Eugene Griffin EGRX

The original TOMA?

 
Diagram.jpg 
 
This might get my HO scale started.
 
This BLOG will follow the development of a small HO scale layout from a variation of a basic "Timesaver" to a standalone switching module and eventually incorporating the module into a layout.
 
The one module approach will be used.
 
 
 
 

Working on:   https://forum.mrhmag.com/post/office-switching-layout-using-a-2018-ho-module-13636599

Holding Pattern: https://forum.mrhmag.com/post/office-switching-layout-using-two-salvaged-proto48-modules-12775340

Reply 0
Greg Baker Mountaingoatgreg

Unloading

Yeah we had 117 cars and had to make almost a complete loop from the main at 5mph which took awhile. We actually got there early then had to wait for the elevator crew for around 45 minutes before we even pulled the train up inside the head house. Then there was a bit of delay getting everything fired up and moving so we probably spent about 6 hours actually unloading the train. Tying up the train took a little but bit as we had to pull clear of the loop switch and then car secure the train.

I had recently flood loaded a coal train at 1.15MPH and I thought thatcher was slow...

I also worked some of the other customers in the area if you have questions let’s me know. 

Reply 0
Eugene Griffin EGRX

A Burley Idaho Question

@Mountaingoatgreg: Thanks for the offer.

 

 
The above formerly rail served industry was already being demolished in 2007 and was gone by 2012. It was located at West Main St and Occidental Ave in Burley, Idaho. Would anyone know what it was?
 
Thanks
 
Eugene

 

Reply 0
Eugene Griffin EGRX

Starting the Track

 

IMG_0133.jpg 

Finished four of the eight switches and started laying ties (left of photo). Had to have a few new cars for this layout.

sion%203.jpg 

Changed the module's track arrangement to better match Burley's track arrangement (Still a Timesaver).

 

Eugene

Reply 0
Neil Erickson NeilEr

Timesaver

Ive been following your progress as I enjoy the game as well but don’t quite see the timesaver in your original post  

 

91DFC86.jpeg  

E42DABF.jpeg 

Neil Erickson, Hawai’i 

My Blogs

Reply 0
Eugene Griffin EGRX

Is it a Timesaver?

@Neil: Good Question.

The following track diagram is based on a picture of a twin of the "Timesaver" as shown on the following site:

http://www.wymann.info/ShuntingPuzzles/sw-timesaver.html 

orgional.jpg 

The first test: The track arrangement.

%20Proof.jpg 

I rotated the original diagram (sorry about the backward numbers) and added blue lines representing each track.

Both my old and the new versions of the module have a track A, B, and C corresponding to the original Timesaver tracks.

I did take some liberty and added a track D in the Old plan and each plan has turnouts that would be unused in a stand alone module.

With respect to the track arrangement I see no significant variance from the original except for Track D in the old version.

The second test: The number of cars per track.

IMG_0135.jpg 

This photo shows the cars that can be placed on the right of the module.

IMG_0134.jpg 

This photo shows the cars that can be placed in the middle of the module.(ignore the little Tank car it was testing fouling of the turnout)

IMG_0137.jpg 

This photo shows the cars that can be placed on the left of the module.

Track B is the easiest to address: 2 cars, 1 car space that doesn't foul the turnout (the same as the original), 2 cars.

Track A is off on the right and only holds two cars (if the turnout isn't fouled) but will hold five cars on the left.

Track C holds three cars and therefore is off by one from the original Timesaver.

My "?Timesaver?" versus the original

It is designed for modern equipment and not for 40 foot cars.

Track B: It matches the function and appearance of the original.

Track A: Has the appearance of the original but the storage areas are either two cars in excess of the original or one car short of the original.

Track C: Has one extra car spot.

Track D: (Old Plan) added extra car spots.

 

The question

Does adding extra cars spots or removing extra car spots change the game as these are storage locations? (Track A,C and D)

If it does then one solution would be to temporarily abandon the extra spots on Track A, C and D and add extra track on A for the needed car spot on the right. Or move the turnouts on Track A to allow for the extra spot on the right.

But you are absolutely correct, If I use the "Docksider" and forty foot equipment. My module definitely would not be a Timesaver.

Not sure what would happen to the original if someone used modern equipment. 

Eugene

Reply 0
Neil Erickson NeilEr

Very cool

Eugene:

I understand now! It should still give you a lot of fun and if the extra spot makes things too easy (imagine!) then you could also just add another car to the game. Of course the only way to know is give it a go. 

Still following along! Thanks. 

Neil Erickson, Hawai’i 

My Blogs

Reply 0
Prof_Klyzlr

HO scale <0.25mph

Dear Gene,

Waaay back in the day (on analog and live-rail no-less), some modellers prided themselves on being able to reliably crawl their locos at speeds measured in minutes-per-sleeper/tie
(and no, the loco was not stalled on a dead-spot/dirty track, the motor was visibly still turning),

< 0.25mile in HO was and still-is possible,
(with the improvement in commercial mechs, it should theoretically be easier...)

Happy Modelling,
Aim to Improve,
Prof Klyzlr
 

Reply 0
Eugene Griffin EGRX

It's fun watching this idea

It's fun watching this idea slowly (maybe slower than a model moving at a scale 0.25 mph) come together. 

I could have used flex track and purchased #8 switches but some of the fun is hand laying the track.

MG_0146.jpeg 

This weekend was no exception, I finished the seventh turnout (only one more to build in the jig), cut all the turnout ties and placed more ties on the module. The first of the eight turnouts took two hours. I was definitely out of practice and a little disorganized, the last time I used the #8 turnout jig was late 2013. Not sure if my speed has improved, I think I will time the assembly of the last turnout.

The rails in the lower left of the photo are only placed on the ties. After all the ties have been glued, I will need to apply and glue the ballast before spiking the rails to the ties. By allowing the ballast glue to dry and adhere to the ties the surface area is increased and punch through is reduced during spiking.

Eugene

 

Reply 0
Wendell1976

Burley, Idaho layout

Eugene, with you modeling Burley, Idaho, have you ever thought about modeling the McCain Foods potato factory(along US Highway 30)? That potato factory has a lot of car spotting and switching scenarios using refrigerated boxcars. Wendell
Reply 0
Eugene Griffin EGRX

@Wendell1976

Hi,

It does have a lot of car spotting locations and switching, the only problem for myself is the amount of mechanical reefers and tank cars that are needed to serve that location. I will admit that the reefers pictured earlier in this post are the first four I have ever purchased and serve as a representation of the fleet in this area. When I started to look for class III railroads to model, the EIRR was at the top of the list (GP35s) but my lack of reefers may have prevented me from proceeding.

20Burley.jpg 

The other concern would be compressing this large plant into something that would fit into my limited space.

If the compression of the track and the car spotting locations still allowed for a reasonable representation then the technique of using a photo backdrop of the factory with modeled "push outs" to give a 3d appearance would further reduce the space and effort to represent this plant.

The added covered hopper unloading area (team track) would also be a interesting feature.

Variety could be achieved with through freights passing by on the main.

Other than the equipment and compression a one industry layout is a possibility, however, I have decided on Burley for the additional industrial leads that can be implied.

On another note, I do not live anywhere near Idaho, so part of the fun is using information from on line sources to model this location. This is often a limitation since the information is from past photos. For example the Street View in Google Earth has a date of August 2012 for the McCain facility and the satellite image is from June 2016.

 

Eugene

 

Reply 0
Eugene Griffin EGRX

Track Variance from TimeSaver

There was one difference that I wanted to analyze, other than the cars spots, between the track arrangement I am using to represent Burley and the original Timesaver. The top crossover track is reversed to better represent Burley, Idaho.

r%20analysis 

In both cases the car and locomotive must be moved from the car spots at the top left of the diagram to car spots at the lowest track of the diagram. The locomotive must be able to drop and leave the car at the new location.

It's interesting to note that the variance in the track arrangement (shown above) actually added moves and required a runaround that the original did not require.  

Eugene

 

Reply 0
BOK

Eugene,if big cars and a lot

Eugene,if big cars and a lot of them is an issue you could push your era back to the 90s-early 2000s when UP and EI used mechanical reefers (they are not called "refrigerated boxcars" by railroaders) in several different colors and covered by Athearn pretty well.

Less expensive cars and a bit shorter would produce more capacity and color for your railroad.

Barry 

Reply 0
Wendell1976

Your location

Eugene, I am just curious. What state, province(Canada), or country are you building your layout in? You don't have to say what city you are living in. You are doing a great job in planning your Burley, Idaho layout. Wendell
Reply 0
Eugene Griffin EGRX

Switch machine or ground throw

IMG_0151.jpg 

I was going to use the ground throws but I found four DPDT slide switches and might be able to source four more locally. Not only can I power the frog and throw the points with the switches I can also control LEDs on a track diagram to indicate switch position. All I need to do is a quick test and design a enclosure on the 3D printer.

The ground throws will find a home in the staging area on either the HO or O scale layouts.

@BOK: More to consider, thankfully the track arrangement in the area that is currently being modeled didn't change much over the last twenty years. The only loss would be the Ethanol facility.

@Wendell1976: Hint!

IMG_2323.jpg 

Eugene

 

 

Reply 0
anteaum2666

Hi Eugene, I thought you

Hi Eugene,

I thought you might be interested to see how I installed my slide switches on my logging branch.  I rounded the switch with a dremel and drilled a hole in the top and side.  The top hole holds a signal target.  It's made from a piece of brass I punched out with a paper punch, soldered to music wire and painted.  It's a press fit, and you can turn it to indicate switch point position.  

The side hole is for the wire to the throw rod.  I put a bend in it to take up slack and hold the points securely.

The whole thing is embedded in the foam bench top, and I build the ties up around it (can't remember their name).

The switch powers my frog.  It works like a charm.  I hope you enjoy building yours.  I'm excited to see what 3D printed container you come up with.

Michael

tsThrow3.JPG 

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 2
Eugene Griffin EGRX

Test Module (now comes the difficult part)

@anteaum2666: I like how you integrated the slide switch into a switch stand. I am also hoping to design something that will eliminate under the layout mounting.

IMG_0173.jpg  

Before I place the ballast on the module, I want to add a wash of paint to better match the colors of the prototype.

 
 

Not sure how it will look so I created a test module for the wash and other details (rail color, road color, grasses, etc.).

 IMG_0156.jpg  IMG_0167.jpg 

I then applied two coats of diluted acrylic craft paint to the ties, on the left a medium brown and to the right of the pencil line and photo a light brown.

Along the EIRR I can't find any grain silos that look like the  Walthers Wet/Dry Grain Storage Bins. I like these models and decided pull them out of the storage container they have been in for the last four years. Maybe I will use the Wet/Dry storage bins and the test module for a diorama or maybe a little modeler's license will allow them to be place in Declo, Idaho.

 

 
I did confirm that on Oct, 2012 a reefer similar to the four I just purchased was in Twin Falls, Idaho. To get to Twin Falls all rail traffic must go through Burley. Since I am not familiar with this railroad I plan on using Google Street View to help identify equipment used on the EIRR. 
 
Eugene
 
Reply 0
anteaum2666

Sweet Rails

Eugene,

Those handlaid ties and track look awesome!!!

Michael - Superintendent and Chief Engineer
ndACLogo.jpg
View My Blogs

Reply 0
Eugene Griffin EGRX

Distraction

Thankfully our last snow fall was on April 16th, the temperature has been gradually climbing and should reach a high of 77F on Saturday, this is good for the outdoor chores but bad for the model railroad.  However, there might be snow Sunday night. 

I was surprised by two local finds. The first surprise was finding the DPDT on-on slide switches I need at the second local electronics supply store that I visited. I also bought some 22 AWG stranded hookup wire for this project, the Cat 5 scrap will do the job but suffers mechanical failure when I get frustrated while pulling the wire through the module, the 22 AWG stranded shouldn't.

The second surprise was the following find at a hobby shop close to the electronics store. 

IMG_0215.jpg 

This will be my first SD40-2 (finally) and first sound equipped HO locomotive. The price for this Athearn (ATH16722) SD40-2 was reasonable and I was surprised by the local find, usually local hobby shops never have the locomotives I am interested in.

I always liked the look of the SD40-2 and will enjoy seeing and hearing it run.

I am not sure if an UP SD40-2 ever rolled through Burley, Idaho. I know an UP SD70M and ES44AC did. Surprisingly UP 1618 was photographed at Salt Lake City, Utah on April 2016, 185 miles to the SE of Burley.

There has been some progress, I have finished laying four turnouts and the adjoining track.

Four more to go (Solder turnout feeders, paint turnout, pull feeders and spike... repeat).

Eugene

 

Reply 0
Eugene Griffin EGRX

A few more spikes to secure

IMG_0228.jpg 

A few more spikes to secure some wheel stops at the far end and that will complete the track for the yesterdays "Timesaver" (with a variation) module. 

However, I couldn't resist starting up the new SD40-2 (As is out of the box).

 
Please excuse the wiring it is temporary.
 
Next: Finish up the wiring, clean the track, do some switching (play the game) and then power the frogs.
 
Eugene

 

Reply 0
BOK

That looks good Eugene. I

That looks good Eugene. I like the look of the hand laid track and turnouts.

However, if it were me I would have moved the bottom runaround switch down to the last switch to accomodate another car or two. It would also make it bit more realistic. I know it's what we used to call a "pocket" track but still you always want as much run around room as possible and this was built by the UP when they used it for that purpose. This is not one of those fool, bunch of facing/trailing point switches where you needed to shove into an industrial park with a man riding the point for protection.

Barry

Reply 0
Eugene Griffin EGRX

Car spot check

_46%20PM.png 0Compare.jpg 

On the above left photo (screen shot from Google Earth), outlined in yellow, is the area being modeled. It is as close as I will get to the prototype in a 8 foot by 10 inch area with the addition of the extra crossover (red arrow right photo) to create the "Timesaver".

@Barry:  Definitely in the future when the layout grows the run around will accommodate 11 feet of HO train (Can't get enough room for 117 freight cars and required power). For now the added cross over (pocket track) allows the module to be used as a "Timesaver".  When I started down this road I thought after the layout grows I will remove the cross over (red arrow right photo) to obtain prototypical appearance. After considering this pocket track, I like the convenience of being able to push around some cars for local switching without the long runaround.

​33%20(3).jpg 

There are two locations where this track plan exceeds the number of car spots required for a "Timesaver".

_0234(1).jpg 

A prototypical solution would be a pile of ballast over the track indicating the remaining track is not to be used.

Eugene

Reply 0
DaminKeenan

End of Track

Quote:

A prototypical solution would be a pile of ballast over the track indicating the remaining track is not to be used.

Another solution, one that's used at the trolley museum I volunteer at, is to put an orange cone between the rails.  Our rule book states that an orange cone between the rails indicates a track that is out of service (i.e. the track beyond the cone).

BTW, an orange cone placed to the right of the track indicates a work zone (trains must be flagged through, or stop and determine that it is safe before proceeding).

Just my $0.02.

Thanks,
Damin.

Reply 0
Eugene Griffin EGRX

Buhl, Idaho

 

Buhl is at the end of the EIRR's Minidoka to Buhl line. Interesting track arrangements in Buhl (including a pocket track), however being a terminus there wouldn't be as much through traffic.

 

Eugene

 

Reply 0
Eugene Griffin EGRX

Turnout Control

It has been a while since these printed without issue.

IMG_4570.jpg 

 

But part one of six for he turnout control didn't.

IMG_0247.jpg 

Oh well, the great thing about home 3d printing is the cost of failure is $0.02231/g used.

I don't have a scale so maybe 50g. 

Back to the drawing board, hopefully it isn't the latest update of ??product??  that caused the problem.

I will admit I stopped working on the module and have been using it to switch freight cars. It's kinda fun, except when the sound stops on the engine.

It might be the unpowered frogs.

Eugene

 

Reply 0
Reply