough adjustment is quicker to accomplish.  
 
It was enlightening to see the Rockville Bridge in place with our setup.   I might need a bigger rig, to add space for a "Winding Gulf" module, to add an Appalachians-based descending grade. 😉
 
Regards,
 
Tim B.
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 3
Yaron Bandell ybandell
NCR-Boomer wrote:
I'll have a detailed description later on an idea for the support leg 'infrastructure'; after seeing what you're doing with the module itself, those legs are going to be a project in and of themselves. 

As for the legs, Drew has come up with Ver. 7 of the NECHS support leg.  It only requires half the router table time, and with one tweak (I jokingly call it 'Ver. 7A'), the rough adjustment is quicker to accomplish.  
 
It was enlightening to see the Rockville Bridge in place with our setup.   I might need a bigger rig, to add space for a "Winding Gulf" module, to add an Appalachians-based descending grade. 😉
 
Regards,
 
Tim B.
Tim,
 
I peeked briefly at the legs from NECHS, but with all the other impressions this weekend I'm not 100% sure if I recall all the details on how they did their slot design. I should've taken pictures with my electronic leash. So if you get the "V7A" slot design on virtual paper, then I can see how I can implement/retrofit that in my leg system  before the Neuse River Valley show. I believe I have the cross bracing design figured out, just need to do a quick mock up.
 
Oh, don't forget it's not the Rockville Bridge,  but the Reading's Susquehanna bridge. The Rockville bridge is a stone masonry bridge and located about a mile or so up the river 🙂 This reminds me that I really need to create a FAQ pamphlet with some stats on the bridge and also print the Free-mo name tag I based off your OpenOffice document "template".
 
And yes, you should build a Winding Gulf module!
 
-Yaron.
Reply 3
Tim Bowser NCR-Boomer
Yaron,
 
Version 7 of the leg removes the slot from one side of the extension, and puts the carriage bolts on that side, reminiscent of how you have the legs now on the Reading Bridge.  This puts the wing nuts on the same side of the leg, and they maintain the same gap (distance apart).  The "7A" revision changes the lower wing nut to a 'Nylok' nut, tightened to just a slight drag when the leg is extended.  If you really need the extra clamping force, keep the double wing nut variant.
 
Tim B.
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 3
Jim at BSME
Saw this too this weekend, very impressive work, expect it to be done by the February show! 😃
 
Curious have any of the Free-Mo goes come up with a use for all those pieces cut out of the waffle other than firewood?
- Jim B.
Baltimore Society of Model Engineers, Estd. 1932
O & HO Scale model railroading
Check out BSME on: Facebook, Instagram
Reply 2
Tim Bowser NCR-Boomer
Yaron,
 
Found the photo of something we were discussing late Sunday afternoon.  Clarence spotted them during the February 2022 GSMTS, I snapped a couple pics when I wandered past them later during the show.  They belong to someone associated with the Western Maryland Railway Society layout, and are apparently referred to as NOMADs (referencing a Star Trek plot device).

WMRS-NOMAD.jpg
 
Modular layout skirting spools, if anyone is wondering what I'm on about...  
 
Tim B.
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 4
Yaron Bandell ybandell
Jim at BSME wrote:
Saw this too this weekend, very impressive work, expect it to be done by the February show! 😃
 
Curious have any of the Free-Mo goes come up with a use for all those pieces cut out of the waffle other than firewood?
February 2024: here is hoping 🙂
 
The cut out pieces: I've saved them for now. I might actually cut them square and glue them together to create shims for those modules of other Free-mo guys unfortunate enough to be connected to the West end of the bridge and need to shim upwards by 3-3/4".
 
NCR-Boomer wrote:
Found the photo of something we were discussing late Sunday afternoon.  Clarence spotted them during the February 2022 GSMTS, I snapped a couple pics when I wandered past them later during the show.
Tim, yeah, that is roughly what I was thinking about. I like the handle on the top to help rotate etc. It seems these have a base on swivel wheels and then the roll with fabric top and bottom guard spinning separately from the base. I was thinking to simply use the swivel wheels of the base to spin the entire thing around while rolling up/unrolling the fabric. I might use some scrap plywood and a set of my swivel wheels destined for legs to test.
 
I did find a cheap source of 2" binder clips today for attaching the skirting to the modules: officesupply dot com had a sale of a box of a dozen for $1.71 per box. I could spend $9 for shipping the 10 boxes or so I need, or buy 27 boxes to get to the $45 minimum for free shipping. I'm hoping the CFO will not be home when 27 boxes of binder clips arrive😳
Reply 5
Tim Moran Speed-Mo Tim
Jim at BSME wrote:
Saw this too this weekend, very impressive work, expect it to be done by the February show! 😃
 
Curious have any of the Free-Mo goes come up with a use for all those pieces cut out of the waffle other than firewood?
Jim,
 
An easy use of that material is to cut it into roadbed wide strips , bevel them, and glue them to the module top. This gives a solid roadbed for any kind of trackwork you're interested in installing.
 
Respectfully,
 
Tim Moran Akron, OH
Reply 5
cdguenther
Here's a video of this amazing project, taken at the Oct 13-15 Timonium train show. I was focused on table construction, span construction, and how he uses the Silhouette machine to scribe the sheet plastic.
 
Reply 7
Yaron Bandell ybandell
It's been a little while since I posted an actual update on the bridge build.
 
Before I could  bring the bridge to the Timonium GSMTS show on October 13-15, I had to build the North-South route a.k.a. the Port Road Branch part of the module since the East-West route is far from being usable. In real life the North-South line runs North towards Norfolk Southern's Enola Yard and crosses the bridge at milepost 66.85.
 
Since the West approach module itself doesn't have proper Free-mo end plates and the Free-mo standard requires basic continuity of scenery and fascia, I had to build "wings" on both side. Here is the South side wing being built in the same waffle box fashion:
 
[0130_20231009_212830]
 
I'm using pins for quick alignment and two bolts to attach the wing to the side of the West approach:
 
[0131_20231009_212901]
 
When placing the pins, I made sure to drill through the Sipping & Switch Society of North Carolina end plates as well. The idea is that the North-South route can be setup at 48-inches nominal and be part of a S&SSofNC layout with a Free-mo layout going across the S&SSofNC layout. If only the North-South route is used with the Free-mo end plates in a Free-mo layout, the  module needs to be raised by 2 inches via the adjustable leg system.
 
After both Free-mo wings were created, I glued on cork for roadbed and weighed it down with a small fortune of boxed cat food cans:
 
[0132_20231011_231805]
 
This shot shows how the continuity of fascia and scenery is going to be established to the rest of the Free-mo layout, by curving the river bank slightly outwards:
 
[0133_20231011_231826]
 
The first of 5 flat river domino sections before placing the top sheet of plywood:
 
[0134_20231011_231914]
 
It seems I didn't take pictures of the wiring of the West approach nor the wings. I'll have to remember to show that when I can reach these pieces of modules again.
 
And then it was time for it's first public showing at Timonium. Some extra overview shots of the bridge in the layout during setup on Friday:
 
[0135_20231013_200022]
 
 
[0136_20231013_200035]
 
After the show it was apparent that I needed to seal the wood. I placed a sweating soda cup on two spots and that left some nasty marks on the wood. So here I'm taking advantage of a nice fall day and put three coats of Varathene outdoor gloss poly on the modules:
 
[0144_20231030_151114]
 
Once the wood was sealed I used some flat black latex paint for the fascia and two craft sized bottles of cheap acrylic "English Ivy Green" as the base color of the river:
 
[0145_20231030_151052]
 
During the TImonium setup I also noticed that I needed more stability in the leg system (mind you, I cut the wood for the legs around midnight the night before and threw together the legs plus the hardware in the morning before leaving for the show.
 
At the Neuse River Valley show in Raleigh, NC on November 4-5, I took some photos of the module leg system aimed to show off the top adjustment using knobs on 5/16th threaded rods and the enhanced bracing in place.
 
[0146_20231104_111618]
 
The threaded rods are placed in a 2x2 block screwed into the side of the 1x2 leg upright. The rods are held in place in the block with a coupling nut at the bottom and a washer/regular nut combination on the top of the 2x2 block:
 
[0147_20231104_111632]
 
The legs have 2 inch casters with brakes on them. I could move the entire 21 feet worth of module plus side wings with extremely little effort. JUst a few pounds of pressure at the end of the Timonium show moved the entire module out of the layout for tear down. At Raleigh, the legs helped us move and rotate the module several times around with just 2 people. Not having wheels on this module when finished would make it impossible to move without a small army. Now I estimate that with at most 3 people we can relocate it anywhere as long as the floor is relatively smooth.
 
[0143_20231021_213605]
 
And yes, I only had two of the three screws holding the leg bracket in place. I did mention the legs were assembled the morning of the first show, right? 🙂
 
The leg height adjustment system received some extra holes as a result of leveling issues at the Timonium show:
 
[0148_20231104_111642]
 
And finally shown below is an overview shot showing off the bracing. There is still some side to side movement that needs to be resolved before I'm going to create the permanent legs. This most likely will be done using an X-type brace in each leg instead of the single horizontal bar about midway.
 
[0149_20231104_111656]
 
And this is what the module looked like at the show in Raleigh. It was at the end of a Free-mo/Speed-mo branch line off of the 32,000 square foot S&SSofNC layout.
 
[0150_20231105_152100]
 
And that brings me up to date until today.
Reply 8
Yaron Bandell ybandell
Today I finished the majority of assembly of another eight span section of the bridge.  I moved out of the garage and into the media room adjacent to the garage. It's about 55F in the garage and my space heater can't really keep it warm enough to work in. The media room has the pellet stove right next to me, so nice and cozy while doing the repetitive assembly work.
 
Here spans 19 through 26:
 
[0151_20231126_154057]
 
I also tested a different way and order of assembly of the spans. When building spans 27 through 30 I attached the barrel to the Spandrel wall first, then built the inner three Spandrel walls and the cross beams as a section. I then attached the Barrel/Spandrel wall sections and placed the span on the short side with the long sides pointing towards the ceiling. This then allowed me to square up the entire span using the diagonal internal bracing parts.
 
[DSC_9538]
 
The result was much straighter spans than the previous spans I built.
 
The second alternate method of assembly was based around how I attach the soffit to the bridge spans. Normally I combine the eight spans first and then put the soffits inside each span. I think I like the new way of assembly a bit more (so far). It's easier to torque the span trying to get the soffit to lay inside the lip on the barrel. Plus it's easier to move the single span around to get the right glue and clamping angles. I think I'm saving about 20 minutes per soffit install doing it this new way. Let's hope when attaching the four new spans together doesn't get more difficult as a result:
 
[0152_20231126_184508]
 
So we're up to 30 of 51 spans. With the above 12 spans built this past week in about 16 hours.
Reply 11
Yaron Bandell ybandell
I've assembled more individual spans and am ready to create the fourth of eight span sections:
 
[0153_20231211_174919]
 
After these I still need to build another 12 of them to make landfall on the East side of the bridge. It'll then match the bridge's original amount of 46 spans.
 
Today my order of 99 yards of code 83 rails from @Andy Reichert's Proto-87 store came in. While last week 150 feet of Central Valley Model Works tie strips arrived. Now I need to get some Contact cement. I stopped at Lowe's on Saturday and decided to not buy the DAP Weldwood contact cement because it explicitly states to not use it on copper or copper alloys. Guess what is in Nickel Silver alloy. Yup, you guessed it, copper... No clue what the negative reaction could be, but not going to risk having to redo the gluing of 220+ feet of rails if there is an adverse effect. I'll go the Pliobond or Barge route instead.
 
Of course work threw in a curve ball requesting me to be in the DC area for the next few days until Monday and actually working the weekend as well. So much for the start of my planned two weeks worth of PTO. The nickel silver lining is that I can compensate those lost PTO hours and weekend days and tack them on in the first week of January. So that'll be close to three weeks of PTO now.
Reply 13
ctxmf74
Travel rib indents? 
 
Do you know what those are for on the prototype?
  Keep up the good work ......DaveB
Reply 2
Yaron Bandell ybandell
ctxmf74 wrote:
Do you know what those are for on the prototype?
Dave, I took the below from an earlier post in this journal:
 
So why does the bridge have these indents anyways? Well, when they were building the arches they used this tool to cast the arch in two parts:
[PRSusquehannaBridge-RailwayAge73-23-005]
(source: Railway Age 73 volume 23)

Each span had to be done in two parts because they were building the new bridge basically through the old bridge while it was still in service.

In this picture below  you can see the two cast parts. The thinner part on the right was done first, the wider side on the left was done second.
[10698813605_c6cb267f1e_b]
(source: Flickr user jag9889)

The Arch rib traveler used the indents to secure itself so it could bear the weight of the concrete arch being poured.
You can see the mechanism more clearly in the technical drawing. There was a hinge at the top of the traveler so it could be folded inwards on the bottom sides. It could then be maneuvered into place. The sides would be cranked outwards, and blocks locked into the indents embedded in the pier. Now the arch could be cast. To remove the traveler, the sides would be pulled inwards and the traveler could be lowered and moved to its new position.

[PRSusquehannaBridge-RailwayAge73-23-003]
(source: Railway Age 73 volume 23)
 
Reply 11
ctxmf74
Thanks Yaron.   That was a neat operation. Maybe you could have cast your arches using plaster of Paris and an HO scale  traveler :>😉 .....DaveB
Reply 2
Yaron Bandell ybandell
ctxmf74 wrote:
Maybe you could have cast your arches using plaster of Paris and an HO scale  traveler
Mimicking the prototype is always an option, but oh boy would the weight of all that plaster make my minivan or trailer go through it's knees 😧
 
It was indeed a clever way to build the arches this way. Especially since the PRR building their bridge right next to it a few years earlier ended up having some massive delays and additional costs for repairing/replacing several of their washed away arch casting supports.
Reply 6
bno4333
The skirting spools are from Harford Modular. There is heavy crossover with the Western Maryland.  We are setup locally until January so I can get any measurements etc. if someone would like to have that. The gentleman that I believe built them isn't around as much, but I can probably contact him and see what he can tell me.
 
Roger Hammond
 
Capitol Free-Mo
Harford Modular
Reply 3
Yaron Bandell ybandell
Happy Holidays everyone! This is the first of hopefully a few updates this coming week and a half.
 
Build progress has resumed after having to be away from home for nearly week for work and having to start my vacation 3 days later than planned. I'm now only one span shy of hitting the Eastern shore of the Susquehanna river! You can see here in the back turned upside down, the eight section of spans 19-26 that are awaiting their pilasters. In the foreground there are individual spans 27 through 45, ready for assembly into two eight-sections spans and one four-section span.
 
[0154_20231227_203248]
Reply 8
Yaron Bandell ybandell
Yesterday I spent most of the day back in my LibreCAD creating the cut files for the final five arches on the Eastern side of the bridge. These five spans were added at some unknown date after the original bridge of 46 spans was finished in 1924. Because of this the design is slightly different. The bottom of the barrel of theses spans only has a 26 feet radius instead of the 33 feet radius of the original spans. The arches were also cast symmetrically, so the grooves in the soffit run straight down the middle unlike the offset center groove on the original span's soffits. Once the cut files were created I fired up both of the Cameos and quickly created the needed arts.
 
Here a photo I made earlier in the year, showing the first of five newer spans. On the left of the span you can see the arch of the last of the original spans. You can clearly see the difference in radius of the two arches.
 
[DSC_9447]
 
And this is what span 46 (original final span) and 47 (first of the newer spans) look like next to each other:
 
[0156_20231229_181140]
 
After doing CAD and cutting all day yesterday, I finally ended up making landfall on the Eastern shore today. Below you see all the remaining original spans that need to be connected in sections of eight, their bases added and pilasters with cut waters attached. Four more new spans to be weeded from the styrene sheets and assembled. In the front left of the picture you can also see the stack of road deck made from 40-thou styrene sheet.
 
[0155_20231229_181100]
 
We're getting there now that the most tedious part is done... Only four weeks till the Amherst West-Springfield, MA show and five weeks till the GSMTS in Tomonium, MD!
 
For the show in Timonium, Capitol Free-mo is confirmed to do a joint setup with the NECHS guys where we use the bridge module not only to cross the height difference between our two layouts but also to switch between their NCE Command Station and our Digitrax Command Station. This preliminary floor plan of the North Hall of the February 2024 GSMTS shows how the show organizers intend to deal with a 56 foot module:
 
[GSMTS_February2024_preliminary]