Yaron Bandell ybandell
This blog will serve as a place to show the progress of my build of the Philadelphia & Reading bridge over the Susquehanna river in Harrisburg, PA.

Build Highlights:
  • Bridge over the Susquehanna river, Harrisburg, Pennsylvania, USA
  • Bridge consists of 51 concrete arches
  • One plate girder bridge
  • Dual track
  • Dual track crossing underneath on west side
  • 0.7% grade
  • No compression
  • Building both dual tracks to Free-mo module standards
  • Main bridge arches, pilasters and piers to be scratch build from 20-thou and 40-thou styrene sheet
  • Main bridge pier cutwaters to be 3D printed
  • Handlay code 83 track on Central Valley Model Works tie strips
  • Fast tracks #10 switches for cross overs
  • Include Free-mo Modular Signal System plus signal heads.
Bridge Background:

A Philadelphia and Reading bridge, now part of Norfolk Southern crossing the Susquehanna river in Harrisburg, PA.

In this Google Earth image you can see the bridge is the one closest to the Interstate 83 bridge:
[Google_Earth_01_1080px]

The complete bridge by an unknown photographer:
[P%26R%20Bridge%2043]

An aerial close up photo by an unknown photographer:
[P%26R%20Bridge%2040]

Originally this bridge was built with only 46 concrete spans in 1924. Each span plus corresponding pier structures measures 76'-3" in length. Each concrete arch measures 66', while the piers are 11’-6” and 9’ wide. There is a reason the piers alternate between these two widths. This bridge was build by replacing an existing bridge in place. The old bridge had spans of 152’-6” wide. The wider piers of the new bridge encased the original bridge’s piers, while the narrower piers were purpose build. At a later date five spans were added on the east side, giving the bridge a total of 51 concrete spans.

An elevation drawing from the west side of the bridge as found in Railway Age 69 volume 21:
[PRSusquehannaBridge-RailwayAGe69-21-002]

In this same Railway Age issue, a detail view of the west side part of the bridge was found:
[PRSusquehannaBridge-RailwayAGe69-21-004]

The pier encasing process is shown in this photo published in Railway Age 73 volume 23:
[PRSusquehannaBridge-RailwayAge73-23-004]

On the west side the mighty PRR crossed with two tracks under the first concrete arch, while the Northern Central crossed with three tracks under the deck girder bridge.

To date, only the PRR tracks (now also Norfolk Southern) still cross under the  bridge as can be seen in this photo by an unknown photographer:
[P%26R%20Bridge%2034]

On the East side there is a pair of cross overs that are protected by signals.

The bridge measures nearly 3,960' in total length, which includes these 51 spans and a 69' plate girder bridge on the west side. Without compression in HO scale this equates to 45'-6". Now convert this all to 14 similar sized module sections for ease of build and transport and you’ll end up with a nearly 50’ long Free-mo module.

The aim is to build the bridge as it looks in the current time frame: the 51 arches, the Northern Central tracks are gone, but the PRR tracks are still there. The PRR track will be modeled such that the module can also be used as a 26” long double track Free-mo module if a setup can’t accommodate the full 50’ bridge.

I'll update this thread with pictures of the various build activities when they occur with the intend to create a more detailed article for publication at a later date. Enjoy!

-Yaron.
Susquehanna Bridge Build | My Personal Website | Capitol Free-mo

Reply 25
KingCoal
Totally cool. Even your module bases are cool. Thanks for sharing.
Reply 5
Yaron Bandell ybandell
KingCoal wrote:
Totally cool. Even your module bases are cool
Thank you KingCoal.
 
Today's update:
 
In the past few days I finished putting the soffits in place on the spans and finished creating all the eight-span sections, including the pier extensions. I placed the 40-thou styrene bridge decks and 30-thou thick string course on all those sections. One of those sections got the parapets installed as well.
 
[0157_20240104_213328]
 
Today I made panel rails using the Central Valley Model Works "2003 branchline" tie strips, Proto-87 code 83 rails using pliobond. I created a total of 33 panels of 18 inches in length. That's just over 48 feet of rail laying there on the workbench:
 
[0158_20240104_213421]
 
You can see how I kept the tie strips in place in between two rulers. I used a 1-2-3 block to put some pressure on the right hand side making it easy to place and remove the tie strips. Once a tie strip is in place, I use the bottle with a 14Ga blunt needle to apply the Pliobond to one line of the tie plates.
 
I then turn to the block held in place by the blue clamp: my rail base gluing jig.
 
[0159_20240104_213432]
 
The scrap piece of wood has a groove that fits the head and web of the rail into it. Made it with a few strokes of a hand saw.  The piece of 40-thou styrene is the clamp to keep the rail in the jig.
 
To glue the base I draw the rail through the slot while applying a thin layer of Pliobond contact cement using the bottle with needle. It takes about eight seconds to neatly apply the glue without spilling it everywhere. After the 48 feet of rail going through my hands, there is next to no glue on my fingers.
 
I then wait for the Pliobond to get tacky before affixing the rail to the tie strips. I do this with the second rail as well and then check the rail alignment/gauge with the NMRA Mark V Gage.
Reply 11
Yaron Bandell ybandell
Last weekend at the Amherst show last the bridge was present but not completely incorporated into the layout (some electrical and alignment issues). We resorted to using the north- south route underneath the bridge like we've done before with 7 feet of bridge sticking out towards the wall of the Mallory Complex. The remaining 42 feet was placed past the layout as a display only piece. 
 
Today was setup time for the #GSMTS at Timonium, MD. The bridge is finally completely together for the very first time, all 56 feet worth of module: 
 
20240202_195809.jpg
 
It's a problem getting the bridge properly in a single picture.  A panoramic shot: 
 
20240202_180823.jpg
 
And a first time showing without a special setup isn't a proper showing.  So we decided to connect the bridge to not only the Capitol Free-mo layout,  but also the NECHS (North East Corridor Historical Society) layout.  Bonus complexity: NECHS uses a NCE Command Station. Capitol Free-mo uses a Digitrax Command  Station. So the bridge is used as a "Command Station" switching point using a bunch of relays to select DCC input source to each track. With on Sunday a potential test of running both layouts via a single TCS CS-105. The equipment is on-site, our  DCC chiefs need some time to test outside of the layouts first.
 
Come see the beast on Saturday or Sunday if you are in the neighborhood and say "hi"!
Reply 10
Ken Rice
That is an impressively long bridge!  Nice setup.  It’s interesting how much difference in the visibility of the bridge the modules with the green painted surface make compared to the white painted surface.  Perhaps the long term plan should include some subtle foot lights to highlight the star of the scene.
 
It’ll be interesting to see how the CS-105 test goes.
Reply 3
blindog10
Here's another shot of Yaron's setup today at Timonium, with a full-scale human at the far end to help you grasp how long it is.  The color change is caused by outside light spilling in.  The bridge is all white at this time.
 
IMG_20240203_195806.jpg
 
It's a show stopper all right.  And a massive road block.....
 
Good to meet you at Springfield, Yaron.  Keep up the good work.
 
Scott Chatfield 
Reply 6
Rustman
Not the first train across the bridge. But the longest to date. This train stretched the full length of the bridge with the locomotives fully in Capitol Free-mo territory while the tail end was still on the Northeast Corridor. My internet is acting up, so you might get a photo. Maybe. Maybe tomorrow sometime. 

 IMG_8404.jpeg

Matt

"Well there's your problem! It's broke."

http://thehoboproletariat.blogspot.com/

 

Reply 4
Yaron Bandell ybandell
Here is a video of the first train going across the bridge: 
Reply 11
Rustman
IMG_8404.jpeg
Now here's a photo of the mile long freight. 

Matt

"Well there's your problem! It's broke."

http://thehoboproletariat.blogspot.com/

 

Reply 7
Nick Santo amsnick
Again from the Springfield show.
IMG_0669.jpegIMG_0668.jpeg

Nick

https://nixtrainz.com/ Home of the Decoder Buddy

Full disclosure: I am the inventor of the Decoder Buddy and I sell it via the link above.

Reply 6
Yaron Bandell ybandell
@amsnick I see at least two MRH Forum members in those Springfield pictures! 
 
Since that was "only 42" feet worth of bridge,  here some similar pictures during Friday's setup of the full 56 feet of module.
 
Looking west from the Harrisburg side with my 16.5 year old daughter at the half way mark: 
 
20240202_181046.jpg
 
Looking East from the Lemoyne side:
 
20240202_181106.jpg
Reply 11
pldvdk
Yaron,
 
Simply awe inspiring!
 
I pity the guy at the show who's got a "hurry up call" to make and finds out the bathrooms are on the other side of the bridge module! 😉

Paul Krentz

Free-lancing a portion of the N&W Pocahontas "Pokey" District

Read my blog

Reply 3
Tim Bowser NCR-Boomer
Yaron,
 
Simply awe inspiring!
 
I pity the guy at the show who's got a "hurry up call" to make and finds out the bathrooms are on the other side of the bridge module! 😉
Funny you should mention that, Paul.  While we had a crowd of folks who thought the Bridge was absolutely great, there were a few that were not so impressed.  One group loudly complained about "restricted access" to their portion of the hall, and were less than gracious during the Sunday evening breakdown and pack out...
 
About ten days or so for the next exhibition in Timonium!
 
Tim Bowser
Capitol Free-mo participant
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 5
Yaron Bandell ybandell
Yaron,
 
Simply awe inspiring!
 
I pity the guy at the show who's got a "hurry up call" to make and finds out the bathrooms are on the other side of the bridge module! 😉
Thank you Paul.
 
As Tim said,  there was a group of folks that were less than impressed with the bridge blocking the majority of the roll up doors on one side of the venue. During teardown we preemptively solved that to move the entire 56'of module away from those doors. That was pretty cool to do and see.
We also worked with the show organizers to move our layouts more towards the middle of the hall this time around,  so we are not in anyone's way during setup or teardow. But the fact is that yes,  it's a long way around the bridge. But it'll keep us fit!
Reply 3
Tim Bowser NCR-Boomer
Thank you Paul.
 
As Tim said,  there was a group of folks that were less than impressed with the bridge blocking the majority of the roll up doors on one side of the venue. During teardown we preemptively solved that to move the entire 56'of module away from those doors. That was pretty cool to do and see.
We also worked with the show organizers to move our layouts more towards the middle of the hall this time around,  so we are not in anyone's way during setup or teardow. But the fact is that yes,  it's a long way around the bridge. But it'll keep us fit!
Seeing the Bridge 'take a walk' is impressive in its own regard, as seen in the breakdown time lapse video by one of our members:

 
Tim B.
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 8
tp
wild!
Reply 2
MikeHughes
That is a LOT of work!
Happy NMRA Member since 2024
Reply 2
Ken Meade EasternSP
That's an awesome project. I was at that Timonium show with another modular club when you debuted it. 
Ken,
CEO, D&J Railroad
DCC guru of sorts for three decades.
Model railroader for half a century
Reply 3
Yaron Bandell ybandell
That's an awesome project. I was at that Timonium show with another modular club when you debuted it. 
Thanks Ken for the kind words. It looks like the bridge will be there again during the October 12-13th GSMTS show.
 
Other dates and shows that the bridge might make an appearance are:
  • Crossroad Village in Flint, MI - August 3-4th (not 100% sure yet)
  • RR museum of PA, Strasburg, PA - August 23-25th
  • Alabama Modular Meet, Bessemer, AL - September 12-14th
Reply 4
Tim Bowser NCR-Boomer
Thanks Ken for the kind words. It looks like the bridge will be there again during the October 12-13th GSMTS show.
 
Other dates and shows that the bridge might make an appearance are:
  • Crossroad Village in Flint, MI - August 3-4th (not 100% sure yet)
  • RR museum of PA, Strasburg, PA - August 23-25th
  • Alabama Modular Meet, Bessemer, AL - September 12-14th
Yaron,
 
Having displayed at Crossroads in the past, the Bridge would be a 'hard sell' to get in the layout.  Dead level floor is a plus, but the length of the Bridge would far exceed the Free-mo layout's given area in the hall.  Doublecheck with Marshall Stull before making any plans (the call went out earlier this week in various Groups.io and FB pages).
 
Tim B.
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 1
Yaron Bandell ybandell
Yaron,
 
Having displayed at Crossroads in the past, the Bridge would be a 'hard sell' to get in the layout.  Dead level floor is a plus, but the length of the Bridge would far exceed the Free-mo layout's given area in the hall.  Doublecheck with Marshall Stull before making any plans (the call went out earlier this week in various Groups.io and FB pages).
 
Tim B.
I've indeed been in contact with Marshall for the Crossroads setup already, even before the announcement went out. He has all the bridge module dimensions and knows the options of how it can be setup. He's checking if it will be possible or not from a space perspective to get the full bridge in there, otherwise it might be the Port Road Branch (North-South) route that would likely be included as has been done in one of the Timonium shows and the Amherst show.
 
Reaching out is to the run chief is the first thing I do when offering up the module for inclusion because the fact it's indivisible on the East-West route does hamper the inclusion in most smaller venues, let alone the grade and need for 3-3/4" blocks for anything connected beyond the high West side of the module.
Reply 4
Tim Bowser NCR-Boomer
I've indeed been in contact with Marshall for the Crossroads setup already, even before the announcement went out. He has all the bridge module dimensions and knows the options of how it can be setup. He's checking if it will be possible or not from a space perspective to get the full bridge in there, otherwise it might be the Port Road Branch (North-South) route that would likely be included as has been done in one of the Timonium shows and the Amherst show.
 
Reaching out is to the run chief is the first thing I do when offering up the module for inclusion because the fact it's indivisible on the East-West route does hamper the inclusion in most smaller venues, let alone the grade and need for 3-3/4" blocks for anything connected beyond the high West side of the module.
All I can say at this point is, if the full Bridge manages to get included, the words "inventive" and "ingenious" will be in the executive summary for the show!  😉
 
If you do head up to the Lower Peninsula (I'm a honorary 'Yooper' by dint of six years at K.I. Sawyer AFB),  enjoy the narrow gauge Huckleberry RR rides, and keep an eye out for the East Broad Top connections.
 
Tim B.
Tim Bowser

Capitol Free-mo Participant, and
Chesapeake Speed-Mo Proponent
Reply 4
ChuckS Chuck Stuettgen
 
Yaron,
 
In case you aren't aware, Amtrak is getting ready to replace the Susquehanna bridge.  

 
 
Chuck S.
"It's a hobby not a race."  What I tell people when I'm asked when my layout will be finished.
[GFRR_Logo_small]
Reply 1
Jim at BSME
 
Yaron,
 
In case you aren't aware, Amtrak is getting ready to replace the Susquehanna bridge.  

 
 
Chuck S.
Chuck, that is not the Susquehanna bridge that Yaron has built his Free-mo modules of, his bridge is known as the Philadelphia & Reading bridge over the Susquehanna in Harrisburg PA.
 
The Susquehanna bridge that Amtrak is replacing is the one in Maryland between Have de Grace and Perryville on the North East Corridor.
- Jim B.
Baltimore Society of Model Engineers, Estd. 1932
O & HO Scale model railroading
Check out BSME on: Facebook, Instagram
Reply 2
Bshoop
WOW😲! I can't believe they FINALLY got the funding to actually make it happen!
They've only been talkin' about that for what, 20 or more years now?🙄
It's fun to sit there where the Port Road joins the NEC near Perry Tower, and watch as the late-nite freight train parade is lined up and waiting, the signals clear, and then they're all squeezed through onto/off of the NEC both ways between their "not interfering with Amtrak " 10pm-6am window.
North at the wye to Wilmington, DE., south to Baltimore/DC.
Makes for a nice busy late-nite Port Road!
Reply 2
ChuckS Chuck Stuettgen
Chuck, that is not the Susquehanna bridge that Yaron has built his Free-mo modules of, his bridge is known as the Philadelphia & Reading bridge over the Susquehanna in Harrisburg PA.
 
The Susquehanna bridge that Amtrak is replacing is the one in Maryland between Have de Grace and Perryville on the North East Corridor.
 
Oh. Mea Culpa.
 
Chuck S.  
"It's a hobby not a race."  What I tell people when I'm asked when my layout will be finished.
[GFRR_Logo_small]
Reply 1
Reply