Eugene Griffin EGRX

The original TOMA?

 
Diagram.jpg 
 
This might get my HO scale started.
 
This BLOG will follow the development of a small HO scale layout from a variation of a basic "Timesaver" to a standalone switching module and eventually incorporating the module into a layout.
 
The one module approach will be used.
 
 
 
 

Working on:   https://forum.mrhmag.com/post/office-switching-layout-using-a-2018-ho-module-13636599

Holding Pattern: https://forum.mrhmag.com/post/office-switching-layout-using-two-salvaged-proto48-modules-12775340

Reply 0
Mike Kieran

Port Able Railway

I feel that the Timesaver could be expanded into an interesting switching layout. I designed mine to be contained within the confines of an old ship yard.  https://forum.mrhmag.com/post/8x1-5-foot-port-able-railway-ho-scale-timesaver-variation-12206230

_________________________________________________________________________________________

To enquiring friends: I have troubles today that I had not yesterday. I had troubles yesterday which I have not today. On this site will be built a bigger, better, Steeplechase Park. Admission to the burning ruins - 10cents. - George C. Tilyou, Owner of Steeplechase Park

Reply 0
anteaum2666

Go for it!

EGRX, 

I say if you want to start with a timesaver, GO FOR IT!  Do I like prototypical layouts, sure.  But I operate on a friend's layout every month, and the 8 or 9 of us have a GREAT time.  He's built the layout over many years, and it includes one section, Robie, right in the middle, which is a timesaver module he built many moons ago.  It's one of the most popular places on the layout!  It's a challenge to switch, it's fun, it causes bottlenecks.  Yard dispatchers have to take it into account when blocking cars for most efficient switching.  Basically, it's a blast, and no one EVER complains that it's there.

I also have a timesaver I built and take to shows.  People love switching it.  If you build yours removable, that's another option.

utnamCo1.JPG 

Whatever you do, have fun!

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
Mike Kieran

operating

EGRX, I like where this layout is going. I'm also interested in your railroad's concept and back story.

A lot of industrial developers will put tracks and buildings wherever they fit in the interest of maximizing it's potential. A lot of industrial complexes have all sorts of crazy track arrangements, so I tend to disagree with the "that's not prototypical" crowd. There are several switching operations made up from the bits and pieces of other railroads - Genesee Valley Transportation's Depew Lancaster & Westen operation in Batavia, NY is one.

While most professional railroaders would not like to switch complex trackwork areas like this, they often had to if they wanted a pay check. Of course, as modelers, we want as much action as possible. There's a big difference between doing it for a livingand doing it for fun. I paid to wear my catcher's tools of ignorance behind home plate, MLB catchers get paid (and still complain).

I try to contain my whole railroad's operations within the footprint of my layout from the time that they punch in to the time that they punch out. While running with a fast clock (I'm thinking 4:1), I want to include as many time constraining obstacles in my track plan. I want to pull the loco out of it's shed and switch my small yard. I want to have grade crossings to flag, etc. I want to basically run as much of an 8 hour shif as possible. Why? because I paid for it.

_________________________________________________________________________________________

To enquiring friends: I have troubles today that I had not yesterday. I had troubles yesterday which I have not today. On this site will be built a bigger, better, Steeplechase Park. Admission to the burning ruins - 10cents. - George C. Tilyou, Owner of Steeplechase Park

Reply 0
Eugene Griffin EGRX

Feasibility

Thanks everyone for all the comments. 

 

The back story for the future layout is easy it’s the prototypes story and that will be addressed in the future. 

 

The back story for the timesaver modules arranged in a non-prototypical fashion should be fun. I will work on that.

 

Is it feasible to build the two 6’ 10 3/4” X 1’ modules?

 

A rough estimate.

 

Location:Above one of my work benches.Measured and it should be no problem.

Shelf: Need supplies.

Module Bases: Need styrofoam, plywood, glue, paint

Scenic material: What is on hand.

Structures: What is on hand.

Track: Let’s estimate what will be required to lay one length of 6’ 10 3/4” track of track.

 

To cover 82 3/4” module I will need the following:

  • ​332 ties with a spacing of 1/4” (21.75 scale inches) on center for one of the three lengths of track. This is just an estimate and will be adjusted for the ties used for the turnouts.
  • 4 sections of 36” rail and 2 sections of 12” rail (rough estimate and again the turnouts will need more rail and this is for only one length)
  • 4 spikes per every third tie, so 440 spikes. (light estimate should increase, again one length)
  • #8 turnouts are used and require 58 turnout ties 
  • In addition each turnout requires 10 pcb turnout ties
  • The #8 turnouts will require an additional 30 inches (estimate) of rail to cover the additional track for the diverging route.
  • Additional Turnout spikes will be handled in the same way as the rail by adding the required spikes for the same length of straight. Roughly 80 additional spikes per turnout.
  • wire, paint, glue, solder, flux, ballast, etc. 

 

Estimated Grand totals for track work per module:

  • Rail: 19.8333 sections of 36” rail rounding up to 20
  • Ties: 590 
  • Turnout ties: 406
  • PCB turnout ties: 70
  • Spikes: 1880

 

If I am building both modules I have the required 40 units of 36” rail in code 83 and code 70.

 

The ties are sold in bags of 1000 and for both modules I will need 1180. I only have a few for maintenance (100 or less) so two bags of ties will be required.

 

For the 812 turnout ties required for both modules I have one bag of 500 so an additional bag will be required.

 

The turnouts will require 140 PCB turnout ties, these are sold in units of 27 so six units are required.

 

Spikes are sold in units of 1000 I have some but and additional 2 containers will be needed.

 

If I added an additional switch per module and a half length of rail per module the following will be needed:

  • Another six lengths of 36” rail.  (I might have it already have to count)
  • Another 332 ties. (order will handle additional requirements)
  • 20 PCB turnout ties. (order will handle additional requirements)
  • 116 turnout ties. (order will handle additional requirements)
  • Spikes (supplies and order will cover additional)

Without shipping (free for this order) and taxes 107 USD for the additional required track supplies.

I will allow $150 for building materials.

 

It’s still doable.

 

I need to refine my idea and order the supplies.

 

Eugene

 
Reply 0
John Colley

Proto Joe!

I agree, Joe, I really like that little feed mill operation a few blocks west of your house! I believe in LDE's. John Colley, Sonoma, CA

Reply 0
Eugene Griffin EGRX

Some Town’s Industrial Interchange

0TOMA(1).jpg 

Competition for rail business can drive some interesting track arrangements and this is one of them. Railroad “A” approached from one side of town and railroad “B” from the other. Both railroads after business in the town’s industrial area.

 

Now initially the track arrangement seems odd, however, history shows that the railroads didn’t interchange here. Each railroad would look after their respective clients and exit town. 

 

The interchange happened after the competing grain terminals merged and demanded that railroads transfer cars as required. The message to both railroads read “You either work together or one of you loses the business”.

 

Losing business to a competitor is not what railroads are willing to do. So both railroads agreed and made a simple interchange agreement. Each railroad  would switch only their respective clients and each railroad could only pull cars from the other’s interchange track.

 

The agreement never said they had to be play nice!

 

 

 

%20base2.jpg 

 

The width of the modules was changed from 12" to 10". This gave the modules symmetry.

Structures will be placed on dioramas and attached to the side of the modules.

 

Thanks for reading and commenting.

 

Eugene

 

 

 

 

Reply 0
Wendell1976

Timesaver

Eugene said: "EIRR - Rupert, Burley, Twin Falls with some modelers license." Eugene, I live in Southern Idaho. I can tell you that the real Eastern Idaho Railroad does not have a "Timesaver" arrangement of tracks with a very short runaround(of only one car). Wendell
Reply 0
Eugene Griffin EGRX

@Wendell

Hi,

I was a little vague and was actual referring to the general arrangement of three parallel tracks and a crossover.

The whole write up is about reusable TOMA modules, even timesavers.

I have tried to find the ideal starting point for a TOMA project but kept coming up with just basic modules that need more modules to be interesting.

g%20TOMA.jpg 

After reading the One Town Layout posts  https://forum.mrhmag.com/post/one-town-layouts-12209407 and the Time Saver Plus post  https://forum.mrhmag.com/post/former-time-saver-plus-major-expansion-12209014 I changed my focus and thought maybe a timesaver can be more than just a time saver.

Diagram.jpg 

By choosing the above configuration with three parallel tracks I was right. The TOMA Timesaver Module can be adapted to the town I will be modeling in the future.

But more importantly, as soon as I build the above module I have a functional timesaver to play with. Build the second and I have a complete timesaver.

Thus the title, I took "Yesterdays Timesaver" and adapted it as "Todays TOMA Timesaver" so I can run and switch trains but more importantly it can be used as "Tomorrows..." part of a layout (In my case a One Town Layout).

 

That being said I do see a timesaver in Burley. You just need a little modelers license and red lines.

Burley.jpg 

 

Eugene

 

Reply 0
Eugene Griffin EGRX

Timesaver, Not a Timesaver

Compare.jpg 

A timesaver is the result of limited length of the lead tracks on either side of the runaround.

The limited leads (usually an engine and a car in length) will create a switching puzzle in a small space with the objective being to move cars from car spots, located on both sides of the module, to car spots on the other side.The limit length of the leads will hinder these switching moves.

As soon as the limited length leads are extended the timesaver is eliminated.

Eugene

 

Reply 0
Wendell1976

A prototypical arrangement

To Eugene: The three-track arrangement with warehouses on both sides of the tracks and a switching lead is a very prototypical Inglenook arrangement. A lot of industrial parks in the big cities and metropolitan areas have this track arrangement. I love it! Wendell
Reply 0
Wendell1976

Inglenook layouts are prototypical

Barry said: "There was one place I switched as an engineer for a switching road which had a genuine Inglenook that modelers are so passoninate about. It wasn't a Timesaver, thank goodness (the crew probably would have refused to switch it if it were). It was three, trailing point switches into a chemical company, into three tracks which held three tanks each with a stub holding one car and a single unit at end of a branch which could not be extended." Many big cities and metropolitan areas have small yards at a industrial park or factory that look like a Inglenook-like yard(with a short switching lead). One reason why the switching lead is short is because a grade crossing(or railroad crossing) is nearby and many cities have ordinances that prohibit blocking a street while switching. Wendell
Reply 0
Eugene Griffin EGRX

Burley Idaho, Timesaver Module, Phase 1 TOMA

Looks like this idea will work so why not build Burley, Idaho.

 
30%20Alt.jpg 
 
The location of the module will be above my work area and placed 6.5 " below the surface of the current HO scale staging yard. The above photo shows this location with the HO scale staging yard above the O scale staging.
 
20Burley.jpg 
 
For this project I will use the above Timesaver module. This one will be 8' long and 10" wide.
 
ley%20ID.jpg 
 
A rough idea of what the module will look like when placed in position on supporting brackets.
 
Future Expansion
 
  • Connection of HO scale staging yard to the module on the Rupert side using a 1.75% grade over 30' of track or the staging yard can be removed from it's current location (see first photo this post).
  • Adding a WSI Union Seed model to the Martin branch near W Main St.
  • Extending the Martin branch and adding industries.
  • Completing the Buhl end of the yard
  • Adding models of Amalgamated Sugar to the Burley Industries spur which runs behind the back drop
 
Eugene
Reply 0
Eugene Griffin EGRX

TOMA Phase 2

hase%202.jpg 

Supplies are ordered and being shipped for phase one. 

Planning for phase two,  Burley to Martin.

This might actually happen.

An oval serving an ethanol plant, phase three?

Eugene

Reply 0
Eugene Griffin EGRX

Burley Idaho, Plan

0Plan(1).jpg 

Not enough real-estate ( https://forum.mrhmag.com/post/if-you-have-the-real-estate-12196300) so the Ethanol Plant won't be modeled, but I believe this will allow the HO scale to be used along with the O scale in the available space.

All points from Burley to the UP interchange in Minidoka, Idaho are represented by the staging area in blue.

There is an industrial line that departs Burley and ends in Declo, Idaho this is represented by a parallel track in the staging area.

A portion of the industries along the line to Martin, Idaho are represent and there is a possible area to add the Amalgamated Sugar.

Eugene

Reply 0
anteaum2666

Inspiration

For inspiration and encouragement, here's a shot of Robie on the Stinky Creek.  This is the timesaver portion of the layout I was referring to, on which I operate every month.  Great fun!

Robie.JPG 

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
Eugene Griffin EGRX

Like it

Thanks for the inspiration.

Hmmmm - steam era, I do have a 2-8-2, 0-8-0 and of course a dockside.

Eugene

(Supplies should arrive in 4 to 5 days. To cheap to pay for faster postal service.)

Reply 0
Eugene Griffin EGRX

Finalizing the Plan and Switching Operations

0-%20top.jpg 

Most of the revision to the plan for the Town of Burley occurred in the staging area. This reduced the number of new modules and used two existing staging yard modules as shown by the color SketchUp labels as asparagus. 

 

The visible staging/holding area also reuses a former staging yard module.

 

 

Switching Operations

 
0staging.jpg 
 

The hidden staging area represent the EIRR line from Burley east to Rupert and eventually to the Union Pacific Interchange at Minidoka, Idaho. Unused cars can be stored in two eleven foot storage tracks. There is room for additional storage in the lower right corner of the plan (see first picture).

 

Trains for Burley can be assembled on the 11 foot staging yard run around track.

 

The 9 mile spur to Declo, Idaho is represented as a storage track in the staging area.

 

 

Burley, Idaho

 

mersaver.jpg 

 

The above shows the Timesaver module that will be incorporated into the layout. A benefit of using this Timesaver module is the concentration of all the yard switches within a four foot nine inch length. 

 

Trains will arrive in Burley, Idaho on either tracks 1, 2, or 3. Track 2 will be used for local switching or through freights to industries and towns west of Burley including Twin Falls and Buhl, Idaho or east of Burley to Rupert and Minidoka, Idaho.

 

Tracks 1 and 3 will be used for arriving trains that have cars for Burley, or industries on the Declo and Martin lines as well as assembling departing trains.

 

Immediate additions to the original Timesaver module will include the old Union Pacific freight warehouse and an industrial spur representing the Amalgamated Sugars Ag operations.

 

From Burley to Martin

 
lead%202.jpg 
 
g%20lead.jpg 
 

The line to Martin is 11 miles long and includes multiple industries. Currently only two industries will be modeled the WSI Union Seed and a warehouse.

 

Visible Staging

 

0staging.jpg 

 

 

A visible staging yard will be added on the west side of Burley. This will serve as holding tracks for through freights and the Amalgamated Sugars Ag operations (Industrial Spur).

 

In addition the tracks will be used for switching operations in Burley.

 

Future Addition

 

l%20Loop.jpg 

 

As mentioned early in this blog, there is an Ethanol Plant on the line to Martin that would add interesting operations. According to the company’s information this facility receives covered hoppers of corn and produces ethanol, wet distillers grain and corn oil.

 

The facility is served by a single track loop with a run around track located near the connection to the Martin track. ( https://forum.mrhmag.com/post/if-you-have-the-real-estate-12196300)

 

Online videos show an UP unit train of covered hoppers at the facility as well as a group of tank cars being pulled from the runaround track by a Trackmobile.

 

In the above plan the model of this facility has a loop with a linear length of 20 feet. This loop can easily accommodate an 11 foot train. There is some modeler’s license required as the visible staging yard needs to be incorporated into the same area.

 

The current plan is to place hinges along the 9+ foot section to allow a 36 inch portion of the addition to fold down and out of the way.

 

That is all the room I have for a HO layout, I have check the clearances and I like this arrangement. The supplies are at the main postal facility in town and should be on my doorstep tomorrow.

 

Eugene

Reply 0
anteaum2666

Software?

Hi Eugene,

Just curious, what program are you using to do your track planning?  I really like your diagrams.

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
Eugene Griffin EGRX

@Michael

The software used is SketchUp, I then export to jpg and use Apple's Preview for labels (in red below).

p%20demo.jpg 

SketchUp's components help reduce the drawing time. So far my component library includes ties, turnouts, details, buildings, rooms, etc.. I usually draw the component in 1:1 scale then make a copy and use SketchUp to change the components scale.

 

Eugene

PS: Supplies + inventory = build time.... the ties are more impressive in O scale...  

IMG_0080.jpg 

Reply 0
Wendell1976

Your layout

To Eugene(two things): First of all, you are doing a great job in planning to model the Eastern Idaho Railroad in Burley, Idaho including the interchange with the Union Pacific Railroad in Minidoka, Idaho. I go to church in Burley. Secondly, I have been giving your 3-track version of the "Timesaver" layout some thought. There are many industrial parks that have a three-track arrangement(with a mainline track in the middle) that is mostly similar to your Timesaver version. The only difference is the "runaround" track is longer than just 1-2 units(or cars). If you look up the Spokane Business & Industrial Park(in Spokane, Washington along Sullivan Road) on Google Maps, you will see that three-track arrangement in many places. Wendell
Reply 0
Eugene Griffin EGRX

Three-track arrangement

There are two goals I would like to achieve with this new module. A complete switching railroad without any additions that could occupy a shelf (a Timesaver). The second is a module that can be reused unlike the below module from a past build.

IMG_2649.jpg 

 

 

dustrial.jpg 

I know the above  8' X 10" "Timesaver" module (in red) that is being created will achieve these goals.  With some imagination and compression the module could be a good starting point for a town with multiple industries and a wye or a town that has a less complex track plan both are represented in the above track diagrams.

It definitely can represent the yard tracks in the town I grew up in or the tracks in another nearby farm town. 

Worse case scenario, it can serve as a portion of a yard or an operating "Timesaver" on a shelf. But unlike the completed module that is pictured above, it won't be scrapped and the work that goes into creating it will not go to waste.

For now it is destined to represent Burley, Idaho , If I actually stay at home long enough to do the work.

The high for the Easter weekend at home was 14F, I traveled 180 miles to the southwest and the high was 50F. In addition to the lovely warm weekend without snow, I was able to get some interesting railroad and industry pictures.  

IMG_3657.jpg 

Eugene

 

Reply 0
Eugene Griffin EGRX

Time to Build

IMG_0082.jpg 

Three thousand ties (including 1000 turnout ties) have be stained. Another coat of brown wash will be applied after the ties are glued to the module.

IMG_0111.jpg 

All supplies are in house and the the new shelf is ready.  Leftover drywall has been used for the backdrop.

IMG_0089.jpg 

Nothing like a bulkhead flat to store (2000) ties. The above module will be used as the two storage tracks in the staging yard.

Next: Nine #8 turnouts and the module base.

Eugene

 

 

Reply 0
hobbes1310

Oh I like how this is shaping

Oh I like how this is shaping up

 

Phil

Reply 0
Greg Baker Mountaingoatgreg

Worst job ever

I have had a lot of jobs that made we wonder why I am a railroader but spotting a corn train at that ethanol plant takes the cake. I picked up the train from the UP ran it to the plant and pulled around to the head house and was told to set the creep control at .25mph. I then spent the rest of my day moving at a speed that was just slightly faster then grass grows. As the cars unloaded we had to stop a few times for stuck gates or the elevator leg to make an adjustment. I barely got the last car unloaded and tied down before my hours of service were up. Made for a 12 and half hour day with 9 of them spent at that plant. 

Reply 0
Eugene Griffin EGRX

@Mountaingoatgreg

Not sure if I can get a HO locomotive to run at 0.25 scale mph under load...guess I will need fast clock. 

A 100 car unit train at 65' per car traveling at 0.25 mph that means roughly 4.9 hours to pass a point at constant speed. There was a lot of 0 mph that day, it would be interesting to see how much time the P. Eng's allowed for stops in their design. Definitely a long day.

Still it might be a great way to hide a reversing loop for the main tracks.

Like the switching puzzles took three iterations before I got 20 moves on puzzle three.

Thanks for the information.

Testing the plan and some other track arrangements. I don't want to find out a measurement was off and a curve track was a little to close to a 2X4. (uncut rigid foam, plan will use only 10" wide section for the module).

           IMG_0119.jpg           IMG_0125.jpg 

Looks like the plan is a go with a little room to spare at the ends for a bumping post or longer engines.

Still looking for my 2-8-2 to see how it will fit, not worried about the "Docksider", the shorter equipment of that era will help.

Always read all the comments.

Eugene

 

Reply 0
Reply