Feasibility
Thanks everyone for all the comments.
The back story for the future layout is easy it’s the prototypes story and that will be addressed in the future.
The back story for the timesaver modules arranged in a non-prototypical fashion should be fun. I will work on that.
Is it feasible to build the two 6’ 10 3/4” X 1’ modules?
A rough estimate.
Location:Above one of my work benches.Measured and it should be no problem.
Shelf: Need supplies.
Module Bases: Need styrofoam, plywood, glue, paint
Scenic material: What is on hand.
Structures: What is on hand.
Track: Let’s estimate what will be required to lay one length of 6’ 10 3/4” track of track.
To cover 82 3/4” module I will need the following:
- 332 ties with a spacing of 1/4” (21.75 scale inches) on center for one of the three lengths of track. This is just an estimate and will be adjusted for the ties used for the turnouts.
- 4 sections of 36” rail and 2 sections of 12” rail (rough estimate and again the turnouts will need more rail and this is for only one length)
- 4 spikes per every third tie, so 440 spikes. (light estimate should increase, again one length)
- #8 turnouts are used and require 58 turnout ties
- In addition each turnout requires 10 pcb turnout ties
- The #8 turnouts will require an additional 30 inches (estimate) of rail to cover the additional track for the diverging route.
- Additional Turnout spikes will be handled in the same way as the rail by adding the required spikes for the same length of straight. Roughly 80 additional spikes per turnout.
- wire, paint, glue, solder, flux, ballast, etc.
Estimated Grand totals for track work per module:
- Rail: 19.8333 sections of 36” rail rounding up to 20
- Ties: 590
- Turnout ties: 406
- PCB turnout ties: 70
- Spikes: 1880
If I am building both modules I have the required 40 units of 36” rail in code 83 and code 70.
The ties are sold in bags of 1000 and for both modules I will need 1180. I only have a few for maintenance (100 or less) so two bags of ties will be required.
For the 812 turnout ties required for both modules I have one bag of 500 so an additional bag will be required.
The turnouts will require 140 PCB turnout ties, these are sold in units of 27 so six units are required.
Spikes are sold in units of 1000 I have some but and additional 2 containers will be needed.
If I added an additional switch per module and a half length of rail per module the following will be needed:
- Another six lengths of 36” rail. (I might have it already have to count)
- Another 332 ties. (order will handle additional requirements)
- 20 PCB turnout ties. (order will handle additional requirements)
- 116 turnout ties. (order will handle additional requirements)
- Spikes (supplies and order will cover additional)
Without shipping (free for this order) and taxes 107 USD for the additional required track supplies.
I will allow $150 for building materials.
It’s still doable.
I need to refine my idea and order the supplies.
Eugene