Eugene Griffin EGRX

The original TOMA?

 
Diagram.jpg 
 
This might get my HO scale started.
 
This BLOG will follow the development of a small HO scale layout from a variation of a basic "Timesaver" to a standalone switching module and eventually incorporating the module into a layout.
 
The one module approach will be used.
 
 
 
 

Working on:   https://forum.mrhmag.com/post/office-switching-layout-using-a-2018-ho-module-13636599

Holding Pattern: https://forum.mrhmag.com/post/office-switching-layout-using-two-salvaged-proto48-modules-12775340

Reply 0
Eugene Griffin EGRX

The TOMA Timesaver

I like this post so much I might give it a try.

https://forum.mrhmag.com/post/former-time-saver-plus-major-expansion-12209014

The key to a time saver is symmetry. That is the minimum length of the leads and the runaround track should match the length of at least one engine and one car.

 

In my case a modern car and engine in HO is 18”.

 
IMG_0078.jpg 
 
The basic module based on the above diagram. (1' X 6' 10 3/4")
 
A%20base.jpg 
 
The timesaver configuration.
 
r%20TOMA.jpg 
 
A TOMA configuration.
 
r%20copy.jpg 
 
Maybe?
 
Eugene
Reply 0
joef

Maybe

Yes, that's a possibility - to do TOMA-oriented timesaver designs. But I have to confess, I vastly prefer prototypical track arrangements to brain teaser designs no prototype in their right mind would want to implement. If it does exist in the prototype, it is as rare as hen's teeth. I prefer to model the typical, not the edge-case oddball track designs. A timesaver fan I am not. Can you tell?

Joe Fugate​    
Publisher, Model Railroad Hobbyist magazine

[siskiyouBtn]

Read my blog

Reply 1
Eugene Griffin EGRX

Hang on!!

The linear design reminds me of a town in Idaho? I need to find which one.

It's a farming town, doesn't exactly have those industries but a "similar" three tracks through town and industries off the track.

Or just add a module between the timesaver modules and the timesavers may disappear.

Eugene

Reply 0
Photo Bud

But then again, here's mine

But then again, here's mine (messy though it might be!).Adjusted.JPG 

Bud (aka John), The Old Curmudgeon

Fan of Northern Pacific and the Rock Island

Reply 0
Eugene Griffin EGRX

Remove timesaver crossovers

I hand lay track in HO. When it is time to say good bye to the timesaver the extra cross overs can be removed.

copy%202.jpg 

Leaving the ties as scenic details.

Maybe?

Eugene

Reply 0
p51

Timesavers?

I've only ever built two layouts, but in each case, I always mapped out where the landscape would be in real life, what I wanted for sidings and track placements, and out in what I felt was a sane placement for how a real RR would put tracks in for the needed role.

I've never understood these switiching puzzles and why so many people thought they were so amazing. I guess the old school guys (like John Allen and the like) loved them, and so many people for years hung onto everything those guys did. But now, a new generation has made a real turn in the hobby toward realism. These puzzles don't have much place in the hobby anymore for the most part.

Quote:

But then again, here's mine (messy though it might be!).

Adjusted.JPG 

Bud, I've always liked your posts, but I gotta say it with due respect; that's nuts!

Lee Bishop

[35532433422_1a63689aeb_n]

My Flickr website with layout photos

https://forum.mrhmag.com/post/etwnc-stoney-creek-branch-12197690?&trail=25

2687 miles and many decades from where my layout takes place.

You can NEVER have too much detail or too many trees on a layout.

Reply 1
Eugene Griffin EGRX

EIRR - Rupert, Burley, Twin

EIRR - Rupert, Burley, Twin Falls with some modelers license.

For myself this is a way to have a switching layout in a small space that could expand into a larger layout using the modules developed.

0closeup.jpg 

So in an area of 8' 10.5" X 2' I can have two railroads switching four industries with an interchange tracks for car storage. Add some staging onto the mains and center tracks and run some trains.

As mentioned earlier if there are excessive crossovers, pull the rails and add weeds.

 

Eugene

 

Reply 0
Don Mitchell donm

Origin vs. belief

John Allen created the Timesaver as a game, not as part of a layout.  It is so described at http://gdlines.org/GDLines/Timesaver.html,in Westcott's book, and by John in person when we played it after some G&D op sessions. 

So the Timesaver shouldn't be taken as something to add to a layout unless to provide a game-type experience -- something that's not too popular in these days where the belief in prototypicality prevails.  As a game, though, it still has legs, and can be enjoyable game played in real 3D rather than playing games on a computer screen.

YMMV

Don Mitchell

R%20logo.jpg
Read my blog

Reply 1
Greg Williams GregW66

Don is 100% correct

I've built a Timesaver and enjoyed the challenge. But that is what it is, a challenge. Never in a million years did John Allen say it was a prototypical arrangement. It was and is intended to be a challenge for FUN. Everytime someone brings up the timesaver someone chimes in about how it isn't prototypical. No, it isn't. No one, especially the original designer said it was. It was something to do after an op session while the boys stood around and chewed the fat. No one sees a game of chess as an historic representation of military moves. No one should see the timesaver as anything more than a game to be played and enjoyed. RPGs are not meant to be historic representaions of anything, they are games. 

And Don, you can play it on a screen. I have the app for my phone, but I never play it because I don't do phone games. Or any other computer type game any more. 

Greg Williams
Superintendent - Eastern Canada Division - NMRA
Reply 1
Eugene Griffin EGRX

So it's the three parallel

So it's the three parallel tracks through a town you don't like or is it the arrangement of the crossovers.

Or is it the initial arrangement of the modules in the timesaver configuration?

Place staging at either end and add some industries to those switches (as shown in the linear placement) and you now have a one town layout.

 

Eugene

 

Reply 0
Tom Edwards edwardstd

Don't, Not, Can't, Shouldn't...

I'm suprised that with all the ruckus lately about people bossing other people around and making fun of them that folks are still telling others what they can't do, shouldn't do, etc...

If a model railroader decides to include a Time Saver, or for heaven's sake, an Inglenook in their layout, should they be banned from the hobby? Does that act no longer qualify them as a model railroader? What about all of those other layouts that have switchbacks just long enough for a locomotive and one car?

Grrrr...

 

Tom Edwards

N scale - C&NW/M&StL - Modeling the C&NW's Alco Line

HO scale - Running on the Minnesota Central (Roundhouse Model RR Club, St. James, MN)

12" to the foot - Member of the Osceola & St. Croix Valley crew (Minnesota Transportation Museum)

Blog Index

Reply 0
Don Mitchell donm

Screen play

Yes, Timesaver can be played on a screen -- but it's not nearly as enjoyable in my experience.  There was nothing like a group of us sitting around the kitchen table at John's with the comradery (and mild razzing) that went on.  Computer screens are too individualized for that sort of group enjoyment.

Don Mitchell

R%20logo.jpg
Read my blog

Reply 0
Eugene Griffin EGRX

Tomorrows... One Town Layout

Add a few Warehouse Modules.

arehouse.jpg 

And...

A%20TOWN.jpg 

A TOMA one TOWN layout.

Just add tracks to staging

So where is that horrible TIMESAVER!!!

Eugene

Reply 0
BOK

There was one place I

There was one place I switched as an engineer for a switching road which had a genuine inglenook that modelers are so passoninate about. It wasn't a timesaver, thank goodness (the crew probably would have refused to switch it if it were). It was three, trailing point switches into a chemical company, into three tracks which held three tanks each with a stub hoilding one car and a single unit at end of a branch which could not be extended. 

We all cringed when we had to switch it because it took so long to move nine cars around using the stub and it was such a hassel...one car at a time. It was even worse during bad weather (hot, cold, rain, snow,etc.) Many of us often wished the business would go away because it was such a disgusting job.

We also had another place, a lumber dealer/wholesale warehouse, we switched late at night which was similar to a timesaver but consisted of two run around tracks along side each other and a trailing point stub track. Sounds simple,right? Wrong. One of the runarounds was used to handle unloading box cars and the other, often had constructively placed cars which would be in our way. The big disappointment was the end of the run around track we used to get around cars which only had room for a single unit and it went right out into a city street before stopping short of a building. Note, plenty of drunks thought they were seeing "ghosts" when they came barreling down the street, late at night, only to find a locomotive blocking their path in the street. The whole area was paved with asphalt which in the winter caused  any number of problems and on a steep little hill to reach it. Last summer I happened to go past this area and was surprised and relieved that the business had closed/moved and the tracks gone.   

If you were to walk into the yard office of that railroad and explain how a timesaver or inglennook would be fun to switch.....I don't think I would want to see the crew's response. Timesavers/Inglenooks not on my railroad. Not prototypical and not desired. 

Barry

Reply 0
jarhead

There is one place

Barry thank you for sharing that experience. Pretty cool.

Nick Biangel 

USMC

Reply 0
Eugene Griffin EGRX

Yes, thank you for the

Yes, thank you for the experience. 

It’s fun reading, seeing and modeling how it use to be.

I guess I will achieve what the crew wanted when my timesaver expands into a town and eliminates those short tracks.

For now, it’s achievable and will allow me to experience the same frustration only on a smaller scale.

Oh and run the engines.

Eugene

Reply 0
George J

The Timesaver Is A Game

The timesaver is a game?

Everything we do in the way of "operations" is a "game".

-George

"And the sons of Pullman porters and the sons of engineers, ride their father's magic carpet made of steel..."

Milwaukee Road : Cascade Summit- Modeling the Milwaukee Road in the 1970s from Cle Elum WA to Snoqualmie Summit at Hyak WA.

Reply 0
Eugene Griffin EGRX

Symmetry

Phase(2).jpg 

Looking to the future when the modules will be used in a town I can see there might be some value in ensuring symmetry and allowing the modules to be connect in various configurations.

 

Eugene

Reply 0
BOK

Happy to share, Nick. The

Happy to share, Nick.

The stuff I wrote about happened about 12 years ago so it's not ancient history.

Barry

Reply 0
Oztrainz

If you want to save some real estate

Hi Eugene and all,

Evil thought - If you want to save some real estate, then replace some of the turnouts on the middle track with a double slip - but then it wouldn't be a TimeSaver even if the route between endpoints is effectively the same?? That is probably a whole lot more "prototypical". This gets rid of the double-shuffle and gets trains to where they need to go quicker.

In confined spaces where real estate is limited, like around terminal stations in cities where the city was there before the tracks, double slips were often used to save space in a ladder of turnouts. I can point you to one place locally where there used to be 14 of them in a row. Yes they were heavy on maintenance but they managed to feed a lot trains across a lot of tracks to where they needed to go for a lot of years. 

Anyone up for the challenge of designing a "slippery" Time-Saver with single and double slips as required??

Regards,

John Garaty

Unanderra in oz

Read my Blog

Reply 0
Eugene Griffin EGRX

Double slips

If any of the possible prototype towns that these modules might represent had double slips I would.

Eugene

PS: I wanted to say “there is a jig for that” a play on the phrase “there is an app for that” but I didn’t know if this translates globally... oh well trying to avoid that slippery slope.

Reply 0
Bremner

Or...

You can lengthen the timesaver and move a switch....

 

am I the only N Scale Pacific Electric Freight modeler in the world?

https://sopacincg.com 

Reply 1
engineer

Industry Ave

I started a similar project years ago:

http://industry-ave.de/index.php/Konzeption:Konzeption

Here are some impressions:

http://industry-ave.de/index.php/Impressionen:Impressionen

 

________________________________________________________________________

    [1]   

Somewhere Southwest at MRH: http://model-railroad-hobbyist.com/node/21520
Modern monopole billboard in MRH: https://forum.mrhmag.com/post/modern-monopole-billboard-for-your-layout-13129796

Prototype Pics: https://somewhere-southwest.de/index.php/Prototype

Reply 1
Lancaster

Test and tune

I am just starting on my "final" layout. I am interested in Proto87 construction, so that's new to me. I have a collection of cars, some of which have never seen a layout. And I want to see something "move".

The answer to all of these desires was a small test track -- but not a boring single track. The Timesaver was "there" already so I chose it. I built an 8"x72" version. I refreshed my handlaying skills, got to know Proto87 and what works for me, I'm tuning-up my rolling stock, and I can see something "move" when I feel the desire. I have never played the actual "game" on it and probably never will. But it sure has satisfied all the goals I had for it.

imesaver.png 

Reply 0
Reply